KR100453895B1 - Fabricate type watermeter case and excution method - Google Patents
Fabricate type watermeter case and excution method Download PDFInfo
- Publication number
- KR100453895B1 KR100453895B1 KR10-2002-0038511A KR20020038511A KR100453895B1 KR 100453895 B1 KR100453895 B1 KR 100453895B1 KR 20020038511 A KR20020038511 A KR 20020038511A KR 100453895 B1 KR100453895 B1 KR 100453895B1
- Authority
- KR
- South Korea
- Prior art keywords
- water meter
- pipe
- lid
- bottom plate
- body portion
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 77
- 230000001681 protective effect Effects 0.000 claims abstract description 18
- 238000009434 installation Methods 0.000 claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 10
- 230000008878 coupling Effects 0.000 claims abstract description 6
- 238000010168 coupling process Methods 0.000 claims abstract description 6
- 238000005859 coupling reaction Methods 0.000 claims abstract description 6
- 238000009413 insulation Methods 0.000 claims description 11
- 230000001012 protector Effects 0.000 claims description 9
- 239000011810 insulating material Substances 0.000 claims description 6
- 238000005056 compaction Methods 0.000 claims 1
- 238000007689 inspection Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 3
- 239000012774 insulation material Substances 0.000 description 3
- 238000009421 internal insulation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000008399 tap water Substances 0.000 description 3
- 235000020679 tap water Nutrition 0.000 description 3
- 230000008014 freezing Effects 0.000 description 2
- 238000007710 freezing Methods 0.000 description 2
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/09—Component parts or accessories
- E03B7/095—Component holders or housings, e.g. boundary boxes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
- E03B7/072—Arrangement of flowmeters
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Measuring Volume Flow (AREA)
Abstract
본 발명은 조립식 수도미터기 보호통 및 시공방법에 관한 것으로서, 보호통을 조립식으로 분리되어진 구조를 이룸으로서 설치작업이 보다 용이하게 이루어질 수 있도록 함과 함께, 미터기 검침시 뚜껑을 분리시키지 않고 내부 점검이 가능함으로 검침작업이 한층 용이하게 이루어질 수 있도록 하기위한 것이다.The present invention relates to a prefabricated water meter protective container and a construction method, which allows the installation to be made more easily by forming a structure in which the protective container is prefabricated, and also allows the internal inspection without removing the lid when the meter is read. It is to make the metering work easier.
이를 실현하기 위한 본 발명의 수도미터기 보호통은, 수도미터기(103)를 소정 높이로 둘러싸는 형태로 입설되되, 상부에 뚜껑부(130) 및 소정 두께의 내부 보온층(122)이 각각 안착 가능하도록 다단 형상의 안착부(121)를 이루고 있는 몸체부(120)와; 상기 몸체부(120)의 상단에 결합되어지며 내부 수도미터기(103)의 검침을 위한 투시용 개폐구(131)가 힌지축(132)을 중심으로 회동이 가능하도록 구비되어진 뚜껑부(130)와; 상기 몸체부(120)의 하단에 결합되어지되, 배관 결합위치에서 대칭형상의 복수의 밑판(111,112)로 분리 구비되어져 있는 밑판부(110);로 구성되어진 것을 특징으로 한다.Water meter protection tube of the present invention for realizing this, is placed in the form surrounding the water meter 103 at a predetermined height, so that the lid portion 130 and the inner insulating layer 122 of a predetermined thickness can be seated thereon, respectively. A body part 120 constituting a seating part 121 having a multi-stage shape; A lid portion 130 coupled to the upper end of the body portion 120 and provided with a viewing opening and closing hole 131 for reading the internal water meter 103 so as to be able to rotate about the hinge shaft 132; It is coupled to the lower end of the body portion 120, the bottom plate portion 110 is provided with a plurality of bottom plate (111, 112) of symmetrical shape in the pipe coupling position; characterized in that consisting of.
Description
본 발명은 조립식 수도미터기 보호통 및 그 시공방법에 관한 것으로서, 더욱 상세하게는 수도미터기 보호를 위해 지반에 매설 시공되어지는 보호통의 설치작업이 용이해지며 내부검침이 보다 효과적으로 이루어질 수 있는 보호통 구조 및 그 시공방법에 관한 것이다.The present invention relates to a prefabricated water meter protective casing and its construction method, and more particularly, to facilitate the installation work of the protective casing buried in the ground for protecting the water meter and to allow the internal meter reading to be performed more effectively. It is about a construction method.
일반적으로, 수도전에는 수도물의 사용량을 검침하기 위한 수도 미터기가 연결되어지고 수도전은 동파를 방지하기 위하여 일정깊이 이상 터파기를 한 후 땅속에 묻게 된다.In general, tap water is connected to a water meter to read the amount of tap water used, and tap water is buried in the ground after a predetermined depth to prevent freezing.
따라서 수도 미터기도 땅속에 묻혀야 하나 외부에서 쉽게 검침하기 위하여 수도 미터기 보호통을 땅에 묻은 후 상기 수도미터기 보호통 내에 수도 미터기를 설치하게 된다.Therefore, the water meter should also be buried in the ground, but in order to easily read from the outside to bury the water meter protector in the ground and install the water meter in the water meter protector.
이때, 수도 미터기는 검침의 편리함을 위하여 땅속에 묻힌 수도전의 깊이보다 높은 위치에 놓이게 되므로 수도미터기와 수도전을 연결하는 입수관 및 출수관이 필요하고, 상기 입수관 및 출수관을 감싸는 연결배관을 구비하여 수도 미터기 보호통 하부에 결합시켜 주게 된다,At this time, the water meter is placed in a position higher than the depth of the tap faucet buried in the ground for the convenience of the meter reading requires a water inlet and outlet pipe connecting the water meter and the tap, the connection pipe surrounding the water inlet and outlet pipe It is equipped with a water meter to be connected to the lower part of the protection tank,
도 1은 종래 기술에 따른 수도미터기 보호통 설치상태를 나타낸 것으로, 압출성형 되어진 미터기 보호통(1)은 소정두께의 보온재(2)가 취부되어져 있음과 함께 상부에는 합성수지 재질의 뚜껑(3)이 결합되어지게 되는데, 보온재(2)의 상면중앙에는 내부를 투시할 수 있도록 투시부(2a)가 형성되어져 있으며, 수도 미터기(4)는 입수관(5)과 급수관(6) 사이에서 앵글관(7)에 의해 결합되어짐으로서 배관 연결구조를 이루게 된다.1 is a view showing the installation state of the water meter protector according to the prior art, the extruded meter protector (1) is fitted with a heat insulating material (2) of a predetermined thickness and the lid (3) of synthetic resin material is coupled to the top In the center of the upper surface of the heat insulating material (2), a see-through portion (2a) is formed to see the inside, the water meter (4) is an angle pipe (7) between the water supply pipe (5) and the water supply pipe (6) By being coupled by the to form a pipe connection structure.
또한, 보호통(1)의 하부에는 배관보온재(12)가 내부에 취부되어진 밑판(1a)이 연장 형성되어짐으로서 입수관(5)과 급수관(6)의 동파를 방지하는 가운데 위치고정이 이루어질 수 있게된다.In addition, the bottom plate (1a) in which the pipe insulation 12 is mounted therein is extended to the lower portion of the protective tube (1) to prevent the freezing of the water inlet pipe (5) and the water supply pipe (6) so that the position can be fixed. do.
그러나 이러한 종래 수도미터기 보호통(1) 구조에서는 수도미터기(4)의 사용량 확인을 위해서는 뚜껑(3)을 개방시킨 후 투시부(2a) 보온재를 열어서 확인을 해야 함으로 확인작업에 있어서 불편이 있음과 함께 뚜껑(3)의 분실위험이 있었으며, 또한 뚜껑(3)을 열었을 경우 보온재(2)가 쉽게 노출되어짐으로서 파손이 발생하게 되는 문제점이 있었다.However, in the structure of the conventional water meter protection tube (1), in order to check the amount of use of the water meter (4), after opening the lid (3) to open and check the insulation (2a) insulation material, and there is inconvenience in the confirmation work There was a risk of loss of the lid (3), and when the lid (3) was opened, there was a problem that breakage occurs because the insulation (2) is easily exposed.
또한, 수도미터기 보호통(1)의 설치 시공시 지반 터파기 후 수도미터기(4)를 소정 높이에서 위치를 고정시킨 상태에서 입수관(5)과 급수관(6)과 나사 등을 이용해 결합시켜주어야 하므로, 작업이 번거롭고 설치 시공에 따른 작업효율이 저하되는 문제점이 있었다.In addition, since the water meter 4 is fixed at a predetermined height after ground breakage when the water meter protection tube 1 is installed and constructed, the water meter 5 and the water supply pipe 6 and the screw must be coupled together. , There is a problem that the work is cumbersome and work efficiency is deteriorated according to the installation construction.
본 발명은 상기한 종래 기술에서의 시공상 문제점을 개선하기 위해 제안된 것으로서, 수도 연결배관과 수도미터기 보호통간의 결합구조를 변형시켜 제공함으로서 보호통 설치시의 설치작업이 한층 용이하게 이루어질 수 있도록 하는데 목적이 있다.The present invention has been proposed to improve the construction problems in the prior art as described above, by providing a modified structure of the coupling between the water connection pipe and the water meter protection cylinder to provide an easier installation work when installing the protection cylinder. There is this.
또한, 본 발명의 다른 목적은 수도미터기의 확인이 용이하며 부품파손의 위험을 감소시킬 수 있도록 하는데 있다.In addition, another object of the present invention is to make it easy to identify the water meter and to reduce the risk of component damage.
도 1은 종래 일 예에 따른 수도미터기 보호통 시공상태 단면도.1 is a cross-sectional view of the construction of the water meter protection tube according to the prior art.
도 2는 본 발명 수도미터기 보호통의 분해 사시도.Figure 2 is an exploded perspective view of the water meter protector of the present invention.
도 3은 본 발명 보호통 설치를 위한 기초 지반공사 상태도.Figure 3 is a ground foundation work state diagram for the present invention protective casing installation.
도 4는 배관 고정을 위한 밑판이 설치된 상태 단면도.Figure 4 is a cross-sectional view of the base plate installed for fixing the pipe.
도 5는 기 설치된 밑판에 몸체가 설치된 상태 단면도.Figure 5 is a cross-sectional view of the body installed on the base plate already installed.
도 6은 본 발명 보호통의 시공상태 단면도.6 is a cross-sectional view of a construction state of the protective container of the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
100 : 수도미터기 보호통 101 : 입수관100: water meter protection box 101: water supply pipe
102 : 급수관 103 : 수도미터기102: water supply pipe 103: water meter
110 : 밑판부 113 : 지지부110: bottom plate 113: support portion
120 : 몸체부 121 : 안착부120: body portion 121: seating portion
122 : 내부 보온층 122': 내부 개폐구122: internal heat insulating layer 122 ': internal opening and closing
130 : 뚜껑부 131 : 투시용 개폐구130: lid 131: see-through opening
132 : 힌지축 133 : 손잡이132: hinge axis 133: handle
134 : 보온재 135 : 지지편134: thermal insulation 135: support
상기 목적은, 지중에 매설되어지는 입수관 및 급수관이 양측에 연결되어지는 수도미터기를 보호하기 위해 설치되어지는 통상의 수도미터기 보호통에 있어서: 상기 수도미터기 보호통은, 수도미터기를 소정 높이로 둘러싸는 형태로 입설되되, 상부에 뚜껑부 및 소정 두께의 보온층이 각각 안착 가능하도록 다단 형상의 안착부를 이루고 있는 몸체부와; 상기 몸체부의 상단에 결합되어지며 내부 수도미터기의 확인을 위한 투시용 개폐구가 힌지축을 중심으로 회동이 가능하도록 구비되어진 뚜껑부와; 상기 몸체부의 하단에 결합되어지되, 배관 결합위치에서 대칭형상의 복수의 개체로 분리 구비되어져 있는 밑판부;로 구성되어진 것을 특징으로 하는 조립식 수도미터기 보호통 및 그 시공방법을 통해 이룰 수 있게된다.The above object is a conventional water meter protection container which is provided to protect the water meter which is buried in the ground and the water supply pipe is connected to both sides: the water meter protection container surrounds the water meter to a predetermined height A body part which is formed in a shape and forms a seating part having a multi-stage shape such that a lid part and a heat insulating layer having a predetermined thickness are seated on the upper part; A lid part coupled to the upper end of the body part and provided with a swivel opening / closing opening for checking the internal water meter to be rotatable about a hinge axis; Is coupled to the lower end of the body portion, the bottom plate portion is provided with a plurality of symmetrical shape separated in the pipe coupling position; prefabricated water meter can be achieved through the protective casing and the construction method.
이하, 본 발명의 구체적인 실시예를 첨부도면을 참조하여 상세히 살펴보기로 한다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.
먼저, 본 실시예에 따른 수도미터기 보호통(100)의 구성을 살펴보면, 도 1의 보호통 분해 사시도 및 도 6의 설치상태 단면도에 도시된 바와같이 하단에 위치하는 압출 수지재질의 밑판부(110)와 본체를 이루는 몸체부(120), 그리고 지면에 노출되어지는 주철재질의 뚜껑부(130) 등이 조립체를 이루게 되는 조립식구성을 이루고 있다.First, looking at the configuration of the water meter protective tube 100 according to the present embodiment, as shown in the exploded perspective view of the protective tube of Figure 1 and the installation state cross-sectional view of Figure 6 and the bottom plate portion 110 of the extruded resin material located at the bottom; Body portion 120 constituting the body, and the lid portion 130 of the cast iron material exposed to the ground, etc. form an assembly configuration to form an assembly.
특히, 설치가 용이하도록 하기위해 밑판부(110)는 배관부를 중심으로 하여상호 대칭형상을 이루며 분리된 제1밑판(111)과 제2밑판(112)로 이루어짐에 있어, 상호 대응위치에는 입수관(101) 및 급수관(102)을 각각 고정 지지하기 위한 지지부(113)가 볼트공(113a)과 함께 형성되어져 있다.Particularly, in order to facilitate installation, the bottom plate part 110 is formed of a first bottom plate 111 and a second bottom plate 112 separated from each other in a symmetrical shape centering on the pipe portion, and the water inlet pipes are provided at mutually corresponding positions. A support portion 113 for fixing and supporting the 101 and the water supply pipe 102, respectively, is formed together with the bolt hole 113a.
그리고, 몸체부(120)는 내벽과 외벽 사이에 보온재가 충진되어져 있는데, 상부 내면측에는 계단형태의 안착부(121)가 형성되어져 있어 뚜껑부(130)의 결합은 물론 내부 보온층(122)의 안착 결합이 이루어질 수 있게된다. 내부 보온층(122)의 중앙에는 내부 투시를 위한 내부 개폐구(122')가 구비되어져 있다.In addition, the body portion 120 is filled with a thermal insulation material between the inner wall and the outer wall, the upper inner surface side is formed with a stair-shaped seating portion 121, the coupling of the lid portion 130 as well as the internal insulation layer 122 A seating bond can be made. In the center of the inner thermal insulation layer 122 is provided with an internal opening and closing (122 ') for the internal perspective.
그리고, 뚜껑부(130)에는 보온재(134)가 취부되어짐과 함께 상기 내부 보온층(122)을 가압하여 지지하기 위한 지지편(135)이 하방으로 돌출 형성되어져 있으며, 상기 내부 개폐구(122')의 대응위치인 중앙에는 힌지축(132)을 중심으로 일단이 회동되면서 개폐가 가능한 투시용 개폐구(131)가 결합되어지게 된다.In addition, a heat insulating material 134 is attached to the lid part 130, and a support piece 135 for pressing and supporting the internal insulating layer 122 is formed to protrude downward, and the internal opening and closing hole 122 ′ is provided. In the center of the corresponding position of one end is rotated around the hinge shaft 132, the opening and closing aperture 131 that can be opened and closed is coupled.
상기 투시용 개폐구(131)는 힌지축(132)과 체결이 이루어지는 체결부(131a)가 일측으로 개방된 형상을 이룸으로서 힌지축(132)과의 조립체결이 이루어질 수 있게된다.The see-through opening and closing hole 131 has a shape in which the fastening portion 131a which is fastened to the hinge shaft 132 is opened to one side, so that assembly of the hinge shaft 132 can be made.
도면중 미설명 부호 107은 배관 보온재이고, 114는 고정볼트이며, 115는 링형태의 고정편이고, 133은 뚜껑용 손잡이를 나타낸다.In the figure, reference numeral 107 is a pipe insulation, 114 is a fixing bolt, 115 is a ring-shaped fixing piece, 133 is a lid handle.
이와같은 구성을 이루고 있는 본 발명 미터기보호통(100)의 설치과정에 따른 작용효과를 도 3 내지 도 6을 참조하여 살펴보기로 한다.With reference to Figures 3 to 6 will be described with respect to the effect of the installation process of the present invention, the meter protection tube 100 having such a configuration.
먼저, 메인 수도관(미도시)으로 부터 분기되어지는 급수관이 배관되어질 경로를 따라 지반 터파기를 한 후 급수관을 배관함과 함께 보온 입상관인입수관(101) 및 급수관(102), 그리고 수도미터기(103)를 설치한다.First, the water supply pipe branched from the main water pipe (not shown) is ground breaking along the path to be piped, and then the water supply pipe is piped together, and the insulated pipe inlet pipe 101 and the water supply pipe 102 and the water meter 103 Install).
그리고 임시관 매달기 및 관 지지 되메우기를 하여 분기관을 임시로 고정시킨 상태에서 도 3에 도시된 바와같이 본 발명의 수도미터기 보호통(100)이 설치되어질 위치에서는 보호통의 높이(h)를 남기고 지반 되메우기 및 다짐작업을 한 후 임시관 매달기를 제거한다.And in the position where the water meter protective tube 100 of the present invention is to be installed, as shown in Figure 3 in the state of temporarily fixing the branch pipe by hanging the temporary tube and backfill the tube leaving the ground (h) of the protective tube Remove the temporary tube suspension after backfilling and compacting.
이후, 도 4에서와 같이 보호통 밑판부(110)를 설치하게 되는데, 이때에는 분리 제작되어진 제1,2밑판(111,112)의 각 지지부(113)에 의해 각각 배관(101,102)이 지지되어지는 형태로 결합시킨 후 링형태의 고정편(115)을 지지부(113)와 대응시킨 상태에서 고정볼트(114)를 볼트공(113a)에 관통 체결함으로서 배관의 고정이 이루어질 수 있게된다.Then, as shown in FIG. 4, the protective plate bottom plate 110 is installed. In this case, the pipes 101 and 102 are supported by the respective support portions 113 of the first and second bottom plates 111 and 112 that are separately manufactured. After coupling, the fixing bolt 114 is fastened to the bolt hole 113a in a state in which the ring-shaped fixing piece 115 corresponds to the support part 113, thereby fixing the pipe.
이와같이 하여 밑판부(110)의 설치가 완료되어지면, 그 위에 도 5에 도시된 바와같이 몸체부(120)를 설치한다.When the installation of the bottom plate 110 is completed in this way, the body 120 is installed thereon as shown in FIG. 5.
그리고, 몸체부(120)의 내측 상부에 계단형태로 형성되어진 안착부(121)에 내부 보온층(122) 및 뚜껑(130)을 순차적으로 올려놓아 결합시킨 후 주위를 되메우기 하고 다짐함으로서 도 6에서와 같이 수도미터기 보호통(100)의 설치가 쉽고 간단하게 완료되어질 수 있게되는 것이다.And, by placing the inner thermal insulation layer 122 and the lid 130 in sequence on the seating portion 121 is formed in a step shape on the inner upper portion of the body portion 120 to backfill and compact around As such, the installation of the water meter protector 100 can be easily and simply completed.
이와같은 과정을 통해 본 발명의 수도미터기 보호통(100)이 설치되어진 상태에서 수도미터기(103)를 검침하고자 하는 경우에는, 먼저 작업자가 뚜껑부(130)에 구비되어져 있는 투시용 개폐구(131)를 힌지축(132)을 중심으로 회동시켜 열고서 내부 보온층(122)에 구비되어져 있는 내부 개폐구(122')를 분리시킴으로서 내부에설치되어져 있는 수도미터기(103)를 점검할 수 있게된다.If you want to read the water meter 103 in a state in which the water meter protection tube 100 of the present invention is installed through such a process, first, the operator opens and closes the opening and closing hole 131 provided in the lid part 130. By rotating and opening the hinge shaft 132 around the center, the internal opening and closing hole 122 'provided in the internal heat insulating layer 122 is separated to check the water meter 103 installed therein.
따라서, 본 발명의 수도미터기 보호통(100)의 경우는 기존에서와 같이 작업자가 뚜껑부(130)를 개방하지 않고도 뚜껑부(130)에 형성되어져 있는 투시용 개폐구(131)를 통해 내부점검이 이루어지게 됨으로서 미터기 점검작업이 용이하게 되며, 스치로폴로 이루어진 내부 보온층(122)이 외부에 노출되지 않게됨으로서 파손의 위험이 감소하게 됨을 알 수 있다.Therefore, in the case of the water meter protection container 100 of the present invention, the internal inspection is made through the opening and closing hole 131 formed in the lid 130 without the operator opening the lid 130 as in the conventional It will be seen that the meter is easy to check, and the internal insulation layer 122 made of Schiropol is not exposed to the outside it can be seen that the risk of damage is reduced.
또한, 보온재가 소정 두께로 취부되어져 있는 뚜껑부(130)와 내부 보온층(122)에서 2중의 보온효과를 나타내게 되어 겨울철 수도관 동파예방에도 더욱 효과를 나타낼 수 있게되는 것이다.In addition, the heat insulating material has a double heat insulation effect in the lid portion 130 and the inner heat insulation layer 122 is mounted to a predetermined thickness will be able to exhibit more effective in winter water pipe freeze prevention.
그리고, 상기에서 본 발명의 특정한 실시예가 설명 및 도시되었지만 본 발명의 보호통 구조 및 시공방법이 당업자에 의해 다양하게 변형되어 실시될 가능성이 있는 것은 자명한 일이다.In addition, although specific embodiments of the present invention have been described and illustrated above, it is obvious that the structure and construction method of the present invention may be variously modified and implemented by those skilled in the art.
그러나, 이와 같은 변형된 실시예들은 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안되며, 이와 같은 변형된 실시예들은 본 발명의 첨부된 특허청구범위 안에 속한다 해야 할 것이다.However, such modified embodiments should not be individually understood from the technical spirit or the prospect of the present invention, and such modified embodiments shall fall within the appended claims of the present invention.
이상에서 살펴본 바와같은 본 발명의 수도미터기 보호통은, 미터기 검침시 뚜껑을 분리시키지 않고 내부 점검이 가능함으로 검침작업이 한층 용이하게 이루어질 수 있으며, 이로인해 내부 보온재가 노출되지 않음으로 보온재의 파손이 방지되어질 수 있게된다.Water meter protection tube of the present invention as described above, because the inspection can be made without removing the lid when reading the meter can be made more easily, so that the internal insulation is not exposed, thereby preventing damage to the thermal insulation material It can be done.
그리고, 미터기 보호통은 몸체부와 밑판부가 분리되어진 구조를 이룸과 함께 배관 고정을 위한 밑판이 대칭형상으로 분리된 조립구조를 이룸으로서 보호통의 설치작업이 보다 용이하게 이루어질 수 있는 효과를 나타낸다.In addition, the meter protection tube has an structure in which the body portion and the bottom plate portion are separated, and the base plate for the pipe fixing is formed in a symmetrical shape, thereby providing an effect that the installation of the protection tube can be more easily performed.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0038511A KR100453895B1 (en) | 2002-07-04 | 2002-07-04 | Fabricate type watermeter case and excution method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0038511A KR100453895B1 (en) | 2002-07-04 | 2002-07-04 | Fabricate type watermeter case and excution method |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020020020239U Division KR200291864Y1 (en) | 2002-07-05 | 2002-07-05 | Fabricate type watermeter case |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040003734A KR20040003734A (en) | 2004-01-13 |
KR100453895B1 true KR100453895B1 (en) | 2004-10-26 |
Family
ID=37314718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2002-0038511A KR100453895B1 (en) | 2002-07-04 | 2002-07-04 | Fabricate type watermeter case and excution method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100453895B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200455205Y1 (en) | 2009-07-13 | 2011-08-23 | 김천수 | Water Meter Protector Lid |
KR101163315B1 (en) | 2010-07-28 | 2012-07-05 | (주)한영계기 | How to form styropole insulation for water meter protection tube with protective film to prevent breakage |
-
2002
- 2002-07-04 KR KR10-2002-0038511A patent/KR100453895B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200455205Y1 (en) | 2009-07-13 | 2011-08-23 | 김천수 | Water Meter Protector Lid |
KR101163315B1 (en) | 2010-07-28 | 2012-07-05 | (주)한영계기 | How to form styropole insulation for water meter protection tube with protective film to prevent breakage |
Also Published As
Publication number | Publication date |
---|---|
KR20040003734A (en) | 2004-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8985903B1 (en) | Bell-hole pipeline protection system | |
US9350148B2 (en) | Utility meter box and meter box cover | |
KR100453895B1 (en) | Fabricate type watermeter case and excution method | |
KR101195008B1 (en) | the enclosured underground waterproof device of hinged type | |
KR200291864Y1 (en) | Fabricate type watermeter case | |
WO2005017290A1 (en) | Street light foundation | |
KR200394863Y1 (en) | Connecting Flange for Manhole Drain Pipe | |
US6532985B1 (en) | Further enhanced features for backflow prevention device enclosure | |
KR20110133208A (en) | The preventive water style manhole by means of the draining equipment | |
KR19990086960A (en) | Water meter protection container with improved insulation | |
KR101266163B1 (en) | Anti-winter sowing water gauge case for separating faucet | |
KR200310432Y1 (en) | Protection box of water meter | |
CN208650166U (en) | Fire hydrant under ground portion frost crack proof device | |
KR200302638Y1 (en) | Anti freezing device of waterworks meter barrel | |
JP2004034995A (en) | Rainwater draining device for underground tank reservoir, and the underground tank reservoir | |
KR200227865Y1 (en) | Protecting box for water gauge | |
KR200379269Y1 (en) | Cap of protective box of water meter | |
KR200417100Y1 (en) | a manhole for prevention water incomming | |
KR200315485Y1 (en) | A water tight structure of protection cap | |
KR20000012724A (en) | Meter joinning system for water service | |
CN219975780U (en) | LNG pipeline vacuumizing embedded component | |
JPH0516301Y2 (en) | ||
CN216552067U (en) | Piping lane underground space and supporting construction thereof | |
KR100670032B1 (en) | A waterworks valve sealing device | |
JP3035848U (en) | Protective cover for above-ground fire hydrant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20101013 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20131014 Year of fee payment: 12 |
|
LAPS | Lapse due to unpaid annual fee |