KR100394535B1 - Tent pole - Google Patents

Tent pole Download PDF

Info

Publication number
KR100394535B1
KR100394535B1 KR10-2000-0037893A KR20000037893A KR100394535B1 KR 100394535 B1 KR100394535 B1 KR 100394535B1 KR 20000037893 A KR20000037893 A KR 20000037893A KR 100394535 B1 KR100394535 B1 KR 100394535B1
Authority
KR
South Korea
Prior art keywords
pole
swaging
thick
thin
thickness
Prior art date
Application number
KR10-2000-0037893A
Other languages
Korean (ko)
Other versions
KR20020005074A (en
Inventor
이윤복
Original Assignee
연안알루미늄 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 연안알루미늄 주식회사 filed Critical 연안알루미늄 주식회사
Priority to KR10-2000-0037893A priority Critical patent/KR100394535B1/en
Publication of KR20020005074A publication Critical patent/KR20020005074A/en
Application granted granted Critical
Publication of KR100394535B1 publication Critical patent/KR100394535B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/60Poles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)

Abstract

본발명은 텐트용 폴에 관한 것으로 특히, 공인발과정과 플러그인발과정 그리고 스웨징과정에 의해 텐트용 폴의 일측에 형성되는 스웨징부를 보강함으로서 간편한 제작과정에 의해 휨응력에 강력하게 대응할 수 있는 스웨징부를 얻을 수 있고 상기 폴의 스웨징부를 후육부와 중육부 그리고 박육부의 3단 구조로 구비함으로서 상기 박육부에 의해 텐트용 폴의 탄력을 향상시키는 동시에 폴의 무게를 경량화 시킬수 있고 상기 후육부에 의해 박육부의 일측부로 삽입되는 다른 폴의 결합을 용이토록 하는 동시에 폴의 휨작용시 적용되는 힘으로 부터 박육부의 일측부를 보호할 수 있으며 상기 중육부에 의해 후육부와 박육부의 경계선으로 과다한 휨응력이 작용되었을 경우 상기의 과다한 휨응력을 박육부 방향으로 유도하여 박육부에서 파단 현상이 일어나도록 함으로서 과다한 휨응력이 작용되어도 보다 더 오래 견딜수 있도록된 텐트용폴의 스웨징부 보강방법 및 그 구조를 제공한다.The present invention relates to tent pawls. In particular, by reinforcing the swaging portion formed on one side of the tent pawls by the authorized footing process, the plug-in footing process and the swaging process, it is possible to strongly respond to the bending stress by the simple manufacturing process. A wedging part can be obtained, and the swaging part of the pole is provided with a three-stage structure of a thick part, a middle part, and a thin part, thereby improving the elasticity of the tent pole by the thin part and at the same time reducing the weight of the pole. It is possible to facilitate the coupling of other poles inserted into one side of the thin part by the same time, and to protect one side of the thin part from the force applied during the bending action of the pole. When excessive bending stress is applied, the excessive bending stress is induced in the thinner part direction, causing breakage in the thinner part. So that by the excessive bending stress to the tent yongpol the withstand even longer than the action Sweden jingbu provides a reinforcement method and structure.

Description

텐트용 폴의 스웨징부 보강방법 및 그구조{TENT POLE}Reinforcing method of swaging part of tent pole and its structure {TENT POLE}

본발명은 텐트용 폴에 관한 것으로 특히, 공인발과정과 플러그인발과정 그리고 스웨징과정에 의해 텐트용 폴의 일측에 형성되는 스웨징부를 보강함으로서 간편한 제작과정에 의해 휨응력에 강력하게 대응할 수 있는 스웨징부를 얻을 수 있고상기 폴의 스웨징부를 후육부와 중육부 그리고 박육부의 3단 구조로 구비함으로서 상기 박육부에 의해 텐트용 폴의 탄력을 향상시키는 동시에 폴의 무게를 경량화 시킬수 있고 상기 후육부에 의해 박육부의 일측부로 삽입되는 다른 폴의 결합을 용이토록 하는 동시에 폴의 휨작용시 적용되는 힘으로 부터 박육부의 일측부를 보호할 수 있으며 상기 중육부에 의해 후육부와 박육부의 경계선으로 과다한 휨응력이 작용되었을 경우 상기의 과다한 휨응력을 박육부 방향으로 유도하여 박육부에서 파단 현상이 일어나도록 함으로서 과다한 휨응력이 작용되어도 보다 더 오래 견딜수 있도록된 텐트용폴의 스웨징부 보강방법 및 그 구조에 관한 것이다.The present invention relates to tent pawls. In particular, by reinforcing the swaging portion formed on one side of the tent pawls by the authorized footing process, the plug-in footing process and the swaging process, it is possible to strongly respond to the bending stress by the simple manufacturing process. A wedging part can be obtained, and the swaging part of the pole is provided with a three-stage structure of a thick part, a middle part, and a thin part, thereby improving the elasticity of the tent pole by the thin part and at the same time reducing the weight of the pole. It is possible to facilitate the coupling of other poles inserted into one side of the thin part by the same time, and to protect one side of the thin part from the force applied during the bending action of the pole. When excessive bending stress is applied, the excessive bending stress is induced in the thinner part direction, causing breakage in the thinner part. The present invention relates to a method for reinforcing the swaging portion of a tent pole and to have a structure that can withstand excessive bending stress even longer.

종래 텐트용 폴의 스웨징부는 플러그인발과정에 의해서만 스웨징부를 제작하였었다.The swaging part of the pole pole for the prior art produced the swaging part only by the plug-in process.

따라서, 상기 스웨징이 완료된 부위와 스웨징이 안된 부위의 두께차가 미약하게 나타나는 2단 구조로 구성되기 때문에 휨응력에 매우 약하게 된다.Therefore, since the two-stage structure in which the thickness difference between the portion where the swaging is completed and the portion without swaging is weak, is very weak to the bending stress.

즉, 상기 스웨징부로 결합되는 다른 폴을 텐트에 설치하여 휠 경우 스웨징부로 많은 휨응력이 집중하게 된다.That is, when the other pole coupled to the swaging portion is installed in the tent, when the wheel is a lot of bending stress is concentrated to the swaging portion.

상기와 같이 스웨징부로 휨응력이 집중되면 스웨징부의 절곡부위가 상기 휨응력에 대응하지 못하고 휘어지면서 직진도가 흐트려지게 되거나 급기야는 상기 스웨징부의 절곡부위가 파단되어 버리는등의 문제점이 있었다.As described above, when the bending stress is concentrated in the swaging portion, the bending portion of the swaging portion does not correspond to the bending stress and the straightness is disturbed, or the feeding portion breaks the bending portion of the swaging portion.

특히, 상기 스웨징부의 절곡부에 과다한 휨응력이 집중될 경우에는 상기 절곡부의 두께가 폴 전체의 두께보다 미약하게 두껍기 때문에 어느정도 버티다가 파단되는 것이 아니라 곧바로 절곡부위가 파단되어버리게 된다.In particular, when excessive bending stress is concentrated in the bending portion of the swaging portion, since the thickness of the bending portion is slightly thicker than the thickness of the entire pole, the bending portion is immediately broken instead of being broken.

따라서, 상기와 같이 스웨징부가 파단되면 텐트의 설치가 불가능하게 되며 응급처치에 의해 설치를 하더라도 폴의 강도유지가 되지 않기 때문에 안정된 텐트를 설치하지 못하게 되는 문제점을 가지고 있었다.Therefore, if the swaging portion is broken as described above, the installation of the tent is impossible, and even though the installation is performed by emergency treatment, the strength of the pole is not maintained, so that the stable tent cannot be installed.

이러한 종래의 문제점등을 해결 보완하기 위한 본발명의 목적은,The purpose of the present invention for solving and solving these conventional problems,

간편한 제작과정에 의해 휨응력에 강력하게 대응할 수 있는 스웨징부를 얻을 수 있고 텐트용 폴의 탄력을 향상시키는 동시에 폴의 무게를 경량화 시킬수 있으며폴의 휨작용시 적용되는 힘으로 부터 스웨징부를 보호할 수 있고 상기 스웨징부에과다한 휨응력이 작용되어도 보다 더 오래 견딜 수 있도록 하는 목적을 제공한다.It is possible to obtain swaging part that can cope with bending stress by simple manufacturing process, improve the elasticity of tent pole, lighten the weight of pole and protect swaging part from the force applied during bending action of pole. And it provides an object to withstand longer than the excessive bending stress applied to the swaging portion.

상기의 목적을 달성하기 위하여 본발명은,In order to achieve the above object, the present invention,

공인발과정과 플러그인발과정 그리고 스웨징과정에 의해 텐트용 폴의 일측에 스웨징부를 형성시키면 본발명의 목적을 달성할 수 있게 된다.When the swaging part is formed on one side of the tent pole by the official footing process, the plug-in footing process and the swaging process, the object of the present invention can be achieved.

또한, 상기 폴의 스웨징부를 후육부와 중육부 그리고 박육부의 3단 구조로 구비하여도 본발명의 목적을 달성 할 수 있게 된다.In addition, it is possible to achieve the object of the present invention by having a swaging portion of the pole in a three-stage structure of a thick portion, a thick portion and a thin portion.

도1은 본발명 텐트용폴의 스웨징부 보강방법중 공인발과정을 나타낸 도면1 is a view showing a certified foot of the swaging part reinforcement method of the present invention tent pole

도2는 본발명 텐트용폴의 스웨징부 보강방법중 플러그인발과정을 나타낸 도면Figure 2 is a view showing the plug-in process of the swaging part reinforcement method of the present invention tent pole

도3 및 도4는 본발명 텐트용폴의 스웨징부 보강방법중 스웨징과정과 폴의 구조를 나타낸 도면3 and 4 is a view showing the swaging process and the structure of the pole in the swaging portion reinforcement method of the present invention tent pole

<도면중 주요 부분에 대한 부호설명><Code Description of Main Parts of Drawing>

101-폴 103-중육부101-Paul 103-Middle

104-박육부 105-후육부104-Thin 105-Thin

112-공인발다이 113-플러그다이112-approved baldie 113-plug die

114-스웨징다이114-Swedging Dies

본발명 텐트용폴의 스웨징 보강방법을 도1 내지 도4에 의해 과정별로 상세히 설명하기로 한다.The swaging reinforcement method of the present invention tent pole will be described in detail by process according to FIGS. 1 to 4.

일정두께(A)를 가진 폴(101)의 일측부만을 공인발다이(112)를 통과시켜서 원래의 두께(A)보다 두꺼운 두께(B)의 중육부(103)로 넓히는 동시에 폴(101)의 관경을 축관시키기 위한 공인발과정과,Only one side of the pawl 101 having a predetermined thickness (A) is passed through the authorized foot die 112 to widen the middle portion 103 of the thickness (B) thicker than the original thickness (A) and at the same time Certified foot process to build the view,

상기 공인발과정에서 두꺼운 두께(B)의 중육부(103)로 넓혀진 일측부를 제외한 나머지부위의 폴(101)을 폴(101)내부로 삽입되는 플러그다이(113)를 통과시켜 최종의 두께(C)인 박육부(104)로 넓히는 동시에 최종의 관경으로 축관시키기 위한 플러그인발과정과The final thickness (C) is passed through the plug die 113 inserted into the pole 101, except for the one side portion widened by the thick portion 103 of the thick thickness (B) in the authorized foot process (C). Plug-in process for widening to thinner portion (104) at the same time and conduit to the final diameter

상기 플러그인발과정을 거친 폴(101)의 두꺼운 두께(B)를 가진 중육부(103)의 일측부만을 스웨징다이(114)에 압입하여 최종적인 두께(D)인 후육부(105)로 더 넓히는 동시에 다른 폴(101)이 결합될 수 있도록 관경을 축관시키는 스웨징과정으로 이루어진 것이다.Only one side of the thick portion 103 having the thick thickness B of the pawl 101 through the plug-in process is press-fitted into the swaging die 114 and further into the thick portion 105 as the final thickness D. At the same time wider swaging process to conduit the diameter so that the other pole 101 can be combined.

한편, 본발명 텐트용폴의 스웨징 보강구조는 도4에 의해 상세히 설명하기로 한다.On the other hand, the swaging reinforcement structure of the tent pole of the present invention will be described in detail with reference to FIG.

텐트용 폴(101)의 탄력을 향상시키는 동시에 폴(101)의 무게를 경량화 시키기 위해 폴(101)에 형성되는 박육부(104)와,Thin portion 104 formed in the pawl 101 to improve the elasticity of the pawl 101 for the tent and at the same time reduce the weight of the pawl 101,

상기 박육부(104)의 일측부로 삽입되는 다른 폴(101)의 결합을 용이토록 하는 동시에 폴(101)의 휨작용시 적용되는 힘으로 부터 박육부(104)의 일측부를 보호하기 위해 박육부(104)의 일측부로 박육부(104)보다 두껍게 형성되는 후육부(105)와,To facilitate the coupling of the other pole 101 inserted into one side of the thin portion 104 and at the same time to protect one side of the thin portion 104 from the force applied during the bending action of the pole 101 ( A thick portion 105 formed on one side of the thicker than the thin portion 104,

상기 후육부(105)와 박육부(104)의 경계선으로 과다한 휨응력이 작용시 후육부(105)와 박육부(104)의 경계선이 파단되는 것을 방지하기 위해 상기 폴(101)의 파단이 박육부(104)에서 발생되도록 파단점을 박육부(104)로 이동시켜주는 후육부(105)와 박육부(104)사이에 중간 두께로 형성된 중육부(103)를 구비한 구성이다.The break of the pawl 101 is thin to prevent the boundary between the thick portion 105 and the thin portion 104 from breaking when excessive bending stress acts on the boundary between the thick portion 105 and the thin portion 104. A thick portion 103 formed between the thick portion 105 and the thin portion 104 for moving the break point to the thin portion 104 so as to be generated at the 104 is formed.

이와같이된 본발명의 스웨징부 보강방법에 대한 작용을 설명하면 다음과 같다.Referring to the effect on the swaging part reinforcement method of the present invention as described above is as follows.

먼저, 공인발과정에서는 일정두께(A)를 가진 폴(101)의 일측부 일정 길이만큼만을 공인발다이(112)를 도1과 같이 통과시킨다First, in the authorized foot process, only the predetermined length of one side of the pole 101 having a predetermined thickness (A) passes the authorized foot die 112 as shown in FIG. 1.

상기와 같이 폴(101)을 공인발다이(112)로 통과시키면 원래의 폴(101)두께(A)보다 두꺼운 두께(B)의 중육부(103)로 넓혀지는 동시에 폴(101)의 관경이 축관되어진다.Passing the pole 101 through the authorized foot die 112 as described above is widened to the middle portion 103 of the thickness (B) thicker than the original pole 101 thickness (A) and at the same time the diameter of the pole 101 It is condensed.

그리고, 상기 공인발과정을 거친 두꺼운 두께(B)의 중육부(103)로 넓혀진 일측부를 제외한 나머지부위의 폴(101)을 플러그인발과정에 의해 폴(101)내부로 도2와 같이 삽입되는 플러그다이(113)를 통과시켜 최종의 두께(C)인 박육부(104)로 넓히는 동시에 최종의 관경으로 축관시킨다.Then, the plug 101 is inserted into the pole 101 by the plug-in process as shown in FIG. It passes through the die 113 and widens to the thin part 104 which is the final thickness C, and is made to be conduited to the final diameter.

또한, 상기 플러그인발과정을 거친 폴(101)의 두꺼운 두께(B)를 가진 도3의 중육부(103)일측부만을 스웨징과정에서 스웨징다이(114)에 도4와 같이 압입하여 최종적인 두께(D)인 후육부(105)로 더 넓히는 동시에 다른 폴(101)이 결합될 수 있도록 관경을 축관시키게 된다.In addition, only one side of the middle portion 103 of FIG. 3 having a thick thickness B of the pawl 101 through the plug-in process is pressed into the swaging die 114 as shown in FIG. The diameter D is made wider to the thick portion 105, and at the same time, the diameter of the tube can be reduced so that the other poles 101 can be coupled.

상기와 같은 과정들에 의해 완성된 폴(101)은 도4에 나타낸 바와같이 박육부(104),중육부(103),후육부(105)등의 3단 구조의 스웨징부를 형성하게 되므로 휨응력에 강력하게 대응할 수 있게 되고 휘어지면서 직진도가 흐트려지거나 파단되는 일이 없게 된다.Since the pole 101 completed by the above processes forms a swaging portion having a three-stage structure such as a thin portion 104, a middle portion 103, a thick portion 105, and the like, as shown in FIG. It will be able to respond powerfully and will not bend or break straightness.

그러나, 상기 다른 폴(101)이 결합되는 스웨징부의 후육부(105)에 과다한 휨응력이 작용되었을 경우에는 후육부(105)로 작용되는 힘이 중육부(103)를 따라 박육부(104)방향으로 이동하게 되므로 후육부(105)가 파단되는 것이 아니라 박육부(104)에서 파단이 발생하게 된다.However, when excessive bending stress is applied to the thick portion 105 of the swaging portion to which the other pole 101 is coupled, the force acting on the thick portion 105 is directed toward the thin portion 104 along the thick portion 103. Since the thick portion 105 is not broken, the thin portion 105 is broken, so that the fracture occurs in the thin portion 104.

따라서, 상기 후육부(105)는 과다한 힘에 대향하여 버틸대로 버티다가 결국은 박육부(104)에서 파단 되도록 하는 파단구조에 의해 파단시간을 지연시킬수 있게 된다.Therefore, the thick portion 105 can stand against the excessive force and thus delay the breaking time due to the breaking structure that causes the thick portion 104 to break in the thin portion 104.

한편, 본발명 스웨징부 보강구조에 있어서는 도4에 나타낸 바와같이 폴(101)에 형성되는 박육부(104)에 의해 텐트용 폴(101)의 탄력을 향상시키는 동시에 폴(101)의 무게를 경량화 시킬수 있게 된다.On the other hand, in the swaging portion reinforcing structure of the present invention, as shown in Fig. 4, the thin portion 104 formed on the pole 101 improves the elasticity of the tent pole 101 and at the same time reduces the weight of the pole 101. You can do it.

그리고, 상기 박육부(104)의 일측부로 박육부(104)보다 두껍게 형성되는 후육부(105)에 의해 상기 박육부(104)의 일측부로 삽입되는 다른 폴(101)의 결합을 용이토록 하는 동시에 폴(101)의 휨작용시 적용되는 힘으로 부터 박육부(104)의 일측부를 보호하게 된다.In addition, the thicker portion 105 formed thicker than the thinner portion 104 on one side of the thinner portion 104 facilitates the engagement of the other pole 101 inserted into one side of the thinner portion 104. The side of the thin portion 104 is protected from the force applied during the bending action of the pole (101).

또한, 상기 폴(101)의 파단이 박육부(104)에서 발생되도록 파단점을 박육부(104)로 이동시켜주는 중육부(103)에 의해 후육부(105)와 박육부(104)의 경계선으로 과다한 휨응력이 작용시 후육부(105)와 박육부(104)의 경계선이 파단되는 것을 방지하여 파단을 지연시킬 수 있게 된다.In addition, the boundary between the thick portion 105 and the thin portion 104 by the middle portion 103 which moves the breaking point to the thin portion 104 so that the break of the pole 101 is generated in the thin portion 104. As a result of excessive bending stress, the boundary between the thick portion 105 and the thin portion 104 is prevented from being broken so that the fracture can be delayed.

이와같이된 본발명은 공인발과정과 플러그인발과정 그리고 스웨징과정에 의해 텐트용 폴의 일측에 스웨징부를 형성시키고 상기 폴의 스웨징부를 후육부와 중육부 그리고 박육부의 3단 구조로 구비함으로서, 간편한 제작과정에 의해 휨응력에 강력하게 대응할 수 있는 스웨징부를 얻을 수 있고 텐트용 폴의 탄력을 향상시키는 동시에 폴의 무게를 경량화 시킬수 있으며 폴의 휨작용시 적용되는 힘으로 부터 스웨징부를 보호할 수 있고 상기 스웨징부에 과다한 휨응력이 작용되어도 보다 더 오래 견딜 수 있는 유용한 효과를 갖는다.The present invention thus formed by forming a swaging portion on one side of the tent pole by the official foot process, plug-in foot process and swaging process, and by having the swaging part of the pole in the thick part, the thick part and the thin part of the structure. In addition, it is possible to obtain swaging parts that can cope with flexural stress by simple manufacturing process, improve the elasticity of tent poles, reduce the weight of poles, and protect swaging parts from the force applied during bending action of poles. It can have a useful effect that can last longer even if excessive bending stress is applied to the swaging portion.

Claims (2)

일정두께(A)를 가진 폴(101)의 일측부만을 공인발다이(112)를 통과시켜서 원래의 두께(A)보다 두꺼운 두께(B)의 중육부(103)로 넓히는 동시에 폴(101)의 관경을 축관시키기 위한 공인발과정과,Only one side of the pawl 101 having a predetermined thickness (A) is passed through the authorized foot die 112 to widen the middle portion 103 of the thickness (B) thicker than the original thickness (A) and at the same time Certified foot process to build the view, 상기 공인발과정에서 두꺼운 두께(B)의 중육부(103)로 넓혀진 일측부를 제외한 나머지부위의 폴(101)을 폴(101)내부로 삽입되는 플러그다이(113)를 통과시켜 최종의 두께(C)인 박육부(104)로 넓히는 동시에 최종의 관경으로 축관시키기 위한 플러그인발과정과The final thickness (C) is passed through the plug die 113 inserted into the pole 101, except for the one side portion widened by the thick portion 103 of the thick thickness (B) in the authorized foot process (C). Plug-in process for widening to thinner portion (104) at the same time and conduit to the final diameter 상기 플러그인발과정을 거친 폴(101)의 두꺼운 두께(B)를 가진 중육부(103)의 일측부만을 스웨징다이(114)에 압입하여 최종적인 두께(D)인 후육부(105)로 더 넓히는 동시에 다른 폴(101)이 결합될 수 있도록 관경을 축관시키는 스웨징과정으로 이루어진 것을 특징으로 하는 텐트용 폴의 스웨징부 보강방법.Only one side of the thick portion 103 having the thick thickness B of the pawl 101 through the plug-in process is press-fitted into the swaging die 114 and further into the thick portion 105 as the final thickness D. The swaging portion reinforcement method of the tent pole, characterized in that made of a swaging process for condensing the diameter so that the other pole 101 can be coupled at the same time. 텐트용 폴의 탄력을 향상시키는 동시에 폴의 무게를 경량화 시키기 위해 폴에 형성되는 박육부와,Thin portion formed on the pole to improve the elasticity of the pole for the tent and at the same time lighten the weight of the pole, 상기 박육부의 일측부로 삽입되는 다른 폴의 결합을 용이토록 하는 동시에 폴의 휨작용시 적용되는 힘으로 부터 박육부의 일측부를 보호하기 위해 박육부의 일측부로 박육부보다 두껍게 형성되는 후육부와,A thick part formed thicker than the thin part on one side of the thin part to facilitate the coupling of another pole inserted into one side of the thin part and to protect one side of the thin part from the force applied during the bending action of the pole; 상기 후육부와 박육부의 경계선으로 과다한 휨응력이 작용시 후육부와 박육부의 경계선이 파단되는 것을 방지하기 위해 상기 폴의 파단이 박육부에서 발생되도록 파단점을 박육부로 이동시켜주는 후육부와 박육부 사이에 중간 두께로 형성된 중육부를 구비한 것을 특징으로 하는 텐트용 폴의 스웨징부 보강구조.The thick part to move the break point to the thin part so that the break of the pole is generated in the thin part in order to prevent the boundary between the thick part and the thin part when the excessive bending stress acts as a boundary between the thick part and the thin part. Swaging part reinforcement structure of a tent pole, characterized in that it has a middle portion formed with a middle thickness between the thin portion.
KR10-2000-0037893A 2000-07-04 2000-07-04 Tent pole KR100394535B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0037893A KR100394535B1 (en) 2000-07-04 2000-07-04 Tent pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0037893A KR100394535B1 (en) 2000-07-04 2000-07-04 Tent pole

Publications (2)

Publication Number Publication Date
KR20020005074A KR20020005074A (en) 2002-01-17
KR100394535B1 true KR100394535B1 (en) 2003-08-14

Family

ID=19676040

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0037893A KR100394535B1 (en) 2000-07-04 2000-07-04 Tent pole

Country Status (1)

Country Link
KR (1) KR100394535B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR840005677A (en) * 1982-08-31 1984-11-16 로버트 제이 에드워즈 Pre-stress and tube device manufacturing
US5143411A (en) * 1986-07-18 1992-09-01 Watts John Dawson Threaded tubular connection
WO1996006379A2 (en) * 1994-08-23 1996-02-29 Philips Electronics N.V. Liquid crystal display device and retardation foil
JPH0941735A (en) * 1995-07-26 1997-02-10 Saiken Ra Tent structure and its preparation
US5643093A (en) * 1995-10-19 1997-07-01 Dana Corporation Aluminum driveshaft having reduced diameter end portion
KR970045857A (en) * 1995-12-22 1997-07-26 사토 이치로 Manufacturing method of tie rod bar
KR20000010883U (en) * 1998-11-27 2000-06-26 라제건 Tent pole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR840005677A (en) * 1982-08-31 1984-11-16 로버트 제이 에드워즈 Pre-stress and tube device manufacturing
US5143411A (en) * 1986-07-18 1992-09-01 Watts John Dawson Threaded tubular connection
WO1996006379A2 (en) * 1994-08-23 1996-02-29 Philips Electronics N.V. Liquid crystal display device and retardation foil
JPH0941735A (en) * 1995-07-26 1997-02-10 Saiken Ra Tent structure and its preparation
US5643093A (en) * 1995-10-19 1997-07-01 Dana Corporation Aluminum driveshaft having reduced diameter end portion
KR970045857A (en) * 1995-12-22 1997-07-26 사토 이치로 Manufacturing method of tie rod bar
KR20000010883U (en) * 1998-11-27 2000-06-26 라제건 Tent pole

Also Published As

Publication number Publication date
KR20020005074A (en) 2002-01-17

Similar Documents

Publication Publication Date Title
EP0059680A2 (en) Rebar splicing and anchoring
MY141030A (en) Deformed reinforcing bar splice and method
EP1260452A3 (en) Cable tie with wide neck
KR100730540B1 (en) Reinforcing bar coupler
CA2268878A1 (en) Method of working connection end of deformed bar for reinforcing concrete, deformed bar worked by the method and structure deformed bar
US5451471A (en) Reinforcement fiber for reinforcing concrete
KR100394535B1 (en) Tent pole
CA2399546A1 (en) Composite profile and method for producing a composite profile
HK1049038A1 (en) Metal fastening element
KR101920670B1 (en) Connection coupler for steel distribution poles
CA2394101A1 (en) A bolt and thread rolling die and the manufacture of the bolt
US20020112436A1 (en) Quick-connector for rebar to concrete dowels
JPS5824027A (en) Reinforcing member for pressurizing anchor
JPH111994A (en) Stranded-wire reinforcing material with opening
JPS6346741Y2 (en)
CN214740010U (en) Reinforcing steel bar tensioning device
JP3107837B2 (en) Fastening bracket
JP3020867B2 (en) Main bar fixing plate
CN210359074U (en) Prevent crooked mould structure of slender pole piece cold-heading
KR200251335Y1 (en) A nut for the PHC file
JP2002030764A (en) Reinforcement clip for high load
KR100799370B1 (en) Connection end of deformed bar for reinforcing concrete
KR19990037609U (en) Latch
PL1528169T3 (en) Assembly for subsequent fixing of construction components on a building part
KR200234873Y1 (en) A connecting structure of reinforcing bar

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120801

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130731

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee