KR100391770B1 - Casing for Anchor Pile - Google Patents

Casing for Anchor Pile Download PDF

Info

Publication number
KR100391770B1
KR100391770B1 KR10-2000-0034585A KR20000034585A KR100391770B1 KR 100391770 B1 KR100391770 B1 KR 100391770B1 KR 20000034585 A KR20000034585 A KR 20000034585A KR 100391770 B1 KR100391770 B1 KR 100391770B1
Authority
KR
South Korea
Prior art keywords
excavation hole
casing
passage
underground anchor
fitting passage
Prior art date
Application number
KR10-2000-0034585A
Other languages
Korean (ko)
Other versions
KR20020000287A (en
Inventor
성낙영
Original Assignee
주식회사 팸택
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 팸택 filed Critical 주식회사 팸택
Priority to KR10-2000-0034585A priority Critical patent/KR100391770B1/en
Publication of KR20020000287A publication Critical patent/KR20020000287A/en
Application granted granted Critical
Publication of KR100391770B1 publication Critical patent/KR100391770B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 구성부품을 단일화하고 굴착공에 맞추어 융통성있게 설치할 수 있도록 구성하여서, 지중앵커파일의 시공능률을 획기적으로 향상시켜 주는 지중앵커파일 시공을 위한 굴착공용 케이싱을 제공하기 위한 것이다.The present invention is to provide a casing for the excavation hole for the construction of the underground anchor pile to improve the construction efficiency of the underground anchor pile, by configuring the components to be installed in a flexible manner in accordance with the excavation hole.

본 발명의 지중앵커파일 시공을 위한 굴착공용 케이싱은 지중에 굴착된 굴착공(1)에 끼워져서 고정될 수 있는 정도의 관경크기를 가지는 원통체로서 길게 형성되는 삽입관부(10)와, 상기 삽입관부(10)의 선단부에 일체로 형성되어서 굴착공(1)내에 주입된 그라우트액(A)의 유출을 차단하여 주는 막이판부(20)와, 상기 막이판부(20)의 중앙에 형성되어서 장볼트(2)가 관통되게 끼워지도록 형성되는 중앙 끼움통로(30)와, 상기 삽입관부(10)의 선단부 근처 둘레면에 주입호스(5)를 끼워넣을 수 있도록 형성되는 주변 끼움통로(40)로서 구성된 것에 있어서, 상기 삽입관부(10)에는 상기 주변 끼움통로(40)와 연계되어서 후단부를 향하여 소정의 폭으로 절개 형성되는 간극부(50)를 포함하여서 된 것이다.Casing for excavation hole for underground anchor pile construction of the present invention is inserted into the tube portion 10 is formed as a cylindrical body having a tube size of a degree that can be fixed by being inserted into the excavation hole (1) excavated in the ground, and the insertion The membrane plate portion 20 is formed integrally with the tip portion of the pipe portion 10 to block the outflow of the grout liquid A injected into the excavation hole 1, and the long bolt is formed in the center of the membrane plate portion 20. (2) is formed as a central fitting passage (30) formed so as to penetrate through, and a peripheral fitting passage (40) formed so that the injection hose (5) can be inserted into the circumferential surface near the distal end of the insertion tube (10) In this case, the insertion pipe portion 10 is to include a gap portion 50 is formed in a predetermined width toward the rear end in connection with the peripheral fitting passage 40.

Description

지중앵커파일 시공을 위한 굴착공용 케이싱{Casing for Anchor Pile}Casing for Anchor Pile for underground anchor pile construction

본 발명은 절토층에 천공된 굴착공의 입구에 삽입되어서 그 절토층을 안정화시키기 위한 지중앵커파일을 능률적으로 시공할 수 있도록 하여 주는 지중앵커파일시공을 위한 굴착공용 케이싱에 관한 것이다.The present invention relates to an excavation casing for underground anchor pile construction that can be inserted into the inlet of the excavated hole drilled in the cut layer to efficiently construct the underground anchor pile for stabilizing the cut layer.

비탈지나 산간지역에서 도로를 개설할 때에 절토작업을 수행하여서 들어난 절토층은 그 자체의 지지력이 매우 취약하고 불안정하여서 붕괴의 위험성이 상존하는 바, 이전부터 이러한 절토층을 안정화하여 주기 위한 방안으로 지중앵커파일을 설치 시공하여 왔다.When cutting roads on slopes or in mountainous areas, the cut layers generated by cutting work are very weak and unstable in their own support, so there is a risk of collapse. Underground anchor file has been installed and installed.

이 지중앵커파일은 절토층을 소요길이로 천공하여서 굴착공을 형성하고, 천공된 굴착공 내에 장볼트를 긴장되게 관입 설치하고, 장볼트가 관입된 굴착공 내부에 그라우트액을 주입 양생시켜서, 굴착공 내에 채워져서 경화되는 그라우트액과 함께 긴장력이 발휘되는 장볼트의 상호작용으로 절토층을 효율적으로 안정화시켜 주는 장점이 있는 것으로 알려져 있다.The underground anchor pile drills the cut layer to the required length to form an excavation hole, installs the long bolts in a tightly drilled excavation hole, and injects and cures the grout solution into the excavated hole in which the long bolts are inserted, It is known that there is an advantage of efficiently stabilizing the cut layer by the interaction of the long bolt exerts tension with the grout liquid to be filled and hardened in the ball.

이와 같은 지중앵커파일을 효율적으로 시공하기 위해서는 굴착공 내에 주입된 그라우트액이 양생되기까지 굴착공의 입구가 함몰되는 일없이 원형 그대로 유지되어야 할 뿐만 아니라, 굴착공 내부에 주입되는 그라우트액의 외부 유출을 차단하여 주도록 조치되어야 할 필요성이 있었다.In order to efficiently construct such underground anchor piles, the grout fluid injected into the excavation hole must not only be maintained without being recessed until the grout fluid injected into the excavation hole is cured. There was a need to be taken to block them.

종래에는 도 1에 도시되는 바와 같이, 원통형 삽입관(110)과 함께 장볼트(2)가 끼워지는 볼트끼움공(121) 및 주입호스(3)가 끼워지는 호스끼움공(122)이 형성된 막이캡(120)을 가지고 지중앵커파일 시공을 위한 굴착공용 케이싱(100)을 구비하여, 삽입관(110)의 선단부에 막이캡(120)을 끼우고 결박시켜서 굴착공용 케이싱(100)을 조립 한 후에, 절토층에 굴착된 굴착공(1)의 입구에 조립된 굴착공용 케이싱(10)을 삽입 설치하여, 그 굴착공용 케이싱의 삽입관(110)으로는 굴착공(1)의 입구를 지탱하여 주어서 함몰됨을 방지하여 주도록 하고, 막이캡(2)을 통하여 장볼트(2)와 주입호스(3)를 끼워서 설치할 수 있도록 하는 동시에, 그 주입호스(3)를 통하여 굴착공(1)의 내부에 주입되는 그라우트액(A)의 외부 유출됨을 차단하여 주도록 하였다.In the related art, as illustrated in FIG. 1, a membrane having a cylindrical insertion tube 110 and a bolt fitting hole 121 into which the long bolt 2 is fitted and a hose fitting hole 122 into which the injection hose 3 is fitted are formed. Having a cap 120 and having an excavation casing 100 for the construction of underground anchor piles, after inserting the membrane cap 120 to the front end of the insertion tube 110 to assemble the excavation casing 100 Insert and install the excavation hole casing 10 assembled at the inlet of the excavation hole (1) excavated in the cut layer, and support the inlet of the excavation hole (1) by the insertion pipe 110 of the excavation hole casing It is to be prevented from being recessed, and the long bolt 2 and the injection hose 3 can be inserted and installed through the cap 2, and injected into the excavation hole 1 through the injection hose 3, respectively. It was to block the outflow of the grout liquid (A) to be.

그러나, 이와 같은 종래고안의 지중앵커파일 시공을 위한 굴착공용 케이싱(100)은 굴착공(1)에 설치할 때에 독립된 부품으로 제공되는 삽입관(110)과 막이캡(120)을 고정끈 또는 테이프 등으로 결박시켜서 조립 사용하여야 하는 번거로움으로 인하여 작업시간이 연장되는 문제점이 있었다. 더욱이, 삽입관(110) 보다 굴착공(1)의 직경이 작게 천공된 경우에 삽입관(110)을 억지로 끼워야하는 불편을 감수하게 될 뿐만 아니라, 심한 경우에는 굴착공(1)의 직경을 다시 크게 넓히는 작업을 실시하게 되므로, 지중앵커파일의 시공능률이 크게 저하되는 문제점을 수반하게 되었다.However, the conventional casing 100 for underground anchor pile construction of the conventional design, such as when fixed to the insertion pipe 110 and the membrane cap 120 provided as an independent component when installed in the excavation hole (1), such as a strap or tape There was a problem in that the working time is extended due to the hassle of having to use the assembly by binding. Furthermore, when the diameter of the excavation hole 1 is smaller than that of the insertion tube 110, not only the inconvenience of forcing the insertion tube 110 to be forced, but also the severeness of the diameter of the excavation hole 1 is reestablished. Since a wider work is performed, the construction efficiency of underground anchor piles is greatly reduced.

본 발명은 구성부품을 단일화하고 굴착공에 맞추어 융통성있게 설치할 수 있도록 구성하여서, 지중앵커파일의 시공능률을 획기적으로 향상시켜 주는 지중앵커파일 시공을 위한 굴착공용 케이싱을 제공하는 데 목적이 있다.An object of the present invention is to provide a casing for an excavation hole for the construction of the underground anchor pile to improve the construction efficiency of the underground anchor pile, by configuring the component to be installed in a flexible manner in accordance with the excavation hole.

도 1은 종래고안의 실시상태를 나타낸 단면도1 is a cross-sectional view showing an embodiment of a conventional design

도 2는 본 발명의 굴착공용 케이싱을 나타낸 사시도Figure 2 is a perspective view showing a casing for excavation of the present invention

도 3는 본 발명의 굴착공용 케이싱의 실시상태를 나타낸 단면도Figure 3 is a cross-sectional view showing an embodiment of the casing for drilling holes of the present invention

도 4는 본 발명의 굴착공용 케이싱의 작용상태를 나타낸 단면도Figure 4 is a cross-sectional view showing the operating state of the casing for drilling holes of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10: 삽입관부 20: 막이판부10: insertion tube 20: membrane plate

30: 중앙 끼움통로 40: 주변 끼움통로30: center fitting passage 40: surrounding fitting passage

50: 간극부 60: 걸림돌기50: gap portion 60: protrusion

본 발명도 지중에 굴착된 굴착공(1)에 끼워져서 고정될 수 있는 정도의 관경 크기를 가지는 원통체로서 길게 형성되는 삽입관부(10)와, 상기 삽입관부(10)의 선단부에 일체로 형성되어서 굴착공(1)내에 주입된 그라우트액(A)의 유출을 차단하여 주는 막이판부(20)와, 상기 막이판부(20)의 중앙에 형성되어서 장볼트(4)가 관통되게 끼워지도록 형성되는 중앙 끼움통로(30)와, 상기 삽입관부(10)의 선단부 근처 둘레면에 주입호스(5)를 끼워넣을 수 있도록 형성되는 주변 끼움통로(40)로서 구성된 점에 있어서는 종래의 것과 기술개념을 같이 한다.The present invention is also formed integrally with the insertion tube portion 10 and the tip of the insertion tube portion 10 is formed as a cylindrical body having a tube size of a degree that can be fixed by being inserted into the excavation hole (1) excavated in the ground And the membrane plate portion 20 which blocks the outflow of the grout liquid A injected into the excavation hole 1, and is formed in the center of the membrane plate portion 20 so that the long bolts 4 may be inserted therethrough. In terms of the center fitting passage 30 and the peripheral fitting passage 40 formed so that the injection hose 5 can be inserted into the circumferential surface near the distal end of the insertion tube portion 10, the technical concept is the same as the conventional one. do.

단, 본 발명의 지중앵커파일 시공을 위한 굴착공용 케이싱(100)에 있어 상기 삽입관부(10)에는 상기 주변 끼움통로(40)와 연계되어서 후단부를 향하여 소정의 폭으로 절개 형성되는 간극부(50)를 포함하여서 됨을 기술구성상의 특징으로 한다.However, in the excavation hole casing 100 for underground anchor pile construction of the present invention, the insertion pipe part 10 is connected to the peripheral fitting passage 40 and is formed to be cut in a predetermined width toward the rear end portion 50. It is characterized by technical configuration.

다시 말해서, 본 발명의 지중앵커파일 시공을 위한 굴착공용 케이싱(100)은 도 2 내지 도 4에 도시되는 바와 같이, 삽입관부(10)에 막이판부(20)와 중앙 및 주변 끼움통로(40)를 형성하여서 구성부품을 단일화하여 주므로, 굴착공용 케이싱(100)을 굴착공(1)에 설치할 때에 구성부품을 일일이 결박하여서 조립하는 번거로움을 해소하여 작업시간을 단축시켜 줌은 물론이고, 삽입관부(10)에 형성된 주변 끼움통로(40)와 연계되도록 절개된 간극부(50)를 갖추어서, 직경이 작게 천공된 굴착공(1)에 맞추어 융통성있게 삽입 설치할 수 있게 하여 주므로, 굴착공용 케이싱(100)의 설치작업을 용이하게 수행할 수 있게 하여 주며, 직경이 작게 천공된 굴착공(1)을 다시 넓히는 불필요한 작업을 생략할 수 있게 하여 주는 등의 장점을 가지게 되는 것이다.In other words, the excavation hole casing 100 for the construction of the underground anchor pile of the present invention, as shown in Figures 2 to 4, the diaphragm 20 and the central and peripheral fitting passage 40 to the insertion tube portion 10 By forming a single component, so that when installing the excavation casing 100 in the excavation hole (1) to eliminate the hassle of assembling the components to assemble one by one, as well as shortening the work time, insertion tube It has a gap portion 50 cut in connection with the peripheral fitting passage 40 formed in the (10), so that it can be flexibly inserted and installed in accordance with the drilled hole (1) small diameter, casing for excavation hole ( The installation of 100) can be easily performed, and the unnecessary work of re-expanding the drilled hole 1 having a smaller diameter can be omitted.

도면중 미설명 부호 200은 옹벽용 PC블럭이다.In the figure, reference numeral 200 denotes a retaining wall PC block.

이하, 첨부도면에 도시되는 구체적인 실시예를 통하여 본발명의 기술내용을 상세히 설명하면 다음과 같다.Hereinafter, the technical details of the present invention through the specific embodiments shown in the accompanying drawings in detail as follows.

삽입관부(10)는 내부가 트여지는 원통체로서 길게 형성되어서 절취면의 절토층에 굴착된 굴착공(1)의 입구가 함몰되지 않도록 지탱하여 주는 기능을 수행하는 구성부이다.Insertion tube portion 10 is a component that performs a function to support the inlet of the excavation hole (1) excavated to the cut layer of the cut surface is formed long as a cylindrical body that is open.

본 발명의 실시예에서 상기 삽입관부(10)는 경질이 합성수지를 소재로 하여 원통체로 만들어서, 굴착공(1)의 입구가 함몰되는 일이 없도록 견실하게 지탱하여 주면서도 전체적인 무게를 경량화시켜서 취급이 용이하도록 한 것으로 예시되어 있다.In the embodiment of the present invention, the insertion pipe part 10 is made of a cylindrical body made of a hard synthetic resin material, while maintaining a strong weight so that the inlet of the excavation hole 1 is not recessed, and is easy to handle by reducing the overall weight. It is illustrated as having been made.

막이판부(20)는 상기 삽입관부(10)의 선단부에 형성되어서 그라우트액(A)의 외부 유출을 차단하여 주는 기능을 수행하는 구성부이다.Membrane plate portion 20 is formed in the tip portion of the insertion tube 10 is a component that performs a function to block the outflow of the grout liquid (A).

이 막이판부(20)는 원판형으로서 상기 삽입관부(10)의 선단부를 막아주도록 형성되어서, 굴착공(1) 내에 주입된 그라우트액(A)이 상기 삽입관부(10)를 통하여 외부로 유출됨을 차단하여 주도록 한다.The diaphragm 20 is formed in a disc shape to block the tip of the insertion tube 10 so that the grout liquid A injected into the drilling hole 1 flows out through the insertion tube 10 to the outside. Block it.

중앙 끼움통로(30)는 상기 막이판부(20)의 중앙부에 뚫어져서 굴착공(1)내에 미리 관입된 장볼트(2)의 자유단이 관통되어서 외부로 노출되게 끼워질 수 있도록 하는 구성부이다.The central fitting passage 30 is a component that is drilled in the central portion of the membrane plate portion 20 so that the free end of the long bolt 2, which is pre-injected into the excavation hole 1, is penetrated and exposed to the outside. .

본 발명의 실시예에서 상기 중앙 끼움통로(30)는 상기 막이판부(20)의 중앙부 내측으로부터 외측을 향하여 내경이 점차로 작아지는 콘형상으로 돌출되는 통로관(31)으로 형성된 것으로 예시하고 있다. 이 통로관(31)은 굴착공(1) 내에 미리 관입되어 있는 장볼트(2)의 자유단을 용이하게 끼워넣을 수 있게 하여 주는 동시에, 이후에 굴착공(1)내에 채워지는 그라우트액(A)이 유출됨을 방지하는 데 도움이 된다.In the embodiment of the present invention, the center fitting passage 30 is exemplified as being formed as a passage tube 31 protruding in a conical shape of the inner diameter gradually toward the outside from the inside of the central portion of the membrane plate portion 20. The passage tube 31 allows the free end of the long bolt 2 that is pre-injected into the excavation hole 1 to be easily inserted, and the grout liquid A subsequently filled in the excavation hole 1 (A). ) Will help prevent leakage.

주변 끼움통로(40)는 상기 삽입관부(10)의 둘레면에 형성되어서 굴착공(1) 내에 그라우트액(A)을 주입하기 위한 주입호스(3)를 끼워서 설치할 수 있게 하여 주는 구성부이다.그리고, 상기 주변 끼움통로(40)는 상기 삽입관부(10)의 둘레면에 선단부와 최대한 근접한 위치에 형성되도록 하여서, 상기 삽입관부(10)를 굴착공(1)의 입구에 관입 고정시킨 상태에서 상기 주변 끼움통로(40)를 통하여 주입호스(3)를 끼워서 설치하는 데 지장이 없도록 함이 바람직하다.Peripheral fitting passage 40 is formed on the circumferential surface of the insertion tube 10 is a component that allows the installation of the injection hose (3) for injecting grout liquid (A) into the excavation hole (1). In addition, the peripheral fitting passage 40 is formed on the circumferential surface of the insertion tube part 10 in the position as close as possible to the tip, and in the state that the insertion tube part 10 is inserted into the inlet of the excavation hole 1 in a fixed state. It is preferable that there is no problem in installing the injection hose 3 through the peripheral fitting passage 40.

이때, 상기 주변 끼움통로(40)는 상기 삽입관부(10)를 굴착공(1) 내에 끼워넣을 때에 상부를 향하도록 조정하여서, 굴착공(1) 내에 채워지는 그라우트액(A)이 임의로 유출됨을 방지하여 주도록 조치함이 바람직하다.At this time, the peripheral fitting passage 40 is adjusted to face upward when the insertion pipe 10 is inserted into the excavation hole (1), so that the grout liquid (A) filled in the excavation hole (1) is optionally discharged It is desirable to take measures to prevent them.

간극부(50)는 상기 삽입관부(10) 둘레면에 형성되어서 그 삽입관부를 굴착공(1)에 융통성있게 끼워서 설치할 수 있도록 하는 구성부이다.The gap portion 50 is formed on the circumferential surface of the insertion tube portion 10 so as to be able to flexibly install the insertion tube portion in the excavation hole (1).

이러한 간극부(50)는 도 2 및 도 4의 도시되는 바와 같이, 상기 삽입관부(10)의 선단부 둘레에 형성된 주변 끼움통로(40)와 연계되어서 후단부를 향하여 소정의 폭으로 절개 형성함이 중요하다. 그 이유는, 상기 삽입관부(10)의 직경크기를 굴착공(1)에 맞추어 임의로 조절하여서, 직경이 작게 천공된 굴착공(1)에 상기 삽입관부(10)를 융통성있게 끼워서 설치할 수 있도록 하기 위함이다.여기에서, 도 2 및 도 4의 도시와 같이 상기 삽입관부(10)의 후단부 외주면 둘레에는 일정간격마다 환상형으로서 단차져서 후방측으로 경사지는 복수의 걸림돌기(60)들을 형성하여서, 굴착공(1)내에 끼워서 고정되는 삽입관부(10)가 임의로 이탈됨을 방지하여 줄 수도 있음을 밝혀 둔다.As shown in FIGS. 2 and 4, the gap 50 is connected to the peripheral fitting passage 40 formed around the distal end of the insertion tube 10 so that the gap 50 is cut in a predetermined width toward the rear end. Do. The reason is that the diameter of the insertion tube 10 is arbitrarily adjusted according to the excavation hole 1, so that the insertion tube part 10 can be flexibly installed in the drilling hole 1 having a small diameter. Here, as shown in FIGS. 2 and 4, the outer peripheral surface of the rear end portion of the insertion tube portion 10 is formed in a plurality of engaging projections 60 which are stepped as an annular shape at regular intervals and inclined to the rear side, It is to be noted that the insertion pipe part 10 inserted and fixed in the excavation hole 1 may be prevented from being arbitrarily separated.

이상에서 살펴 본 바와 같이, 본 발명은 구성부품을 단일화하고 굴착공에 맞추어 융통성있게 설치할 수 있도록 구성함으로써, 굴착공용 케이싱을 굴착공에 설치할 때에 구성부품을 일일이 결박하여서 조립하는 번거로움을 해소하여 작업시간을 단축시켜 줌은 물론이고, 굴착공용 케이싱의 설치작업을 용이하게 수행할 수 있게 하여 주며, 직경이 작게 천공된 굴착공을 다시 넓히는 불필요한 작업을 생략할 수 있게 하여 주는 등의 효과를 가지는 유용한 발명인 것이다.As described above, the present invention is configured to unify the components and to be installed flexibly in accordance with the excavation hole, to eliminate the hassle of assembling the components by assembling the components when installing the excavation casing in the excavation hole It not only shortens the time, but also facilitates the installation work of the excavation casing, and it is useful to have the effect of eliminating the unnecessary work of re-expanding the perforated excavation hole with a small diameter. It is an invention.

Claims (5)

지중에 굴착된 굴착공(1)에 끼워져서 고정될 수 있는 정도의 관경크기를 가지는 원통체로서 길게 형성되는 삽입관부(10)와, 상기 삽입관부(10)의 선단부에 일체로 형성되어서 굴착공(3)내에 주입된 그라우트액(A)의 유출을 차단하여 주는 막이판부(20)와, 상기 막이판부(20)의 중앙에 형성되어서 장볼트(2)가 관통되게 끼워지도록 형성되는 중앙 끼움통로(30)와, 상기 삽입관부(10)의 선단부 근처 둘레면에 주입호스(3)를 끼워넣을 수 있도록 형성되는 주변 끼움통로(40)로서 구성된 것에 있어서,Insertion tube part 10, which is formed as a cylindrical body having a tube size of a degree that can be fixed by being inserted into the excavation hole (1) excavated in the ground and the excavation hole is formed integrally with the distal end of the insertion tube part (10) (3) the central plate passage formed in the center of the membrane plate portion 20 to block the outflow of the grout liquid A injected into the membrane plate portion 20 to be inserted through the long bolt (2) 30 and the peripheral fitting passage 40 formed so that the injection hose 3 can be inserted into the circumferential surface near the distal end of the insertion pipe section 10, 상기 삽입관부(10)에는 상기 주변 끼움통로(40)와 연계되어서 후단부를 향하여 소정의 폭으로 절개 형성되는 간극부(50)를 포함하여서 됨을 특징으로 하는 지중앵커파일 시공을 위한 굴착공용 케이싱.The insertion pipe part 10 is a casing for excavation hole for underground anchor pile construction, characterized in that it comprises a gap portion 50 is formed in a predetermined width toward the rear end in connection with the peripheral fitting passage (40). 제1항에 있어서, 상기 중앙 끼움통로(30)는 상기 막이판부(20)의 중앙부 내측으로부터 외측을 향하여 내경이 점차로 작아지는 콘형상으로 돌출되는 통로관(31)으로 형성됨을 특징으로 하는 지중앵커파일 시공를 위한 굴착공용 케이싱.The underground anchor passage of claim 1, wherein the central fitting passage (30) is formed of a passage tube (31) protruding in a cone shape, the inner diameter of which is gradually reduced from the inner side of the central portion of the diaphragm portion to the outer side. Excavator casing for pile construction. 제1항에 있어서, 상기 주변 끼움통로(40)는 상기 삽입관부(10)의 둘레면에 선단부와 최대한 근접한 위치에 형성하여서 됨을 특징으로 하는 지중앵커파일 시공을 위한 굴착공용 케이싱.According to claim 1, The peripheral fitting passage 40 is excavated hole casing for underground anchor pile construction, characterized in that formed on the circumferential surface of the insertion tube portion 10 as close as possible to the position. 삭제delete 제1항에 있어서, 상기 삽입관부(10)의 후단부 외주면 둘레에는 일정간격마다 환상형으로서 단차져서 후방측으로 경사지는 복수의 걸림돌기(60)들을 형성하여서 됨을 특징으로 하는 지중앵커파일 시공을 위한 굴착공용 케이싱.The method of claim 1, wherein around the outer periphery of the rear end portion of the insertion pipe 10 is formed in a plurality of engaging projections (60) which are stepped as an annular shape at regular intervals and inclined toward the rear side. Excavator casing.
KR10-2000-0034585A 2000-06-22 2000-06-22 Casing for Anchor Pile KR100391770B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0034585A KR100391770B1 (en) 2000-06-22 2000-06-22 Casing for Anchor Pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0034585A KR100391770B1 (en) 2000-06-22 2000-06-22 Casing for Anchor Pile

Publications (2)

Publication Number Publication Date
KR20020000287A KR20020000287A (en) 2002-01-05
KR100391770B1 true KR100391770B1 (en) 2003-07-16

Family

ID=19673315

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0034585A KR100391770B1 (en) 2000-06-22 2000-06-22 Casing for Anchor Pile

Country Status (1)

Country Link
KR (1) KR100391770B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121803A (en) 2014-09-05 2014-10-16 씨제이제일제당 (주) Gel-type stock composition and a method for producing the same

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712616B1 (en) * 2006-11-30 2007-05-02 우암종합건설(주) Planter for non-point source contaminant decrease
KR102183041B1 (en) * 2018-08-01 2020-11-26 (주)금강지오테크 Fixed anchor construction method of marine structure
KR102556184B1 (en) 2021-07-21 2023-07-20 (주)금강지오테크 Offshore structure fixed anchor and anchor method using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0627929U (en) * 1992-09-11 1994-04-15 大成建設株式会社 Ground mixing device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0627929U (en) * 1992-09-11 1994-04-15 大成建設株式会社 Ground mixing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121803A (en) 2014-09-05 2014-10-16 씨제이제일제당 (주) Gel-type stock composition and a method for producing the same

Also Published As

Publication number Publication date
KR20020000287A (en) 2002-01-05

Similar Documents

Publication Publication Date Title
JP3201413B2 (en) How to install injection pipes and ground anchors
KR200424432Y1 (en) Direct punching simultaneous poruing equipment
KR100776304B1 (en) Direct punching simultaneous poruing equipment and grouting construction method
KR102244516B1 (en) Rockbolt with multi-cap and construction method using the same
KR101477259B1 (en) Injection and grouting grouting solution construction method
KR102551818B1 (en) Spiral Bolt For Ground Reinforcement
KR100391770B1 (en) Casing for Anchor Pile
KR100697629B1 (en) Grout injector and nailing apparatus having the same
KR100588606B1 (en) Multi in-situ packer set for deep depth grouting hole and grouting method
JP4587886B2 (en) Injection nozzle for pinning method and pinning method using the same
JP3672638B2 (en) Drilling bit
KR200434206Y1 (en) Grouting injection device check valve
JP2009293266A (en) High-function water-stopping check valve in backfilling material injection hole
KR102115509B1 (en) Reinforced steel pipe one shot grouting
JP4034644B2 (en) Winged steel pipe pile
KR200437221Y1 (en) Spacer fitted with nail
KR100457131B1 (en) Cap for preventing clogging of drainage holes in concrete structures
KR200255662Y1 (en) Direct-boring grouting apparatus
KR200214389Y1 (en) A earth anchor had grouting means
JP4823042B2 (en) Branch tunnel construction segment
KR102183344B1 (en) Seperate type stiffener injection device
KR102700655B1 (en) Four-way diffusion acupressure anchor assembly
KR200363708Y1 (en) Pipe end sealing apparauts for grouting
KR200339985Y1 (en) The fixing device for cutting wall of road by land development
JP2023123131A (en) Reinforcement structure and reinforcement method of masonry retaining wall as well as tubular reinforcement member

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130703

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140703

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20160702

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170628

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190702

Year of fee payment: 17