KR100283845B1 - Sand fiber band (sand foam) and its construction method - Google Patents
Sand fiber band (sand foam) and its construction method Download PDFInfo
- Publication number
- KR100283845B1 KR100283845B1 KR1019980034388A KR19980034388A KR100283845B1 KR 100283845 B1 KR100283845 B1 KR 100283845B1 KR 1019980034388 A KR1019980034388 A KR 1019980034388A KR 19980034388 A KR19980034388 A KR 19980034388A KR 100283845 B1 KR100283845 B1 KR 100283845B1
- Authority
- KR
- South Korea
- Prior art keywords
- sand
- temporary
- fiber band
- fiber
- band
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
- E02D3/103—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Revetment (AREA)
Abstract
본 발명의 모래 섬유대는 가물막이 호안공, 폐기물 처리장, 연약지반 보강, 모래 야적장, 임시 가설용 제방 등에 시공할 수 있는 모래 섬유대로서, 상하직물(11, 12)두 겹을 일정한 간격으로 지그재그 위치에서 서로 접합시킨 접합부(필터부)(13)를 형성하고 접합부(13) 이외의 공간 내부에 모래를 충진시켜 기둥부(공간부)(14)를 형성하거나, 원통형의 직물을 서로 인접하도록 배열하고 그 원통형의 공간 내부에 모래를 충진시켜 병렬 배열된 기둥부를 형성한다. 본 발명의 모래 섬유대로써 시공하는 방법은 우선 모래 섬유대를 시공하고자 하는 면을 포크레인 등을 이용하여 고르게 작업하고, 작업된 평탄면에 본 발명의 모래 섬유대를 충분한 길이로 배열한 후 경사면의 상부 또는 필요한 위치에서 고정시키고, 고정된 섬유대의 내부로 모래를 충진시킨다. 시공되었던 모래 섬유대를 철거하고자 하는 경우에는 직물로 이루어진 섬유대를 칼과 같은 도구로써 절개 및 절단하여 섬유대만을 회수한다. 섬유대 내부에 투입되었던 모래는 그대로 자연에 방치될 수 있기 때문에, 콘크리트로 시공된 경우와는 달리, 모래를 별도로 철거할 필요가 없다.The sand fiber band of the present invention is a sand fiber band that can be installed in a temporary revetment, waste treatment plant, soft ground reinforcement, sand yard, temporary temporary embankment, etc. Forming the joined portion (filter portion) 13 and filling the sand inside the space other than the bonded portion 13 to form the pillar portion (space portion) 14, or arrange the cylindrical fabrics adjacent to each other and the cylindrical Filling the sand inside the space of the column to form a columnar arrangement arranged in parallel. In the method of constructing the sand fiber band according to the present invention, first, the surface of the sand fiber band to be constructed is worked evenly by using a fork-lane, etc. It is fixed at the top or required position, and the sand is filled into the fixed fiber band. In the case of removing the sand fiber band that has been constructed, the fiber band made of fabric is cut and cut with a tool such as a knife to recover only the fiber band. Since sand that has been introduced into the fiber band can be left as it is, it is not necessary to remove sand separately, unlike concrete.
Description
본 발명은 폴리에스테르와 같은 토목섬유로 제직된 섬유대 내부에 모래를 충진시킨 모래 섬유대(샌드 폼)에 관한 것이다. 보다 구체적으로, 본 발명은 가물막이 호안공, 폐기물 처리장, 연약지반 보강, 모래 야적장, 임시 가설용 제방 등에 다양하게 시공될 수 있는 섬유대 내부에 모래가 충진된 모래 섬유대에 관한 것이다.The present invention relates to a sand fiber band (sand foam) in which sand is filled into a fiber band woven from geotextiles such as polyester. More specifically, the present invention relates to a sand-filled sand fiber band inside the fiber band that can be variously constructed, such as a temporary revetment, waste treatment plant, soft ground reinforcement, sand yard, temporary temporary embankment.
토목공사에 있어서, 가물막이 호안공을 시공하는 경우, 폐기물 처리장에서 폐기물을 1차로 정화하는 경우, 연약지반을 보강하는 경우, 임시 가설용 제방을 설치하는 경우 등에는 어떠한 형태로든지 이들 각각에 적합한 시공방법을 통하여 적절한 토목공사 내지는 폐기물을 처리하여 왔다.In civil engineering, construction works are suitable for each type in case of construction of temporary revetment work, purification of waste at the waste treatment plant, reinforcement of soft ground, installation of temporary temporary embankment, etc. Through proper civil engineering or waste disposal has been treated.
예를들어, 가물막이 호안공을 시공하는 경우에 콘크리트를 사용하여 호안공사를 하고, 가물막이 호안공을 철거하고 있다. 이때 가물막이 호안공이 콘크리트로 시공된 경우에는 이들 콘크리트를 철거해야 하는 어려움이 뒤따르고 있다. 가물막이 호안공은 짧게는 수개월부터 통상 1∼2년 동안 임시적으로 설치된 후 철거되기 때문에, 그 호안공이 콘크리트로 시공된 경우에는 콘크리트를 특정 폐기물로 분류하여 별도 처리해야 하고, 따라서 많은 철거비용이 소요된다. 다른 예로, 화력 발전소 등에서 발생하는 플라이 애쉬(fly ash)와 같은 폐기물을 처리하기 위해서는 오염된 폐기물 폐수를 1차로 정화시킨 후 배수구(드레인 파이프)를 통하여 처리장으로 흘려보내야 한다. 이 경우에도 이제까지는 폐기물 처리장의 하부에 모래층을 형성하여 폐기물을 처리하여 왔다. 이 폐기물 처리장의 모래층은 지지대가 없기 때문에 일정한 두께를 유지할 수 없고 특히 측면과 같이 경사면에서는 모래가 흘러내리는 결점이 있다.For example, when a temporary curtain constructs a revetment work, it uses the concrete to carry out a revetment work, and the temporary curtain removes a revetment work. In this case, when the temporary curtain is constructed of concrete, the difficulty of dismantling these concrete is accompanied. Temporary revetment is temporarily removed for a few months from one to two years. Therefore, when the revetment is constructed of concrete, the concrete must be treated as a specific waste and thus requires a lot of demolition cost. . As another example, in order to treat wastes such as fly ash generated in thermal power plants, the contaminated waste wastewater has to be first purified and then flowed to a treatment plant through drains (drain pipes). Even in this case, the waste has been treated by forming a sand layer under the waste disposal plant. The sand layer of this waste treatment plant cannot support a constant thickness because there is no support, and in particular, there is a drawback that sand flows down the slope.
또 다른 예로, 지반이 연약한 곳에는 지반을 보강할 필요가 있는데, 이 경우에도 모래등을 깔아서 연약지반을 보강하고 있다. 특히 토목공사장 주변에는 지반이 연약해지는 곳이 발생할 수 있는데, 이 연약지반 위로 중장비가 진입하여야 하는 경우에는 지반을 필수적으로 보강하여야 한다. 이러한 지반을 보강하기 위하여 모래나 잡석 등을 깔고 있지만, 보강효과를 위하여 상당히 두꺼운 층을 형성하여야 한다.As another example, where the ground is soft, it is necessary to reinforce the ground. In this case, sand is also used to reinforce the soft ground. Particularly, the ground may be softened around the civil engineering works. If heavy equipment should enter the soft ground, the ground should be reinforced. Sand and rubble are laid to reinforce the ground, but for the reinforcing effect, a fairly thick layer should be formed.
또 다른 예로, 공사장 같은 곳에서 모래를 야적하는 장소에서는 모래가 흘러내리는 것을 방지할 필요가 있다. 또한 바위 발파공사나 건축물 발파공사와 같이 위험한 공사가 수반되는 경우에는 그 주변에 임시 가설용 제방이나 보호벽을 설치할 필요가 있고, 그 경사면 또한 적절한 방법으로 시공되어야 한다.In another example, where sand is dumped, such as in a construction site, it is necessary to prevent sand from flowing down. In addition, when dangerous work is involved, such as rock blasting work or building blasting work, it is necessary to install temporary temporary embankment or protection wall, and the slope should be constructed in a proper way.
본 발명은 상기와 같이 가물막이 호안공, 폐기물 처리장, 연약지반, 모래 야적장, 임시 가설용 제방 등이 아주 편리하게 시공될 수 있고 그 안정성이나 설치 및 철거 비용면에 있어서 상당히 우수한 모래 섬유대에 관한 것이다.The present invention relates to a sand fiber band that can be installed very conveniently as described above, such as temporary revetment work, waste treatment plant, soft ground, sand yard, temporary temporary embankment, etc. in terms of stability and installation and removal cost. .
본 발명의 목적은 가물막이 호안공을 설치 및 철거함에 있어서 그 비용을 절감할 수 있는 모래 섬유대를 제공하기 위한 것이다.An object of the present invention is to provide a sand fiber band that can reduce the cost in installing and dismantling the temporary protection ball.
본 발명의 다른 목적은 폐기물 처리장에 설치하여 오염폐수를 1차로 정화시킬 수 있는 모래 섬유대를 제공하기 위한 것이다.Another object of the present invention is to provide a sand fiber band that can be installed in the waste treatment plant to purify the contaminated waste water first.
본 발명의 또 다른 목적은 연약지반을 보강할 수 있는 모래 섬유대를 제공하기 위한 것이다.Another object of the present invention is to provide a sand fiber band that can reinforce the soft ground.
본 발명의 또 다른 목적은 모래 야적장이나 임시 가설용 제방의 경사면을 보호할 수 있는 모래 섬유대를 제공하기 위한 것이다.Another object of the present invention is to provide a sand fiber band that can protect the slope of the sand yard or temporary temporary embankment.
본 발명의 또 다른 목적은 두 겹의 직물이나 원통형의 직물내부에 모래를 투입시킨 모래 섬유대로서 특히 철거시의 비용을 절감할 수 있는 모래 섬유대를 제공하기 위한 것이다.It is still another object of the present invention to provide a sand fiber band in which sand is introduced into a two-ply fabric or a cylindrical fabric, which can reduce the cost particularly when dismantling.
본 발명의 상기 및 기타의 목적들은 하기 설명되는 본 발명에 의하여 모두 달성될 수 있다.The above and other objects of the present invention can be achieved by the present invention described below.
본 발명의 구체예에 대한 상세한 내용은 첨부된 도면을 참고로 하기에 설명될 것이다.Details of the embodiments of the present invention will be described below with reference to the accompanying drawings.
제1도는 본 발명의 모래 섬유대가 가물막이 호안공에 시공된 상태의 개략적인 단면도이다.1 is a schematic cross-sectional view of the sand fiber band of the present invention when the temporary film is constructed in a revetment hole.
제2도는 본 발명의 모래 섬유대가 폐기물 처리장에 시공된 상태의 개략적인 단면도이다.2 is a schematic cross-sectional view of the sand fiber band of the present invention constructed in a waste treatment plant.
제3도는 본 발명의 모래 섬유대가 연약지반 위에 시공된 상태의 개략적인 단면도이다.3 is a schematic cross-sectional view of the sand fiber band of the present invention constructed on a soft ground.
제4도는 본 발명의 모래 섬유대가 모래 야적장에 시공된 상태의 개략적인 단면도이다.4 is a schematic cross-sectional view of the sand fiber band of the present invention constructed in a sand yard.
제5도는 본 발명의 모래 섬유대가 임시가설 제방에 시공된 상태의 개략적인 단면도이다.5 is a schematic cross-sectional view of the sand fiber band of the present invention constructed on the temporary temporary embankment.
제6도는 본 발명에 따른 모래 섬유대의 개략적인 사시도이다.6 is a schematic perspective view of a sand fiber board according to the present invention.
제7도는 본 발명에 따른 다른 태양의 모래 섬유대의 개략적인 사시도이다.7 is a schematic perspective view of a sand fiber strip of another aspect according to the present invention.
* 도면의 주요부호에 대한 간단한 설명 *Brief description of the main symbols in the drawing
1: 모래 섬유대 11: 상부직물1: sand fiber band 11: upper fabric
12: 하부직물 13: 필터부(접합부)12: lower fabric 13: filter part (bonding part)
14: 공간부(기둥부)14: space part (column part)
본 발명의 모래 섬유대는 가물막이 호안공, 폐기물 처리장, 연약지반, 모래 야적장, 임시 가설용 제방 등에 시공할 수 있는 모래 섬유대로서, 상하직물(11, 12)두 겹을 일정한 간격으로 지그재그 위치에서 서로 접합시킨 접합부(필터부)(13)를 형성하고 접합부(13) 이외의 공간 내부에 모래를 충진시켜 기둥부(공간부)(14)를 형성하거나, 원통형의 직물을 서로 인접하도록 배열하고 그 원통형의 공간 내부에 모래를 충진시켜 병렬 배열된 기둥부를 형성한다.The sand fiber band of the present invention is a sand fiber band that can be installed in a temporary revetment hole, waste treatment plant, soft ground, sand yard, temporary temporary embankment, etc., and the upper and lower fabrics 11 and 12 are bonded to each other at zigzag positions at regular intervals. Forming a joint part (filter part) 13 and filling the sand into a space other than the joint part 13 to form a column part (space part) 14, or arranging the cylindrical fabrics adjacent to each other and Sand is filled in the space to form pillars arranged in parallel.
본 발명의 모래 섬유대로써 시공하는 방법은 우선 모래 섬유대를 시공하고자 하는 면을 포크레인 등을 이용하여 고르게 작업하고, 작업된 평탄면에 본 발명의 모래 섬유대를 충분한 길이로 배열한 후 경사면의 상부 또는 필요한 위치에서 고정시키고, 고정된 섬유대의 내부로 모래를 충진시킨다. 시공되었던 모래 섬유대를 철거하고자 하는 경우에는 직물로 이루어진 섬유대를 칼과 같은 도구로써 절개 및 절단하여 섬유대만을 회수한다. 섬유대 내부에 투입되었던 모래는 그대로 자연에 방치될 수 있기 때문에, 콘크리트로 시공된 경우와는 달리, 모래를 별도로 철거할 필요가 없다.In the method of constructing the sand fiber band according to the present invention, first, the surface of the sand fiber band to be constructed is worked evenly by using a fork-lane, etc. It is fixed at the top or required position, and the sand is filled into the fixed fiber band. In the case of removing the sand fiber band that has been constructed, the fiber band made of fabric is cut and cut with a tool such as a knife to recover only the fiber band. Since sand that has been introduced into the fiber band can be left as it is, it is not necessary to remove sand separately, unlike concrete.
제1도는 본 발명의 모래 섬유대(纖維袋: fabric form)가 임시 가설된 가물막이 호안공에 시공된 상태를 개략적으로 도시한 단면도이다. 제1도에 도시된 바와 같이, 하천이나 해양에 구조물을 설치하고자 하는 경우에는 임시로 가물막이를 형성하고 그 가물막이 호안공을 시공하여야 한다. 가물막이 호안공은 구조물 공사를 위하여 소요되는 기간만큼 통상 수개월부터 1∼2년 정도기간 만큼 유지되어야 하기 때문에 호안공사를 하여야 한다. 이제까지는 가물막이 호안공이라 할지라도 콘크리트를 이용하여 시공하여 왔다. 그러나 콘크리트 호안공은 철거시에 많은 철거비용이 소요된다. 본 발명에서는 그 경사면 섬유대(1)를 포설하고 그 내부에 모래를 충진시켜 호안공을 형성한다. 구조물이 완성되어 가물막이를 철거하고자 하는 경우에는 섬유대를 절개 및 절단하여 모래는 그대로 방치하고 섬유대만을 회수한다.1 is a cross-sectional view schematically showing a state in which a temporary film on which a fabric form of the present invention is temporarily installed is constructed in a revetment hole. As shown in FIG. 1, when a structure is to be installed in a river or an ocean, a temporary barrier must be temporarily formed, and the temporary barrier must be constructed with a revetment hole. Temporary revetment work should be carried out as it is generally required to be maintained for several months to one to two years. Until now, even if the temporary curtain is a revetment ball, it has been constructed using concrete. However, the concrete revetment costs a lot of demolition cost. In the present invention, the inclined surface fiber band 1 is laid and sand is filled therein to form a revetment ball. When the structure is completed and the temporary barrier is to be removed, the fiber band is cut and cut to leave sand as it is and to recover only the fiber band.
제2도는 본 발명의 모래 섬유대(1)가 폐기물 처리장에 시공된 상태를 개략적으로 도시한 단면도이다. 폐기물 처리장의 하부 및 측부벽 표면에 섬유대(1)를 설치하고 그 내부에 폐기물을 투기한다. 폐기물로부터 나온 오염폐수는 모래 섬유대(1)의 모래층을 통과하면서 여과된다. 1차 정화된 폐수는 배수구(드레인 파이프)로 집수되어 폐수처리장으로 보내진다. 폐기물 처리장인 경우, 모래 섬유대(1)의 모래층의 두께는 10∼30㎝가 바람직하지만, 폐기물 처리장의 크기, 폐기물의 종류, 폐수의 농도 등에 따라 다르며, 이는 이 기술분야에서 통상의 지식을 가진 자에 의하여 용이하게 실시될 수 있다.2 is a cross-sectional view schematically showing a state in which the sand fiber band 1 of the present invention is constructed in a waste treatment plant. The fiber band 1 is installed on the lower and side wall surfaces of the waste disposal plant and the waste is dumped therein. The contaminated wastewater from the waste is filtered while passing through the sand layer of the sand fiber band 1. The primary purified wastewater is collected in drains (drain pipes) and sent to the wastewater treatment plant. In the case of a waste treatment plant, the thickness of the sand layer of the sand fiber band 1 is preferably 10 to 30 cm, but depends on the size of the waste treatment plant, the type of waste, the concentration of the waste water, and the like. It can be easily carried out by a ruler.
제3도는 본 발명의 모래 섬유대(1)가 연약지반 위에 시공된 상태의 개략적인 단면도이다. 연약지반을 보강하여 중장비가 진입할 수 있다. 연약지반을 보강할 목적인 경우에는, 필터부(13)를 갖는 섬유대(Fabric Form)가 아니라 원통형의 섬유대(Tubular Form)를 사용하는 것이 바람직하다.3 is a schematic cross-sectional view of the sand fiber band 1 of the present invention constructed on a soft ground. Heavy equipment can enter by reinforcing soft ground. In the case of reinforcing the soft ground, it is preferable to use a cylindrical form instead of a fiber form having the filter portion 13.
제4도는 본 발명의 모래 섬유대(1)가 모래 야적장의 경사면에 설치된 상태를 나타낸 단면도이다. 모래 야적장에서는 야적된 모래를 보호할 필요가 있으며, 이 경우에 본 발명의 모래 섬유대로 적절히 시공될 수 있다.4 is a cross-sectional view showing a state in which the sand fiber zone 1 of the present invention is installed on the inclined surface of the sand yard. In a sand yard, it is necessary to protect the sand piled up, and in this case, it can be appropriately constructed with the sand fiber of the present invention.
제5도는 본 발명의 모래 섬유대(1)가 임시 가설 제방에 설치된 상태의 단면도이다. 바위발파공사나 건축물 발파공사와 같이 위험한 공사가 수반되는 경우에는 그 주변에 임시 가설용 제방을 쌓게 되는데 이 때 그 경사면을 모래가 충진된 모래 섬유대(1)로 시공할 수 있다.5 is a cross-sectional view of the sand fiber band 1 of the present invention installed on a temporary temporary embankment. In the case of dangerous construction such as rock blasting construction or building blasting construction, temporary temporary dikes are built around the slope, and the slope can be constructed with sand-filled sand fiber (1).
위의 구체예에서 가물막이 호안공, 폐기물 처리장, 모래 야적장 및 임시 가설용 제방에서는 Fabric Form이나 Tubular Form의 섬유대가 설치될 수 있고, 연약지반을 보강하는 경우에는 Tubular Form의 섬유대가 설치되는 것이 바람직하다.In the above embodiment, in the embankment revetment ball, waste treatment plant, sand yard and temporary temporary embankment, fabric band of fabric form or tubular form may be installed, and in case of reinforcing soft ground, it is preferable to install fiber band of tubular form. .
제6도는 본 발명에 따른 Fabric Form의 섬유대를 개략적으로 도시한 사시도이다. 두 겹의 상하직물(11,12)은 일정한 간격으로 지그재그 형태로 필터부(접합부)(13)가 형성되어 접합되고, 필터부(13) 이외의 내부 공간에 모래를 주입시켜 기둥부(14)를 형성한다. 섬유대의 상하직물(11,12)은 일종의 토목섬유로서 폴리에스테르나 폴리프로필렌으로 제조된다.6 is a perspective view schematically showing a fiber band of a fabric form according to the present invention. The two layers of upper and lower fabrics 11 and 12 are formed in a zigzag form at regular intervals with a filter part (junction part) 13 formed therein, and are joined to each other by injecting sand into an internal space other than the filter part 13 to form a pillar part 14. To form. The upper and lower fabrics 11 and 12 of the fibrous band are a kind of geotextile made of polyester or polypropylene.
제7도는 본 발명에 따른 Tubular Form의 섬유대의 개략적인 사시도이다. 토목직물이 원형을 이루도록 형성되고, 이러한 원형의 Tubular Form이 복수개로 병렬결합된다. 각각의 원통형의 Form은 서로 섬유직물등에 의하여 결합된다. Tubular Form은 많은 강도가 요구되는 지역에 적절하게 설치되어 시공될 수 있다.7 is a schematic perspective view of the fiber band of the tubular form according to the present invention. Civil fabric is formed to form a circle, these circular tubular forms are coupled in plurality in parallel. Each cylindrical form is bonded to each other by a textile fabric. Tubular Form can be installed and installed properly in areas where high strength is required.
본 발명의 모래 섬유대로써 시공하는 방법은 우선 모래 섬유대를 시공하고자 하는 면을 포크레인 등을 이용하여 고르게 작업하고, 작업된 평탄면에 본 발명의 모래 섬유대를 충분한 길이로 배열한 후 경사면의 상부 또는 필요한 위치에서 고정시키고, 고정된 섬유대의 내부로 모래를 충진시킨다. 시공되었던 모래 섬유대를 철거하고자 하는 경우에는 직물로 이루어진 섬유대를 칼과 같은 도구로써 절개 및 절단하여 섬유대만을 회수한다. 섬유대 내부에 투입되었던 모래는 그대로 자연에 방치될 수 있기 때문에, 콘크리트로 시공된 경우와는 달리, 모래를 별도로 철거할 필요가 없다.In the method of constructing the sand fiber band according to the present invention, first, the surface of the sand fiber band to be constructed is worked evenly by using a fork-lane, etc. It is fixed at the top or required position, and the sand is filled into the fixed fiber band. In the case of removing the sand fiber band that has been constructed, the fiber band made of fabric is cut and cut with a tool such as a knife to recover only the fiber band. Since sand that has been introduced into the fiber band can be left as it is, it is not necessary to remove sand separately, unlike concrete.
섬유대에 모래를 주입시키는 방법은 주입구(도시되지 않음)를 통하여 주입시킬 수 있으며, 이는 이 기술분야에서 통상의 지식을 가진 자에 의하여 용이하게 실시할 수 있다. 모래주입은 준설용 소형 스크류 펌프, 수중오니펌프(샌드 펌프), 에어 콘프레셔 등으로 현장 여건에 맞도록 선택하여 준비된 모래를 압송시킨다.The method of injecting sand into the fiber band may be injected through an injection hole (not shown), which can be easily performed by a person skilled in the art. Sand injection is a small screw pump for dredging, a submersible sludge pump (sand pump), an air compressor, etc., and the prepared sand is pumped according to the site conditions.
필요에 따라 가호안용은 자외선 보호용 매트 등을 육상부분에 깔아 일정기간 보호할 수 있도록 하고, 폐기물 처리용과 지반보강용은 중장비 진입이나 기타 유해물질에 대하여 보호될 수 있도록 보호용 재료를 표면에 깔아주는 공법을 병행할 수 있다.If necessary, protector protects land for a certain period by applying UV protection mats on the land part.For waste treatment and ground reinforcement, protective material is laid on the surface to protect against heavy equipment entry or other harmful substances. Can be parallel.
본 발명은 가물막이 호안공을 설치 및 철거함에 있어서 그 비용을 절감할 수 있고, 폐기물 처리장에 설치하여 오염폐수를 1차로 정화시킬 수 있으며, 연약지반을 보강할 수 있고, 모래 야적장이나 임시 가설용 제방의 경사면을 보호할 수 있으며, 두 겹의 직물이나 원통형의 직물내부에 모래를 투입시킴으로써 철거시의 비용을 절감할 수 있는 모래 섬유대를 제공할 수 있는 발명의 효과를 갖는다.The present invention can reduce the cost in installing and dismantling the temporary revetment ball, it can be installed in the waste treatment plant to purify the contaminated waste water first, reinforce the soft ground, sand yard or temporary embankment It is possible to protect the inclined surface, and by putting sand into the two-layer fabric or cylindrical fabric has the effect of the invention can provide a sand fiber band that can reduce the cost of demolition.
본 발명의 단순한 변형 내지 변경은 이 분야의 통상의 지식을 가진 자에 의하여 용이하게 실시될 수 있으며, 이러한 변형이나 변경은 모두 본 발명의 영역에 포함되는 것으로 볼 수 있다.Simple modifications or changes of the present invention can be easily carried out by those skilled in the art, and all such modifications or changes can be seen to be included in the scope of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980034388A KR100283845B1 (en) | 1998-03-18 | 1998-03-18 | Sand fiber band (sand foam) and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980034388A KR100283845B1 (en) | 1998-03-18 | 1998-03-18 | Sand fiber band (sand foam) and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19980082107A KR19980082107A (en) | 1998-11-25 |
KR100283845B1 true KR100283845B1 (en) | 2001-03-02 |
Family
ID=65899379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019980034388A KR100283845B1 (en) | 1998-03-18 | 1998-03-18 | Sand fiber band (sand foam) and its construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100283845B1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100411314B1 (en) * | 2000-11-17 | 2003-12-18 | (주)건설기술개발공사 | Anti-Scouring and Anti-Erosion Construction Method for Hydraulic Structure and Seaside |
KR101875448B1 (en) * | 2016-03-30 | 2018-07-06 | 한동훈 | Method for excavating base rock of on the sea |
-
1998
- 1998-03-18 KR KR1019980034388A patent/KR100283845B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR19980082107A (en) | 1998-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100290288B1 (en) | Leachate Block System and Method Using Submersible Reflux Tank | |
CN110258622B (en) | Pile plate type retaining wall and construction method thereof | |
CN107366251B (en) | Construction method of sludge pond site in-situ ecological restoration system | |
JP2009102819A (en) | Underground decontamination structure and method of constructing the same | |
KR100896707B1 (en) | The stucture for exclude leachate of waste reclaimed land | |
KR100283845B1 (en) | Sand fiber band (sand foam) and its construction method | |
JP3508997B2 (en) | How to clean contaminated soil | |
JP6593703B2 (en) | Coal ash landfill method | |
KR100411314B1 (en) | Anti-Scouring and Anti-Erosion Construction Method for Hydraulic Structure and Seaside | |
KR100402437B1 (en) | The construction method of cassion basis using a coagulant | |
CN210658431U (en) | Pile plate type retaining wall | |
JP3684981B2 (en) | Contaminated soil purification method | |
RU2444589C1 (en) | Soil-reinforced structure and method of its erection | |
JP3091995B2 (en) | Waste treatment plant | |
KR102699632B1 (en) | Stabilization of the surface layer for dredged soil ponds and embankment | |
KR100218901B1 (en) | Construction method of filled-up-land | |
RU2176700C1 (en) | Method for protecting territory from flooding | |
RU2301862C2 (en) | Method to create cutoff curtain with filtering openings | |
JPS611712A (en) | Liquid shield sheet assembly | |
KR100691502B1 (en) | The scour part repair method of a underwater structure of having used scour prevention member for underwater structures, and this | |
CN218233688U (en) | Leachate collecting system of ash slag backfilling open pit | |
JP3157131B2 (en) | Sludge / garbage runoff control type gutter structure | |
CN216691168U (en) | Tunnel water-proof and drainage system | |
JPH10317367A (en) | Water-returning structure using steel-pipe-column-line earth-retaining wall and method for constructing the same | |
KR200239546Y1 (en) | A structure of protection from water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
G15R | Request for early opening | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121213 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20131213 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20141212 Year of fee payment: 15 |
|
LAPS | Lapse due to unpaid annual fee |