KR0183142B1 - Automatically testing method of r2 inter-office trunk line - Google Patents
Automatically testing method of r2 inter-office trunk line Download PDFInfo
- Publication number
- KR0183142B1 KR0183142B1 KR1019950055872A KR19950055872A KR0183142B1 KR 0183142 B1 KR0183142 B1 KR 0183142B1 KR 1019950055872 A KR1019950055872 A KR 1019950055872A KR 19950055872 A KR19950055872 A KR 19950055872A KR 0183142 B1 KR0183142 B1 KR 0183142B1
- Authority
- KR
- South Korea
- Prior art keywords
- test
- line
- relay
- signaling
- relay line
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q1/00—Details of selecting apparatus or arrangements
- H04Q1/18—Electrical details
- H04Q1/20—Testing circuits or apparatus; Circuits or apparatus for detecting, indicating, or signalling faults or troubles
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Monitoring And Testing Of Exchanges (AREA)
Abstract
본 발명은 알투(R2) 교환국간에 설치된 중계선에 대한 설치 확인 시험을 알투(R2) 신호 방식을 이용하여 자동으로 수행할 수 있는 국간 중계선 자동 시험 방법에 관한 것으로, 교환국간에 알투(R2) 신호 방식을 적용하는 중계선을 설치하는 경우에, 외부에 구성되는 별도의 중계선 자동 시험 장치를 사용하지 않고, 알투(R2) 신호 방식의 특성을 사용하여 운용자가 자동으로 중계선 설치 확인 시험을 할 수 있도록 하는 국간 중계선 자동 시험 방법을 제공하기 위하여, 중계선 시험 요구를 수신하면, 시험이 필요한 중계선의 회선을 점유하는 제1단계; 알투(R2) 신호 장비를 접속하여 점유한 회선에 대해서 알투(R2) 시그널링(signalling)을 수행하여 상대 교환기와의 알투(R2) 시그널링이 정상적으로 수행됨에 따라 상기 알투(R2) 신호 장비의 접속을 해제하는 제2단계; 점유한 회선에 톤 수신기를 접속하여 상기 상대 교환기로부터 시험톤을 수신하여 정상적으로 중계선이 설치되었는지를 확인하는 제3단계; 점유한 회선을 해제한 후에 알투(R2) 국간 중계선 시험 결과를 기록하는 제4단계; 및 시험하고자 하는 모든 회선에 대하여 상기 각 단계를 반복 수행한 후에 알투 국간 중계선 시험 결과를 운용자에게 통보하는 제5단계를 포함하여, 별도의 시험 장비를 사용하지 않고도 R2 신호 방식이 적용되는 교환기간에 새로이 설치된 중계선에 대한 설치 확인 시험을 R2 신호 방식의 특성을 이용하여 자동으로 수행할 수 있고, 운용자가 교환기간에 설치된 중계선에 대한 설치 확인 시험 및 운용을 하는데 융통성과 편리성을 가질 수 있는 효과가 있다.The present invention relates to a relay station automatic test method that can automatically perform an installation verification test for a relay line installed between an Altu (R2) switching station using an Altu (R2) signaling method. In case of installing the applied relay line, it is possible to use the Al2 (R2) signal type characteristic to allow the operator to automatically perform the relay line installation confirmation test without using an external relay line automatic test device. In order to provide an automatic test method, a first step of, when receiving a relay line test request, occupies a line of a trunk line requiring testing; The connection of the Al2 (R2) signaling device is released as the Al2 (R2) signaling is normally performed by performing Al2 (R2) signaling on the line occupied by connecting the Al2 (R2) signaling device. A second step of doing; A third step of connecting a tone receiver to an occupied line and receiving a test tone from the counterpart exchange to confirm that the relay line is normally installed; A fourth step of recording the relay line test result between the Alto (R2) stations after releasing the occupied line; And a fifth step of notifying the operator of the results of the relay line test between the Alto stations after repeating each step for all the lines to be tested, during the exchange period in which the R2 signaling method is applied without using any test equipment. The installation confirmation test for newly installed repeater cables can be automatically performed using the characteristics of R2 signaling method, and the operator can have the flexibility and convenience to perform the installation verification test and operation for the relay cable installed during the exchange period. have.
Description
제1도는 전전자 교환기의 외부에 구성된 종래의 중계선 자동 시험 장치의 구성예시도.1 is an exemplary view of the configuration of a conventional trunk line automatic test apparatus configured outside of an electronic exchanger.
제2도는 본 발명이 적용되는 종합정보통신망(ISDN) 교환기의 일실시예 구조도.2 is a structural diagram of an embodiment of an Integrated Services Digital Network (ISDN) exchange to which the present invention is applied.
제3도는 본 발명에 따른 국간 중계선 자동 시험 방법의 처리 순서를 나타내는 일실시예 흐름도.Figure 3 is a flow diagram of an embodiment showing the processing sequence of the automatic trunk line test method according to the present invention.
제4a 및 4b 도는 본 발명에 따른 국간 중계선 자동 시험 방법의 세부 흐름도.4a and 4b is a detailed flow chart of the method for the automatic test between the relay station between the station according to the present invention.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
21 : 운용자 정합보드 22 : 스위치21: operator registration board 22: switch
23 : 중계선 정합보드 24 : R2 송/수신기23: relay line matching board 24: R2 transmitter and receiver
25 : 톤 송/수신기 26 : 제어 프로세서25: tone transmitter / receiver 26: control processor
본 발명은 알투(R2) 교환국간에 설치된 중계선에 대한 설치 확인 시험을 알투(R2) 신호 방식을 이용하여 자동으로 수행할 수 있는 국간 중계선 자동 시험 방법에 관한 것이다.The present invention relates to an inter-station relay line automatic test method capable of automatically performing an installation verification test for a relay line installed between an Altu (R2) switching station using the Altu (R2) signaling method.
일반적으로, 교환국간에 중계선을 설치할 경우에, 운용자가 설치된 중계선에 대한 설치 확인 시험을 수동으로 수행하였기 때문에 중계선의 설치 이상 여부를 확인하는데 많은 시간이 소요되었다. 특히, 설치된 중계선의 수가 많은 경우에는, 운용자가 수동으로 설치 확인 시험을 하는 경우에 많은 불편이 따르는 문제점이 있었다.In general, in the case of installing relay cables between exchanges, it was very time consuming to check the installation of the relay cables because the operator manually performed the installation verification test for the relay cables. In particular, in the case of a large number of relay lines installed, there is a problem that a lot of inconvenience comes when the operator performs the installation confirmation test manually.
이러한 문제점을 해결하기 위하여 안출된 종래의 중계선 자동 시험 장치의 일예를 도1을 참조하여 살펴보면 다음과 같다.An example of a conventional trunk line automatic test apparatus devised to solve this problem will be described with reference to FIG. 1.
제1도는 전전자 교환기의 외부에 구성된 종래의 중계선 자동 시험 장치의 구성예시도이다.1 is an exemplary view of the configuration of a conventional trunk line automatic test apparatus configured outside of an electro-electric exchanger.
종래의 중계선 자동 시험 장치는, 전전자 교환기의 데이터버스를 통하여 그 내부의 프로세서와 메시지를 통신할 수 있도록 전전자 교환기의 데이터 버스회로와의 정합기능을 담당하는 데이터버스 정합회로, 대국의 응답장치로부터 송출된 자동응답톤을 전전자 교환기의 서브하이웨이 버스를 통하여 수신하고 송출할 자동응답톤을 서브하이웨이 버스를 통하여 전전작 교환기로 송신할 수 있는 통화로를 구성하기 위하여 전전자 교환기의 서브하이웨이 버스회로와의 정합기능을 담당하는 서브하이웨이 버스정합회로, 대국의 자동응답장치에서 송출한 자동응답톤을 전전자 교환기의 서브하이웨이 버스의 특정 타임슬롯으로 수신하여 공급하여 주는 자동응답톤 수신회로, 자동응답톤 수신회로에 의해 공급되는 자동응답톤의 레벨을 측정하기 위한 레벨 측정회로, 대국에서 중계선 시험을 위하여 전전자 교환기의 자동응답장치를 호출한 경우에 소정의 자동응답톤을 발생시키는 자동응답톤 발생회로, 자동응답톤 발생회로의 출력단에 연결되어 있으며 전전자 교환기의 서브하이웨이 버스의 특정 타임슬롯(0번)을 통하여 대국으로 응답톤을 송출하는 자동응답톤 송신회로 및 상기 각 구성요소의 제반 동작 수행을 스케쥴링하고 제어하는 중앙제어회로를 포함한다.Conventional repeater automatic test apparatus includes a data bus matching circuit and a response device of a power station, which perform a matching function with a data bus circuit of an all-electronic exchange to communicate messages with a processor therein through the data bus of the all-electronic exchange. The subhighway bus of the all-electronic exchange in order to construct a communication path capable of receiving the answering tone sent from the through the subhighway bus of the electronic switchboard and transmitting the answering tone to be sent to the all-electric switchgear via the subhighway bus. Subhighway bus matching circuit in charge of matching with circuit, automatic answer tone receiving circuit for receiving and supplying the answering tone sent from the automatic answering device of the power to a specific time slot of subhighway bus of all electronic switchgear, automatic Level for measuring level of auto answer tone supplied by response tone receiving circuit It is connected to the output of the automatic response tone generating circuit and the automatic response tone generating circuit, which generates a predetermined automatic response tone when the measuring circuit or the automatic response device of the electronic switching system is called for the relay line test in a large country. An automatic response tone transmission circuit for transmitting response to a power station through a specific timeslot (No. 0) of the subhighway bus, and a central control circuit for scheduling and controlling the performance of the overall operation of each component.
상기와 같이 종래에는 중계선을 자동으로 시험하기 위해서 전전자 교환기의 외부에 구성되는 중계선 자동 시험 장치를 별도로 필요하였고, 이에 따라 많은 시간과 비용이 소요되었으며, 시험할 중계선의 개수를 조정할 수 없는 문제점이 있었다.As described above, in order to automatically test a relay line, a relay line automatic test apparatus which is configured outside of an electronic switchgear is separately required, and accordingly, a lot of time and cost are required, and there is a problem in that the number of relay lines to be tested cannot be adjusted. there was.
상기 문제점을 해결하기 위하여 안출된 본 발명은, 교환국간에 알누(R2) 신호 방식을 적용하는 중계선을 설치하는 경우에, 외부에 구성되는 별도의 중계선 자동 시험 장치를 사용하지 않고, 알투(R2) 신호 방식의 특성을 사용하여 운용자가 자동으로 중계선 설치 확인 시험을 할 수 있도록 하는 국간 중계선 자동시험 방법을 제공하는데 그 목적이 있다.The present invention devised to solve the above problems, in the case of installing a relay line applying the Alnu (R2) signal system between exchanges, without using a separate relay line automatic test device configured externally, Alto (R2) signal The purpose of this service is to provide a method for automatic test of trunk line between stations that allows the operator to automatically perform the test of relay line installation using the characteristics of the method.
즉, 중계선이 연결된 교환국간에 R2 신호 방식이 적용되면 R2 신호 방식은 음성/비음성 데이터가 전송되는 중계선의 회선을 이용하여 R2 시그널링(signalling)을 수행하므로, R2 시그널링의 정상적인 종료 여부에 따라 설치된 중계선 이상 유부를 확인할 수 있고, 설치 확인 시험을 위해 교환국간에 지정된 번호를 이용하여 중계선의 모든 회선에 대해 R2 시그널링을 수행하면 추가 장비의 부담없이 종래의 R2 장비만으로도 중계선의 설치 이상 여부를 자동으로 시험할 수 있는 국간 중계선 자동 시험 방법을 제공하는데 그 목적이 있다.That is, when the R2 signaling method is applied between switching stations to which the relay line is connected, the R2 signaling method performs R2 signaling by using the line of the relay line through which voice / non-voice data is transmitted, and thus the relay line installed according to whether the R2 signaling is normally terminated. You can check whether there are any abnormalities, and if you perform R2 signaling on all the lines of the relay line using the numbers specified between the exchanges for the installation confirmation test, you can automatically test whether the relay line is installed with the conventional R2 equipment without burdening additional equipment. The purpose is to provide a method for automatic test of trunk line between stations.
상기 목적을 달성하기 위하여 본 발명은, 알투(R2) 신호 방식이 적용되는 중계선으로 연결된 종합정보통신망 교환기간에 적용되는 국간 중계선 자동 시험 방법에 있어서, 중계선 시험 요구를 수신하면, 시험이 필요한 중계선의 회선을 점유하는 제1단계; 알투(R2) 신호 장비를 접속하여 점유한 회선에 대해서 알투(R2) 시그널링(signalling)을 수행하여 상대 교환기와의 알투(R2) 시느널링이 정상적으로 수행됨에 따라 상기 알투(R2) 신호 장비의 접속을 해제하는 제2단계; 점유한 회선에 톤 수신기를 접속하여 상기 상대 교환기로부터 시험톤을 수신하여 정상적으로 중계선이 설치되었는지를 확인하는 제3단계; 점유한 회선을 해제한 후에 알투(R2) 국간 중계선 시험 결과를 기록하는 제4단계; 및 시험하고자 하는 모든 회선에 대하여 상기 각 단계를 반복 수행한 후에 알투 국간 중계선 시험 결과를 운용자에게 통보하는 제5단계를 포함하여 이루어진 것을 특징으로 한다.In order to achieve the above object, the present invention, in the relay station automatic test method between trunks applied to the integrated telecommunications network switching period connected to the relay line to which the Alto (R2) signaling method is applied, when the relay line test request is received, A first step of occupying the line; As the Al2 (R2) signaling with the counterpart exchange is normally performed by performing Al2 (R2) signaling on the line occupied by connecting the Al2 (R2) signaling equipment, the connection of the Al2 (R2) signaling equipment is established. A second step of releasing; A third step of connecting a tone receiver to an occupied line and receiving a test tone from the counterpart exchange to confirm that the relay line is normally installed; A fourth step of recording the relay line test result between the Alto (R2) stations after releasing the occupied line; And a fifth step of notifying the operator of the results of the relay line test between Alto stations after repeating each step for all the lines to be tested.
이하, 첨부된 도면을 참조하여 본 발명에 따른 일실시예를 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment according to the present invention;
제2도는 본 발명이 적용되는 종합정보통신망(ISDN) 교환기의 일실시예 구조도이다.2 is a structural diagram of an embodiment of an ISDN switch to which the present invention is applied.
운용자 정합보드(21)는 운용자 단말기를 통하여 운용자와 정합하여 운용자 요구를 수신하며, 처리 결과를 운용자 단말기로 출력하는 기능을 수행한다. R2 송/수신기(24)는 R2 신호를 처리하는 기능을 수행하며, 톤(Tone) 송/수신기(25)는 시험톤을 송신/수신하는 기능을 수행한다.The operator matching board 21 receives an operator request by matching with the operator through the operator terminal and performs a function of outputting the processing result to the operator terminal. The R2 transmitter / receiver 24 performs a function of processing an R2 signal, and the tone transmitter / receiver 25 performs a function of transmitting / receiving a test tone.
교환기간의 데이터 전송 매체로 사용되는 디지털 중계선인 T1(1.544Mbps) 중계선과 E1(2.048Mbps) 중계선은 물리적 계층의 기능을 수행하고, 중계선 정합보드(23)는 T1 또는 E1 중계선을 집선하여 제어하는 기능을 수행한다.The T1 (1.544 Mbps) relay line and the E1 (2.048 Mbps) relay line, which is a digital relay line used as a data transmission medium during the exchange period, perform a physical layer function, and the relay line matching board 23 controls the T1 or E1 relay line by concentrating. Perform the function.
스위치(Switch)(22)는 통화로를 구성하는 기능을 수행하며, 제어 프로세서(26)는 운용자 정합보드(21), R2송/수신기(24), 톤 송/수신기(25), 스위치(22) 및 중계선 정합보드(23)를 제어한다.The switch 22 performs a function of constructing a call path, and the control processor 26 includes an operator matching board 21, an R2 transmitter / receiver 24, a tone transmitter / receiver 25, and a switch 22. ) And the relay line matching board 23.
제3도는 본 발명에 따른 국간 중계선 자동 시험 방법의 처리 순서를 나타내는 일실시예 흐름도이다.3 is a flow chart of an embodiment showing the processing procedure of the automatic trunk line test method according to the present invention.
운용자 단말기를 통하여 운용자의 중계선 시험 요구를 수신하면(31), 교환기는 시험 중계선이 설치된 상대 교환기로 점유 신호를 송신하고 점유 응답을 수신하여 시험이 필요한 중계선의 회선을 점유하고(32,33)R2 신호 장비를 접속한다.Upon receipt of the operator's relay line test request through the operator terminal (31), the exchange transmits the occupancy signal to the counterpart installed with the test relay line and receives the occupancy response to occupy the trunk of the relay line requiring testing (32, 33). Connect signaling equipment.
중계선 설치 확인 시험용으로 배정된 가입자 번호를 착신번으로 하고 R2 시그널링(signalling)에 필요한 발신 가입자의 종류를 유지 보수 장치로 하여, 점유한 회선에 대해서 R2 시그널링(signalling)을 수행한다(34). 상대 교환기와의 R2 시그널링(signallign)이 정상적으로 수행되면(35), R2 신호 장비의 접속을 해제하고, 점유한 회선에 시험톤의 수신기를 접속한다.Using the subscriber number assigned for the relay line installation verification test as the called party number and the type of calling subscriber required for R2 signaling as a maintenance device, R2 signaling is performed on the occupied circuit (34). If the R2 signaling with the counterpart exchange is performed normally (35), the R2 signaling equipment is disconnected and the receiver of the test tone is connected to the occupied circuit.
상대 교환기로부터 시험톤이 일정시간내에 수신되면(36) 중계선의 설치가 정상적으로 되었음을 판단할 수 있다. 이후, 상대 교환기로 전방향 복구 신호(CLF : Clear Forward)를 송신하여 점유한 회선을 해제하라고 통보하고(37), 상대 교환기로부터 해제 완료 신호(RLG : Release Guard)를 수신하면 점유한 회선을 해제한다(38). 이후, 두 교환기 사이에 설치된 모든 회선에 대한 설치 확인 시험이 완료되면, R2 국간 중계선 시험 결과를 운용자에게 통보한다(39).When the test tone is received from the counterpart exchange within a certain time (36), it can be determined that the installation of the relay line is normally performed. Afterwards, the counterpart exchange transmits an omnidirectional recovery signal (CLF: Clear Forward) to notify the release of the occupied line (37), and upon receipt of the release completion signal (RLG: Release Guard) from the counterpart exchange, releases the occupied line. (38). Subsequently, upon completion of the installation verification test for all circuits installed between the two exchanges, the operator is notified of the relay line test results between the R2 stations (39).
제 4a 및 4b 도는 본 발명에 따른 국간 중계선 자동 시험 방법의 세부 흐름도이다.4A and 4B are detailed flowcharts of the method for automatic test of trunk line trunking according to the present invention.
운용자로부터 교환기에 설치한 중계선의 설치 확인 시험 요구를 수신하면(41) 상대교환기로 연결된 중계선의 처음 회선을 점유한다(42).When the operator receives a request for confirmation of installation of a relay line installed at the exchange (41), the operator occupies the first line of the relay line connected to the counterpart exchange (42).
이때, 회선을 점유하지 못한 경우에는(43), 지금까지 수행한 시험 결과를 기록한 후에(53) 설치된 중계선의 모든 회선에 대해 설치 확인 시험이 수행되었는지를 확인하여(59) 시험이 완료되지 않았으면 다음 회선을 점유한 다음에(60) 점유 이후의 과정을 계속 수행한다. 시험이 완료되었으면 시험 결과를 운용자에게 출력하고 중계선 설치 확인 시험을 종료한다(61).At this time, if the line is not occupied (43), after recording the test results performed so far (53) to check whether the installation verification test has been performed for all the lines of the installed relay line (59) if the test is not completed After occupying the next line (60), the process after the occupancy is continued. If the test is completed, the test results are output to the operator and the repeater installation verification test is completed (61).
회선이 점유되면(43), 해당 회선으로 R2 장비를 연결한 후에(44) 중계선 설치 확인 시험용으로 배정된 가입자 번호를 착신번으로 하고, R2 시그널링(signalling)에 필요한 발신 가입자의 종류를 유지 보수 장치로 하여 상대 교환기와 R2 시그널링(signalling)을 수행한다(45).When the line is occupied (43), after connecting the R2 equipment to the corresponding line (44), the subscriber number assigned for the relay line installation confirmation test is called as the called party number, and the type of outgoing subscriber required for R2 signaling is maintained. R2 signaling with the counterpart exchange is performed (45).
이때, 상대 교환기와의 R2 시그널링(signalling)이 실패한 경우에는(46), R2 신호 장비의 접속을 해제한 후에(47) 상대 교환기로 전방향 복구 신호(CLF : Clear Forward)를 송신하여 점유한 회선을 해제하라고 통보하고(56), 점유한 회선을 해제한 다음에(57) 지금까지 수행한 시험 결과를 기록하고(58) 설치된 중계선의 모든 회선에 대해 설치 확인 시험이 수행되었는지를 확인하여(59) 시험이 완료되지 않았으면 다음 회선을 점유한 다음에(60) 점유 이후의 과정을 계속 수행한다. 시험이 완료되었으면 시험 결과를 운용자에게 출력하고 중계선 설치 확인 시험을 종료한다(61).At this time, if the R2 signaling with the counterpart exchange fails (46), after disconnecting the R2 signaling equipment (47), the circuit occupied by transmitting an omnidirectional recovery signal (CLF: Clear Forward) to the counterpart exchange. Release the occupied line (57), record the test results so far (58), and verify that the installation verification test has been performed for all the lines of the installed repeating line (59). If the test is not completed, the next line is occupied (60) and the process after the occupancy is continued. If the test is completed, the test results are output to the operator and the repeater installation verification test is completed (61).
상대 교환기와의 R2 시그널링(signalling)이 성공한 경우에는(46), R2 신호장비의 접속을 해제하고(48) 상대 교환기로부터 시험톤을 수신하기 위하여 점유한 회선에 톤 수신기를 접속한 후에(49) 시험톤을 대기하는 타이머를 구동하고(50), 시험톤 대기 상태로 들어간다.If the R2 signaling with the counterpart exchange is successful (46), disconnect the R2 signaling equipment (48) and after connecting the tone receiver to the occupied line to receive the test tone from the counterpart exchange (49). A timer for waiting for the test tone is driven (50) and enters the test tone standby state.
일정 시간 동안 상대 교환기로부터 시험톤이 수신되지 않아, 타이머가 종료되면(51) 톤 수신기의 접속을 해제한 후에(52) 상대 교환기로 전방향 복구 신호(CLF : Clear Forward)를 송신하여 점유한 회선을 해제하라고 통보하고(56), 점유한 회선을 해제한 다음에(57) 지금까지 수행한 시험 결과를 기록하고(58) 설치된 중계선의 모든 회선에 대해 설치 확인 시험이 수행되었는지를 확인하여(59) 시험이 완료되지 않았으면 다음 회선을 점유한 다음에(60) 점유 이후의 과정을 계속 수행한다. 시험이 완료되었으면 시험 결과를 운용자에게 출력하고 중계선 설치 확인 시험을 종료한다(61).If the test tone is not received from the counterpart exchange for a certain time, and the timer expires (51), the tone receiver is disconnected (52), and then the omni-directional recovery signal (CLF: Clear Forward) is transmitted to the counterpart exchange. Release the occupied line (57), record the test results so far (58), and verify that the installation verification test has been performed for all the lines of the installed repeating line (59). If the test is not completed, the next line is occupied (60) and the process after the occupancy is continued. If the test is completed, the test results are output to the operator and the repeater installation verification test is completed (61).
일정 시간내에 상대 교환기로부터 시험톤이 수신되면(53), 타이머의 구동을 중지하고(54), 톤 수신기의 접속을 해제한 후에(55) 상대 교환기로 전방향 복구 신호(CLF : clear Forward)를 송신하여 점유한 회선을 해제하라고 통보하고(56), 점유한 회선을 해제한 다음에(57) 지금까지 수행한 시험 결과를 기록하고(58) 설치된 중계선의 모든 회선에 대해 설치 확인 시험이 수행되었는지를 확인하여(59) 시험이 완료되지 않았으면 다음 회선을 점유한 다음에(60) 점유 이후의 과정을 계속 수행한다. 시험이 완료되었으면 시험 결과를 운용자에게 출력하고 중계선 설치 확인 시험을 종료한다(61).When a test tone is received from the counterpart exchange within a predetermined time (53), the timer stops driving (54), and after the tone receiver is disconnected (55), a forward recovery signal (CLF: clear forward) is sent to the counterpart exchange. Send a notification to release the occupied line (56), release the occupied line (57), record the results of the tests performed so far (58), and verify that the installation verification test was performed on all the lines of the (59) If the test is not complete, then occupy the next line (60) and continue the process after occupancy. If the test is completed, the test results are output to the operator and the repeater installation verification test is completed (61).
이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하다는 것이 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various substitutions, modifications, and changes can be made in the art without departing from the technical spirit of the present invention. It will be apparent to those of ordinary knowledge.
상기와 같은 본 발명은, 별도의 시험 장비를 사용하지 않고도 R2 신호 방식이 적용되는 교환기간에 새로이 설치된 중계선에 대한 설치 확인 시험을 R2 신호 방식의 특성을 이용하여 자동으로 수행할 수 있고, 운용자가 시험할 중계선의 개수를 조정할 수 있으며, 운용자가 교환기간에 설치된 중계선에 대한 설치 확인 시험 및 운용을 하는데 융통성과 편리성을 가질수 있는 효과가 있다.The present invention as described above, the installation confirmation test for the newly installed relay line in the exchange period when the R2 signaling method is applied without using a separate test equipment can be automatically performed using the characteristics of the R2 signaling method, the operator The number of repeaters to be tested can be adjusted and the operator can have flexibility and convenience in conducting installation verification tests and operations on the repeaters installed during the exchange.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950055872A KR0183142B1 (en) | 1995-12-23 | 1995-12-23 | Automatically testing method of r2 inter-office trunk line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950055872A KR0183142B1 (en) | 1995-12-23 | 1995-12-23 | Automatically testing method of r2 inter-office trunk line |
Publications (2)
Publication Number | Publication Date |
---|---|
KR970058090A KR970058090A (en) | 1997-07-31 |
KR0183142B1 true KR0183142B1 (en) | 1999-05-15 |
Family
ID=19444036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019950055872A KR0183142B1 (en) | 1995-12-23 | 1995-12-23 | Automatically testing method of r2 inter-office trunk line |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR0183142B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100604564B1 (en) * | 1999-12-17 | 2006-07-28 | 주식회사 케이티 | A Testing method between TTTU and AXE-10 exchange using by R2 signal |
-
1995
- 1995-12-23 KR KR1019950055872A patent/KR0183142B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR970058090A (en) | 1997-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5353326A (en) | Method for performing continuity check in an electronic exchange system | |
CN109787814B (en) | Method, system and terminal for positioning communication fault | |
KR0183142B1 (en) | Automatically testing method of r2 inter-office trunk line | |
JPS6093868A (en) | Data telephone terminal test equipment | |
KR960013274B1 (en) | Electronic exchanger testing device | |
KR950003683B1 (en) | Trunk bit-error-rate testing method | |
KR950005990B1 (en) | Trunk testing method | |
KR100270742B1 (en) | Apparatus and method for processing call in remote subscriber module of full electronic telephone exchange | |
KR0160346B1 (en) | Implementation of collect call service | |
JP2917965B2 (en) | Method for testing remote subscriber equipment in V5 communication line | |
KR100197404B1 (en) | Method for transmitting number in full electronic switching system | |
KR100674333B1 (en) | Method for offering successive call using telephone card service on intelligent network | |
JP2001028627A (en) | Line exchange and terminal equipment | |
KR970011429B1 (en) | Full electronic switching system | |
JP2994504B2 (en) | Telephone system | |
JP3102728B2 (en) | Line test control method | |
JPH11355869A (en) | Large capacity electronic exchange and its method | |
KR100235114B1 (en) | Apparatus and method for processing transit call in full-electronic telephone exchange having operator position system | |
KR100478917B1 (en) | Apparatus for Switching Signal Lines for Use in Switching System | |
KR100489570B1 (en) | How to connect remote switch and main unit switch | |
US3383470A (en) | Auxiliary line circuit | |
KR100198925B1 (en) | Transmission digital call processing method for switching system | |
JPH0374990B2 (en) | ||
JPS6119241A (en) | Line setting method of dama communication system | |
GB2074814A (en) | Reduction of operator involvement in SVI/CNI calls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20071115 Year of fee payment: 10 |
|
LAPS | Lapse due to unpaid annual fee |