KR0139534Y1 - Sole plate of p.c. beam - Google Patents

Sole plate of p.c. beam Download PDF

Info

Publication number
KR0139534Y1
KR0139534Y1 KR2019960000739U KR19960000739U KR0139534Y1 KR 0139534 Y1 KR0139534 Y1 KR 0139534Y1 KR 2019960000739 U KR2019960000739 U KR 2019960000739U KR 19960000739 U KR19960000739 U KR 19960000739U KR 0139534 Y1 KR0139534 Y1 KR 0139534Y1
Authority
KR
South Korea
Prior art keywords
plate body
concrete structure
bearing
plate
beam concrete
Prior art date
Application number
KR2019960000739U
Other languages
Korean (ko)
Other versions
KR970049682U (en
Inventor
이효수
Original Assignee
이효수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=19449481&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR0139534(Y1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 이효수 filed Critical 이효수
Priority to KR2019960000739U priority Critical patent/KR0139534Y1/en
Publication of KR970049682U publication Critical patent/KR970049682U/en
Application granted granted Critical
Publication of KR0139534Y1 publication Critical patent/KR0139534Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings
    • E01D19/047Pot bearings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 피.시.빔 콘크리트 구조물 저면에 솔 플레이트를 매입시켜 지승의 상,하판체를 분리하지 않은 상태에서 상판체를 피시빔 콘크리트 구조물 저면에 결합 고정 시킬 수 있도록 한 고안으로, 하판체(11)와 상판체(12) 사이에 미끄럼판체(13)를 개재(介在)시키고, 하판체(11)의 양측으로 볼트조인되는 브래킷(14)에 의해 조립되어지는 지승에 있어서, 상기 상판체(12) 상면으로 결합되어지는 솔 플레이트(17)를 포함하되, 상기 솔 플레이트(17)는 상판체(12)의 중앙으로 형성된 돌부(16)가 결합되어지는 요부(18)를 중앙에 가지고 있고, 상면에는 피.시.빔 콘크리트 구조물(5)에 안정되게 타설되어질 수 있는 길이와 간격을 이룬 다수개의 양카바(19)(19')가 설치되어 있으며, 네모서리에는 상판체(12)에 볼트(20)조인 할 수 있도록 볼트공(22)이 형성되어 있는 것에 의해 지승의 상,하판체를 분리하지 않고 결합되어진 상태에서 피.시.빔 콘크리트 구조물에 지승을 고정시킬 수 있고, 상,하판체가 결합되어진 상태에서 지승이 피.시.빔 콘크리트 구조물에 고정되어지기 때문에 미끄럼판체의 접촉면 오염을 방지함과 동시에 오염물질에 의한 접촉면이 손상되는 것을 예방할 수 있으며, 지승 시공작업이 편리하여 시공에 따른 작업시간을 단축할 수 있을 뿐만 아니라, 정밀하게 시공할 수 있도록 한 매우 유용한 고안인 것이다.The present invention is designed to allow the upper plate to be fixed to the bottom of the fish beam concrete structure without the upper and lower plates of the bearing by buying a sole plate on the bottom of the P. beam concrete structure, The upper plate body (12) is sandwiched between the upper plate body (11) and the upper plate body (12) and assembled by a bracket (14) bolted to both sides of the lower plate body (11). 12) a sole plate 17 is coupled to the upper surface, the sole plate 17 has a recessed portion 18 to which the protrusions 16 formed in the center of the upper plate body 12 is coupled, The upper surface is provided with a plurality of Yangkaba (19) (19 ') with a length and spacing that can be stably placed on the P. beam concrete structure (5), the square is bolted to the top plate (12) (20) Because the bolt hole 22 is formed to be joined The bearing can be fixed to the P. beam concrete structure in the combined state without separating the upper and lower plate bodies of the bearing, and the bearing can be fixed to the P. beam concrete structure in the combined state of the upper and lower plate bodies. Therefore, the contact surface of the sliding plate body can be prevented and the contact surface caused by the pollutant can be prevented from being damaged, and the construction work is convenient, which can shorten the working time according to the construction and can also provide precise construction. It is a very useful design.

Description

피.시.빔용 지승(支承) 솔 플레이트Supporting brush plate for PC beam

본 고안은 피.시.빔 콘크리트 구조물과 교각 콘크리트 구조물 사이에 설치되는 지승에 관한 것으로, 특히 피.시.빔 콘크리트 구조물 저면에 솔 플레이트를 매입시켜 지승의 상,하판체를 분리하지 않은 상태에서 상판체를 피.시.빔 콘크리트 구조물 저면에 결합 고정시킬 수 있도록 한 고안이다.The present invention relates to a support that is installed between a beam beam concrete structure and a pier concrete structure, and in particular, a brush plate is embedded in the bottom of the beam beam concrete structure to separate the upper and lower plate bodies of the support beam. It is designed to fix the top plate to the bottom of the concrete beam.

종래에는 제1도에 도시된 바와같이 지승(1)의 하판체(2)와 상판체(3)를 교각 콘크리트 구조물(4)과 피.시.빔 콘크리트 구조물(5)에 각각 고정시키려면 현장에서 볼트(7a)를 풀어서 브래킷(7)을 제거한 다음 하판체(2)는 저면으로 형성된 앙카바(2a)를 교각 구조물(4)에 매입하여 고정시키고, 상판체(3)는 상판체(3)의 상면으로 형성된 앙카바(3a)를 피.시.빔 콘크리트 구조물에 매입 고정시킨다.Conventionally, in order to fix the lower plate body 2 and the upper plate body 3 of the bearing 1 to the pier concrete structure 4 and the P. beam concrete structure 5 as shown in FIG. Loosen the bolt (7a) to remove the bracket (7) and then the lower plate body (2) is embedded in the bridge structure (4) by fixing the anchor bar (2a) formed on the bottom surface, the upper plate body (3) is the upper plate body (3) The anchor bar (3a) formed by the upper surface of the) is embedded in the P. beam concrete structure.

상기와 같이 작업현장에서 지승의 상,하판체를 분리하여 고정시킬 경우, 미끄럼판체(6)가 외부로 노출되어지게 된다.As described above, when the upper and lower plate body of the support is separated and fixed at the work site, the sliding plate body 6 is exposed to the outside.

상기와 같이 미끄럼판체가 외부로 노출되어지면, 미끄럼판체 접촉되어지는 접촉면으로 먼지등과 같은 이물질이 혼입되어 접촉면을 손상시키게 되고, 미끄럼판체의 본래 기능을 상실하게 되는 문제점을 야기하게 된다.When the sliding plate body is exposed to the outside as described above, foreign matter such as dust is mixed into the contact surface which is in contact with the sliding plate body, which damages the contact surface and causes a problem of losing the original function of the sliding plate body.

또한 작업현장에서 지승의 상판체와 하판체를 분리한 상태에서 시공이 이루어지기 때문에 정밀시공에 어려움이 있었다.In addition, there was a difficulty in precision construction because the construction was made in the state of separating the upper and lower plates of jiseung at the work site.

상기한 종래의 피.시.빔 지승의 문제점을 해소하기 위하여 안출된 본 고안은, 하판체와 상판체로 이루어진 지승을 분리하지 않은 상태에서 피.시.빔 콘크리트 구조물 저면으로 타설되어지는 솔 플레이트에 조립 고정시킬 수 있게 한 것으로 첫째, 지승의 상,하판체를 분리하지 않고 결합되어진 상태에서 피.시.빔 콘크리트 구조물에 지승을 고정시킬 수 있고; 둘째, 상,하판체가 결합되어진 상태에서 지승이 피.시.빔 콘크리트 구조물에 고정되어지기 때문에 미끄럼판체의 접촉면 오염을 방지함과 동시에 오염물질에 의한 접촉면이 손상되는 것을 에방할 수 있으며;, 셋째, 지승 시공이 편리하여 시공에 따른 작업시간을 단축할 수 있을 뿐만 아니라, 정밀하게 시공할 수 있는 피.시.빔(P.C.Beam)용 지승(支承)의 솔 플레이트(Sole Plate)를 제공하는데 있다.The present invention devised to solve the above-mentioned problem of the conventional beam beam, the sole plate to be poured into the bottom of the beam beam concrete structure without separating the support consisting of the lower plate and the upper plate body First, it is possible to fix the assembly to the P. beam concrete structure in the state of being combined without separating the upper and lower plates of the bearing. Second, because the bearing is fixed to the beam concrete structure when the upper and lower plates are combined, it prevents the contact surface contamination of the sliding plate body and prevents the contact surface from being damaged by the pollutants; In addition, it is possible to shorten the working time according to the construction because it is easy to carry out the construction, and to provide the sole plate of the bearing for the PCBeam that can be precisely constructed. .

제1도는 종래 피.시.빔용 지승의 일부 단면도.1 is a partial cross-sectional view of a conventional bearing for a beam.

제2도는 본 고안의 요부인 솔 플레이트를 발췌한 사시 구성도.2 is a perspective configuration diagram taken from the sole plate, which is the main part of the present invention.

제3도는 본 고안의 솔 플레이트가 적용된 지승의 설치상태도.3 is an installation state of the bearing applied to the sole plate of the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

11 : 하판체 12 : 상판체11: lower plate 12: upper plate

13 : 미끄럼판체 14 : 브래킷13 sliding plate 14 bracket

16 : 돌부 17 : 솔 플레이트16: protrusion 17: sole plate

18 : 요부 19,19' : 앙카바18: female 19,19 ': Anqaba

20 : 볼트 22 : 볼트공20: bolt 22: bolt ball

이러한 본 목적은, 하판체(11)와 상판체(12) 사이에 미끄럼판체(13)를 개재(介在)시키고, 하판체(11)의 양측으로 볼트조인 되는 브래킷(14)에 의해 조립되어지는 지승에 있어서, 상기 상판체(12) 상면으로 결합되어지는 솔 플레이트(17)를 포함하되, 상기 솔 플레이트(17)는 상판체(12)의 중앙으로 형성된 돌부(16)가 결합되어지는 요부(18)를 중앙에 가지고 있고, 상면에는 피.시.빔 콘크리트 구조물(5)에 안정되게 타설되어질 수 있는 길이와 간격을 이룬 다수개의 앙카바(19)(19')가 설치되어 있으며, 네모서리에는 상판체(12)에 볼트(20)조인 할 수 있도록 볼트공(22)이 형성되어 있는 것에 의해 달성된다.This object is such that the sliding plate body 13 is interposed between the lower plate body 11 and the upper plate body 12, and is assembled by a bracket 14 which is bolted to both sides of the lower plate body 11. In the support, the upper plate body 12 includes a sole plate 17 to be coupled to the upper surface, wherein the sole plate 17 is a main portion to which the protrusion 16 formed in the center of the upper plate body 12 is coupled ( 18) is in the center, and the upper surface is provided with a plurality of anchors 19, 19 'with a length and spacing that can be stably placed on the P. beam concrete structure 5, and a corner In this case, the bolt hole 22 is formed so that the bolt 20 can be joined to the upper plate body 12.

이하, 본 고안의 바람직한 실시예를 명세서에 첨부된 도면을 참조하여 보다 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

제2도는 본 고안의 요부인 솔 플레이트를 발췌한 사시 구성도이고, 제3도는 본 고안의 솔 플레이트가 적용된 지승의 설치상태도이다.2 is an isometric view of the sole plate, which is the main part of the present invention, and FIG. 3 is a diagram showing the installation state of the earth where the sole plate of the present invention is applied.

도시한 바와 같이, 본 고안에 따른 지승을 설치할 때에는 솔 플레이트(17)를 포함하는 지승을 운반하여 지승의 상판체(12) 상면으로 조립되어 있는 솔 플레이트(17)를 분리하게 되는데, 솔 플레이트(17)를 분리할 때에는 볼트공(22)에 체결되어 있는 볼트(21)를 풀어 분리하게 된다.As shown, when installing the bearing according to the present invention is to carry the bearing including the sole plate 17 to separate the sole plate 17 assembled to the upper surface of the upper plate body 12 of the bearing, the sole plate ( When the 17 is removed, the bolt 21 fastened to the bolt hole 22 is released and separated.

상기와 같이 지승의 상판체(12)로부터 분리되어진 솔 플레이트(17)를 타설되어진 피.시.빔 콘크리트 구조물(5)의 저면 양쪽으로 위치하도록 매입하게 되는데, 상기 솔 플레이트(17)의 상면으로 설치된 다수의 양카바(19)(19')를 매입시켜 고정하게 된다.As described above, the sole plate 17 separated from the upper plate body 12 of the bearing is embedded so as to be located at both sides of the bottom surface of the poured P. beam concrete structure 5, and the upper surface of the sole plate 17. A plurality of installed both cover (19, 19 ') is to be purchased and fixed.

한편, 상판체(12)와 하판체(11)가 결합되어 있는 지승은 하판체(11)의 저면으로 설치되 앙카바를 교각 콘크리트 구조물(4)에 매입하여 고정시키게 되는 것이다.On the other hand, the support that the upper plate body 12 and the lower plate body 11 is coupled to be installed to the bottom surface of the lower plate body 11 to be fixed by embedding the anchor in the pier concrete structure (4).

상기와 같이 솔 플레이트(17)가 피.시.빔 콘크리트 구조물(5)에 고정되고, 지승이 교각 콘크리트 구조물(4)에 고정되어지면, 피.시.빔 콘크리트 구조물(5)에 고정되어진 솔 플레이트(17)가 교각 콘크리트 구조물(14)에 고정되어 있는 지승의 상판체(12)에 위치하도록 조립하게 되고, 솔 플레이트(17)를 상판체(12)에 조리할 때에는 솔 플레이트(17)의 중앙으로 형성된 요부(18)에 상판체(12) 상면 중앙으로 형성된 돌부(16)가 끼워지게 한다.As described above, when the sole plate 17 is fixed to the beam concrete structure 5 and the support is fixed to the pier concrete structure 4, the brush fixed to the beam beam concrete structure 5 is fixed. The plate 17 is assembled so as to be located on the upper plate body 12 of the support fixed to the pier concrete structure 14, when the sole plate 17 is cooked on the plate body 12 of the sole plate 17 The protrusion 16 formed at the center of the upper surface of the upper plate body 12 is fitted to the recessed portion 18 formed at the center thereof.

상기와 같은 상태에서 제3도에 도시된 바와 같이 솔 플레이트(17)의 볼트공(22)에 볼트(21)를 나사결합하여서 피.시.빔 콘크리트 구조물(5)과 교각 콘크리트 구조물(4) 사이에 지승의 설치를 완료하게 되는 것이다.As shown in FIG. 3, the beam beam concrete structure 5 and the pier concrete structure 4 are screwed into the bolt holes 22 of the sole plate 17 in the above state. In the meantime, the installation of Jiseung will be completed.

이상과 같은 본 고안은 상술한 특성의 바람직한 실시예에 한정되지 아니하며 청구범위에서 청구하는 본 고안의 요지를 벗어남 없이 당해 고안이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능할 것이다.The present invention as described above is not limited to the preferred embodiment of the above-described characteristics, anyone of ordinary skill in the art to which the subject innovation belongs without departing from the gist of the present invention claimed in the claims will be able to implement various changes. .

상기된 바와 같이 본 고안에 피.시.빔(P.C.Beam)용 지승(支承)의 솔 플레이트(Sole Plate)는, 지승의 상,하판체를 분리하지 않고 결합되어진 상태에서 피.시.빔 콘크리트 구조물에 지승을 고정시킬 수 있고, 상,하판체가 결합되어진 상태에서 지승이 피.시.빔 콘크리트 구조물에 고정되어지기 때문에 미끄럼판체의 접촉면 오염을 방지함과 동시에 오염물질에 의한 접촉면이 손상되는 것을 예방할 수 있으며, 지승 시공작업이 편리하여 시공에 따른 작업시간을 단축할 수 있을 뿐만 아니라, 정밀하게 시공할 수 있도록 한 매우 유용한 고안인 것이다.As described above, the sole plate of the bearing for PCBeam in the present invention is bonded to the beam beam in a state in which the upper and lower plates of the bearing are combined without being separated. It is possible to fix the bearing on the structure, and because the bearing is fixed to the beam concrete structure when the upper and lower plates are combined, it prevents the contact surface contamination of the sliding plate body and damages the contact surface by contaminants. It is a very useful design that can be prevented, and the construction work is convenient, which not only shortens the working time according to construction, but also enables precise construction.

Claims (1)

하판체(11)와 상판체(12) 사이에 미끄럼판체(13)를 개재(介在)시키고, 하판체(11)의 양측으로 볼트조인 되는 브래킷(14)에 의해 조립되어지는 지승에 있어서, 상기 상판체(12) 상면으로 결합되어지는 솔 플레이트(17)를 포함하되, 상기 솔 플레이트(17)는 상판체(12)의 중앙으로 형성된 돌부(16)가 결합되어지는 요부(18)를 중앙에 가지고 있고, 상면에는 피.시.빔 콘크리트 구조물(5)에 안정되게 타설되어질 수 있는 길이와 간격을 이룬 다수개의 앙카바(19)가 설치되어 있으며, 네모서리에는 상판체(12)에 볼(20)조인 할 수 있도록 볼트공(22)이 형성되어 있는 것을 특징으로 하는 피.시.빔용 지승의 솔 플레이트.In the support that is assembled by the bracket 14 which is interposed between the lower plate body 11 and the upper plate body 12 by the sliding plate body 13, and is bolted to both sides of the lower plate body 11, The sole plate 17 includes a sole plate 17 coupled to an upper surface of the upper plate body 12, and the sole plate 17 includes a recessed portion 18 to which the protrusion 16 formed at the center of the upper plate body 12 is coupled. The upper surface is provided with a plurality of anchors 19 having a length and spacing which can be stably placed on the P. beam concrete structure 5, and the corners have a ball (12) on the top plate 12. 20) The sole plate of the bearing for the P. beam, characterized in that the bolt hole 22 is formed to be joined.
KR2019960000739U 1996-01-19 1996-01-19 Sole plate of p.c. beam KR0139534Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019960000739U KR0139534Y1 (en) 1996-01-19 1996-01-19 Sole plate of p.c. beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019960000739U KR0139534Y1 (en) 1996-01-19 1996-01-19 Sole plate of p.c. beam

Publications (2)

Publication Number Publication Date
KR970049682U KR970049682U (en) 1997-08-12
KR0139534Y1 true KR0139534Y1 (en) 1999-04-01

Family

ID=19449481

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019960000739U KR0139534Y1 (en) 1996-01-19 1996-01-19 Sole plate of p.c. beam

Country Status (1)

Country Link
KR (1) KR0139534Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101725405B1 (en) 2016-04-04 2017-04-11 안병표 Fixed unit for cutting the side of the steel product for a sole plate

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100432436B1 (en) * 2000-07-28 2004-05-22 주식회사 비엔지컨설턴트 Seat device for upper plate launching of a bridge and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101725405B1 (en) 2016-04-04 2017-04-11 안병표 Fixed unit for cutting the side of the steel product for a sole plate

Also Published As

Publication number Publication date
KR970049682U (en) 1997-08-12

Similar Documents

Publication Publication Date Title
CA1212270A (en) Manhole/access cover and frame assemblies
DE69001030D1 (en) SUBSTRATE FOR GROUNDLESS CULTURE.
KR0139534Y1 (en) Sole plate of p.c. beam
ES2066827T3 (en) UNION INSULATING DEVICE FOR CONSTRUCTION PLATES.
JPH0349124Y2 (en)
JP2000291118A (en) Ditch cover
KR200222439Y1 (en) Bridge Bearing equipped with deck restrainer
SK285365B6 (en) Square or rectangular road system device comprising a support frame and a cover element
JPH0613573Y2 (en) trough
SU1490216A1 (en) Arrangement for securing the slopes of large canals
SE8601186L (en) ASSEMBLY FLANGE FOR DRAINAGE TOWNS
JPH01151603A (en) Method of installing expansion joint device
KR200283561Y1 (en) a bridge equipment for the bridge
KR200264080Y1 (en) Expansion joint preventing a falldown and secession of bridge
JPS6437547U (en)
KR200156610Y1 (en) A cover of sewage
JP2001115543A (en) Grating for side ditch
JPS627788Y2 (en)
DK557686D0 (en) ASSEMBLY PLATE FOR TECHNICAL CONSTRUCTION ELEMENTS AND PROCEDURE FOR THE MANUFACTURING OF SUCH A
JPS597370Y2 (en) Support installation jig
SU1384684A1 (en) Butt joint of mounted wall panels with column
IE54393B1 (en) Improvements in or relating to manhole/access cover and frame assemblies
JPS6236798Y2 (en)
JPH08144459A (en) Connection structure of concrete foundation and main entrance step
ATE221157T1 (en) TIE ANCHOR FOR FRAME

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
J204 Request for invalidation trial [patent]
J121 Written withdrawal of request for trial

Free format text: WITHDRAWAL OF TRIAL FOR INVALIDATION REQUESTED 20000810

Effective date: 20010309

FPAY Annual fee payment

Payment date: 20061205

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee