KR0135643B1 - Movement device in a crane - Google Patents
Movement device in a craneInfo
- Publication number
- KR0135643B1 KR0135643B1 KR1019950026111A KR19950026111A KR0135643B1 KR 0135643 B1 KR0135643 B1 KR 0135643B1 KR 1019950026111 A KR1019950026111 A KR 1019950026111A KR 19950026111 A KR19950026111 A KR 19950026111A KR 0135643 B1 KR0135643 B1 KR 0135643B1
- Authority
- KR
- South Korea
- Prior art keywords
- equipment
- crane
- rope
- horizontal protrusion
- frame
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/01—General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
본 발명은 이미 완성된 골조부로부터 돌출되어 설치된 돌출구조물의 직하부에 크레인으로 중량기자재를 효율적으로 운반하여 줄 수 있도록 하여주는 크레인 양중보조대에 관한 것으로 그 기술적 구성상의 특징은 전체적으로 크레인로프(700)에 양중될 수 있도록 연결하여 주는 로프연결부(100)와, 상기 로프연결부의 하부에 일체로 부착되며 그 내부에는 중량물체(210)가 내장되어 전체적인 무게균형을 유지하여 주는 틀체부(200)와, 상기 틀체부의 내측으로 수평하게 돌출되는 수평돌출부(300)와, 상기 수평 돌출부의 끝부분에 고정되어 각종 기자재를 매달수 있도록 하여주는 기자재행거부(400)로 구성되도록 하여, 상기 수평돌출부(300)가 돌출구조물의 직하부 내측으로 진입되도록 하여 기자재를 돌출구조물의 직하부에 운반할 수 있도록 하는 것이다.The present invention relates to a crane lifting aid for efficiently transporting heavy materials to the crane directly under the projecting structure installed to protrude from the already completed frame, the technical features of the crane rope as a whole Rope connecting portion 100 for connecting so that it can be double in weight, the body portion 200 which is integrally attached to the lower portion of the rope connecting portion and the weight object 210 is built therein to maintain the overall weight balance, and The horizontal protrusion part 300 protruding horizontally into the frame part and the equipment hanger 400 fixed to the end of the horizontal protrusion part to suspend various equipment, the horizontal protrusion part 300 ) Is to enter the inner side of the protruding structure directly to be able to carry the equipment to the lower portion of the protruding structure.
Description
제1도는 본 발명의 크레인 양중보조대가 설치된 상태의 예시도.1 is an exemplary view of a crane lifting aid installed in the present invention.
제2도는 본 발명 크레인 양중보조대의 사시도.2 is a perspective view of the crane lifting aid of the present invention.
제3도는 본 발명의 정면도.3 is a front view of the present invention.
제4도는 본 발명의 일측면도.4 is a side view of the present invention.
* 도면의 주요 부분에 대한 부호의 설명** Explanation of symbols for the main parts of the drawings *
10 : 크레인 양중보조대100 : 로프연결부10: crane lifting aids 100: rope connection
101 : 연결구멍200 : 틀체부101: connecting hole 200: frame body
201 : 체결구멍210 : 중량물체201: fastening hole 210: heavy object
220 : 체결봉300 : 수평돌출부220: fastening bar 300: horizontal protrusion
310 : 지지보강대400 : 기자재행거부310: support reinforcement 400: refusal of equipment
500 : 기자재600 : 골조부500: Equipment 600: Frame
610 : 돌출구조물610: protrusion structure
본 발명은 이미 완성된 골조부로부터 돌출되어 설치된 돌출구조물의 직하부에 크레인 중량기자재를 효율적으로 운반하여 줄 수 있도록 하여주는 크레인 양중보조대에 관한 것이다.The present invention relates to a crane lifting aid that allows to efficiently transport the crane weight material directly under the projecting structure installed to protrude from the already completed frame.
일반적으로 건설현장에서 사용되는 크레인은 크레인로프 끝에 기자재를 양중하여 필요한 작업장소에 기자재를 운반하여 주는 데 사용되는 것이다. 그러나 크레인으로 기자재를 양중할 시 이미 완성된 골조부로부터 돌출된 돌출구조물이 설치되어 있는 그 직하부에는 기자재를 양중하는 것이 곤란하였다. 왜냐하면 크레인로프 끝에 양중된 기자재의 무게하중으로 인하여 크레인로프가 수직하게 하부로로 연장되기 때문이다. 즉 무게하중으로 수직하게 연장되는 크레인로프가 돌출구조물에 의해서 장애를 받기 때문에 크레인로프가 돌출구조물의 직하부에는 진입되는 것이 불가능하였다. 그러므로 크레인로프가 돌출구조물에 의해서 장애를 받지 않도록하여 주면서도 돌출구조물의 직하부에 기자재를 원활하게 양증되도록 하여 줄 필요성이 있었다.In general, the crane used in the construction site is used to transport the equipment to the necessary work place by lifting the equipment at the end of the crane rope. However, when lifting the equipment by crane, it was difficult to lift the equipment directly under the projecting structure protruding from the completed frame part. This is because the crane rope extends vertically downward due to the weight load of the equipment lifted at the end of the crane rope. That is, it was impossible to enter the crane rope directly below the projecting structure because the crane rope extending vertically by the weight load is interrupted by the projecting structure. Therefore, there was a need to allow the crane rope to be smoothly increased in the equipment directly under the projecting structure while not being obstructed by the projecting structure.
본 발명의 목적은 이미 완성된 골조부로부터 돌출된 돌출구조물이 설치되어 있는 그 직하부에 중량기자재를 효율적으로 운반하여 줄 수 있도록 하여주는 크레인 양중보조대를 제공하는 데 있다.It is an object of the present invention to provide a crane lifting aid for efficiently transporting heavy materials to the lower part of the projecting structure protruding from the already completed frame part.
이하, 본 발명의 기술적 구성을 상세히 설명하면 다음과 같다.Hereinafter, the technical configuration of the present invention in detail.
본 발명의 크레인 양중보조재(10)는 전체적으로 크레인로프(700)에 양중될 수 있도록 연결하는 로프 연결부(100)와, 상기 크레인연결부의 하부에 일체로 부착되며 그 내부에는 중량물체(210)가 내장되어 전체적인 무게균형을 유지하여 주는 틀체부(200)와, 상기 틀체부의 내측으로 수평하게 돌출되는 수평돌출부(300)와, 상기 수평돌출부의 끝부분에 고정되어 각종 기자재를 매달수 있도록 하여주는 기자재행거부(400)로 구성되도록 함을 그 기술적 구성상의 기본적인 특징으로 한다.Crane lifting aid 10 of the present invention is a rope connection portion 100 to be connected to be lifted on the crane rope 700 as a whole, and integrally attached to the lower portion of the crane connection portion and a heavy object 210 therein Frame part 200 for maintaining the overall weight balance, a horizontal protrusion 300 protruding horizontally into the frame body horizontally, and fixed to the end of the horizontal protrusion so that various materials can be suspended The hanger 400 is configured to be a basic feature of the technical configuration.
여기에서, 상기 틀체부의 내측으로 수평하게 돌출되는 수평돌출부(300)를 가지도록 하는 것은 수평 돌출부(300)가 골조부(600)로부터 돌출된 돌출구조물(610)의 직하부 내측으로 진입할 수 있도록 하여 수평돌출부(600)의 끝부분에 고정된 기자재행거부(400)에 매달려진 기자재(500)들을 원활하게 운반할 수 있도록 하기 위함이다.In this case, the horizontal protrusion 300 protruding horizontally into the frame portion may enter the lower portion of the protruding structure 610 protruding from the frame 600. This is to ensure that the equipment 500 hanging on the equipment hanger 400 fixed to the end of the horizontal protrusion 600 can be smoothly transported.
이와 같이 구성되는 본 발명의 실시예는 제1도에서 도시되는 바와 같이, 엘리베이터핏트 내부에 적용되는 것을 예시해 보여준다. 즉, 본 발명은 골조부(600)로부터 돌출된 돌출구조물(610)인 엘리베이터레일의 직하부에 기자재(500)인 입상파이프를 운반하여 설치하는 데 사용되는 것으로서, 수평돌출부(300)의 끝부분에 고정된 기자재행거부(400)에 운반할 중량기자재(500)를 매단 후, 크레인로프(700)를 로프 연결부(100)에 연결되어 골조부(600)로부터 돌출된 돌출구조물(610)의 직하부 내측으로 수평돌출부(300)의 끝부분이 진입되도록 한 다음 중량기자재(500)를 돌출구조물(610)의 직하부에 수월하게 운반하는 데 사용되는 것이다.The embodiment of the present invention configured as described above shows an example applied to the interior of the elevator fit, as shown in FIG. That is, the present invention is used to transport and install the granular pipe, which is the equipment 500, directly under the elevator rail, which is a protruding structure 610, which protrudes from the frame part 600, and an end of the horizontal protrusion 300. After hanging the heavy material 500 to be transported to the equipment hanger 400 fixed to the crane rope 700 is connected to the rope connection portion 100 of the projecting structure 610 protruding from the frame 600 The end of the horizontal protrusion 300 is entered into the lower inner side and then used to easily transport the heavy material 500 directly below the protrusion structure 610.
또한, 본 발명의 크레인 양중보조대(10)로 기자재(500)를 돌출구조물(610)의 직하부에 운반한 후 기자재(500)를 기자재행거부(400)로부터 해체하는 것은 그 해당층 높이의 골조부(600)에서 기자재(500)를 기자재행거부(400)로부터 해체할 수 있는 것이다.In addition, dismantling the equipment 500 from the equipment hanger 400 after transporting the equipment 500 to the lower portion of the protruding structure 610 with the crane lifting aid 10 of the present invention frame of the corresponding floor height In the unit 600, the equipment 500 may be dismantled from the equipment rejection unit 400.
이와 같이 사용되는 본 발명은 충분한 수평길이를 가지는 수평돌출부(300)가 돌출구조물(610)의 직하부에 진입되고 그 수평돌출부의 끝부분에 고정된 기자재행거부(400)에 운반할 기자재를 매달아서 양중하여 주기 때문에 이미 완성된 골조부(600)로부터 돌출된 돌출구조물이 설치되어 있는 그 직하부에 기자재를 효율적으로 운반하여 줄 수 있는 적용효과를 가진다.In the present invention used as described above, the horizontal protrusion 300 having a sufficient horizontal length enters the lower portion of the protruding structure 610 and suspends the equipment to be transported to the equipment hanger 400 fixed to the end of the horizontal protrusion. Due to the heavy lifting, it has an application effect that can efficiently transport equipment to the lower portion of the projecting structure protruding from the already completed frame part 600 is installed.
상기 로프연결부(100)는 양중보조대(10)가 크레인로프(700)에 양중될 수 있도록 틀체부(200) 및 수평돌출부(300)의 상부에 일체로 용접되는 구조부치다. 본 발명의 실시예에서 제2도 내지 제4도에서 도시되는 바와 같이, 로프연결부(100)는 틀체부(200) 외측상단 좌우에 연결구멍(101)이 뚤린 한쌍의 고정편(110)과, 상기 틀체부(200) 및 수평돌출부(300)의 상단 중심선에 일정한 간격마다 연결구멍(101)들이 뚫려지며 길이방향으로 세워져서 부착되는 일자형의 다공편(120)으로 만들어진 것을 예시해 보여준다.The rope connecting portion 100 is a structural portion welded integrally to the upper portion of the frame portion 200 and the horizontal protrusion 300 so that the lifting aid 10 can be lifted on the crane rope 700. As shown in Figures 2 to 4 in the embodiment of the present invention, the rope connection portion 100 is a pair of fixing pieces 110, the connection hole 101 is bent at the upper and left sides of the outer frame portion 200, Connection holes 101 are drilled at regular intervals on the upper center line of the frame part 200 and the horizontal protrusion 300, and are made of a linear porous piece 120 that is attached to stand in the longitudinal direction.
이와 같이 만들어지는 로프연결부(100)는 양중보조대(10)를 크레인로프(700)에 연결하여 주는 기능을 수행할 뿐만 아니라 전체적인 무게중심의 균형을 유지하여 주는 기능도 수행하여 주는 것이다. 즉, 제2도에서 도시되는 바와 같이, 한쌍의 고정편(110)에 한쌍의 고정로프(710)를 연결하고 일자형 다공편(120)에 이동로프(720)를 연결하여 기자재(500)의 중량에 따라 이도이로프(720)의 연결위치를 이동하여 줌으로써 전체적인 무게 균형을 어느 정도 유지할 수 있도록 하는 것이다.The rope connection portion 100 made in this way not only performs the function of connecting the lift bar 10 to the crane rope 700, but also performs the function of maintaining the balance of the overall center of gravity. That is, as shown in Figure 2, by connecting a pair of fixing ropes 710 to a pair of fixing piece 110 and a moving rope 720 to the straight porous piece 120, the weight of the equipment 500 By moving the connection position of the ear ropes 720 to maintain the overall weight balance to some extent.
다시 말하자면, 고정로프(710)는 고정편(110)에 고정하여 둔 상태에서, 기자재(500)의 하중이 크면 이동로프(720)를 다공편(120)의 내측에 가깝도록 연결하고 기자재(500)의 중량이 작으면 이동로프(720)를 다공편(120)의 외측에 가깝도록 연결하여 무게중심의 균형을 유지하도록 하는 것이다. 이때 무게중심의 균형이란 양중보조대(10)가 전체적으로 수평상태를 유지하는 것임을 밝혀둔다.In other words, in the state in which the fixing rope 710 is fixed to the fixing piece 110, when the load of the equipment 500 is large, the moving rope 720 is connected to the inner side of the porous piece 120 and the equipment 500 If the weight of) is small to connect the moving rope 720 to the outside of the porous piece 120 to maintain the balance of the center of gravity. At this time, the balance of the center of gravity puts out that both sides of the support (10) to maintain the overall horizontal state.
이와 같이 로프연결부(100)는 전체적인 양중보조재(10)를 크레인로프(700)에 연결되도록 하는 역할을 수행하여 주면서도 한쌍의 고정편(110)에 한쌍의 고정로프(710)를 연결하고 일자형 다공편(120)에 이동로프(720)를 연결하여 기자재(500)의 중량에 따라 이동로프(720)의 연결위치를 이동하여 연결하여 주기 때문에 양중보조재(10)의 전체적인 무게 균형을 어느 정도 유지하여 주는 효과를 가진다.As such, the rope connection part 100 serves to connect the entire lifting aid 10 to the crane rope 700, while connecting the pair of fixing ropes 710 to the pair of fixing pieces 110 and the straight porous piece. The moving rope 720 is connected to the 120 to move and connect the connection position of the moving rope 720 according to the weight of the equipment 500, thereby maintaining the overall weight balance of the heavy auxiliary material 10 to some extent. Has an effect.
상기 틀체부(200)는 연결구의 하부에 일체로 부착되며 그 내부에는 중량물체(210)가 내장되어 전체적인 무게중심 균형을 유지하여 주는 역할을 수행하여 주는 구조부이다. 상기에서 설명한 바와 같이 로프연결부(100)가 어느 정도 무게중심 균형을 유지하여 주지만 이는 보조역할을 하는 구조부이고, 무게중심의 균형을 유지하여 주는 주구조부는 틀체부가 수행하여 주는 것이다.The frame part 200 is integrally attached to the lower portion of the connector, the inside of the heavy object 210 is a structural part that serves to maintain the overall center of gravity balance. As described above, the rope connection part 100 maintains the center of gravity to some extent, but this is a structural part that plays an auxiliary role, and the main structure that maintains the balance of the center of gravity is performed by the frame part.
즉, 제1도 및 제2도에서 도시되는 바와 같이, 틀체부(200)의 내부 외측으로부터 콘크리트판으로 만들어진 중량물체(210)를 내장하여 그 반대쪽인 기자재행거부(400)에 매달리는 기자재(500)의 무게와 균형을 이룰 수 있도록 하는 것이다. 틀체부내부에 내장되는 중량물체(210)의 양은 기자재(500)의 무게에 따라 비례하여 내장되는 것이다.That is, as shown in FIG. 1 and FIG. 2, the equipment 500 is embedded in the heavy material 210 made of a concrete plate from the inner outer side of the frame part 200 and suspended on the equipment hanger 400 on the opposite side. To balance the weight. The amount of the weight object 210 embedded in the frame portion is built in proportion to the weight of the equipment 500.
여기에서, 상기 틀체부(200)는 제2도 내지 제4도에서 도시되는 바와 같이, 그 내부에 체결봉(220)이 연결되도록 하여 중량물체(210)가 상기 체결봉에 끼워져서 지지되도록 하는 것이 바람직하다. 이는 체결봉(220)이 중량물체에 끼워지도록 하여 중격 및 진동 등에 의해서 틀체부로부터 낙하되는 것을 방지하여 주는 역할을 수행하는 것이다.Here, as shown in FIGS. 2 to 4, the frame part 200 has a fastening rod 220 connected therein so that the weight object 210 is inserted into and supported by the fastening rod. It is preferable. This serves to prevent the fastening rod 220 to fall from the frame portion by the septum and vibration by fitting to the heavy object.
즉, 본 발명의 실시예에서는 체결봉(220)의 양끝부분들이 틀체에 뚫린 체결구멍(201)에 끼워져서 고정되도록 하되, 중량물체(210)는 끼움구멍(211)을 통하여 체결봉(220)에 끼워져서 지지되는 것이다.That is, in the embodiment of the present invention, both ends of the fastening rods 220 are inserted into the fastening holes 201 bored in the frame, and fixed to each other, and the weight object 210 is fastened to the fastening rods 220 through the fitting holes 211. It is inserted into and supported.
여기에서, 제3도에서 도시되는 바와 같이, 체결봉의 일측끝은 볼트머리(221)로 만들어지고 다측끝은 나사부(222)가 형성되어서 틀체의 체결구멍(201)에 끼워져서 체결너트(223)로 나사돌림하여 고정된다. 그리고 체결봉(220)에 끼워진 중량물체(210)들이 요동하지 않도록 체결봉에 스토퍼(224)로 고정시키는 것이 바람직하다.Here, as shown in FIG. 3, one end of the fastening rod is made of a bolt head 221, and the multi-side end is formed with a threaded portion 222, which is inserted into the fastening hole 201 of the frame to fasten the nut 223. It is fixed by screwing it with. In addition, it is preferable to fix the stopper 224 to the fastening rod so that the heavy objects 210 inserted in the fastening rod 220 do not swing.
한편, 체결봉(220)은 여러 개가 끼워질 수 있지만 제2도 및 제4도에서 도시되는 바와 같이 본 발명의 실시예에서는 2개가 수평하게 나란히 끼워진 것을 예시해 보여주는 것이다.On the other hand, the fastening rods 220 may be fitted with several, but in the embodiment of the present invention as shown in Figures 2 and 4 is shown to illustrate that two are inserted side by side horizontally.
이와 같이 체결봉(220)은 틀체부의 내부에 내장되는 중량물체(210)를 관통하여 그 양끝부분이 틀체부(200)에 견고하게 지지 고정되기 때문에 양중작업시 충격 및 진동 등에 의해서 중량물체(210)가 틀체부(200)로부터 바닥에 낙하되는 것을 방지하여 주는 효과를 가지면서도 안전사고를 예방하여 주는 효과를 가진다.As described above, the fastening rod 220 penetrates the heavy object 210 embedded in the frame part so that both ends thereof are firmly supported and fixed to the frame part 200. 210 has an effect of preventing the fall from the frame portion 200 to the floor while preventing the safety accident.
상기 수평돌출부(300)는 제1도 내지 제3도에서 도시되는 바와 같이, 틀체부의 내측으로 수평하게 돌출되어 상부쪽에 설치된 돌축구조물의 직하부에 진입할 수 있도록 소정의 길이를 가지도록 하는 구조부이다. 본 발명의 실시예에서는 수평돌출부(300)가 틀체부의 상부에서 일체로 돌출된 것을 예시해 보여 주지만 중간부 또는 하부에서 내측으로 돌출될 수도 있음을 밝혀둔다.As shown in FIGS. 1 to 3, the horizontal protrusion 300 has a predetermined length so as to protrude horizontally into the inner side of the frame body so as to enter a lower portion of the protrusion structure installed on the upper side. It is a structural department. In the embodiment of the present invention shows that the horizontal protrusion 300 integrally protrudes from the upper portion of the frame portion, but it is noted that it may protrude inward from the middle portion or the lower portion.
여기에서, 수평돌출부(300)는 제2도 내지 제4도에서 도시되는 바와 같이, 그 내측하부에서 틀체부의 내측하부 좌, 우끝부분까지 경사지게 연결하여 주는 한쌍의 지지보강대(310)가 설치되는 것이 바람직하다. 이는 수평돌출부의 끝부분에 기자재행거부(400)가 고정되어 기자재가 매달리기 때문에 기자재의 다소의 하중이 한쌍의 지지보강대(310)를 통하여 틀체부 하부로 분산 전달시켜 주기 위함이다.Here, the horizontal protrusion 300 is a pair of supporting reinforcement 310 is installed to be inclined from the inner lower portion to the inner lower left, right end portion of the frame portion as shown in FIGS. It is preferable. This is because the equipment hanger 400 is fixed to the end of the horizontal projection to hang the equipment, so that some of the load of the equipment is distributed to the lower portion of the frame through the pair of support reinforcement 310.
즉, 지지보강대(310)는 수평돌출부가 틀체부 상부에 연결되는 연결부에 기자재의 집중하중이 전달되는 것을 방지하기 위해 기자재 하중의 일부는 수평돌출부(300)를 통하여 틀체부의 상부로 전달되고, 그 나머지는 한쌍의 지지보강대(310)를 통하여 틀체부의 하부로 전달되도록 하여, 수평돌출부의 휘어짐 또는 파손되는 역할을 수행하는 것이다. 그리고 틀체부에 전달된 하중은 로프연결부(100)를 통하여 크레인로프(700)에 전달되어 최종적으로 크레인 몸체에 전달되는 것이다.That is, the support reinforcement 310 is a part of the load of the equipment is transmitted to the upper portion of the frame through the horizontal protrusion 300 in order to prevent the concentrated load of the equipment to be transmitted to the connecting portion where the horizontal protrusion is connected to the upper portion of the frame, The rest is to be transmitted to the lower portion of the frame through a pair of support reinforcement 310, to perform the role of bending or breaking the horizontal protrusion. And the load transmitted to the frame portion is delivered to the crane rope 700 through the rope connection portion 100 is finally delivered to the crane body.
따라서, 한쌍의 지지보강대(310) 일측끝이 수평돌출부의 내측하부에 고정되고 타측끝이 틀체부의 내측하부 각 좌, 우끝부분에 경사지게 연결되어 기자재(500)의 일부 하중을 틀체부의 하부에 전달하여 주기 때문에 수평돌출부가 틀체부 상부에 연결되는 연결부에 집중하중을 방지하여 주므로 수평돌출부(300)가 휘어지거나 파손되는 것을 방지하여 주는 효과를 가진다.Accordingly, one pair of support reinforcing bars 310 is fixed to the inner lower portion of the horizontal protrusion, and the other end is inclined to the left and right ends of the inner lower portion of the frame portion to partially load the load of the equipment 500 to the lower portion of the frame portion. Since the horizontal protrusion prevents the concentrated load from the connecting portion connected to the upper part of the frame body, the horizontal protrusion 300 has an effect of preventing the horizontal protrusion 300 from being bent or damaged.
한편, 상기에서 설명한 지지보강대(310)는 이동로프(720)가 틀체부(200) 상부쪽 다공편(120)에 연결되었을 경우에 해당되는 것이다. 그러나 이동로프(720)가 수평돌출부(300) 상부쪽 다공편(120)에 즉, 기자재행거부(400) 가까운쪽에 연결되었을 경우에는 기자재의 하중이 틀체부(200)를 통하지 않고 직접적으로 수평돌출부(300) 내측에서 이동로프(720)로 직접 전달되기 때문에 수평돌출부(300)의 연결부를 보호하여 주는 효과를 가진다.On the other hand, the support reinforcing bar 310 described above corresponds to the case where the moving rope 720 is connected to the porous piece 120 on the upper side of the frame part 200. However, when the moving rope 720 is connected to the porous projection 120 at the upper side of the horizontal protrusion 300, that is, close to the equipment hanger 400, the load of the equipment is not directly passed through the frame 200, but the horizontal protrusion directly. Since 300 is directly transmitted to the moving rope 720 from the inside has an effect of protecting the connection of the horizontal projection (300).
상기 기자재행거부(400)는 수평돌출부의 끝부분에 고정되어 각종 기자재를 매달수 있도록 하여주는 구조부이다. 이와 같은 기자재행거부는 단순한 걸고리를 설치하여 사용할 수도 있지만, 본 발명의 실시예서는 제2도 내지 제4도에서 도시되는 바와 같이, 미세한 상하 길이를 조절할 수 있는 체인블록이 설치되어 사용되는 것을 예시해 보여준다. 이는 작업자가 체인블록 가까이에서 육안으로 직접 보면서 미세한 상하길이를 조절할 수 있도록 하여 기자재(500)의 정확한 위치에 안치하는 작업이 간편하게 이루어질 수 있도록 하기 위함이다.The equipment hanger 400 is a structure that is fixed to the end of the horizontal projection to allow to hang various equipment. Such equipment hanger can be used by installing a simple hook, but the embodiment of the present invention, as shown in Figure 2 to Figure 4, illustrating that the chain block is installed and used to adjust the fine vertical length Shows. This is to allow the operator to adjust the fine vertical length while looking directly at the naked eye near the chain block so that the work placed in the correct position of the equipment 500 can be easily performed.
즉, 전체적인 상하이동 및 수평이동은 크레인으로 조절하여 상부쪽에 설치된 돌출구조물의 직하부까지 기자재(500)를 이동한다. 이때 타워크레인은 조정자가 있는 조정실이 크레인의 몸체 꼭대기에 위치해 있으므로 조정자와 양중보조대(10)간의 거리가 멀뿐만 아니라 양중보조대 상부에 돌출구조물이 설치되어 있기 때문에 양중되는 기자재가 잘 보이지 않는 불편한 점이 있다. 그래서 작업자가 중간위치에서 깃발로 신호를 조정실에 보내어서 돌출구조물(610)의 직하부까지 기자재(500)를 운반하는 것이다.That is, the overall shandong and horizontal movement is controlled by a crane to move the equipment 500 to the lower portion of the protrusion structure installed on the upper side. At this time, the tower crane is located at the top of the crane body, because the control room with the adjuster is located on the top of the crane body, not only the distance between the adjuster and the lift bar 10, but also because the protrusion structure is installed on the upper lift bar is difficult to see the lifting equipment is not easy to see . Therefore, the operator sends a signal to the control room with a flag in the intermediate position to transport the equipment 500 to the lower portion of the protrusion structure 610.
이와 같이 조정자와 양중되는 기자재간의 거리가 멀뿐만 아니라 기자재의 상부쪽에 돌출구조물(610)이 설치되어 있어서 육안으로 식별이 어렵기 때문에 기자재(500)의 정확한 위치에 안치하는 것이 곤란하다. 그러므로 체인블록은 크레인으로 기자재(500)를 돌출구조물(610)의 직하부에 이동한 후, 육안으로 식별이 가능한 기자재 가까이에서 기자재의 미세한 상하길이를 조절할 수 있기 때문에 기자재를 수월하게 정확한 위치에 안치할 수 있는 효과를 가진다.In this way, the distance between the coordinator and the heavy lifting equipment is not only far, and because the protrusion structure 610 is installed on the upper side of the equipment, it is difficult to visually identify it, so it is difficult to settle in the correct position of the equipment 500. Therefore, after the chain block moves the equipment 500 by a crane directly below the protruding structure 610, it is possible to adjust the fine vertical length of the equipment near the equipment that can be visually identified, so that the equipment is easily placed in the correct position. It has an effect that can be done.
이상에서 살펴 본 바와 같이 본 발명은 충분한 수평길이를 가지는 수평돌출부가 돌출구조물의 직하부에 진입되고 그 수평돌출부의 끝부분에 고정된 기자재행거부에 운반할 기자재를 매달아서 양중하여 주기 때문에 이미 완성된 골조부로부터 돌출된 돌출구조물이 설치되어 있는 그 직하부에 기자재를 원활하게 운반하여 줄 수 있는 매우 유용한 것이다.As described above, the present invention has already been completed because the horizontal protrusion having a sufficient horizontal length enters the lower portion of the protruding structure and suspends and lifts the equipment to be transported to the equipment hanger fixed at the end of the horizontal protrusion. It is very useful that can smoothly transport the equipment under the protruding structure protruding from the frame.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950026111A KR0135643B1 (en) | 1995-08-23 | 1995-08-23 | Movement device in a crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950026111A KR0135643B1 (en) | 1995-08-23 | 1995-08-23 | Movement device in a crane |
Publications (2)
Publication Number | Publication Date |
---|---|
KR970010628A KR970010628A (en) | 1997-03-27 |
KR0135643B1 true KR0135643B1 (en) | 1998-04-24 |
Family
ID=19424204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019950026111A KR0135643B1 (en) | 1995-08-23 | 1995-08-23 | Movement device in a crane |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR0135643B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101426026B1 (en) * | 2011-03-14 | 2014-08-05 | 현대중공업 주식회사 | Transportation device for drill ship transportation test |
-
1995
- 1995-08-23 KR KR1019950026111A patent/KR0135643B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR970010628A (en) | 1997-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9506267B2 (en) | Method for supporting an upstanding mast | |
JP2648373B2 (en) | Beam for suspending elevator traction wire rope pulley | |
KR0135643B1 (en) | Movement device in a crane | |
JP2909413B2 (en) | Suspension device for building exterior walls | |
CN212270712U (en) | Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine | |
US6595331B2 (en) | Bracket for securing elevator components | |
JP6661142B1 (en) | Hanging scaffold | |
JP2508198Y2 (en) | Pallet hanger | |
KR200459687Y1 (en) | An apparatus for engaging the rope for cleaning the surface of a building | |
CN111706060A (en) | Steel wire rope inclined-pulling type hanging basket device | |
JPH10203749A (en) | Car unit lifting method of elevator for unit housing and lifting jig | |
JP2022076945A (en) | Suspended scaffold | |
JP2009227419A (en) | Suspension stand | |
CN218843701U (en) | Anchoring type riding high-suspension hanging basket | |
KR0119386Y1 (en) | Structure for connecting the sagety rope to steel construction | |
KR100260674B1 (en) | A net of safety styled for cable stayed bridge | |
JP4886292B2 (en) | Retention structure of parent rope in elevator installation work | |
JP2845673B2 (en) | Elevator installation equipment | |
KR200497116Y1 (en) | Safety guard fixing device | |
CN212639671U (en) | Carrying pole beam for hoisting rolling mill frame | |
KR102334708B1 (en) | Lifting equipment for short soot blower | |
JPH0317350A (en) | Scaffold for building structure | |
KR200281445Y1 (en) | Bracket for scaffolding | |
JPH0772064B2 (en) | Elevator tower hoistway | |
CN112061952A (en) | Carrying pole beam for hoisting rolling mill frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20080102 Year of fee payment: 11 |
|
LAPS | Lapse due to unpaid annual fee |