KR0121187Y1 - Calibration gauge for reduction roll gap - Google Patents
Calibration gauge for reduction roll gap Download PDFInfo
- Publication number
- KR0121187Y1 KR0121187Y1 KR2019950014665U KR19950014665U KR0121187Y1 KR 0121187 Y1 KR0121187 Y1 KR 0121187Y1 KR 2019950014665 U KR2019950014665 U KR 2019950014665U KR 19950014665 U KR19950014665 U KR 19950014665U KR 0121187 Y1 KR0121187 Y1 KR 0121187Y1
- Authority
- KR
- South Korea
- Prior art keywords
- roll
- gap
- rolling
- gauge
- roll gap
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
- B22D11/20—Controlling or regulating processes or operations for removing cast stock
- B22D11/208—Controlling or regulating processes or operations for removing cast stock for aligning the guide rolls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/128—Accessories for subsequent treating or working cast stock in situ for removing
- B22D11/1287—Rolls; Lubricating, cooling or heating rolls while in use
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
본 고안은 브룸연주기 중 주편압하량을 일정하게 유지시키기 위한 경압하장치에 관한 것으로, 압하롤 사이의 갭을 설정치로 축소하는 과정에서 정확한 교정이 이루어지도록 압하롤 갭의 설정치에 해당하는 높이(H)로 형성됨과 동시에 압하롤의 평면도 불량을 수용하여 수평상태를 유지하도록 압하롤 길이의 3분의 1이상에 해당하는 폭(W)으로 형성된 블럭게이지(1)를 외력에 의하여 왕복작동할 수 있도록 된 더미바(100)의 헤드부에 연결된 구조로 이루어져, 압하롤 갭의 설정치와 동일한 높이로 형성됨과 동시에 압하롤 길이의 3분의 1이상의 폭으로 형성된 블럭게이지를 이용하여 압하롤 갭을 교정하게 되므로, 압하롤 갭의 교정을 위한 작업시간이 단축될 뿐만 아니라 압하롤의 평면도가 불량인 경우에도 정확하게 교정할 수 있게 되는 것이다.The present invention relates to a pressure reduction device for maintaining a constant casting pressure reduction during the bromyeon cycle, the height corresponding to the set value of the rolling roll gap to reduce the gap between the rolling rolls to the set value (H) At the same time, the block gauge 1 having a width (W) corresponding to one third or more of the length of the down roll can be reciprocated by an external force to accommodate horizontal defects of the down roll. Consists of a structure connected to the head portion of the dummy bar 100, to be formed at the same height as the set value of the roll roll gap, and at the same time to correct the roll roll gap by using a block gauge formed in a width of more than one third of the roll roll length. Therefore, not only the working time for the calibration of the rolling roll gap is shortened, but also the correctness can be corrected even when the flatness of the rolling roll is bad.
Description
본 고안은 브룸연주기 중 주편압하량을 균일하게 유지하기 위한 경압하장치에 관한 것으로, 특히 경압하장치의 압하롤 갭을 정밀하면서도 신속하게 교정시킬 수 있도록 된 경압하롤 갭 교정용 게이지에 관한 것이다.The present invention relates to a pressure reduction device for maintaining the cast slab load uniformly during a bromyeon cycle, and more particularly, to a pressure drop gap calibration gauge capable of accurately and quickly correcting a pressure drop roll gap of a pressure reduction device. .
일반적으로, 경압하장치(soft reduction system)는 연주기로 주조된 열간주편의 압하량을 일정하게 유지시킬 수 있도록 미응고구간 내에서 다수개의 경압하롤을 이용하여 단계적으로 압하하기 위한 장치로서, 이러한 경압하장치는 주편의 내부편석을 저감시키게 될 뿐만 아니라 내부크랙(internal crack)등을 억제시키게 되는 것이다.In general, a soft reduction system is a device for stepping down by using a plurality of pressure reduction rolls in a non-solidified section so as to maintain a constant reduction in the amount of hot cast cast by the machine. The low pressure device not only reduces the internal segregation of the cast, but also suppresses the internal crack.
따라서, 경압하장치는 작업특성상 고부가가치 제품으로 제한하여 사용되어지는 것이다. 또한, 경압하장치는 주편의 종류별로 정확한 압하패턴을 적용할 수 있도록 압하롤 갭을 정밀하게 유지해야만 하는 것이다.Therefore, the low pressure device is limited to high value-added products due to its work characteristics. In addition, the pressure reduction device must precisely maintain the rolling roll gap so as to apply an accurate rolling pattern for each type of cast steel.
즉, 경압하장치의 압하롤 갭은 실제 오차가 최소값 ±0.3mm로 유지되어야 하는데, 설비나 작업의 특성상 압하롤의 표면마모, 롤축의 베어링마모 등에 의해 최초로 측정하여 설정한 압하롤의 갭이 수시로 변하면서 주편압하량의 정밀도가 저하되므로, 주기적으로 측정하여 교정하여야 한다.In other words, the actual rolling error of the pressure reduction device should be maintained at a minimum value of ± 0.3mm, and the gap of the pressure reduction roll that was first measured and set by the surface wear of the rolling roll, the bearing wear of the roll shaft, etc. may be frequently changed due to the characteristics of the equipment or work. As the precision of cast iron load decreases while changing, it should be periodically measured and calibrated.
상기한 압하롤의 갭을 측정하는 종래의 측정게이지는 손잡이 선단에 압하롤 캡의 설정규격치로 만들어진 측정봉이 설치된 T자형 게이지로서, 휴대용 핀타입(pin type)게이지이다.The conventional measuring gauge for measuring the gap of the rolling roll is a T-shaped gauge provided with a measuring rod made of the set standard value of the rolling roll cap at the tip of the handle, and is a portable pin type gauge.
그 사용방법은 작업자가 각각의 압하롤 사이에 측정게이지를 끼워 육안으로 측정하게 되는데, 이때 측정게이지의 삽입상태는 압하롤과 측정봉이 상호 직각이 되도록 삽입한 상태에서 측정하게 된다.In the method of use, the operator inserts a measuring gauge between each pressing roll and visually measures the insertion state of the measuring gauge, so that the pressing roll and the measuring rod are inserted at right angles to each other.
만일, 작업자가 측정게이지가 압하롤의 사이에 제대로 삽입되지 않거나 지나치게 틈새가 확장되어 있다고 판단하는 경우에는 PLC로다의 운전자에게 무전기로 연락하여 교정하는 방법을 이용하게 되는 것이다.If the operator determines that the measuring gauge is not properly inserted between the rolling rolls or the gap is too wide, the operator of the PLC loader is contacted by a radio to calibrate.
그런데, 상기한 측정방법은 인위적으로 접근하기 불편한 5단계의 압하롤에 각각 작업자가 접근하여 측정결과를 PLC로다의 운전자와 교신하여 교정해야만 할 뿐아니라 한 개의 압하롤 측정 및 교정시간이 약 10분 이상 소요되므로, 압하롤 전체를 교정하기 위해서는 약 1시간 이상이 소요되어 조업에 막대한 지장을 초래하게 된다는 문제점이 있었다.By the way, the measuring method described above requires the operator to approach each of the five step down rolls, which are inconveniently accessible, to communicate with the driver of the PLC loader to calibrate the measurement results, and to measure and calibrate one roll down roll for about 10 minutes. Since it takes longer, it takes about 1 hour or more to calibrate the entire roll down roll, causing a problem in the operation.
이에, 본 고안은 상기한 바와 같은 문제점을 해결하기 위하여 안출된 것으로, 좁은 공간을 이동할 수 있도록 된 더미바와 조립하여 사용할 수 있도록 블럭타입(block type)으로 제작된 경압하롤 캡 교정용 게이지를 제공하는 데에 그 목적이 있다.Accordingly, the present invention has been devised to solve the problems described above, and provides a light pressure roll cap calibration gauge made of a block type (block type) to be used in combination with the dummy bar to move a narrow space. Its purpose is to.
도 1은 본 고안에 따른 경압하롤 갭 교정용 게이지를 개략적으로 도시한 사시도.1 is a perspective view schematically showing a gauge for calibrating down roll gap according to the present invention.
도 2는 본 고안에 따른 경압하롤 갭 교정용 게이지가 더미바에 결합된 상태를 도시한 측단면도.Figure 2 is a side cross-sectional view showing a state in which the pressure drop roll gap correction gauge coupled to the dummy bar according to the present invention.
도 3은 본 고안에 다른 경압하롤 갭 교정용 게이지의 사용상태도이다.Figure 3 is a state diagram of use of the gauge for light pressure roll gap correction according to the present invention.
*도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
1:블럭게이지 2:연결부1: Block gauge 2: Connection part
H:압하롤 캡의 설정치와 동일한 두께H: Thickness equal to the set value of the pressure roll cap
W:압하롤 길이의 3분지 1이상의 두께W: Thickness more than three quarters of the length of the rolling roll
이하, 본 고안에 따른 실시예를 첨부된 예시도면을 참조로 하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings illustrating an embodiment according to the present invention in detail as follows.
도 1은 본 고안에 따른 경압하롤 갭 교정용 게이지를 개략적으로 도시한 사시도이고, 도 2는 본 고안에 따른 경압하롤 갭 교정용 게이지가 더미바에 결합된 상태를 도시한 측단면도이며, 도 3은 본 고안에 따른 경압하롤 갭 교정용 게이지의 사용상태도로서, 이들 도면에 도시된 바와 같이, 압하롤 사이의 갭을 설정치로 축소하는 과정에서 정확한 교정이 이루어지도록 압하롤 갭의 설정치에 해당하는 높이(H)로 형성됨과 동시에 압하롤의 평면도 불량을 수용하여 수평상태를 유지하도록 압하롤 길이의 3분의 1이상에 해당하는 폭(W)으로 형성된 블럭게이지(1)를 외력에 의하여 왕복작동할 수 있도록 된 더미바(100)의 걸림부(101)에 연결한 구조로 되어 있다.1 is a perspective view schematically showing a gauge for low pressure roll gap correction according to the present invention, Figure 2 is a side cross-sectional view showing a state in which the pressure gauge for low roll gap correction according to the present invention is coupled to the dummy bar, 3 is a state diagram of the gauge for calibrating the pressure drop roll gap according to the present invention, as shown in these figures, corresponding to the set value of the pressure drop roll gap so that accurate calibration is made in the process of reducing the gap between the pressure drop rolls to a predetermined value. Reciprocating the block gauge 1 formed with the width W corresponding to at least one-third of the length of the rolling roll to receive the flatness of the rolling roll and maintaining the horizontal state by accommodating the badness of the flat roll. It is structured to be connected to the engaging portion 101 of the dummy bar 100 to operate.
여기서, 블럭게이지(1)는 내마모성인 우수한 특수강으로 되어 있으며, 압하롤과 직접 밀착되는 상면과 하면에는 일정경도를 갖도록 경화처리(HRC 58±5)되어 있다.Here, the block gauge 1 is made of a special steel having excellent wear resistance, and is hardened (H R C 58 ± 5) to have a certain hardness on the upper and lower surfaces which are in direct contact with the rolling roll.
그리고, 블럭게이지(1)의 두께(H)는 연주기를 통해 일정크기로 주조된 열간 주편의 압하량을 정밀하게 유지시킬 수 있도록 압하롤 갭의 설정치와 동일한 높이로 형성되어 있으며, 폭(W)은 압하롤의 평면도 불량에 의해 발생되는 측정오차의 요인을 최소화하기 위하여 압하롤 길이의 3분의 1이상으로 형성된 구조로 되어 있다.In addition, the thickness (H) of the block gauge (1) is formed at the same height as the set value of the rolling roll gap in order to precisely maintain the rolling reduction amount of the hot cast cast to a certain size through the playing machine, the width (W) In order to minimize the cause of the measurement error caused by the poor flatness of the roll down roll, the roll roll has a structure formed at least one third of the length of the down roll.
또한, 블럭게이지(1)의 몸체에는 일측면을 따라 더미바(100)와 분해 또는 결합시킬 수 있도록 걸고리 형상으로 된 연결부(2)가 일체로 형성된 구조로 되어 있다.In addition, the body of the block gauge (1) has a structure in which the connecting portion (2) having a hook shape is formed integrally so as to be disassembled or coupled with the dummy bar (100) along one side.
물론, 더미바(100)의 일측면에는 연결부(2)와 결합시킬 수 있도록 된 걸림부(101)가 일체로 형성된 구조로 되어 있다.Of course, one side of the dummy bar 100 has a structure formed integrally with the engaging portion 101 to be coupled to the connecting portion (2).
이하, 본 고안에 따른 작용을 첨부된 예시도면을 참고로 하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings illustrating the operation according to the present invention in detail as follows.
먼저, 오차가 발생된 압하롤을 모두 개방시킨 상태에서 더미바(100)의 헤드를 제거시키고, 이 헤드부가 제거된 더미바(100)의 걸림부(101)에 블럭게이지(1)의 연결부(2)를 끼워 결합시킨다.First, the head of the dummy bar 100 is removed in a state in which all of the rolling rolls in which the error is generated are removed, and the connection part of the block gauge 1 is connected to the engaging portion 101 of the dummy bar 100 from which the head part is removed. Insert 2) to join.
그리고, 더미바(100)의 걸림부(101)와 블럭게이지(1)의 연결부(2)가 상호 결합된 압하롤 교정용 게이지를 경압하장치(200)를 구성하는 다수개의 압하롤(201∼204)사이로 진입시킨다.In addition, a plurality of pressure reduction rolls 201 to 20 which constitute a pressure reduction device 200 may be configured as a pressure reduction roll calibration gauge in which the engaging portion 101 of the dummy bar 100 and the connection portion 2 of the block gauge 1 are coupled to each other. 204).
이때, 측정자는 블럭게이지(1)가 경압하장치의 첫번째 압하롤(201)(201)의 중앙으로 위치하게 되면, 무전기를 이용하여 PCL로다 운전자와 교신하면서 압하롤을 서서히 축소시킬 것을 요구한다.At this time, when the block gauge 1 is positioned at the center of the first push down rolls 201 and 201 of the low pressure lowering device, the measurer needs to gradually reduce the push down roll while communicating with the driver of the PCL loader using the radio.
이와 같이 블럭게이지(1)를 첫번째 압하롤(201)(201)의 사이에 정지시킨 상태에서 PCL로다 운전자는 측정자와 교신하면서 서서히 첫번째 압하롤(201)(201)의 갭을 축소하면서 교정작업을 완료한다.In this state, the block gauge 1 is stopped between the first rolls 201 and 201, and the driver of the PCL loader communicates with the measuring device while gradually reducing the gap of the first rolls 201 and 201. To complete.
그리고, 상기한 과정을 통해 첫번째 압하롤(201)(201)의 교정작업이 끝나게 되면, 이 더미바(100)를 경압하장치(200)의 내측방향으로 이동시킨다.When the calibration of the first roll down rolls 201 and 201 is completed through the above-described process, the dummy bar 100 is moved inward of the light pressure lowering device 200.
즉, 더미바(100)의 걸림부(101)에 연결된 블럭게이지(1)를 두번째 압하롤(202)(202)의 사이로 진입시키면서 측정 및 교정작업을 시행한다.That is, while the block gauge 1 connected to the locking portion 101 of the dummy bar 100 enters between the second pressing rolls 202 and 202, measurement and calibration work is performed.
물론, 블럭게이지(1)를 세번째 압하롤(203)(203), 그리고 네번째 압하롤(204)(204)의 사이로 서서히 진입시키면서 상기와 동일한 과정을 통해 측정 및 교정작업을 반복한다.Of course, while slowly entering the block gauge 1 between the third push down rolls 203 and 203 and the fourth push down rolls 204 and 204, the measurement and calibration operations are repeated through the same process as described above.
물론, 압하롤의 측정 및 교정작업이 완료된 후에는 더미바(100)와 블럭게이지(1)를 분해하고, 이 더미바(100)의 걸림부(101)에 헤드를 결합시키게 되면 모든 교정작업이 완료되는 것이다.Of course, after the measurement and calibration of the pressing roll is completed, the dummy bar 100 and the block gauge 1 are disassembled, and when the head is coupled to the engaging portion 101 of the dummy bar 100, all the calibration work is performed. It's done.
이상에서 설명한 바와 같이 본 고안에 따른 경압하롤 갭 교정용 게이지에 의하면, 압하롤 갭의 설정치와 동일한 높이로 형성됨과 동시에 압하롤 길이의 3분의 1 이상의 폭으로 형성된 블럭게이지를 이용하여 압하롤 갭을 교정하게 되므로, 압하롤 갭의 교정을 위한 작업시간이 단축될 뿐만 아니라 압하롤의 평면도가 불량인 경우에도 정확하게 교정할 수 있게 되는 효과가 있는 것이다.As described above, according to the low pressure roll gap calibration gauge according to the present invention, the pressure reduction roll is formed by using a block gauge formed at the same height as the set value of the pressure reduction roll gap and formed at a width equal to or greater than one third the length of the pressure reduction roll gap. Since the gap is corrected, the work time for the calibration of the rolling roll gap is not only shortened, but also when the flatness of the rolling roll is bad, it is possible to accurately correct the gap.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019950014665U KR0121187Y1 (en) | 1995-06-24 | 1995-06-24 | Calibration gauge for reduction roll gap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019950014665U KR0121187Y1 (en) | 1995-06-24 | 1995-06-24 | Calibration gauge for reduction roll gap |
Publications (2)
Publication Number | Publication Date |
---|---|
KR970000612U KR970000612U (en) | 1997-01-21 |
KR0121187Y1 true KR0121187Y1 (en) | 1998-08-01 |
Family
ID=19416447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019950014665U KR0121187Y1 (en) | 1995-06-24 | 1995-06-24 | Calibration gauge for reduction roll gap |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR0121187Y1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100452613B1 (en) * | 2002-10-10 | 2004-10-14 | 씨멘스브이디오한라 주식회사 | Fixing Structure of Metal Frame for Parts of Instrument Cluster |
CN107116193B (en) * | 2017-05-11 | 2022-10-25 | 河钢股份有限公司承德分公司 | Device and method for quickly adjusting opening degree of foot roller of continuous casting crystallizer |
-
1995
- 1995-06-24 KR KR2019950014665U patent/KR0121187Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR970000612U (en) | 1997-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8826719B2 (en) | Machine calibration artifact | |
US6832440B2 (en) | Spindle squaring device and method of operation | |
KR0121187Y1 (en) | Calibration gauge for reduction roll gap | |
US20030106229A1 (en) | Reference gauge for calibrating a measuring machine and method for calibrating a measuring machine | |
CN109282772B (en) | Method for determining coordinate system of blank workpiece of cylinder cover | |
US6519996B1 (en) | Pressing-bending machine with a device for detecting the lower and upper cross-members deflection, aimed at interacting with at least one crowning system | |
EP0732564A1 (en) | Method of measuring sizes of mold and mold-associated components by laser measuring instrument | |
US6289713B1 (en) | Method of calibrating gages used in measuring intensity of shot blasting | |
JP2004192152A (en) | Numerical control device | |
KR200230157Y1 (en) | Pocket type unit bluck standing device | |
CN113720231A (en) | Detection process for automobile instrument board beam component assembly | |
CN211103571U (en) | Pressing block type positioning device | |
KR200160697Y1 (en) | A position measuring supplement block | |
KR100452302B1 (en) | Apparatus for taper measuring on sleeve for hot strip mill | |
KR100407440B1 (en) | Roll forming roller changing auto system | |
CN214492293U (en) | Beam mold board size inspection device with adjustable | |
KR200141859Y1 (en) | Adapter for a dial gauge | |
KR100432771B1 (en) | Apparatus of measuring crt flat panel and measuring method thereof | |
US5421099A (en) | Inspection tool | |
JPS62297701A (en) | Tooth thickness measuring tool for gear | |
KR200490676Y1 (en) | Testing apparatus for thread micrometer | |
KR200151484Y1 (en) | Jig measuring the bearing cap of the cylinder block crank housing | |
KR20240010203A (en) | Inspection device for cooling plate | |
KR100412222B1 (en) | Compensation method and Compensation apparatus of NC measure three-dimensional position error | |
KR20020052815A (en) | Pocket type unit bluck standing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20010320 Year of fee payment: 4 |
|
LAPS | Lapse due to unpaid annual fee |