JPWO2023095328A5 - - Google Patents

Download PDF

Info

Publication number
JPWO2023095328A5
JPWO2023095328A5 JP2023563476A JP2023563476A JPWO2023095328A5 JP WO2023095328 A5 JPWO2023095328 A5 JP WO2023095328A5 JP 2023563476 A JP2023563476 A JP 2023563476A JP 2023563476 A JP2023563476 A JP 2023563476A JP WO2023095328 A5 JPWO2023095328 A5 JP WO2023095328A5
Authority
JP
Japan
Prior art keywords
water distribution
target
plan
water
distribution plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2023563476A
Other languages
English (en)
Japanese (ja)
Other versions
JPWO2023095328A1 (https=
JP7790444B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/JP2021/043618 external-priority patent/WO2023095328A1/ja
Publication of JPWO2023095328A1 publication Critical patent/JPWO2023095328A1/ja
Publication of JPWO2023095328A5 publication Critical patent/JPWO2023095328A5/ja
Application granted granted Critical
Publication of JP7790444B2 publication Critical patent/JP7790444B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2023563476A 2021-11-29 2021-11-29 情報処理装置、情報処理方法及びプログラム Active JP7790444B2 (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/043618 WO2023095328A1 (ja) 2021-11-29 2021-11-29 情報処理装置、情報処理方法及びプログラム

Publications (3)

Publication Number Publication Date
JPWO2023095328A1 JPWO2023095328A1 (https=) 2023-06-01
JPWO2023095328A5 true JPWO2023095328A5 (https=) 2024-07-30
JP7790444B2 JP7790444B2 (ja) 2025-12-23

Family

ID=86539026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023563476A Active JP7790444B2 (ja) 2021-11-29 2021-11-29 情報処理装置、情報処理方法及びプログラム

Country Status (3)

Country Link
US (1) US20250013945A1 (https=)
JP (1) JP7790444B2 (https=)
WO (1) WO2023095328A1 (https=)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116484647B (zh) * 2023-05-24 2023-09-05 长江水利委员会长江科学院 面向统筹协调的分布式水资源配置方法及系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6851247B2 (ja) * 2017-04-26 2021-03-31 株式会社日立製作所 運用計画立案装置、運用制御システム、および、運用計画立案方法

Similar Documents

Publication Publication Date Title
Ma et al. Resilience enhancement of distribution grids against extreme weather events
Dorfner et al. Large-scale district heating network optimization
JP2025022904A (ja) 配管損傷予測
Lee et al. Forecasting nonlinear time series of energy consumption using a hybrid dynamic model
Kelly Estimating economic loss from cascading infrastructure failure: a perspective on modelling interdependency
Shayesteh et al. Multi-station equivalents for short-term hydropower scheduling
JP2023099662A (ja) 多数の水資源の管理ツール
CN107423859A (zh) 一种组合模型建模方法及系统
Parreño Forecasting electricity consumption in the Philippines using ARIMA models
Ponte et al. Intelligent decision support system for real-time water demand management
JP7790444B2 (ja) 情報処理装置、情報処理方法及びプログラム
JPWO2023095328A5 (https=)
JP2014006612A (ja) 水道情報管理システム,及び管理方法
Ioannou et al. Effect of electricity market price uncertainty modelling on the profitability assessment of offshore wind energy through an integrated lifecycle techno-economic model
He et al. Combined forecasting of regional logistics demand optimized by genetic algorithm
Mansor et al. Medium-term electricity load demand forecasting using holt-winter exponential smoothing and SARIMA in university campus
Rao et al. Optimising water supply and distribution operations
Alamri et al. Agent based modelling in digital twins for household water consumption forecasting
Mokoma et al. Water provision planning on the basis of human population growth forecasts: A case study of the City of uMhlathuze, KwaZulu-Natal Province, South Africa
Murali et al. Hybrid simulation and reinforcement learning-based scheduling for resilient infrastructure networks
Bataev et al. Public-private partnership as a mechanism for the development of heat supply
Ponte et al. Real-time water demand forecasting system through an agent-based architecture
JP7767526B1 (ja) 情報処理装置、情報処理方法及びプログラム
Zhang et al. A Three‐Stage Birandom Program for Unit Commitment with Wind Power Uncertainty
Li Multi-criteria optimization of group replacement schedules for distributed water pipeline assets