JPS6449877U - - Google Patents

Info

Publication number
JPS6449877U
JPS6449877U JP8211887U JP8211887U JPS6449877U JP S6449877 U JPS6449877 U JP S6449877U JP 8211887 U JP8211887 U JP 8211887U JP 8211887 U JP8211887 U JP 8211887U JP S6449877 U JPS6449877 U JP S6449877U
Authority
JP
Japan
Prior art keywords
calendar
diagram
january
year
week
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8211887U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP8211887U priority Critical patent/JPS6449877U/ja
Publication of JPS6449877U publication Critical patent/JPS6449877U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Electric Clocks (AREA)

Description

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第2図は本願考案の「万年カレンダー
」を構成するもので第1図イは大円板に西暦年・
曜日を表示し各西暦年1月1日の曜日の配列状況
を示した図。第1図ロは、西暦年の下2桁の数字
で、第1図イ西暦と曜日表示の大円板の上に小円
板を重ねて回転可能に組み合わせるもので「01
〜99」の配列状況を示した図。第2図aは七曜
表示で、第1図イ西暦年曜日表示の大円板の裏面
で七曜の配列状況を示した図。第2図bは、12
ケ月の表示で、第2図a七曜表示の大円板の上に
中円板を重ねて回転可能に組み合わせるもので1
2ケ月の配列状況を示した図。第2図cは、1ケ
月の表示で第2図b12ケ月の表示の中円板の上
に小円板を重ねて回転可能に組み合わせるもので
日付の配列状況を示した図。第3図〜第6図は、
各世紀暦年「01〜99」の1月1日の曜日が解
かる実施例を示した図で第3図は「2,6,10
,14,18,22,26……」世紀の西暦年の
下2桁「01〜99」までの1月1日の曜日を表
した図。第4図は「3,7,11,15,19,
23,27……」世紀の西暦年の下2桁「01〜
99」までの1月1日の曜日を表した図。第5図
は「5,9,13,17,21,25,29……
」世紀の西暦年の下2桁「01〜99」までの1
月1日の曜日を表した図。第6図は「4,8,1
6,24,28……」世紀の西暦年の下2桁「0
1〜99」までの1月1日の曜日を表した図。第
7図a〜第7図gから第13図a〜第13図gは
、1月1日が七曜に表される使用状態を示した各
12ケ月のカレンダーの図で、第7図a〜第7図
gは、1月1日が木曜日の場合で、第7図aは、
1月・10月のカレンダーの図である。第7図b
は、2月・3月・11月のカレンダーの図である
。第7図cは、4月・7月のカレンダーの図であ
る。第7図dは、5月のカレンダーの図である。
第7図eは、6月のカレンダーの図である。第7
図fは、8月のカレンダーの図である。第7図g
は、9月・12月のカレンダーの図である。第8
図a〜第8図gは、1月1日が月曜日の場合で、
第8図aは、1月・10月のカレンダーの図であ
る。第8図bは、2月・3月・11月のカレンダ
ーの図である。第8図cは、4月・7月のカレン
ダーの図である。第8図dは、5月のカレンダー
の図である。第8図eは、6月のカレンダーの図
である。第8図fは、8月のカレンダーの図であ
る。第8図gは、9月・12月のカレンダーの図
である。第9図a〜第9図gは、1月1日が火曜
日の場合で、第9図aは、1月・10月のカレン
ダーの図である。第9図bは、2月・3月・11
月のカレンダーの図である。第9図cは、4月・
7月のカレンダーの図である。第9図dは、5月
のカレンダーの図である。第9図eは、6月のカ
レンダーの図である。第9図fは、8月のカレン
ダーの図である。第9図gは、9月・12月のカ
レンダーの図である。第10図a〜第10図gは
、1月1日が水曜日の場合で、第10図aは、1
月・10月のカレンダーの図である。第10図b
は、2月・3月・11月のカレンダーの図である
。第10図cは、4月・7月のカレンダーの図で
ある。第10図dは、5月のカレンダーの図であ
る。第10図eは、6月のカレンダーの図である
。第10図fは、8月のカレンダーの図である。
第10図gは、9月・12月のカレンダーの図で
ある。第11図a〜第11図gは、1月1日が金
曜日の場合で、第11図aは、1月・10月のカ
レンダーの図である。第11図bは、2月・3月
・11月のカレンダーの図である。第11図cは
、4月・7月のカレンダーの図である。第11図
dは、5月のカレンダーの図である。第11図e
は、6月のカレンダーの図である。第11図fは
、8月のカレンダーの図である。第11図gは、
9月・12月のカレンダーの図である。第12図
a〜第12図gは、1月1日が土曜日の場合で、
第12図aは、1月・10月のカレンダーの図で
ある。第12図bは、2月・3月・11月のカレ
ンダーの図である。第12図cは、4月・7月の
カレンダーの図である。第12図dは、5月のカ
レンダーの図である。第12図eは、6月のカレ
ンダーの図である。第12図fは、8月のカレン
ダーの図である。第12図gは、9月・12月の
カレンダーの図である。第13図a〜第13図g
は、1月1日が土曜日の場合で、第13図aは、
1月・10月のカレンダーの図である。第13図
bは、2月・3月・11月のカレンダーの図であ
る。第13図cは、4月・7月のカレンダーの図
である。第13図dは、5月のカレンダーの図で
ある。第13図eは、6月のカレンダーの図であ
る。第13図fは、8月のカレンダーの図である
。第13図gは、9月・12月のカレンダーの図
である。第14図a〜第14図bから第20図a
〜第20図bは閏年で、1月1日が七曜に表され
る使用状態を示した各1月・4月・7月と各2月
・8月のカレンダーの図で、第14図a〜第14
図bは閏年で1月1日が水曜日の場合で第14図
aは、1月・4月・7月のカレンダーの図である
。第14図bは、2月・8月のカレンダーの図で
ある。第15図a〜第15図bは閏年で1月1日
が日曜日の場合で第15図aは、1月・4月・7
月のカレンダーの図である。第15図bは、2月
・8月のカレンダーの図である。第16図a〜第
16図bは閏年で1月1日が月曜日の場合で第1
6図aは、1月・4月・7月のカレンダーの図で
ある。第16図bは、2月・8月のカレンダーの
図である。第17図a〜第17図bは閏年で1月
1日が火曜日の場合で第17図aは、1月・4月
・7月のカレンダーの図である。第17図bは、
2月・8月のカレンダーの図である。第18図a
〜第18図bは閏年で1月1日が木曜日の場合で
第18図aは、1月・4月・7月のカレンダーの
図である。第18図bは、2月・8月のカレンダ
ーの図である。第19図a〜第19図bは閏年で
1月1日が金曜日の場合で第19図aは、1月・
4月・7月のカレンダーの図である。第19図b
は、2月・8月のカレンダーの図である。第20
図a〜第20図bは閏年で1月1日が土曜日の場
合で第20図aは、1月・4月・7月のカレンダ
ーの図である。第20図bは、2月・8月のカレ
ンダーの図である。
Figures 1 and 2 constitute the "perpetual calendar" invented in this application.
A diagram showing the days of the week and the arrangement of the days of January 1st of each Christian year. Figure 1 B is the last two digits of the year, and Figure 1 B is a rotatable combination of a small disk overlaid on a large disk displaying the year and day of the week.
-99'' is a diagram showing the arrangement situation. Figure 2a shows the seven days of the week, and Figure 1a shows the arrangement of the seven days of the week on the back of the large disk showing the days of the week in the Western calendar. Figure 2b is 12
It is a display of the moon, and the middle disk is placed on top of the large disk of the Seven Days display in Figure 2a, and it is combined so that it can rotate.
A diagram showing the arrangement status for 2 months. Figure 2c is a diagram showing the arrangement of dates in which a small disc is rotatably stacked on top of a middle disc to display 12 months in Figure 2b. Figures 3 to 6 are
Figure 3 shows an example of how to find the day of the week on January 1st for each century calendar year "01-99".
, 14, 18, 22, 26...'' A diagram showing the day of the week of January 1st in the last two digits ``01-99'' of the Western calendar year of the century. Figure 4 shows "3, 7, 11, 15, 19,
23, 27…” Last two digits of the year of the century “01~
A diagram showing the days of the week on January 1st up to ``99''. Figure 5 shows "5, 9, 13, 17, 21, 25, 29...
” The last two digits of the Western calendar year of the century “01-99” 1
A diagram showing the days of the week on the 1st of the month. Figure 6 shows "4, 8, 1
6, 24, 28…” The last two digits of the year of the century “0”
A diagram showing the days of the week on January 1st from 1 to 99. Figures 7a to 7g to 13a to 13g are diagrams of calendars for each of the 12 months showing usage conditions in which January 1st is represented on the Seven Days. Figure 7g is for the case where January 1st is a Thursday, and Figure 7a is for the case where January 1st is a Thursday.
It is a diagram of a calendar for January and October. Figure 7b
is a diagram of a calendar for February, March, and November. FIG. 7c is a diagram of the calendar for April and July. Figure 7d is a diagram of the calendar for May.
FIG. 7e is a diagram of the June calendar. 7th
Figure f is a diagram of the calendar for August. Figure 7g
is a diagram of a calendar for September and December. 8th
Figures a to 8g are for cases where January 1st is a Monday,
FIG. 8a is a diagram of a calendar for January and October. FIG. 8b is a diagram of a calendar for February, March, and November. FIG. 8c is a diagram of the calendar for April and July. Figure 8d is a diagram of the calendar for May. FIG. 8e is a diagram of the June calendar. FIG. 8f is a diagram of the calendar for August. FIG. 8g is a diagram of the calendar for September and December. Figures 9a to 9g are for the case where January 1st is a Tuesday, and Figure 9a is a calendar diagram for January and October. Figure 9b shows February, March, and November
It is a diagram of a lunar calendar. Figure 9c shows April...
It is a diagram of a calendar for July. FIG. 9d is a diagram of the calendar for May. FIG. 9e is a diagram of the June calendar. FIG. 9f is a diagram of the calendar for August. FIG. 9g is a diagram of a calendar for September and December. Figures 10a to 10g are for the case where January 1st is a Wednesday, and Figure 10a is for the case where January 1st is a Wednesday.
It is a figure of a calendar of month and October. Figure 10b
is a diagram of a calendar for February, March, and November. FIG. 10c is a diagram of the calendar for April and July. Figure 10d is a diagram of the calendar for May. Figure 10e is a diagram of the June calendar. Figure 10f is a diagram of the calendar for August.
FIG. 10g is a diagram of the calendar for September and December. Figures 11a to 11g are for the case where January 1st is a Friday, and Figure 11a is a diagram of the calendar for January and October. FIG. 11b is a diagram of a calendar for February, March, and November. FIG. 11c is a diagram of a calendar for April and July. FIG. 11d is a diagram of the calendar for May. Figure 11e
is a diagram of the calendar for June. FIG. 11f is a diagram of the calendar for August. Figure 11g is
It is a diagram of a calendar for September and December. Figures 12a to 12g are for the case where January 1st is a Saturday.
FIG. 12a is a diagram of a calendar for January and October. FIG. 12b is a diagram of a calendar for February, March, and November. FIG. 12c is a diagram of a calendar for April and July. Figure 12d is a diagram of the calendar for May. Figure 12e is a diagram of the June calendar. Figure 12f is a diagram of the calendar for August. FIG. 12g is a diagram of a calendar for September and December. Figure 13a to Figure 13g
is the case where January 1st is a Saturday, and Figure 13a is
It is a diagram of a calendar for January and October. FIG. 13b is a diagram of a calendar for February, March, and November. FIG. 13c is a diagram of a calendar for April and July. Figure 13d is a diagram of the calendar for May. Figure 13e is a diagram of the June calendar. FIG. 13f is a diagram of the calendar for August. FIG. 13g is a diagram of a calendar for September and December. Figures 14a to 14b to 20a
~Figure 20b is a diagram of the calendar for each of January, April, July, February and August, showing the usage status in which January 1st is expressed as the seventh day of the year in a leap year, and Figure 14a ~14th
Figure b shows a leap year in which January 1st falls on a Wednesday, and Figure 14a shows a calendar for January, April, and July. FIG. 14b is a diagram of the calendar for February and August. Figures 15a to 15b are for cases where January 1st is a Sunday in a leap year, and Figure 15a is for January, April, and 7th.
It is a diagram of a lunar calendar. FIG. 15b is a diagram of the calendar for February and August. Figures 16a to 16b are leap years and January 1st is a Monday.
Figure 6a is a diagram of a calendar for January, April, and July. FIG. 16b is a diagram of the calendar for February and August. Figures 17a to 17b are diagrams for the case where January 1st falls on a Tuesday in a leap year, and Figure 17a is a calendar diagram for January, April, and July. Figure 17b is
It is a diagram of a calendar for February and August. Figure 18a
~Figure 18b is a leap year in which January 1st is a Thursday, and Figure 18a is a calendar diagram for January, April, and July. FIG. 18b is a diagram of the calendar for February and August. Figures 19a to 19b are for the case where January 1st is a Friday in a leap year, and Figure 19a is for the case where January
It is a diagram of a calendar for April and July. Figure 19b
is a diagram of a calendar for February and August. 20th
Figures a to 20b are for the case where January 1st is a Saturday in a leap year, and Figure 20a is a calendar diagram for January, April, and July. FIG. 20b is a diagram of the calendar for February and August.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 表面側に、西暦年1月1日の曜日を配列した大
盤円板に、回転可能な西暦年の下2桁の数字を配
列した小盤円板を重ね、表面の大円板の裏面側に
七曜を配列し、この上側に回転可能な12ケ月の
数字を配列した中円板を重ね、さらに回転可能な
日付を配列した小円板を重ね、表面、裏面の大中
小4つの円板に5つの表示を組み合わせて構成さ
れることを特徴とする円板を回転することにより
幾西暦年月日の曜日をも確実に知ることが出来る
「万年カレンダー」である。
On the obverse side, a large disc with the days of the week of January 1, 2017 arranged, and a rotatable small disc with the last two digits of the year in the Christian calendar arranged on it, and on the back side of the large disc on the front side. The seven days of the year are arranged, and on top of this is a rotatable medium disk with 12 month numbers arranged on it, and a rotatable small disk with dates arranged on top of it. It is a ``perpetual calendar'' that allows you to reliably know the day of the week, month, day, and year of any Western calendar by rotating the disk, which is characterized by a combination of two displays.
JP8211887U 1987-05-30 1987-05-30 Pending JPS6449877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8211887U JPS6449877U (en) 1987-05-30 1987-05-30

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8211887U JPS6449877U (en) 1987-05-30 1987-05-30

Publications (1)

Publication Number Publication Date
JPS6449877U true JPS6449877U (en) 1989-03-28

Family

ID=31306883

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8211887U Pending JPS6449877U (en) 1987-05-30 1987-05-30

Country Status (1)

Country Link
JP (1) JPS6449877U (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5842989U (en) * 1981-09-16 1983-03-23 日新電機株式会社 Shield for electric field mitigation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5842989U (en) * 1981-09-16 1983-03-23 日新電機株式会社 Shield for electric field mitigation

Similar Documents

Publication Publication Date Title
JPS6449877U (en)
US4863193A (en) Multi-year calendar
US5271172A (en) Scheduling device
US5189285A (en) Calendar date finder
US5950338A (en) Cylinder-type perpetual calendar assembly
US5125688A (en) Calendrical device
US4531314A (en) Calendar
JP7535275B2 (en) calendar
US2631391A (en) Calendar
US2341599A (en) Perpetual calendar
JP3060680U (en) Perpetual calendar
JP3226808U (en) calendar
JPH0528493Y2 (en)
JPH0715006Y2 (en) calendar
JPS6111007Y2 (en)
JP3217236U (en) Refill, notebook and notebook
JPH026458Y2 (en)
JP3071793U (en) Date stamp
JP2502225Y2 (en) calendar-
JPS63200486U (en)
JPS62181982U (en)
JPS60191470U (en) calendar
JPH11305662A (en) Calendar
JPS6113322Y2 (en)
JPS6328438Y2 (en)