JPS6439232U - - Google Patents
Info
- Publication number
- JPS6439232U JPS6439232U JP13402687U JP13402687U JPS6439232U JP S6439232 U JPS6439232 U JP S6439232U JP 13402687 U JP13402687 U JP 13402687U JP 13402687 U JP13402687 U JP 13402687U JP S6439232 U JPS6439232 U JP S6439232U
- Authority
- JP
- Japan
- Prior art keywords
- spout
- opening
- annular collar
- pouring tool
- edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229920003002 synthetic resin Polymers 0.000 claims 1
- 239000000057 synthetic resin Substances 0.000 claims 1
Landscapes
- Rigid Containers With Two Or More Constituent Elements (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13402687U JPS6439232U (es) | 1987-09-02 | 1987-09-02 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13402687U JPS6439232U (es) | 1987-09-02 | 1987-09-02 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6439232U true JPS6439232U (es) | 1989-03-08 |
Family
ID=31392422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13402687U Pending JPS6439232U (es) | 1987-09-02 | 1987-09-02 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6439232U (es) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7152005B2 (en) | 2001-02-27 | 2006-12-19 | Hitachi, Ltd. | System for aiding the preparation of operation and maintenance plans for a power generation installation |
-
1987
- 1987-09-02 JP JP13402687U patent/JPS6439232U/ja active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7152005B2 (en) | 2001-02-27 | 2006-12-19 | Hitachi, Ltd. | System for aiding the preparation of operation and maintenance plans for a power generation installation |