JPS6369513A - Sand basin installation - Google Patents

Sand basin installation

Info

Publication number
JPS6369513A
JPS6369513A JP21078786A JP21078786A JPS6369513A JP S6369513 A JPS6369513 A JP S6369513A JP 21078786 A JP21078786 A JP 21078786A JP 21078786 A JP21078786 A JP 21078786A JP S6369513 A JPS6369513 A JP S6369513A
Authority
JP
Japan
Prior art keywords
sand
chain
screen
backets
scraping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21078786A
Other languages
Japanese (ja)
Inventor
Fusao Yoshikawa
吉川 房男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP21078786A priority Critical patent/JPS6369513A/en
Publication of JPS6369513A publication Critical patent/JPS6369513A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To remove and discharge sands as well as scums floating in a water stream, by providing a scum removing bar screen in front of a chain in a sand scraping-up conveyer and providing claws to the backets provided to a chain to comb through between the bars of the bar screen. CONSTITUTION:A scum removing bar screen 30 is provided to the upward moving part 18 of the chain 2 of the settled sand scraping-up conveyer so as to be brought into contact with the chain 2, and numerous claws 31a to comb between bars 30a of the bar screen 30 is provided to backets 31 installed to the chain 2. The scums in the water stream flowed into the sand basin are caught by the scum screen 30 and combed by the claws 31a of the backets 31 and discharged with the sands in the backets to the outside. Thus the scum removing function is integrated with the scraping-up function of settled sands into one unit, and the required area for the sand basin as well as the cost for the installation of the sand basin are reduced.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は下水処理場の沈砂池設備の改良に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to improvements in settling basin equipment for sewage treatment plants.

〔従来の技術〕[Conventional technology]

第3図は従来の下水処理場の沈砂池の側面一部断面図で
、(1)は沈砂池、(2はチェイン、(3)はバケット
、(4)はスプロケットホイール、(5)はアーム、(
6)はアームリフタ、(7)は回転軸、(8)は駆動軸
、(9)はモータ、αQはティクアップ、(1υはベル
トコンベヤ、Ozはスクリーン、aツはし漬スクリーン
、α4)はし清掻揚機、(15)はベルトコンベヤ、(
16)はチェインの8動方向を示す矢印、α7)はチェ
インの水平移動部、α印は同上方移動部、叫は水流、母
は砂、21)は水面である。
Figure 3 is a partial cross-sectional side view of a settling basin in a conventional sewage treatment plant, where (1) is the settling basin, (2 is the chain, (3) is the bucket, (4) is the sprocket wheel, and (5) is the arm. ,(
6) is the arm lifter, (7) is the rotating shaft, (8) is the drive shaft, (9) is the motor, αQ is the pick-up, (1υ is the belt conveyor, Oz is the screen, azuki screen, α4) is (15) is a belt conveyor, (
16) is an arrow indicating the 8 movement directions of the chain, α7) is the horizontal movement part of the chain, α is the upward movement part, the scream is the water flow, the base is the sand, and 21) is the water surface.

下水は水流(2)となって導入され、先づスクリーン(
財)で浮遊する木片やプラスチック破片が除去された後
、沈砂池(1)内に流入する。沈砂池(1)は断面積が
大きく水流(2)は流速が落ちるので、水流α0中の砂
翰は沈降して地底に堆積する。砂翰を沈降除去した水流
α印は、ついでし漬スクリーンθ印で水流中の浮遊物(
し渣)を除去した後、次工程へ流入する。し渣スクリー
ンaつに捕集されたし清は、し清掻揚機α句により掻上
げられ、ベルトコンベヤ(1υにより場外へ排出される
The sewage is introduced as a stream (2) and first passes through the screen (
After the floating wood and plastic debris are removed by the sand sink (1), they flow into the settling basin (1). Since the sand basin (1) has a large cross-sectional area and the water flow (2) has a low flow velocity, the sand in the water flow α0 settles and is deposited on the ground. The water flow where the sand has been settled and removed is marked α, and the floating matter in the water stream (marked θ) is
After removing the residue), it flows into the next step. The sludge collected on the sludge screen is scraped up by a sludge scraper α and discharged outside the site by a belt conveyor (1υ).

地底に堆積した砂翰を排出するには、バケット(3)を
装着したヂエインを矢印06)の方向に8動せしめて、
地底の砂翰を掻きとり、バケット(3)で上方へ運び、
ベルトコンベヤ(1υにより場外へ排出する。チェイン
(2)の駆動は、モータ(9)により駆動軸(8)を作
動して行なう。なお、地底に堆積した砂翰の表面高さは
時間とともに変動するので、アームリフタ(6)を作動
してアーム(5)を回転@h (7)を釉として一点鎖
線のように平行移動し、バケット(3)が常に堆積した
砂翰をうまく掻きとりつるように調節する。
To discharge the sand piles accumulated on the underground, move the engine equipped with the bucket (3) 8 in the direction of arrow 06).
Scrape up the sand from the underground and carry it upwards with the bucket (3).
A belt conveyor (1υ) is used to discharge the sand out of the site.The chain (2) is driven by a drive shaft (8) driven by a motor (9).The surface height of sand piles deposited on the ground changes over time. Therefore, operate the arm lifter (6) and rotate the arm (5) @h (7) as the glaze and move it in parallel as shown by the dashed line so that the bucket (3) can always scrape off the accumulated sand. Adjust to

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

ところで上記沈砂池の設備においては、沈砂を掻取り排
出する設備と、し渣を捕集し排出する設備とは別個に配
置され夫々別個に運転されている。そのため沈砂池の所
要面積も大きくなり全体の設備コストが嵩むことになる
ので、設備コストを低減するために、上記両機能の一体
化が懸案事項となっていた。
By the way, in the above-mentioned sand settling basin equipment, the equipment for scraping and discharging the settled sand and the equipment for collecting and discharging the sludge are arranged separately and operated separately. As a result, the area required for the sand settling basin becomes larger and the overall equipment cost increases.Therefore, in order to reduce the equipment cost, it has been a matter of concern to integrate both of the above-mentioned functions.

本発明は上記要望に応えて、沈砂池における沈砂掻揚機
能と、し漬除去機能とを一体化した設備を提供しようと
するものである。
In response to the above-mentioned needs, the present invention aims to provide equipment that integrates the functions of sand removal and sand removal in a sand settling basin.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的を達成するため、本発明は沈砂池の沈砂掻揚機
において、チェインの上方移動部のチェインの前方にし
漬除去用のバースクリーンを配設し、チェインに装着し
たバケットに、該バースクリーンのバーの間を挿通する
爪を備えた。
In order to achieve the above object, the present invention provides a sand scraper for a sand settling basin, in which a bar screen for removing pickling is provided in front of the chain in the upward moving part of the chain, and the bar screen is attached to a bucket attached to the chain. Equipped with a claw that can be inserted between the bars.

〔作用〕[Effect]

沈砂池の沈砂掻揚機を上記のように構成したので、該沈
砂掻揚機は、池底に堆積した砂とともに、水流中に浮遊
するし清も併せて除去排出することができる。
Since the sediment scraper for the sand settling pond is constructed as described above, the sand sediment scraper can remove and discharge not only the sand deposited on the pond bottom but also the sediment floating in the water flow.

〔発明の実施例〕[Embodiments of the invention]

第1図は本発明の一実施例を示す沈砂及びし清掻揚機の
構成図、第2図はその要部拡大図である。図中(1)〜
QDは従来装置と同一部品、□□□はし漬スクリーン、
  (30a)はスクリーンバー、臼υは爪つきバケッ
ト、(31a)  は爪、(2)はし漬である。
FIG. 1 is a block diagram of a sand settling and scavenging machine showing one embodiment of the present invention, and FIG. 2 is an enlarged view of the main parts thereof. (1) in the diagram
QD has the same parts as the conventional device, □□□ Hashizuke screen,
(30a) is a screen bar, mortar υ is a bucket with a claw, (31a) is a claw, and (2) a pickle.

図に示すようにチェイン(りの上方移動部側に、し漬ス
クリーン(支)を配設し、バケット(31)にスクリー
ン(支)のスクリーンバー(30a)の間を挿通ずる多
数の爪(+ta)を装着する。この結果沈砂池(1)内
に流入した水流α9中に浮遊するし漬(2)は、し渣ス
クリーン■υに捕集され、それをバケットの爪(31a
)が掻取ってベルトコンベヤ(lυに、バケット(1)
内の砂翰とともに排出し、ベルトコンベヤ(11)は砂
し清ともに場外へ輸送する。
As shown in the figure, a dipping screen (support) is provided on the upward moving part side of the chain, and a large number of claws (support) are inserted into the bucket (31) between the screen bars (30a) of the screen (support). As a result, the sludge (2) floating in the water flow α9 that has flowed into the settling basin (1) is collected by the sludge screen ■υ, and is then transferred to the bucket claw (31a).
) is scraped by the belt conveyor (lυ), and the bucket (1)
The belt conveyor (11) transports the sand together with the sand to the outside.

爪(31a)はスクリーン(2)の捕集したし渣(2)
を掻きとるだけでなく、池底に堆積した砂翰をバケッ1
− (31)で掻きとり収納する場合にも好都合である
The claw (31a) is the residue (2) collected by the screen (2).
In addition to scraping off the sand, we also put a bucket of sand that has accumulated on the bottom of the pond.
- It is also convenient when storing by scraping with (31).

爪(31a)の構造、材質は上記実施例のそれに限定す
るものでなく、沈砂池に流入する下水の仕様に応じ適宜
決定すべきである。
The structure and material of the claws (31a) are not limited to those of the above embodiments, but should be appropriately determined according to the specifications of the sewage flowing into the settling basin.

〔発明の効果〕〔Effect of the invention〕

本発明は下水処理物の沈砂池設備において、沈砂掻揚機
とし渣処理機とを一体化したので、沈砂池設備の仕様を
簡易化するとともに、沈砂池所要面積を大幅に低減させ
ることが可能となり、沈砂池の建設費ならびに運転経費
を低減させるという優れた効果をあげることができた。
The present invention integrates a sediment scraping machine and a sludge treatment machine in settling basin equipment for sewage treatment, making it possible to simplify the specifications of the settling basin equipment and to significantly reduce the area required for the settling basin. As a result, we were able to achieve the excellent effect of reducing the construction and operating costs of the settling basin.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例である沈砂し清掻揚機の構成
図、第2図はその要部の(a)は拡大側面図、(b)は
拡大平面図、第3図は従来の沈砂池の側面図である。 図中(1)は沈砂池、(りはチェイン、(17)はチェ
インの水平移動部、(1印は同上方移動部、(2)は水
流、翰は砂、((1)はしン査スクリーン、(30a)
  はスクリーンバー、臼υはバケット、(31a)は
バケットの爪、((5)はし清である。 代理人 弁理士  佐 藤 正 年 第 1 図 1:戊砂丸 2:チェイン 17:チェインの木千今動部 18:子エイノの上方坊勧音p 19:水 流 20:? 30ニジ遺スクリーン 30qニスクリーン八− 32ニジ旌 第2vA (a) 手  続  補  正  書 (自発)昭和61年12
用4 日
Fig. 1 is a configuration diagram of a sand settling and scraping machine which is an embodiment of the present invention, Fig. 2 shows its main parts (a) is an enlarged side view, (b) is an enlarged plan view, and Fig. 3 is a FIG. 2 is a side view of a conventional sand settling basin. In the figure, (1) is the sand settling basin, (ri is the chain, (17) is the horizontal moving part of the chain, (1 mark is the upward moving part, (2) is the water flow, the handle is the sand, ((1) is the chain, and (1) is the horizontal moving part of the chain. Inspection screen, (30a)
is the screen bar, mortar υ is the bucket, (31a) is the claw of the bucket, and ((5) is Hashikiyo. Agent: Patent Attorney Masashi Sato Kichikon Motion Department 18: Child Eino's Kamigatabo Kanne p 19: Mizuryu 20:? 30 Niji Ishi Screen 30q Nishi Screen 8- 32 Niji Jei No. 2vA (a) Proceedings Amendment (Spontaneous) 1986 12
4 days

Claims (1)

【特許請求の範囲】[Claims] 下水処理場の沈砂池の沈砂掻揚機において、チェインの
上方移動部にチェインに当接してし渣スクリーンを配設
し、上記スクリーンに捕集されたし渣を掻き取るための
爪を各バケットに装着したことを特徴とする沈砂池設備
In a sediment scraper for a settling pond in a sewage treatment plant, a sludge screen is placed in contact with the chain in the upward moving part of the chain, and each bucket has a claw for scraping off the sludge collected on the screen. A sand settling basin equipment characterized by being attached to.
JP21078786A 1986-09-09 1986-09-09 Sand basin installation Pending JPS6369513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21078786A JPS6369513A (en) 1986-09-09 1986-09-09 Sand basin installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21078786A JPS6369513A (en) 1986-09-09 1986-09-09 Sand basin installation

Publications (1)

Publication Number Publication Date
JPS6369513A true JPS6369513A (en) 1988-03-29

Family

ID=16595121

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21078786A Pending JPS6369513A (en) 1986-09-09 1986-09-09 Sand basin installation

Country Status (1)

Country Link
JP (1) JPS6369513A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04105125U (en) * 1991-02-20 1992-09-10 株式会社クボタ Sand and dust removal equipment
KR100826316B1 (en) 2005-10-06 2008-04-30 주식회사 화성 Screen equipment of wastewater disposal plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04105125U (en) * 1991-02-20 1992-09-10 株式会社クボタ Sand and dust removal equipment
KR100826316B1 (en) 2005-10-06 2008-04-30 주식회사 화성 Screen equipment of wastewater disposal plant

Similar Documents

Publication Publication Date Title
JPS6369513A (en) Sand basin installation
JP2004016862A (en) Oil recovery apparatus and cleaning treatment apparatus for soil contaminated with oil
JPS6369512A (en) Sand basin installation
JP3909539B2 (en) Sludge scraping machine
JP2916363B2 (en) Sedimentation washer
JP3909538B2 (en) Sludge scraping machine
JP3181470B2 (en) Sludge scraper of settling pond
JPS59139905A (en) Screening and apparatus for conveying scraped sand
JPS597288Y2 (en) Export device for sand settling ponds, etc.
JPS5923057Y2 (en) Dust removal equipment
JPH04126505A (en) Scraper for settled sand and screenings
JPS591707Y2 (en) dust cleaning device
JPS6154298A (en) Apparatus for discharging deposited sand in sludge vessel
JPS6129442Y2 (en)
JPS6366009A (en) Sunken sand scraping-up machine
JPS5820249A (en) Apparatus for rub washing collected sand
JPH0319947Y2 (en)
JPH0994405A (en) Grit and dust separating and ejecting device
JPS55152508A (en) Machine facility for sedimentation basin
JPH09262413A (en) Clogging preventive device for screen installed in tank
JPS5942051A (en) Sand washing device
JPS5980343A (en) Method for washing precipitated sand in sewage treatment
JPH09299940A (en) Scum skimmer
JPH0441939Y2 (en)
JPH0128105Y2 (en)