JPS6363582U - - Google Patents
Info
- Publication number
- JPS6363582U JPS6363582U JP15891086U JP15891086U JPS6363582U JP S6363582 U JPS6363582 U JP S6363582U JP 15891086 U JP15891086 U JP 15891086U JP 15891086 U JP15891086 U JP 15891086U JP S6363582 U JPS6363582 U JP S6363582U
- Authority
- JP
- Japan
- Prior art keywords
- ignition timing
- cylinder pressure
- operating state
- engine
- correction amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001514 detection method Methods 0.000 claims description 5
- 238000000605 extraction Methods 0.000 claims 1
- 239000000446 fuel Substances 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 238000005070 sampling Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 8
Landscapes
- Electrical Control Of Ignition Timing (AREA)
Description
第1図は本考案の基本概念図、第2〜10図は
本考案の一実施例を示す図であり、第2図はその
全体構成図、第3図はそのクランク角と筒内圧の
関係を示す図、第4図はその点火時期と筒内圧最
大時期との関係を示す図、第5図はその点火時期
を変えたときの筒内圧最大時期の分布状態を示す
図、第6図はその点火時期制御のプログラムを示
すフローチヤート、第7図はその点火時期を変え
たときの筒内圧最大時期の変化を示す図、第8図
はその点火時期を変えたときの筒内圧最大時期が
適性となる確率を示す図、第9図はその筒内圧の
検出間隔が狭すぎるときの筒内圧最大時期が適正
となる確率を示す図、第10図はその筒内圧の検
出間隔が広すぎるときの筒内圧最大時期が適正と
なる確率を示す図である。
1a〜1d……筒内圧センサ(圧力検出手段)
、5……コントロールユニツト(抽出手段、補正
量決定手段、点火時期設定手段)、8……運転状
態検出手段、20……点火手段。
Figure 1 is a basic conceptual diagram of the present invention, Figures 2 to 10 are diagrams showing one embodiment of the present invention, Figure 2 is its overall configuration, and Figure 3 is the relationship between the crank angle and cylinder pressure. Figure 4 is a diagram showing the relationship between the ignition timing and the maximum cylinder pressure timing, Figure 5 is a diagram showing the distribution of the maximum cylinder pressure timing when the ignition timing is changed, and Figure 6 is a diagram showing the distribution state of the cylinder pressure maximum timing when the ignition timing is changed. A flowchart showing the ignition timing control program, Figure 7 is a diagram showing the change in the maximum cylinder pressure timing when the ignition timing is changed, and Figure 8 is a diagram showing the change in the maximum cylinder pressure timing when the ignition timing is changed. Figure 9 shows the probability that the cylinder pressure maximum timing will be appropriate when the cylinder pressure detection interval is too narrow, and Figure 10 shows the probability that the cylinder pressure maximum timing will be appropriate when the cylinder pressure detection interval is too wide. FIG. 3 is a diagram showing the probability that the cylinder pressure maximum timing will be appropriate. 1a to 1d... Cylinder pressure sensor (pressure detection means)
, 5... Control unit (extracting means, correction amount determining means, ignition timing setting means), 8... Operating state detecting means, 20... Ignition means.
Claims (1)
と、 b エンジンの運転状態を検出する運転状態検出
手段と、 c 圧力検出手段の出力に基づいてエンジンの発
生トルクが最大となる筒内圧最大時期近傍の複数
のクランク角における筒内圧をサンプリングする
抽出手段と、 d 筒内圧最大時期近傍の複数のクランク角にお
ける筒内圧のうち何れが最大であるかを判別し、
この判別結果から点火時期の補正量を決定する補
正量決定手段と、 e エンジンの運転状態に基づいて基本点火時期
を設定し、これを補正量決定手段の出力に応じて
補正する点火時期設定手段と、 f 点火時期設定手段の出力に基づいて混合気に
点火する点火手段と、 を備えたことを特徴とする点火時期制御装置。[Scope of Claim for Utility Model Registration] a. Pressure detection means for detecting the cylinder pressure of the engine; b. Operating state detection means for detecting the operating state of the engine; c. an extraction means for sampling the in-cylinder pressure at a plurality of crank angles near the time when the cylinder pressure becomes maximum;
A correction amount determining means for determining the correction amount of the ignition timing from the result of this determination, and an ignition timing setting means for setting the basic ignition timing based on the operating state of the engine and correcting it in accordance with the output of the correction amount determining means. An ignition timing control device comprising: (f) ignition means for igniting the air-fuel mixture based on the output of the ignition timing setting means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15891086U JPS6363582U (en) | 1986-10-17 | 1986-10-17 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15891086U JPS6363582U (en) | 1986-10-17 | 1986-10-17 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6363582U true JPS6363582U (en) | 1988-04-26 |
Family
ID=31082844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15891086U Pending JPS6363582U (en) | 1986-10-17 | 1986-10-17 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6363582U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04128456A (en) * | 1990-09-19 | 1992-04-28 | Misawa Homes Co Ltd | Formation of roof panel |
-
1986
- 1986-10-17 JP JP15891086U patent/JPS6363582U/ja active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04128456A (en) * | 1990-09-19 | 1992-04-28 | Misawa Homes Co Ltd | Formation of roof panel |