JPS6361693B2 - - Google Patents

Info

Publication number
JPS6361693B2
JPS6361693B2 JP59083574A JP8357484A JPS6361693B2 JP S6361693 B2 JPS6361693 B2 JP S6361693B2 JP 59083574 A JP59083574 A JP 59083574A JP 8357484 A JP8357484 A JP 8357484A JP S6361693 B2 JPS6361693 B2 JP S6361693B2
Authority
JP
Japan
Prior art keywords
job
queue
job information
information
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59083574A
Other languages
Japanese (ja)
Other versions
JPS60229144A (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP59083574A priority Critical patent/JPS60229144A/en
Publication of JPS60229144A publication Critical patent/JPS60229144A/en
Publication of JPS6361693B2 publication Critical patent/JPS6361693B2/ja
Granted legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation

Description

【発明の詳細な説明】 本発明は、システム中断に際してシステムの高
速かつ中断前の状態を保証した再立ち上げを行う
ことにより、ジヨブの再実行を迅速かつ正しく行
い得るようにした計算機におけるジヨブ制御方式
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention provides a job control system in a computer that enables job re-execution quickly and correctly by restarting the system quickly and guaranteeing the state before the interruption when the system is interrupted. It is related to the method.

従来のシステム中断によるジヨブの処理プログ
ラム再実行のための方式としては、ジヤーナル方
式(ジヨブ情報中の変化分のみを別フアイルとし
て切り出す方式)と、チエツク・ポイント・フア
イル方式(利用者の契機指定により利用者フアイ
ルにジヨブ情報をすべて吐き出す方式)とが知ら
れている。これらの従来方式では、ジヨブの処理
プログラム再実行時にはシステム中断前の情報
(利用者が指定した計算機資料群に関するジヨブ
制御文など)とジヤーナル情報やチエツク・ポイ
ント情報のマージを行なわなければならない。こ
れがシステム再立ち上げの大幅に遅れる要因とな
つている。また、ジヤーナル情報やチエツク・ポ
イント情報が存在しないときには、ジヨブの再実
行が不可になつたり、ジヨブのガーベージが残つ
たりする不都合が発生する可能性が高かつた。
Conventional methods for re-running a job processing program due to system interruption include the journal method (a method in which only changes in the job information are extracted as a separate file) and the checkpoint file method (a method in which only changes in the job information are extracted as a separate file) and a checkpoint file method (a method in which only changes in job information are extracted as a separate file) A known method is to dump all job information into a user file. In these conventional methods, when re-executing a job processing program, it is necessary to merge information from before the system was interrupted (such as job control statements regarding a group of computer data specified by the user) with journal information and check point information. This is causing a significant delay in restarting the system. Furthermore, if journal information or check point information does not exist, there is a high possibility that problems will occur, such as making it impossible to re-execute the job or leaving job garbage behind.

本発明は、上記の考察に基づくものであつて、
システム中断などに際してシステムを早急に回復
し立ち上げ得ると共にジヨブの処理プログラム再
実行を円滑に行い得ること及びシステムにガーベ
ージを残さないこと等の特徴を有するジヨブ制御
方式を提供することを目的としている。そしてそ
のため、本発明のジヨブ制御方式は、ジヨブ入力
制御部と、ジヨブ実行処理部と、ジヨブ実行制御
部と、ジヨブ実行後処理部と、ジヨブ出力制御部
と、キユー管理部と、ジヨブ情報管理部と、上記
キユー管理部によつて管理されるキユー・バツフ
アと、上記キユー管理部によつて管理されるキユ
ー情報用二重化フアイルと、上記ジヨブ情報管理
部によつて管理されるジヨブ情報バツフアと、上
記ジヨブ情報管理部によつて管理されるジヨブ情
報用二重化フアイルとを備え、 上記ジヨブ入力制御部は、投入されたジヨブに
対してキユー・バツフアにキユー・エレメントを
確保すること及び該キユー・エレメントのステー
タスを入力中にすることを上記キユー管理部に要
求し、入力されたジヨブ制御文に基づいてジヨブ
情報を設定し、設定したジヨブ情報を上記ジヨブ
情報バツフアに格納すべきことを上記ジヨブ情報
管理部に要求し、その後に該ジヨブに対するキユ
ー・エレメントのステータスを実行待ちにするこ
とを上記キユー管理部に要求するように構成さ
れ、待ちのステータスを待つジヨブの中から1個
のジヨブを選択し、選択したジヨブの次への処理
部に対する指令を司どるジヨブ・スケジユール制
御部では実行待ちのジヨブの中から1個のジヨブ
を選択し、選択したジヨブについて実行前処理を
行うべきことを実行前処理部に対して指令し、上
記実行前処理部は、ジヨブの実行前処理を行うべ
きことを指令された場合、該ジヨブに対するキユ
ー・エレメントのステータスを実行前処理中にす
べきことを上記キユー管理部に要求し、ジヨブ実
行のための必要な計算機資料をジヨブに割り当て
ると共に割り当てた計算機資源をジヨブ情報とし
て記憶するため上記ジヨブ情報バツフアに格納す
べきことを上記ジヨブ情報管理部に要求し、その
後に該ジヨブのキユー・エレメントのステータス
を処理プログラム実行中にすべきことを上記キユ
ー管理部に要求するように構成され、 上記キユー管理部は、キユー・エレメントの内
容の更新要求があつたとき、指定ジヨブに対する
キユー・エレメントの内容をキユー・バツフア上
で更新すると共に、更新されたキユー・バツフア
の内容を上記キユー情報用二重化フアイルにコピ
ーするように構成され、 上記ジヨブ情報管理部は、ジヨブ情報の更新要
求があつたとき、該当するジヨブ情報バツフアの
内容を更新すると共に、所定のタイミングでジヨ
ブ情報バツフアの内容を上記ジヨブ情報用二重化
フアイルにコピーするように構成されていること
を特徴とするものである。以下、本発明を図面を
参図しつつ説明する。
The present invention is based on the above considerations, and includes:
The purpose of the present invention is to provide a job control method that has the characteristics of being able to quickly recover and start up the system in the event of a system interruption, smoothly re-executing the job processing program, and not leaving any garbage in the system. . Therefore, the job control method of the present invention includes a job input control section, a job execution processing section, a job execution control section, a job post-execution processing section, a job output control section, a queue management section, and a job information management section. a queue buffer managed by the queue management unit, a duplicate file for queue information managed by the queue management unit, and a job information buffer managed by the job information management unit. , and a duplex file for job information managed by the job information management section, and the job input control section secures a queue element in the queue buffer for the input job and the job information management section. Requests the queue management section to set the status of the element to inputting, sets job information based on the input job control statement, and requests that the set job information be stored in the job information buffer. The queue management unit is configured to request the information management unit, and then request the queue management unit to change the status of the queue element for the job to execution waiting, and select one job from among the jobs waiting for the waiting status. The job schedule control unit, which controls the command to the next processing unit for the selected job, selects one job from among the jobs waiting to be executed, and instructs that pre-execution processing should be performed on the selected job. When the pre-execution processing unit is instructed to perform pre-execution processing of a job, the pre-execution processing unit instructs the queue element status for the job to be performed during pre-execution processing. A request is made to the job information management section to allocate computer resources necessary for job execution to the job, and to store the allocated computer resources in the job information buffer in order to store them as job information. The queue management unit is configured to request the queue management unit to change the status of the queue element of the job during execution of the processing program, and the queue management unit receives a request to update the contents of the queue element. The job information management unit is configured to update the contents of the queue element for the specified job on the queue buffer and copy the updated contents of the queue buffer to the duplex file for queue information. , when a job information update request is received, the contents of the corresponding job information buffer are updated, and the contents of the job information buffer are copied to the duplex file for job information at a predetermined timing. This is a characteristic feature. Hereinafter, the present invention will be explained with reference to the drawings.

図は本発明の一実施例を示すものであつて、1
は入力制御部、2は実行前処理部、3はジヨブ実
行制御部、4は実行後処理部、5は出力制御部、
6はキユー管理部、7はキユー・バツフア、7′
はキユー・エレメント、8−1と8−2はフアイ
ル、9はジヨブ情報管理部、10はジヨブ情報バ
ツフア、11−1と11−2もフアイル、12と
13はスケジユーラ、14は計算機資源群、1
4′と14″はサブ計算機資源群、14′−2と1
4′−nと14″−1と14″−2と14″−nは計
算機資源をそれぞれ示している。また、、…
は処理ステツプを特定するものである。なお、矢
印の先についたは矢印の元についたに接続さ
れ、、矢印の先についたは矢印の元について
に接続されているものと考えてよい。
The figure shows one embodiment of the present invention, 1
is an input control section, 2 is a pre-execution processing section, 3 is a job execution control section, 4 is a post-execution processing section, 5 is an output control section,
6 is Kyu Management Department, 7 is Kyu Batshua, 7'
are queue elements, 8-1 and 8-2 are files, 9 is a job information management unit, 10 is a job information buffer, 11-1 and 11-2 are also files, 12 and 13 are schedulers, 14 is a computer resource group, 1
4' and 14'' are sub computer resource groups, 14'-2 and 1
4'-n, 14''-1, 14''-2 and 14''-n indicate computer resources, respectively. Also,...
identifies a processing step. It should be noted that the end of the arrow may be considered to be connected to the end of the arrow, and the end of the arrow may be considered to be connected to the end of the arrow.

入力制御部1は下記の、、の処理を行う
ものである。
The input control unit 1 performs the following processing.

キユー・エレメントの確保および該キユー・
エレメントへのステータスの書込みをキユー管
理部6に依頼する。この際のステータスは入力
中である。1個のキユー・エレメント7′の大
きさは32バイトであり、また、1個のキユー・
エレメント7′は1個のジヨブ情報バツフア1
0と1対1の対応をなしている。1個のジヨブ
情報バツフアの大きさは4096バイトである。
Securing queue elements and
The queue management section 6 is requested to write the status to the element. The status at this time is inputting. The size of one queue element 7' is 32 bytes, and the size of one queue element 7' is 32 bytes.
Element 7' contains one job information buffer 1.
There is a one-to-one correspondence with 0. The size of one job information buffer is 4096 bytes.

入力されたジヨブ制御文を制御プログラムが
読める形のジヨブ情報(例として、計算機資源
群14のうちの計算機サブ資源群14′または
14″)に変換し、このジヨブ情報をジヨブ情
報バツフア10に格納すべきことをジヨブ情報
管理部9に依頼する。1つのジヨブは複数のジ
ヨブ情報バツフア10をもつことが出来る。
Converts the input job control statement into job information in a format readable by the control program (for example, the computer sub-resource group 14' or 14'' of the computer resource group 14), and stores this job information in the job information buffer 10. The job information management section 9 is requested to do what should be done.One job can have a plurality of job information buffers 10.

該ジヨブに対するキユー・エレメントのステ
ータスを「実行待ち」にすべきことをキユー管
理部6に依頼する。スケジユーラ12は、実行
待ちのジヨブの中から1個のジヨブを選択し、
選択したジヨブについて実行前処理を行うべき
ことをジヨブ実行前処理部2に対して指令す
る。ジヨブの実行前処理が指令されると、実行
前処理部2は、下記、、の処理を行う。
The queue management unit 6 is requested to change the status of the queue element for the job to "waiting for execution". The scheduler 12 selects one job from among the jobs waiting to be executed,
It instructs the job pre-execution processing section 2 to perform pre-execution processing on the selected job. When the pre-execution processing of a job is instructed, the pre-execution processing unit 2 performs the following processing.

該ジヨブに対するキユー:エレメントのステ
ータスを「実行前処理中」にすべきことをキユ
ー管理部6に依頼する。
A request is made to the queue management unit 6 to change the status of the queue:element to "pre-execution processing" for the job.

利用者が指定した計算機サブ資源群14′ま
たは14″に対して特定計算機資源14′−nま
たは14″−nを割当てるために、ジヨブ管理
の計算機サブ資源群14′または14″を特定計
算機資源14′−nまたは14″−nに更新す
る。そして割り当てた計算機資源14′−nま
たは4″−nに更新したジヨブ情報をジヨブ情
報バツフア10に格納すべきことをジヨブ情報
管理部9に依頼する。更に、新たにフアイル空
間を確保する場合にも、その旨ジヨブ情報バツ
フア10に格納すべきことをジヨブ情報管理部
9に依頼する。これにより、システム中断によ
るシステムの再立ち上げに備えるとともにジヨ
ブの処理プログラム再実行に備える。
In order to allocate a specific computer resource 14'-n or 14''-n to the computer sub-resource group 14' or 14'' specified by the user, the job management computer sub-resource group 14' or 14'' is assigned as a specific computer resource. Update to 14'-n or 14''-n. Then, the job information management unit 9 is requested to store the updated job information in the assigned computer resource 14'-n or 4''-n in the job information buffer 10. The job information management unit 9 is also requested to store this information in the job information buffer 10. This prepares for restarting the system due to system interruption and prepares for re-execution of the job processing program.

ジヨブの処理プログラムの走行に際して必要
な資源の割当て等の前処理が完了したならば、
該キユー・エレメントのステータスを「処理プ
ログラム実行中」にすべきことをキユー管理部
6に依頼する。以上により、ジヨブの処理プロ
グラムのシステム中断による由実行に備える。
再実行時には、ジヨブ情報を直接更新している
効果により再実行のための特殊な処理が不要と
なり通常時のルート(実行前処理部2)を再度
走行させるだけで処理プログラムに制御を渡す
ことが可能となる。かつ、利用者指定資源を特
定資源としているため、システム中断前の状態
を完全に復元することが出来る。
Once the preprocessing such as allocating resources necessary for running the job processing program is completed,
The queue management unit 6 is requested to change the status of the queue element to "processing program in progress." With the above steps, preparations are made for unexpected execution of the job processing program due to system interruption.
At the time of re-execution, the effect of directly updating the job information eliminates the need for special processing for re-execution, allowing control to be passed to the processing program simply by running the normal route (pre-execution processing section 2) again. It becomes possible. In addition, since the user-designated resources are used as specific resources, the state before system interruption can be completely restored.

ジヨブの実行前処理が終了すると、ジヨブ実
行制御部3を起動する。ジヨブ実行制御部3
は、ジヨブ制御文で指定された処理プログラム
に制御権を渡し、この処理プログラムを起動す
る。処理プログラムの走行が終了すると、実行
後処理部4に制御権が渡される。実行後処理部
4は下記、の処理を行う。
When the job execution pre-processing is completed, the job execution control section 3 is activated. Job execution control unit 3
transfers control to the processing program specified in the job control statement and starts this processing program. When the processing program finishes running, control is passed to the post-execution processing section 4. The post-execution processing unit 4 performs the following processing.

該ジヨブに対するキユー・エレメントのステ
ータスを「実行後処理中」にすべきことをキユ
ー管理部6に依頼する。
A request is made to the queue management unit 6 to change the status of the queue element for the job to "post-execution processing".

資源の解放処理を行い、資源の解放をジヨブ
情報に反映させるべきことをジヨブ情報管理部
9に依頼する。
The job information management unit 9 is requested to perform resource release processing and reflect the resource release in job information.

該ジヨブに対するキユー・エレメントのステ
ータスを「出力待ち」にすべきことをキユー管
理部6に依頼する。
The queue management unit 6 is requested to change the status of the queue element for the job to "wait for output".

スケジユーラ13は、出力待ちのジヨブの中
から、1個のジヨブを選択し、選択したジヨブ
について出力処理すべきことを出力制御部5に
依頼する。出力制御部5は下記、、の処
理を行う。
The scheduler 13 selects one job from among the jobs waiting for output, and requests the output control unit 5 to perform output processing on the selected job. The output control unit 5 performs the following processing.

該ジヨブに対するキユー・エレメントのステ
ータスを「出力中」にすべきことをキユー管理
6に依頼する。
A request is made to the queue management 6 to change the status of the queue element for the job to "outputting".

出力制御部でジヨブ情報を出力するためにジ
ヨブ情報管理部9にジヨブ情報の読み出しを依
頼し、ジヨブ情報を出力する。
In order to output the job information, the output control section requests the job information management section 9 to read out the job information, and outputs the job information.

該ジヨブに対するキユー・エレメントの返却
をキユー管理部6に依頼する。キユー管理部6
は下記、の処理を行う。
The queue management unit 6 is requested to return the queue element for the job. QU management department 6
performs the following processing.

利用者のキユー更新要求に応じて該キユー・
エレメントの更新を行う。
In response to the user's queue update request, the corresponding queue
Update elements.

利用者からのキユー更新要求に同期してキユ
ー・バツフアの内容をフアイル8−1,8−2
にコピーする。
The contents of the queue buffer are sent to files 8-1 and 8-2 in synchronization with the queue update request from the user.
Copy to.

ジヨブ情報管理部9は下記、の処理を行
う。
The job information management section 9 performs the following processing.

利用者からのジヨブ情報更新要求に従い、該
当するジヨブ情報バツフア10の内容を更新す
る。
In accordance with a job information update request from a user, the contents of the corresponding job information buffer 10 are updated.

ジヨブ情報バツフア10の内容をフアイル1
1−1,11−2にコピーする。フアイル11
−1,11−2の中のジヨブ情報の更新は、利
用者の更新要求とは同期しない。ジヨブ情報の
更新契機は非常に多いので、その都度の入出力
動作はオーバ.ヘツドを増大させる。よつて、
ジヨブ毎に定められた数のバツフアを待ち、
LRUアルゴリズムを用いてI回数の削減を
図つて処理の高速化を行つている。入出力動作
が非同期に行われるため、フアイル11−1,
11−2の情報の保証は、キユー・エレメント
のステータスの更新が行われた時、関連せるジ
ヨブ情報バツフアの内容をフアイル11−1,
11−2に吐き出すことによつて行つている。
Save the contents of job information buffer 10 to file 1
Copy to 1-1 and 11-2. File 11
Job information updates in -1 and 11-2 are not synchronized with user update requests. There are so many opportunities to update job information that the input/output operations each time become overloaded. Increase head. Then,
Wait for a set number of battles for each job,
The LRU algorithm is used to speed up processing by reducing the number of I times. Since input/output operations are performed asynchronously, files 11-1,
The information guarantee in 11-2 is such that when the status of a queue element is updated, the contents of the related job information buffer are transferred to the file 11-1,
This is done by exhaling in 11-2.

以上の説明から明らかなように、本発明によれ
ば、システム中断に際してシステムを中断直前の
状態に素早く復元し、再立ち上げ出来ること、ジ
ヨブの処理プログラム再実行を迅速かく正しく行
い得ること、及びシステムにジヨブによるガーペ
ージを残さないこと等の顕著な効果を奏すること
が出来る。なお、入力制御部1、実行前処理部2
ジヨブ実行制御部3、実行後処理部4、出力制御
部5、キユー管理部6およびジヨブ情報管理部9
は、プログラムで実現されるものである。
As is clear from the above description, according to the present invention, when the system is interrupted, the system can be quickly restored to the state immediately before the interruption and restarted, the job processing program can be re-executed quickly and correctly, and It is possible to achieve remarkable effects such as not leaving garpages caused by jobs in the system. Note that the input control unit 1, the execution preprocessing unit 2
Job execution control section 3, post-execution processing section 4, output control section 5, queue management section 6, and job information management section 9
is realized by a program.

【図面の簡単な説明】[Brief explanation of drawings]

図は本発明の一実施例を示すものである。 1……入力制御部、2……実行前処理部、3…
…ジヨブ実行制御部、4……実行後処理部、5…
…出力制御部、6……キユー管理部、7……キユ
ー・バツフア、7′……キユー・エレメント、8
−1と8−2……フアイル、9……ジヨブ情報管
理部、10……ジヨブ情報バツフア、11−1と
11−2……フアイル、12と13……スケジユ
ーラ、14……計算機資源群、14′と14″……
サブ計算機資源群、14′−1と14′−2と1
4′−nと14″−1と14″−2と14″−n……
計算機資源。
The figure shows one embodiment of the invention. 1...Input control unit, 2...Execution preprocessing unit, 3...
...Job execution control unit, 4...Post-execution processing unit, 5...
...output control unit, 6...queue management section, 7...queue buffer, 7'...queue element, 8
-1 and 8-2... file, 9... job information management department, 10... job information buffer, 11-1 and 11-2... file, 12 and 13... scheduler, 14... computer resource group, 14' and 14''...
Sub computer resource group, 14'-1, 14'-2 and 1
4'-n, 14''-1, 14''-2 and 14''-n...
Computer resources.

Claims (1)

【特許請求の範囲】 1 ジヨブ入力制御部と、ジヨブ実行前処理部
と、ジヨブ実行制御部と、ジヨブ実行後処理部
と、ジヨブ出力制御部と、キユー管理部と、ジヨ
ブ情報管理部と、ジヨブ・スケジユール制御部
と、上記キユー管理部によつて管理されるキユ
ー・バツフアと、上記キユー管理部によつて管理
されるキユー情報用二重化フアイルと、上記ジヨ
ブ情報管理部によつて管理されるジヨブ情報バツ
フアと、上記ジヨブ情報管理部によつて管理され
るジヨブ情報用二重化フアイルとを備え、 上記ジヨブ入力制御部は、投入されたジヨブに
対してキユー・バツフアにキユー・エレメントを
確保すること及び該キユー・エレメントのステー
タスを入力中にすることを上記キユー管理部に要
求し、入力されたジヨブ制御文に基づいてジヨブ
情報を設定し、設定したジヨブ情報を上記ジヨブ
情報バツフアに格納すべきことを上記ジヨブ情報
管理部に要求し、その後に該ジヨブに対するキユ
ー・エレメントのステータスを実行待ちにするこ
とを上記キユー管理部に要求するように構成さ
れ、待ちのステータスを待つジヨブの中から、1
個のジヨブを選択し、選択したジヨブの次への処
理部に対する指令を司どるジヨブ・スケジユール
制御部では、実行待ちのジヨブの中から1個のジ
ヨブを選択し、選択したジヨブについて実行前処
理を行うべきことを実行前処理部に対して指令
し、上記実行前処理部は、ジヨブの実行前処理を
行うべきことを指令された場合、該ジヨブに対す
るキユー・エレメントのステータスを実行前処理
中にすべきことを上記キユー管理部に要求し、ジ
ヨブ実行のための必要な計算機資源をジヨブに割
り当てると共に割り当てた計算機資源をジヨブ情
報として記憶するため上記ジヨブ情報バツフアに
格納すべきことを上記ジヨブ情報管理部に要求
し、その後に該ジヨブのキユー・エレメントのス
テータスを処理プログラム実行中にすべきことを
上記キユー管理部に要求するように構成され、 上記キユー管理部は、キユー・エレメントの内
容の更新要求があつたとき、指定ジヨブに対する
キユー・エレメントの内容をキユー・バツフア上
で更新すると共に、更新されたキユー・バツフア
の内容を上記キユー情報用二重化フアイルにコピ
ーするように構成され、 上記ジヨブ情報管理部は、ジヨブ情報の更新要
求があつたとき、該当するジヨブ情報バツフアの
内容を更新すると共に、所定のタイミングでジヨ
ブ情報バツフアの内容を上記ジヨブ情報用二重化
フアイルにコピーするように構成されていること
を特徴とするジヨブ制御方式。
[Scope of Claims] 1. Job input control section, job execution pre-processing section, job execution control section, job execution post-processing section, job output control section, queue management section, job information management section, A job schedule control section, a queue buffer managed by the queue management section, a duplicate queue information file managed by the queue management section, and a queue information management section managed by the job information management section. It comprises a job information buffer and a duplex file for job information managed by the job information management section, and the job input control section secures a queue element in the queue buffer for the submitted job. and request the queue management section to set the status of the queue element to inputting, set job information based on the input job control statement, and store the set job information in the job information buffer. The job information management unit is configured to request the job information management unit to change the status of the queue element for the job, and then request the queue management unit to change the status of the queue element for the job to the waiting status, and from among the jobs waiting for the waiting status, 1
The job schedule control unit selects one job from among the jobs waiting to be executed and performs pre-execution processing on the selected job. When the pre-processing unit is instructed to perform pre-processing of a job, the pre-processing unit changes the status of the queue element for the job under pre-processing. The queue manager is requested to allocate computer resources necessary for job execution to the job, and to store the allocated computer resources in the job information buffer in order to store them as job information. The queue management unit is configured to request the information management unit to check the status of the queue element of the job, and then request the queue management unit to check the status of the queue element of the job during execution of the processing program; When an update request is received, the contents of the queue element for the specified job are updated on the queue buffer, and the updated contents of the queue buffer are copied to the duplex file for queue information. The job information management unit is configured to update the contents of the corresponding job information buffer when a job information update request is received, and to copy the contents of the job information buffer to the job information duplex file at a predetermined timing. The job control method is characterized by:
JP59083574A 1984-04-25 1984-04-25 Job control system Granted JPS60229144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59083574A JPS60229144A (en) 1984-04-25 1984-04-25 Job control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59083574A JPS60229144A (en) 1984-04-25 1984-04-25 Job control system

Publications (2)

Publication Number Publication Date
JPS60229144A JPS60229144A (en) 1985-11-14
JPS6361693B2 true JPS6361693B2 (en) 1988-11-30

Family

ID=13806274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59083574A Granted JPS60229144A (en) 1984-04-25 1984-04-25 Job control system

Country Status (1)

Country Link
JP (1) JPS60229144A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6192423B2 (en) * 2013-08-12 2017-09-06 キヤノン株式会社 Information processing apparatus, information processing method, information processing system, and program

Also Published As

Publication number Publication date
JPS60229144A (en) 1985-11-14

Similar Documents

Publication Publication Date Title
US7882136B2 (en) Foresight data transfer type hierarchical storage system
JP5966927B2 (en) Distributed processing apparatus and distributed processing system
JP5909566B2 (en) Computer system and control method thereof
JPH04195577A (en) Task scheduling system for multiprocessor
CN108469982B (en) Online migration method for container
JPH0589061A (en) Version up method
US9170962B2 (en) Dynamic designation of retirement order in out-of-order store queue
JP2724078B2 (en) Maintenance method for redundant memory
US10289306B1 (en) Data storage system with core-affined thread processing of data movement requests
JP3135714B2 (en) Checkpoint restart method
JPS6361693B2 (en)
JP3644042B2 (en) Multitask processing device
JPH0895810A (en) Batch job execution system
JPS603229B2 (en) Information processing method
JPH06318191A (en) Multi-thread processing system
WO2021002054A1 (en) Computer system and program execution method
JP2001166956A (en) Job scheduling system in composite system
JP2926873B2 (en) Computer system
CN113760460A (en) vCPU scheduling method of dom0, storage medium and physical computer
JPS5854467A (en) Logging data collection controlling system
JPH07114522A (en) Multiprocessor system
JPS59163647A (en) Task control method
JPH01222335A (en) Multi-task processing system
JPH0247772B2 (en) MACHIGYORETSUSEIGYOHOSHIKI
JPS60167037A (en) Emulation system