JPS6356093A - Centralized supervisory and control equipment - Google Patents

Centralized supervisory and control equipment

Info

Publication number
JPS6356093A
JPS6356093A JP20063086A JP20063086A JPS6356093A JP S6356093 A JPS6356093 A JP S6356093A JP 20063086 A JP20063086 A JP 20063086A JP 20063086 A JP20063086 A JP 20063086A JP S6356093 A JPS6356093 A JP S6356093A
Authority
JP
Japan
Prior art keywords
monitoring
terminal
signal
control
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20063086A
Other languages
Japanese (ja)
Other versions
JPH0783509B2 (en
Inventor
Masayuki Kanetani
金谷 雅之
Toshiyuki Masuda
敏行 増田
Akihiko Hamada
昭彦 濱田
Osamu Yamada
修 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP20063086A priority Critical patent/JPH0783509B2/en
Publication of JPS6356093A publication Critical patent/JPS6356093A/en
Publication of JPH0783509B2 publication Critical patent/JPH0783509B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

PURPOSE:To permit a controller having a voltage applied contact output such as EE switches to control a load by providing input terminals to which operation inputs consisting of the voltage applied contacts for a supervisory terminal. CONSTITUTION:The supervisory terminal 25 is provided with signal input terminals 10a and 10b to which signal lines 4 are connected in one end of a terminal part on the upper surface of a case 9 in which a terminal circuit 8 is stored, and input terminals 12a and 12b to which the operation inputs consisting of the voltage applied contacts in the other terminal part. The terminal circuit 8 consists of an insulating input terminal 8a having photocouplers PC1-PC3 and a signal processing circuit 8b which is driven in a circuit power source where a transmission signal Vs is rectified and smoothed. The voltage applied contact inputs inputted to the input terminals 12a and 12b are fetched in a state where they are electrically insulated from a signal system.

Description

【発明の詳細な説明】 [技術分野1 本発明は、操作入力を集中監視するとともに、操作入力
に基いて負荷を集中制御する集中監視制御装置に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field 1] The present invention relates to a centralized monitoring and control device that centrally monitors operational input and centrally controls a load based on the operational input.

[背景技術1 従来、操作入力を集中監視するとともに、操作入力に基
いて負荷を集中制御するこの種の集中監視制御装置は、
i8図に示すように、中央制御7=置1と、操作スイッ
チs w 、 、 s w 2・・・・・・による操作
入力を監視する監視端末器2と、負荷L 、 、 L、
・・・・・・を制御する制御端末器3とを一対の信号i
!、′2・1に接続し、中央制御装置1から各監視端末
器2をアクセスして監視データを返送させ、監視データ
に基いて形成された負荷り、、L2・・・・・・を制御
する制御データを中央制御装置1から制御滞末器3をア
クセスして伝送するようになっていた。第9図は、中央
制御装置1から送イ3される伝送信号■・3の一例を示
すもので、抜性信号として送信される伝送信号Vsは、
信号伝送開始を示すスタート信号STと、各端末器2,
3をアクセスするためのアドレズ′データを伝送するア
ドレスデータ信号ADと、制御端末器3に制御データを
伝送する制御データ信号CDと、返送待機期間信号WT
とで植成されており、各データはパルス幅変調によって
伝送されるようになっている。また、各監視端末器2あ
るいは制御端末器3から監視データあるいは制御確認信
号を中央制御装W11に返送する返送信号VBは、返送
待機期間信号WTに同期して電流モード信号(信号#I
4間に適宜低抵抗を接続して得られる信号)により返送
される。また、各端末器2,3では、伝送信号Vsを整
流平滑して回路電源を得るようになっている。
[Background Art 1 Conventionally, this type of centralized monitoring and control device centrally monitors operation inputs and centrally controls loads based on the operation inputs.
As shown in FIG.
A pair of signals i are connected to the control terminal 3 that controls .
! , '2.1, accesses each monitoring terminal 2 from the central control device 1, causes the monitoring data to be sent back, and controls the loads formed based on the monitoring data, L2... The control data to be transmitted is transmitted from the central control device 1 by accessing the control storage device 3. FIG. 9 shows an example of the transmission signals ① and 3 sent from the central control device 1, and the transmission signal Vs sent as the extraction signal is
A start signal ST indicating the start of signal transmission, each terminal device 2,
3, a control data signal CD that transmits control data to the control terminal 3, and a return waiting period signal WT.
Each data is transmitted by pulse width modulation. Further, a return signal VB for returning monitoring data or a control confirmation signal from each monitoring terminal device 2 or control terminal device 3 to the central control unit W11 is a current mode signal (signal #I) in synchronization with the return waiting period signal WT.
(signal obtained by connecting an appropriate low resistance between the two terminals). Further, each terminal device 2, 3 rectifies and smoothes the transmission signal Vs to obtain circuit power.

ところで、このような従来例において、監視端末器2は
、有電圧接点よりなる操作入力を受は付けるようになっ
ていなかったので、EEスイッチなどの有電圧接点出力
を具備した制御機器出力にて負荷を制御することができ
ないという問題があった。また、監視端末器の形状が分
電盤協約寸法になっていなかったので、分電盤内に配設
する場合における配設作業および配線作業が面倒になる
という問題があった。
By the way, in such a conventional example, the monitoring terminal device 2 was not designed to accept operation inputs made of voltage contacts, so it was not designed to accept operation inputs made of voltage contacts, so it was not possible to receive operation inputs from control equipment such as EE switches equipped with voltage contact outputs. There was a problem that the load could not be controlled. Furthermore, since the shape of the monitoring terminal did not conform to the dimensions agreed upon by the distribution board, there was a problem in that the installation work and wiring work when installing it in the distribution board became troublesome.

[発明の目的] 本発明は上記の点に鑑みて為されたものであり、その目
的とするところは、有電圧接点出力を操作入力として負
荷を制御することができ、しかも分電盤内に容易に配設
することができ、配設作業および配線作業を簡略化でき
る集中監視制御装置を提供することにある。
[Object of the Invention] The present invention has been made in view of the above points, and its purpose is to be able to control a load by using a voltage contact output as an operation input, and to be able to control a load within a distribution board. It is an object of the present invention to provide a centralized monitoring and control device that can be easily installed and can simplify installation and wiring work.

[発明の開示] (実施例) fn1図乃至第4図は本発明一実施例を示すもので、中
央制御装置1と、操作入力を監視する監視端末器2.〜
25と、負荷り、、L2・・・・・・を制御する制@端
末器3とを一対の信号線4に接続し、中央制御装置1か
ら監視端末器21〜25をアクセスして監視データを返
送させ、該監視データに基いて形成された負荷を制御す
る制御データを中央制御装置1から制御端末器3をアク
セスして伝送するようにした従来例と同様の集中監視制
御装置において、有電圧接点よりなる複数の操作入力が
接続される入力端子12a、12bが設けられ分電盤協
約寸法に形成された監視端末器2.を分電盤A内に配設
したものであり、実施例では、中央制御装置1、タイマ
ーユニット51〜51、無電圧接点出力を操作入力とし
て監視する監視端末器2I〜24、制御端末器3お上り
リモコンリレー61’?62も分電盤協約寸法に設定さ
れており、分電盤A内に容易に配設できるようになって
いる。また、監視端末器2.は、第2図および第3図に
示すように、端末器回路8が収納され分電盤協約寸法に
形成されたケース9の上面の一方の4子部に、信号線4
が接続される信号入力幼子10a、10bが設けられる
とともに、他方のタコ子部に、有電圧接点よりなる操作
入力が接続される4Nの入力端子12a。
[Disclosure of the Invention] (Embodiment) Figures fn1 to 4 show an embodiment of the present invention, which includes a central control device 1, a monitoring terminal 2 for monitoring operation input. ~
25 and a control @ terminal device 3 that controls the load, L2, etc. are connected to a pair of signal lines 4, and the monitoring terminal devices 21 to 25 are accessed from the central control device 1 to receive monitoring data. In a centralized monitoring and control device similar to the conventional example, the control data for controlling the load formed based on the monitoring data is transmitted from the central control device 1 by accessing the control terminal device 3. A monitoring terminal device 2, which is provided with input terminals 12a and 12b to which a plurality of operation inputs consisting of voltage contacts are connected, and which is formed to the dimensions agreed upon by the distribution board. are arranged in the distribution board A, and in the embodiment, a central control device 1, timer units 51 to 51, monitoring terminals 2I to 24 that monitor the non-voltage contact output as an operation input, and a control terminal 3. Upward remote control relay 61'? 62 is also set to the dimensions agreed upon by the distribution board, so that it can be easily installed in the distribution board A. In addition, the monitoring terminal 2. As shown in FIGS. 2 and 3, the signal line 4 is attached to one of the four terminals on the upper surface of the case 9, which houses the terminal circuit 8 and is formed to the dimensions agreed upon by the distribution board.
A 4N input terminal 12a is provided with signal input terminals 10a and 10b to which are connected, and a 4N input terminal 12a to which an operation input consisting of a voltage contact is connected to the other tacho terminal.

12bが設けられており、入力ra子12aはケ・−ス
9内で共通′#:続されている。また、ケース9の上面
中央には監視端末a;2.の固有アドレスを設定するア
ドレス設定スイッチ13が設けられており、この7ドレ
ス設定スイツチ13には変更自在なスイッチに対応した
窓が形成された保護カバー138が覆着されている。
12b is provided, and the input RA terminals 12a are commonly connected within the case 9. Also, in the center of the upper surface of the case 9 are a monitoring terminal a; 2. An address setting switch 13 for setting a unique address is provided, and this 7-dress setting switch 13 is covered with a protective cover 138 in which a window corresponding to the changeable switch is formed.

また、端末器回路8はPt54図に示すように、グイオ
ードD0.7オトカプラpc、〜pc、、抵抗Ros 
 R11−RI4およびコンデンサC,,−C,4、C
21〜C24よりなるMA緑大入力回路8a、伝送信号
Vsを整流平滑した回路電源(図示せず)にて駆!?l
Jされる信号処理回路8bとで形成されており、入力端
子12a、12bに入力される有心圧接、−χ人力が信
号系と電気的に絶縁された状態で取1)込まれるように
なっている。なお、実施例では、EEスイッチ7の出力
は接、gf、 S。を介して支流電源Ac1oovが出
力されるようになっており、絶縁入力回路8aはA C
100Vが出力される有電圧接点に対応できるようにな
っている。また、Ax電圧接点出力を操作入力とする監
視?Jj末器21〜2□は、操作入力を7オトカプラを
介して取り込むよう(こなっており、7オトカ7°うの
厚手J)電源としてAC24Vが電源端子11a+11
t」に人力(整流平滑して7オトカプラの入力側に供給
する)されている。
In addition, the terminal circuit 8 includes guiodes D0.7, automatic couplers pc, ~pc, and resistors Ros, as shown in the diagram Pt54.
R11-RI4 and capacitor C,,-C,4,C
The MA Midori University input circuit 8a consisting of 21 to C24 is driven by a circuit power supply (not shown) that rectifies and smoothes the transmission signal Vs! ? l
The input terminals 12a and 12b are formed with a signal processing circuit 8b, and the cored pressure welding and -χ human power input to the input terminals 12a and 12b are taken in electrically insulated from the signal system. There is. In the embodiment, the outputs of the EE switch 7 are closed, gf, and S. The tributary power supply Ac1oov is outputted through the insulated input circuit 8a.
It is compatible with voltage contacts that output 100V. Also, monitoring using Ax voltage contact output as operation input? The JJ terminals 21 to 2□ are connected to power terminals 11a+11 with AC24V as the power source, so that the operation input is taken in through the 7 Oto couplers (this is the case).
t'' manually (rectified and smoothed and supplied to the input side of the 7-point coupler).

以下、実施例の動作について具体的に説明する。The operation of the embodiment will be specifically explained below.

第5図および第6図は、中央制御装置1の監視制御動作
を示すフローチャートであり、まず、中央$制御装置1
は、制御端末器3をアクセスして負荷り、、L2・・・
・・・の制御状態を示す動作R語信号を返送させ、各負
荷り、、L2・・・・・・の動作状態をランプ表示する
。次に、中央制御装置1は、監視制御に関係のないダミ
ーデータを伝送するダミー伝送信号VSを連続し、監視
端末器2.〜25がらの割り込み要求があるかどうかを
チェックする。一方、監視端末器21〜2sでは、いず
れかの操作入力があったときにダミー伝送信号Vsのス
タート信号STに同期して電流モード信号よりなる割り
込み信号を発生して、中央制御装置1に操作入力があっ
たことを知らせて割り込み処理によるアクセスを要求す
る。この割り込み信号を受イ3した中央制御装置1では
、割り込み発生監視端末y?2 +〜2.の検出を行い
、その割り“込み発生監視端末器21〜2、から監視デ
ータを返送させ、ffi ?Mデータが受信された場合
に割り込み解除用の伝送信号Vsを伝送して割り込み処
理を終了する。次に中央制御装置1では、返送された監
視データに基いて操作入力の確認を行って所定の負荷り
、、L2・・・・・・を制御する制御データを作成する
とともに、この負荷L + −L 2・・・・・・を制
御する制御端末器3をアクセスして制御データを伝送す
る。制御端末器3では、自己の固有アドレスと伝送信号
V、のアドレスデータ信号ADにて伝送されたアドレス
とを比較し、アドレス一致が得られたときに、それに続
く制御データ信号CDにて送られた制御データを取り込
んで負荷を制御する負荷制御信号を出力し、この負荷制
御信号によってリモコンリレー[3,,62・・・・・
・を駆動して負荷り、、L2・・・・・・を制御するよ
うになっている。次に、制御端末器3がらは制御確認信
号が返送待8!IM間信号WTに同期して電流モード信
号にて中央制御装置1に返送される。中央制御装r!1
1″Chは、この制御確認信号を受信して負荷り、、L
2・・・・・・の動作状態を確認し、動作表示ランプを
制御して現在の負荷制御状態をランプ表示させる。
5 and 6 are flowcharts showing the monitoring and control operation of the central control device 1. First, the central $control device 1
accesses the control terminal 3 and loads it, L2...
The operation R word signal indicating the control state of each load is returned, and the operation state of each load, L2, etc. is displayed with a lamp. Next, the central control device 1 continuously transmits a dummy transmission signal VS transmitting dummy data unrelated to the monitoring control, and sends a dummy transmission signal VS to the monitoring terminal 2. Check to see if there are any interrupt requests. On the other hand, in the monitoring terminals 21 to 2s, when there is any operation input, an interrupt signal consisting of a current mode signal is generated in synchronization with the start signal ST of the dummy transmission signal Vs, and an interrupt signal consisting of a current mode signal is generated to cause the central control unit 1 to perform the operation. Notifies that there is an input and requests access via interrupt processing. The central control unit 1 that received this interrupt signal asks the interrupt occurrence monitoring terminal y? 2 + ~ 2. is detected, the monitoring data is sent back from the interrupt generation monitoring terminal 21 to 2, and when ffi?M data is received, a transmission signal Vs for canceling the interrupt is transmitted and the interrupt processing is terminated. Next, the central control device 1 checks the operation input based on the returned monitoring data to create control data for controlling a predetermined load, L2, and so on. + -L 2... Accesses the control terminal 3 that controls the control terminal 3 and transmits the control data.The control terminal 3 transmits the data using its own unique address and the transmission signal V, which is the address data signal AD. When an address match is obtained, a load control signal for controlling the load is output by taking in the control data sent in the subsequent control data signal CD, and this load control signal is used to control the remote control. Relay [3,,62...
, L2, etc. are controlled by driving . Next, the control terminal 3 waits for the control confirmation signal to be returned! It is sent back to the central controller 1 as a current mode signal in synchronization with the inter-IM signal WT. Central control unit! 1
1"Ch receives this control confirmation signal and loads...
2. Check the operating status of . . . and control the operation indicator lamp to display the current load control status.

ここに、タイマー二二ツ)5..52,5.は予め設定
された時刻に負荷り、、L2・・・・・・をパターン制
御するものであり、タイマーユニット5.は、建物全体
の負荷を対象としたパターン制御を所定のタイムスケジ
ュールで行うものであり、タイマーユニット52は、各
707の負荷を対象としたパターン制御を所定のタイム
スケジュールで行うものであり、タイマーユニット5.
は負荷のオールオンあるいはオールオフをカレンダーに
基いて行うものである。なお、フロアに設置されるパタ
ーン操作スイッチを監視する監視端末器(図示せず)と
、分電盤A内に設置されるパターン操作入力監視用の監
視端末器21〜23とを同一の固有アドレスに設定すれ
ば、パターン繰作スイッチによる手動操作と、タイマー
ユニツ)5..5□、5.による自動操作とが併用でき
ることになる。
Here, there are 22 timers) 5. .. 52,5. The timer unit 5. is used to apply load at a preset time and perform pattern control on L2, . . . The timer unit 52 performs pattern control targeting the load of the entire building according to a predetermined time schedule, and the timer unit 52 performs pattern control targeting the load of each 707 according to a predetermined time schedule. Unit 5.
This method performs all-on or all-off of loads based on a calendar. Note that the monitoring terminal (not shown) installed on the floor for monitoring pattern operation switches and the monitoring terminals 21 to 23 for monitoring pattern operation input installed in distribution board A have the same unique address. If set to , manual operation using the pattern repeat switch and timer unit)5. .. 5□, 5. This means that it can be used in conjunction with automatic operation.

また、ECスイッチ7出力(有電圧接、r:j、出力)
を操作入力とする監視端末器2.と、1・−1別禄作ス
イッチSW1〜SW、を操作入力とする監視端末器2゜
とを同一アドレスに設定して、ECスイッチ7による自
動Ii制御が行なわれている負荷り、、L、・・・・・
・を埋め込みスイッチ盤14の繰作スイッチS W 。
Also, EC switch 7 output (voltage connection, r:j, output)
A monitoring terminal device that uses as an operation input 2. and the monitoring terminal 2゜ whose operation inputs are the 1.-1 Bessakusaku switches SW1 to SW, are set to the same address, and the load is being automatically controlled by the EC switch 7. ,...
- Embed the switch SW in the switch board 14.

−5W4により手動制御できるようにしても良い。-5W4 may be used for manual control.

第7図は、本天施例における操作例を示すもので、操作
スイッチSWlとECスイッチ7によって負荷L1を自
動制御下る場合において、同図(a)1こ示すように、
ECスイッチ7により負荷L1が自動的にオン制御され
る易性に、操作スイッチS W 。
FIG. 7 shows an operation example in the present embodiment. When the load L1 is automatically controlled by the operation switch SWl and the EC switch 7, as shown in FIG.
The load L1 is easily controlled to be turned on automatically by the EC switch 7, and the operation switch SW.

にて負荷り、をオンにしたり、同図(11)に示すよう
に、ECスイッチ7による自rf4)J制御;こて負荷
L1がオンされているときに、操作スイッチS〜°ν′
1にて負荷L1をオフしたりでさることiこなる。
When the iron load L1 is turned on, the operating switch S~°ν'
1, the load L1 is turned off.

以上のように、本発明においζは、有1゛ヱ圧接、c尺
よりなる操作入力が接続される入力Sツ子12a、12
!Jが監視92末2マ2.に設けら1ているので、EC
スイッチ7などの有電圧接点出力を具幀1した制御公器
にて負荷L 、 、 L 、・・・・・・を制御するこ
とができろようiこなってJ3す1.圭た、′、盲ネ見
踊末+4;2sl土t1電盤協約寸法に設定されている
ので、監視端末器2.を分電盤A内に容易に配設でき、
配設作業および配線作業が筒略化される。さらにまた、
実施例にあっては、一方の入力端子12aをケース9内
で共通接続しているので、配線がより簡単に行えること
になる。さらにまた、有電圧接点出力よりなる繰作入力
を7オトカプラPC,−PC,を介して信号処理回路8
t+i:取り込んでいるので、電源ノイズによる誤動作
を防止できるようになっている。
As described above, in the present invention, ζ is the input S connector 12a, 12 to which the operation input consisting of the pressure contact and c scale is connected.
! J is monitoring 92 end 2 ma 2. Since there is one set up in EC
It would be possible to control the loads L, , L, . . . with a control device equipped with a voltage contact output such as a switch 7. Keita, 'Blind Nene Dance End +4; 2SL Sat T1 Electric board agreement dimensions are set, so the monitoring terminal 2. can be easily installed in the distribution board A,
Installation work and wiring work are simplified. Furthermore,
In the embodiment, one of the input terminals 12a is commonly connected within the case 9, so wiring can be done more easily. Furthermore, the operation input consisting of the voltage contact output is sent to the signal processing circuit 8 through the 7 Oto couplers PC, -PC,
Since t+i: is taken in, it is possible to prevent malfunctions due to power supply noise.

[発明の効果] 本発明は上述のように、中央制御装置と、操作入力を監
視する監視端末器と、負荷を制御する制御端末器とを一
対の信号線に接続し、中央制御装置から監視端末器をア
クセスして監視データを返送させ、該監視データに基い
て形成された負荷を制御する制御データを中央制御装置
からル制御端末器をアクセスして伝送するようにした集
中監視制御装置において、有電圧接点よりなる複数の繰
作入力が接続される入力端子が設けられ分電盤協約寸法
に形成された監視端末器を分電盤内に配設したものであ
り、有電圧液2αよりなる操作入力が接続される入力端
子を監視端末器に設けているので、EEスイ・7チなど
の有電圧接点出力を具備した制御機器にて負荷を制御す
ることができ、また、監視端末器の形状を分電盤協約寸
法に設定しているので、監視端末器を分電盤内に容易に
配設することができ、配設作業および配線作業を容易に
することができるという効果がある。
[Effects of the Invention] As described above, the present invention connects a central control device, a monitoring terminal device that monitors operation input, and a control terminal device that controls a load to a pair of signal lines, and performs monitoring from the central control device. In a centralized monitoring and control device, the terminal device is accessed to return monitoring data, and control data for controlling a load formed based on the monitoring data is transmitted from the central control device by accessing the control terminal device. , a monitoring terminal device is installed in the distribution board, and is provided with an input terminal to which multiple operation inputs consisting of voltage contacts are connected, and is formed to the dimensions agreed upon by the distribution board. Since the monitoring terminal is equipped with an input terminal to which the operation input is connected, the load can be controlled with a control device equipped with voltage contact output such as an EE switch or Since the shape of the monitor is set to the dimensions agreed upon on the distribution board, the monitoring terminal can be easily installed inside the distribution board, which has the effect of making installation and wiring work easier. .

【図面の簡単な説明】[Brief explanation of drawings]

fjS1図は本発明一実施例の概略構成図、第2図は同
上の要部上面図、第3図は同上の要部側面しI、第4図
は同上の要部ブロック回路図、第5図75至第7図は同
上の動作説明図、第8図は従来例の概略構成図、第9父
は同上の動ず弊説明図であるつ1は中央@IJ 御ij
!ciff、2.−2.は監視端末器、3は1り御端末
器、4は信号線、ノ\は分電盤である。 代理人 弁理士 石 1)長 七 第2図 第3図 8  2、  9 第7図 ■ Llわ     Lxイア Ltイシ    L、不フ
Fig. fjS1 is a schematic configuration diagram of an embodiment of the present invention, Fig. 2 is a top view of the main parts of the same, Fig. 3 is a side view of the main parts of the same, Fig. 4 is a block circuit diagram of the main parts of the same, and Fig. 5 is a block diagram of the main parts of the same. 75 to 7 are explanatory diagrams of the same operation as above, FIG. 8 is a schematic configuration diagram of the conventional example, and 9th figure is an explanatory diagram of the same as above.
! ciff, 2. -2. is a monitoring terminal, 3 is a control terminal, 4 is a signal line, and \ is a distribution board. Agent Patent Attorney Ishi 1) Chief 7 Figure 2 Figure 3 Figure 8 2, 9 Figure 7 ■ Llwa Lxia Ltishi L, Fufu

Claims (3)

【特許請求の範囲】[Claims] (1)中央制御装置と、操作入力を監視する監視端末器
と、負荷を制御する制御端末器とを一対の信号線に接続
し、中央制御装置から監視端末器をアクセスして監視デ
ータを返送させ、該監視データに基いて形成された負荷
を制御する制御データを中央制御装置から制御端末器を
アクセスして伝送するようにした集中監視制御装置にお
いて、有電圧接点よりなる複数の操作入力が接続される
入力端子が設けられ分電盤協約寸法に形成された監視端
末器を分電盤内に配設したことを特徴とする集中監視制
御装置。
(1) Connect the central control device, the monitoring terminal device that monitors operation input, and the control terminal device that controls the load to a pair of signal lines, access the monitoring terminal device from the central control device, and send back the monitoring data. In a centralized monitoring and control device in which control data for controlling a load formed based on the monitoring data is transmitted from a central control device by accessing a control terminal device, a plurality of operation inputs made of voltage contacts are transmitted. A centralized monitoring and control device characterized in that a monitoring terminal device provided with input terminals to be connected and formed to dimensions agreed upon by the distribution board is disposed within the distribution board.
(2)複数の入力端子の一方をケース内で共通接続した
ことを特徴とする特許請求の範囲第1項記載の集中監視
制御装置。
(2) The centralized monitoring and control device according to claim 1, wherein one of the plurality of input terminals is commonly connected within the case.
(3)操作入力をフォトカプラを介して信号処理回路に
取り込むようにしたことを特徴とする特許請求の範囲第
1項記載の集中監視制御装置。
(3) The centralized monitoring and control device according to claim 1, wherein the operation input is taken into the signal processing circuit via a photocoupler.
JP20063086A 1986-08-26 1986-08-26 Centralized monitoring controller Expired - Lifetime JPH0783509B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20063086A JPH0783509B2 (en) 1986-08-26 1986-08-26 Centralized monitoring controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20063086A JPH0783509B2 (en) 1986-08-26 1986-08-26 Centralized monitoring controller

Publications (2)

Publication Number Publication Date
JPS6356093A true JPS6356093A (en) 1988-03-10
JPH0783509B2 JPH0783509B2 (en) 1995-09-06

Family

ID=16427575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20063086A Expired - Lifetime JPH0783509B2 (en) 1986-08-26 1986-08-26 Centralized monitoring controller

Country Status (1)

Country Link
JP (1) JPH0783509B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02134097A (en) * 1988-11-15 1990-05-23 Matsushita Electric Works Ltd Remote monitor control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02134097A (en) * 1988-11-15 1990-05-23 Matsushita Electric Works Ltd Remote monitor control system

Also Published As

Publication number Publication date
JPH0783509B2 (en) 1995-09-06

Similar Documents

Publication Publication Date Title
JPH0737310B2 (en) Elevator monitoring equipment
JPS6356093A (en) Centralized supervisory and control equipment
JPH07121146B2 (en) Centralized monitoring controller
JPH084351B2 (en) Centralized monitoring controller
JPH0722944Y2 (en) Remote monitoring controller
JPH0783510B2 (en) Centralized monitoring controller
JPS6010897A (en) Transmitter-receiver
JP2731585B2 (en) Remote monitoring and control system
JP3098776B2 (en) Monitoring terminal for remote monitoring and control system
JP2703634B2 (en) Address Duplication Detection Method for Remote Monitoring and Control System
JPS60248942A (en) Controlling device of air conditioner
JPS62147695A (en) Load control method
JPH01135254A (en) Building management system
JP2685891B2 (en) Motion display system
JPH047640B2 (en)
JPS61277332A (en) Power source feeder/controller
JPS59170952A (en) Information processor
JPH0346894A (en) Terminal equipment for remote control
JP3026607B2 (en) Remote monitoring and control system
JPH01265695A (en) Remote supervisory and control system
JPH02134097A (en) Remote monitor control system
JPH0289499A (en) Supervisory control system
JPH04123693A (en) Terminal equipment for remote control
JPH0659115B2 (en) Remote monitoring control system
JPS6136820A (en) Power supply control system of data processor

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term