JPS6326388Y2 - - Google Patents

Info

Publication number
JPS6326388Y2
JPS6326388Y2 JP1984057855U JP5785584U JPS6326388Y2 JP S6326388 Y2 JPS6326388 Y2 JP S6326388Y2 JP 1984057855 U JP1984057855 U JP 1984057855U JP 5785584 U JP5785584 U JP 5785584U JP S6326388 Y2 JPS6326388 Y2 JP S6326388Y2
Authority
JP
Japan
Prior art keywords
hanging
bell cranks
ribs
block
earth retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984057855U
Other languages
Japanese (ja)
Other versions
JPS60170384U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP5785584U priority Critical patent/JPS60170384U/en
Publication of JPS60170384U publication Critical patent/JPS60170384U/en
Application granted granted Critical
Publication of JPS6326388Y2 publication Critical patent/JPS6326388Y2/ja
Granted legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は、コンクリートブロツク用吊具、さら
に詳しくは、擁壁工事等において大型コンクリー
トブロツクを所定の法勾配に合せて吊下げて運搬
するために使用される吊具の改良に関するもので
ある。
[Detailed description of the invention] The present invention is a hanging tool for concrete blocks, more specifically, a hanging tool used for suspending and transporting large concrete blocks in accordance with a predetermined legal slope in retaining wall construction, etc. It is about improvement.

近年、擁壁工事の省力化を図るため、第1図に
示すような土留めブロツクW(寸法1250×800mm、
重量約411Kg)を用いて施工するように計画され
ているが、擁壁工事は第2図〜に示すよう
に、現場打ちされたブロツク基礎B上に3トン吊
りクレーンMにてブロツクWを法勾配に合せて吊
上げて法面に合致させ(第2図参照)、次いで
パイプサポートSをもつて施工面より支え(第2
図参照)、鋼製型枠Fを設置した後(第2図
参照)、コンクリート層Cを裏打ちし(第2図
参照)、裏込め材Lを入れて転圧後、型枠Fを抜
き取り(第2図参照)、再転圧した後、パイプ
サポートSを取外し(第2図参照)、その上に
2段目のブロツクWを積上げるようにして施工し
ている(第2図参照)。
In recent years, in order to save labor in retaining wall construction, earth retaining blocks W (dimensions 1250 x 800 mm,
The retaining wall construction is planned to be carried out using a 3-ton lifting crane M on the block foundation B cast on site, as shown in Figure 2. Lift it up to match the slope (see Figure 2), then support it from the construction surface using the pipe support S (second
After installing the steel formwork F (see Fig. 2), line it with a concrete layer C (see Fig. 2), add backfilling material L, and after compacting, remove the formwork F (see Fig. 2). After re-rolling (see Fig. 2), the pipe support S is removed (see Fig. 2), and the second stage blocks W are stacked on top of it (see Fig. 2).

したがつて、クレーンMにてブロツクWを法勾
配に合せて吊上げる作業を確実つ迅速に行えるこ
とが肝要となつている。
Therefore, it is important that the crane M can reliably and quickly lift the block W in line with the legal slope.

本考案は、かゝる大型ブロツクを一定の法勾配
に合せた吊下げ勾配で吊上げるに当つて、吊上げ
力を有効利用することにより確実かつ簡易迅速に
吊上げることのできる吊具を提供することを目的
とする。
The present invention provides a lifting tool that can reliably, simply and quickly lift such a large block at a hanging slope that matches a certain legal slope by effectively utilizing the lifting force. The purpose is to

以下、本考案を添付図面に示す具体例に基き詳
細に説明する。
Hereinafter, the present invention will be explained in detail based on specific examples shown in the accompanying drawings.

第3図は本考案吊具Tの斜視図であり、第4図
はその側面図、第5図はその平面図、第6図はそ
の正面図である。
FIG. 3 is a perspective view of the hanger T of the present invention, FIG. 4 is a side view thereof, FIG. 5 is a plan view thereof, and FIG. 6 is a front view thereof.

図面に示すように、吊りアーム2の先端に吊具
本体1が設けられ、吊りアーム2の後端または中
間部を吊上げることにより、吊具本体1に土留め
ブロツクWは所定の法勾配に見合つた吊下げ勾配
をもつて吊下げられるようになつている。
As shown in the drawing, a suspension main body 1 is provided at the tip of a suspension arm 2, and by lifting the rear end or middle part of the suspension arm 2, a retaining block W is attached to the suspension main body 1 at a predetermined legal slope. It is designed to be hung at a suitable hanging slope.

吊具本体1は、第5図に示すごとく、後部に背
当ビーム10を有し、前部に支点R,Rを中心と
して対称的に側方へ開閉動作可能な一対の大略L
字形のベルクランク11,11を備えている。し
かして、ベルクランク11,11の各々の上端1
1a,11aは付勢部材(コイルバネ)12にて
連結されて常時相引状態に付勢していると共に、
同上端部には更にチエーン13,13が各々連結
してあつてブレスハンガー14の左右両端に連繋
され、吊りチエーンを介して吊部材(リング)1
5に連なつている。
As shown in FIG. 5, the hanging main body 1 has a back support beam 10 at the rear, and a pair of roughly L beams at the front that can be opened and closed symmetrically laterally around fulcrums R and R.
It is equipped with letter-shaped bell cranks 11, 11. Therefore, the upper end 1 of each of the bell cranks 11, 11
1a and 11a are connected by a biasing member (coil spring) 12 and are constantly biased in a mutually biased state.
Chains 13, 13 are further connected to the upper end thereof, and are connected to both left and right ends of the breath hanger 14, and a hanging member (ring) 1 is connected through the hanging chain.
It is connected to 5.

他方、ベルクランク11,11の垂下部には、
外側には側方へ突出せる掛止ピン16,16が突
設してあり、その掛止ピン16,16の上下には
緩衝ゴム板17,17が付設してある。さらに、
このベルクランク11,11垂下部の狭間部には
一対のトグルリンク18,18を関節状に屈伸自
在に連結して構成したトグル機構18,18が配
設してあり、前記トグルリンク18,18の連結
部が引き上げられて伸長状態になつたときベルク
ランク11,11を外方へ押圧して開脚動作せし
めるようになつている。
On the other hand, in the hanging parts of the bell cranks 11, 11,
On the outside, latch pins 16, 16 that can protrude laterally are provided, and buffer rubber plates 17, 17 are attached above and below the latch pins 16, 16. moreover,
A toggle mechanism 18, 18, which is constructed by connecting a pair of toggle links 18, 18 in an articulated manner so as to be bendable and extensible, is disposed in the gap between the hanging parts of the bell cranks 11, 11. When the connecting portion is pulled up and extended, the bell cranks 11, 11 are pressed outward to cause the legs to open.

次に、上記吊りアーム2の前端には固定滑車2
0が配設されており、また同アーム2の後端には
位置調節自在に移動滑車21が配設してある。こ
の移動滑車21の位置調節は、吊りアーム2の側
面に穿設された固定穴22,22…の何れかを選
択して其処に滑車フレーム21aを掛止させるこ
とによつて行なえるようになつている。したがつ
て、この移動滑車21の吊りアーム2に対する位
置を後端に取れば、吊下げるブロツクの吊勾配が
大きくなり、反対に先端方へスライドさせること
により吊勾配を次第に小さく調節することができ
る。しかして、これら固定滑車20および移動滑
車21には条材19が仕掛けられ、その一端は上
記トグルリンク18,18の連結部に結着され、
もう一方の自由端部はループ状の吊掛部19aと
なつている。なお、図示例においては、移動滑車
21のフレーム21aが前後に傾斜すると、吊勾
配が変化するのでアーム2に対し常に垂直位置に
保持させるべく支持ブラケツト23が付設されて
いるが、支持ブラケツト23から移動滑車フレー
ム21aへ伸びるスクリユーロツド23を回転操
作することにより吊勾配を更に微調節することも
可能である。なお、24は吊りアーム2の支点を
なすステー部材である。
Next, a fixed pulley 2 is attached to the front end of the hanging arm 2.
0 is provided, and a movable pulley 21 is provided at the rear end of the arm 2 so that its position can be freely adjusted. The position of the movable pulley 21 can be adjusted by selecting one of the fixing holes 22, 22, . ing. Therefore, if the movable pulley 21 is positioned relative to the hanging arm 2 at the rear end, the hanging slope of the suspended block will increase, and by sliding it toward the tip, the hanging slope can be adjusted to be gradually smaller. . A strip 19 is attached to the fixed pulley 20 and the movable pulley 21, one end of which is tied to the connecting portion of the toggle links 18, 18.
The other free end is a loop-shaped hanging portion 19a. In the illustrated example, when the frame 21a of the movable pulley 21 tilts back and forth, the suspension slope changes. It is also possible to further finely adjust the suspension slope by rotating the screw rod 23 extending to the movable pulley frame 21a. Note that 24 is a stay member that serves as a fulcrum of the hanging arm 2.

上記構成の吊具においては、第3図に示すよう
にチエーン13,13に連なる吊部材(リング)
15をクレーンのフツク(図示せず)に引掛け、
吊具T全体を吊上げると、ベルクランク11,1
1は、その上端が外方に矢印A方向へ引張られ、
下方脚部が矢印B方向へ回動して閉脚動作するよ
うになる。
In the hanging device having the above structure, as shown in FIG.
15 on the crane hook (not shown),
When the entire hanging tool T is lifted, the bell crank 11,1
1 has its upper end pulled outward in the direction of arrow A,
The lower leg portion rotates in the direction of arrow B to perform a leg-closing operation.

そこで、ベルクランク11,11部分をコンク
リートブロツクWの2個のリブ間に挿入させ、つ
いで吊具Tの吊上力を解除すると、ベルクランク
11,11は付勢部材(コイルバネ)12の復元
弾力により元の状態に復帰するので、その垂下部
が矢印C方向へ回動する。すると、ベルクランク
11,11に突設された掛止ピン16,16はブ
ロツクW背面のリブ掛止孔に嵌入して当該ブロツ
クWが吊上げ可能となる。
Therefore, when the bell cranks 11, 11 are inserted between the two ribs of the concrete block W, and then the lifting force of the hanging tool T is released, the bell cranks 11, 11 are restored by the restoring force of the biasing member (coil spring) 12. As a result, the hanging portion rotates in the direction of arrow C. Then, the latching pins 16, 16 protruding from the bell cranks 11, 11 fit into the rib latching holes on the back surface of the block W, and the block W can be lifted.

そこで、条材19に吊上力を加えると、トング
機構18,18のリンク連結部が引き上げられて
当該トングリンクは伸長状態となり、ベルクラン
ク11,11の閉脚は阻止されることになる。し
たがつて、そのまゝ吊掛部19aをクレーン(図
示せず)のフツクに引掛けて引上げれば、当該ブ
ロツクWは吊具Tにシツカリと把持された状態で
安定的に吊上がることになるのである。
Therefore, when a lifting force is applied to the strip 19, the link connecting portions of the tongue mechanisms 18, 18 are pulled up, the tongue links are in an extended state, and the bell cranks 11, 11 are prevented from closing. Therefore, if the hanging portion 19a is hooked to the hook of a crane (not shown) and pulled up, the block W will be stably lifted up while being firmly held by the hanging tool T. It will become.

そして、目的の箇所へブロツクWを移動させて
条材19を外し、吊部材15をクレーンのフツク
(図示せず)に引掛けてチエーン13,13を吊
り上げれば、ベルクランク11,11が閉脚動作
して掛止ピン16,16が土留めブロツクWの背
面リブの掛止孔から離脱するので、吊具Tはブロ
ツクWから離分される。
Then, move the block W to the desired location, remove the strip 19, hook the hanging member 15 to the hook of the crane (not shown), and lift the chains 13, 13, and the bell cranks 11, 11 will close the legs. As the latching pins 16, 16 are moved away from the latching holes in the back rib of the earth retaining block W, the hanging tool T is separated from the block W.

以上説明したとおり、本考案によれば、吊りア
ーム2の先端に吊具本体1を配設して吊上げる土
留めブロツクWに一定の吊勾配を付与することが
できるだけでなく、吊具Tの吊上げ力を利用して
コンクリートブロツクを迅速かつ確実に把持して
吊上げることができるので擁壁工事の施工が誠に
安全容易となる。
As explained above, according to the present invention, it is possible not only to provide a certain hanging slope to the earth retaining block W to be lifted by disposing the hanging tool main body 1 at the tip of the hanging arm 2, but also to Concrete blocks can be grasped and lifted quickly and reliably using the lifting force, making retaining wall construction work very safe and easy.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は擁壁工事に使用される土留めブロツク
の斜視図、第2図は擁壁工事の施工順序を示す説
明図、第3図は本考案に係る吊具の斜視図、第4
図は同側面図、第5図は同正面図、第6図は同平
面図である。 1……吊具本体、11……ベルクランク、12
……付勢部材、13……チエーン、14……ブレ
スハンガー、15……吊部材、16……掛止ピ
ン、18……トグルリンク、19……条材、2…
…吊りアーム、20……固定滑車、21……移動
滑車、22……固定穴、W……土留めブロツク、
R……支点。
Figure 1 is a perspective view of an earth retaining block used in retaining wall construction, Figure 2 is an explanatory diagram showing the construction order of retaining wall construction, Figure 3 is a perspective view of a hanging device according to the present invention, and Figure 4 is a perspective view of a retaining block used in retaining wall construction.
The drawings are a side view, FIG. 5 is a front view, and FIG. 6 is a plan view. 1... Hanging tool body, 11... Bell crank, 12
... Biasing member, 13 ... Chain, 14 ... Breath hanger, 15 ... Hanging member, 16 ... Latching pin, 18 ... Toggle link, 19 ... Strip material, 2 ...
...Hanging arm, 20... Fixed pulley, 21... Moving pulley, 22... Fixed hole, W... Earth retaining block,
R...Fulcrum.

Claims (1)

【実用新案登録請求の範囲】 吊りアーム2の先端に吊具本体1を設け、吊り
アーム2の後端または中間部を吊上げることによ
り重心を偏向させて吊具本体1に吊下げられる土
留めブロツクWに所定の吊下げ勾配を付与する吊
具において、 対象とする土留めブロツクWは、その背面に垂
下方向に沿つて突出する2個のリブを有すると共
に、これらのリブには当該リブ形成方向に対し直
交方向に掛止孔が対向的に開設されており、 前記吊りアーム2には、その長さ方向に沿つて
固定穴22,22…を設け、移動滑車21を取付
け部材21aを介して何れかの固定穴に選択的に
固定可能とすると共に、その前端には固定滑車2
0を配設する一方、 吊具本体1には、支点R,Rを中心として左右
に対称的に開閉脚可能で、かつ、その各々の開脚
側には掛止ピン16,16を対称的に備える一対
のベルクランク11,11が垂設され、このベル
クランク11,11が垂下せる狭間部には一対の
トグルリンク18と18とを屈伸自在に連結させ
たトグル機構18,18が介設されてあつて、こ
れら両トグルリンク18,18の連結部を引き上
げて伸長させたとき当該ベルクランク11,11
の垂下部を外方へ押圧して同ベルクランク側方へ
開脚動作が可能であると共に、これらベルクラン
ク11,11の上端部は付勢部材12によつて相
引状態に常時付勢されており、 しかも、これらベルクランク11,11の上端
部は、チエーン13,13によりブレスハンガー
14の両端に連繋されていると共に、このブレス
ハンガー14の上部が吊部材15に連繋されてあ
り、 さらに、前記トグルリンク18,18の連結部
には、前記固定滑車20および移動滑車21を介
し条材19が配設されてあると共に、かつ、当該
条材19の自由端は吊掛部19aとなつており、 前記土留めブロツクWにおけるリブの掛止孔に
対し掛止ピン16,16が差込状態となつた状態
で当該リブ間に挿入された吊具本体1のベルクラ
ンク11,11の垂下部を、前記条材19の吊掛
部19aを吊り上げることによつてトグル機構1
8,18を伸長動作させることにより土留めブロ
ツクWのリブ間に突つ張り状態に圧接するように
したことを特徴とするコンクリートブロツク用吊
具。
[Scope of Claim for Utility Model Registration] A hanging device body 1 is provided at the tip of a hanging arm 2, and the center of gravity is deflected by lifting the rear end or middle part of the hanging arm 2, and the earth retaining device is suspended from the hanging device body 1. In a hanging tool that gives a predetermined hanging slope to a block W, the target earth retaining block W has two ribs protruding along the hanging direction on its back surface, and these ribs have the rib formation. The suspension arm 2 is provided with fixing holes 22, 22, . It can be selectively fixed to any of the fixing holes, and a fixing pulley 2 is attached to the front end of the fixing hole.
On the other hand, the suspension main body 1 has legs that can be opened and closed symmetrically to the left and right around the fulcrums R and R, and latching pins 16 and 16 are arranged symmetrically on the opening side of each leg. A pair of bell cranks 11, 11 are provided vertically, and a toggle mechanism 18, 18 in which a pair of toggle links 18, 18 are connected in a bendable and extensible manner is interposed in the gap where the bell cranks 11, 11 can hang down. When the connecting portions of both toggle links 18, 18 are pulled up and extended, the bell cranks 11, 11
The bell cranks 11 can be opened laterally by pressing the hanging portions of the bell cranks outward, and the upper ends of these bell cranks 11, 11 are always urged in a biasing state by the urging member 12. Moreover, the upper ends of these bell cranks 11, 11 are connected to both ends of a breath hanger 14 by chains 13, 13, and the upper part of this breath hanger 14 is connected to a hanging member 15, and further, , a strip 19 is disposed at the connecting portion of the toggle links 18, 18 via the fixed pulley 20 and movable pulley 21, and the free end of the strip 19 becomes a hanging portion 19a. The bell cranks 11, 11 of the hanging tool main body 1 inserted between the ribs are suspended in a state where the latching pins 16, 16 are inserted into the latching holes of the ribs in the earth retaining block W. The toggle mechanism 1 is activated by lifting the hanging portion 19a of the strip 19.
A hanging tool for a concrete block, characterized in that the hanging tool 8 and 18 are brought into pressure contact between the ribs of the earth retaining block W in a tensioned state by extending them.
JP5785584U 1984-04-18 1984-04-18 Hanging equipment for concrete blocks Granted JPS60170384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5785584U JPS60170384U (en) 1984-04-18 1984-04-18 Hanging equipment for concrete blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5785584U JPS60170384U (en) 1984-04-18 1984-04-18 Hanging equipment for concrete blocks

Publications (2)

Publication Number Publication Date
JPS60170384U JPS60170384U (en) 1985-11-12
JPS6326388Y2 true JPS6326388Y2 (en) 1988-07-18

Family

ID=30582787

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5785584U Granted JPS60170384U (en) 1984-04-18 1984-04-18 Hanging equipment for concrete blocks

Country Status (1)

Country Link
JP (1) JPS60170384U (en)

Also Published As

Publication number Publication date
JPS60170384U (en) 1985-11-12

Similar Documents

Publication Publication Date Title
JPH0755011B2 (en) Automatic open / close kite catcher
JPS6326388Y2 (en)
US4545609A (en) Curb lifting device
JP2843974B2 (en) Lifting hook device
JPS6315266Y2 (en)
EP0160021B1 (en) A device for lifting and handling objects
JP3325701B2 (en) Suspension device
JPH0748086A (en) Suspending tool
JP2585679Y2 (en) Block hanger
JPH08226128A (en) Stone gripper and stone masonry method
JP2640771B2 (en) Large block gripper
JP2549970Y2 (en) Block hanger
JPH0754387Y2 (en) Hangers for gutter lids
JP3041463U (en) Lifting carrier for gutter lid
JPS6131033Y2 (en)
JPS5924709Y2 (en) Open bottom box container
JPH0637045Y2 (en) Hanging equipment for construction of pedestrian border blocks
JP2003002575A (en) Suspension tool for heavy load
JPS6015871Y2 (en) gripping device
JP3027582U (en) Cable car for cable installation
JPH072708Y2 (en) Square manhole cover opening / closing tool
JPH1036063A (en) Cubic block and block suspending device
JPS595035Y2 (en) horizontal hanging clamp
JPS583826Y2 (en) Grap Bucket
JP2601871B2 (en) Long member gripping device