JPS6325124B2 - - Google Patents

Info

Publication number
JPS6325124B2
JPS6325124B2 JP15265683A JP15265683A JPS6325124B2 JP S6325124 B2 JPS6325124 B2 JP S6325124B2 JP 15265683 A JP15265683 A JP 15265683A JP 15265683 A JP15265683 A JP 15265683A JP S6325124 B2 JPS6325124 B2 JP S6325124B2
Authority
JP
Japan
Prior art keywords
rubble
sheet body
backfilling
top surface
embankment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15265683A
Other languages
Japanese (ja)
Other versions
JPS6043512A (en
Inventor
Masato Oshikawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAMAMIZU SANGYO KK
Original Assignee
YAMAMIZU SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAMAMIZU SANGYO KK filed Critical YAMAMIZU SANGYO KK
Priority to JP15265683A priority Critical patent/JPS6043512A/en
Publication of JPS6043512A publication Critical patent/JPS6043512A/en
Publication of JPS6325124B2 publication Critical patent/JPS6325124B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は埋立護岸における裏込捨石部にシート
材を被覆する方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a method of covering the backfilling rubble portion of a reclaimed seawall with a sheet material.

[従来の技術] 従来、海岸等を埋立てる際に、まず埋立地域に
沿つて海上などにコンクリート製のブロツクやケ
ーソンからなる堤体を構築し、この堤体の埋立側
に裏込捨石部を形成して埋立護岸を構築する方法
が採られており、その際、裏込捨石部の頂面なら
びに法面を防水性のシート体で被覆して潮流、波
浪などによる裏込捨石部の崩壊や流失、或いは埋
立側に投入した産業廃棄物中の有害物質の流出な
どを防止している。
[Conventional technology] Conventionally, when reclaiming a coast, etc., an embankment consisting of concrete blocks or caissons was first constructed on the sea along the reclaimed area, and a backfilling rubble section was installed on the reclaimed side of the embankment. The method used is to construct a reclaimed seawall by covering the top surface and slope of the backfilling rubble section with a waterproof sheet to prevent the backfilling rubble section from collapsing due to tidal currents, waves, etc. This prevents hazardous substances from being washed away or from industrial waste thrown into the landfill.

そして、海側からの波圧や風圧が堤体や裏込捨
石部の隙間を通つてシート体の裏面に広い範囲に
亘つて作用し、その結果シート体が浮上して煽ら
れ或いは破損し、更には裏込捨石部が法崩れを起
すことある。そこで適所に水抜き用および空気抜
き用の透孔を形成したシート体を用いる方法も知
られている(実公昭56―138927号公報)。
Then, wave pressure and wind pressure from the sea side act over a wide range on the back surface of the sheet body through the gaps between the embankment body and the backfilling rubble, and as a result, the sheet body floats up and is agitated or damaged. Furthermore, the backfill rubble section may cause collapse of the slope. Therefore, there is also known a method of using a sheet body having through holes formed at appropriate locations for draining water and venting air (Japanese Utility Model Publication No. 138927/1983).

[発明が解決しようとする問題点] ところが、前記透孔は通常の場合は有効に作用
するが、埋立完了までに長期間を要する場合、台
風や強風などで波浪の荒い場合などには主として
低水位よりも上方の堤体の隙間や空隙から裏込捨
石部へ多量の空気や海水などが侵入して殊に低水
位よりも上方の裏込捨石部に圧入され、シート体
に多大な水圧、風圧が作用して繰返し煽ることに
よつて破損させることがある。シート体は破損す
ると破損部位から裏込捨石が空気や海水とともに
噴出し、或いは裏込捨石部が崩壊し、その結果シ
ート体と裏込捨石部との間に空洞が形成されて更
に裏込捨石部の崩壊を促進するなどの問題があつ
た。
[Problems to be Solved by the Invention] However, although the above-mentioned through holes work effectively in normal cases, they mainly work poorly in cases where it takes a long time to complete the reclamation, or when the waves are rough due to a typhoon or strong wind. A large amount of air and seawater enters the backfilling rubble from gaps and voids in the embankment body above the water level and is forced into the backfilling rubble, especially above the low water level, creating a large amount of water pressure on the sheet body. It may be damaged by repeated fanning due to wind pressure. When the sheet body is damaged, the backfilling rubble is ejected from the damaged area along with air and seawater, or the backfilling rubble portion collapses, resulting in the formation of a cavity between the sheet body and the backfilling rubble portion, and further backfilling rubble. There were problems such as promoting the collapse of the department.

本発明は斯る点に鑑みてなされたものであつ
て、埋立完了までに長期間を要する場合、台風や
強風などで波浪の荒い場合などに殊に低水位より
も上方の裏込捨石部に多量の空気や海水などが圧
入されたとしてもシート体の破損ならびに裏込捨
石部の崩壊などを生じることのない埋立護岸にお
ける裏込捨石部の被覆方法を提供するものであ
る。
The present invention has been developed in view of the above, and is particularly suitable for backfilling rubble above the low water level when it takes a long time to complete the reclamation, or when the waves are rough due to a typhoon or strong wind. To provide a method for covering a backfilling rubble part in a reclaimed seawall that does not cause damage to the sheet body and collapse of the backfilling rubble part even if a large amount of air, seawater, etc. are forced in.

[問題点を解決するための手段] 上記の問題点を解決するため本発明である埋立
護岸における裏込捨石部の被覆方法は、堤体の埋
立側に頂面が低水位時の水面とほぼ同じ高さとな
るように第一の裏込捨石部を形成すること、前記
第一の裏込捨石部の頂面ならびに法面を堤体側の
頂面の一部を残して第一のシート体で被覆するこ
と、前記第一の裏込捨石部の法肩近傍まで埋立が
行われたとき前記第一のシート体で被覆されてい
る第一の裏込捨石部の頂面上に第二の裏込捨石部
を形成すること、前記第二の裏込捨石部の頂面な
らびに法面を第二のシート体で被覆すること、か
らなることを特徴としている。
[Means for Solving the Problems] In order to solve the above problems, the method of covering the backfilling rubble part in the reclaimed seawall according to the present invention is such that the top surface on the reclaimed side of the embankment is approximately equal to the water level at low water level. forming a first backfilling rubble part so as to have the same height; covering the top surface of the first backing rubble section covered with the first sheet body when the reclamation is carried out to the vicinity of the slope shoulder of the first backfilling rubble section; The present invention is characterized in that it comprises forming a rubble-filling portion, and covering the top surface and slope of the second back-filling rubble portion with a second sheet body.

[実施例] 次に本発明を実施例に基いて説明する。[Example] Next, the present invention will be explained based on examples.

図面は本発明の一実施例を示すものであり、ま
ず、第1図に示すように埋立地域に沿つて海上な
どにケーソンからなる堤体1を構築し、この堤体
1の埋立側15の壁面2に沿つて頂面3が低水位
時の水面4とほぼ同じ高さとなるように第一の裏
込捨石部5を形成する。次に、例えば厚さ1〜6
mm、巾3〜7m、長さ6〜20m程度の軟質ポリ塩
化ビニル製または帆布製などの可撓性ならびに防
砂性を有する第一のシート体8の複数枚を堤体1
の長手方向へ順次接続して裏込捨石部5の頂面3
ならびに法面6から水底7に亘つて被覆する。こ
のとき、例えば堤体1の埋立側の壁面2に止金具
9を固着して第一のシート体8の堤体1側の端縁
10とロープ11により係着して第一のシート体
8が滑落しないようにし、且つ壁面2と第一のシ
ート体8との間に隙間12を形成することにより
頂面3の堤体1側の一部を残して第一の裏込捨石
部5を被覆する。もつとも、第一のシート体8の
滑落防止手段はこれに限定されるわけでなく、例
えば頂面3の堤体1側の一部を残して敷設した第
一のシート体8の上から第一の裏込捨石部5に頭
付杭を直接打ち込むなど他の方法によることもで
きる。尚、第一のシート体8の法面6を覆う部分
には、従来と同様に上端縁を固着して上下に可動
開閉する弁板13によつて閉止された窓孔14を
形成しておくこともできる。
The drawings show one embodiment of the present invention. First, as shown in FIG. A first backfilling rubble part 5 is formed along the wall surface 2 so that the top surface 3 is approximately at the same height as the water surface 4 at a low water level. Next, for example, thickness 1 to 6
A plurality of first sheets 8 having flexibility and sandproof properties made of soft polyvinyl chloride or canvas and having a width of 3 to 7 m and a length of 6 to 20 m are attached to the embankment body 1.
The top surface 3 of the backfilling rubble section 5 is connected sequentially in the longitudinal direction.
Also, the area from the slope 6 to the bottom 7 of the water is coated. At this time, for example, a fastener 9 is fixed to the wall surface 2 on the reclaimed side of the embankment body 1, and the end edge 10 of the first sheet body 8 on the embankment body 1 side is engaged with the rope 11. By forming a gap 12 between the wall surface 2 and the first sheet body 8, the first backfilling rubble portion 5 is formed while leaving a part of the top surface 3 on the embankment body 1 side. Cover. However, the means for preventing the first sheet body 8 from falling off is not limited to this. For example, the means for preventing the first sheet body 8 from falling off is not limited to this. It is also possible to use other methods, such as directly driving a pile with a head into the backfilling rubble portion 5. Incidentally, in the portion of the first sheet body 8 that covers the slope 6, a window hole 14 is formed which is closed by a valve plate 13 whose upper edge is fixed and which is movable up and down to open and close, as in the conventional case. You can also do that.

そして、一般に海岸など広範囲に亘つて埋立る
場合など埋立完了までに長期間を要する場合は、
引続いて埋立作業を進行し短時間で完了する場合
を除いて第1図に示した状態で放置されることと
なるが、その際、潮の満干などの影響で低水位の
水面4よりも下方において第一の裏込捨石部5に
弱い圧力で流入する僅かな空気や海水などは従来
のものと同様に第一のシート体8に設けられた窓
孔14を通つて埋立側15に排出されるため、第
一のシート体8の破損ならびに裏込捨石部5の崩
壊を引起こすことはない。また、潮の満干による
水位の変化や強風などによる波浪により高い圧力
で大量の空気や海水などが堤体1の隙間からに埋
立側15に侵入したとしても、それらの影響を受
ける低水位の水面4よりも堤体1の上方に位置す
る部分には裏込捨石部が形成されていないため、
空気や海水などは自由に埋立側15へと噴出する
ため第一のシート体8はその影響を殆んど受け
ず、第一のシート体8が煽られて破損し、或いは
第一の裏込捨石部5が崩壊することはない。更に
低水位の水面4付近の強い圧力を有する空気や海
水などが第一の裏込捨石部5に流入したとして
も、第一のシート体8は頂面3と堤体1の壁面2
との間に隙間12を有して裏込捨石部5を被覆し
ているためこの隙間12から埋立側15へと噴出
することとなり、同じく第一のシート体8を破損
し或いは第一の裏込捨石部5が崩壊することがな
い。
In general, when it takes a long time to complete the reclamation, such as when reclaiming over a wide area such as the coast,
Unless the reclamation work continues and is completed in a short period of time, it will be left in the state shown in Figure 1, but in that case, the water level will be lower than the water level 4 due to the effects of tides, etc. A small amount of air or seawater flowing downward into the first backfilling rubble section 5 under weak pressure is discharged to the landfill side 15 through the window hole 14 provided in the first sheet body 8, similar to the conventional one. Therefore, damage to the first sheet body 8 and collapse of the backing rubble portion 5 will not occur. Furthermore, even if a large amount of air or seawater enters the reclaimed side 15 through gaps in the embankment body 1 under high pressure due to changes in the water level due to the ebb and flow of the tide or waves caused by strong winds, the low water level affected by these changes will be affected. Since no backfilling rubble is formed in the part located above the embankment body 1 than 4,
Since air, seawater, etc. freely blow out to the landfill side 15, the first sheet body 8 is hardly affected by it, and the first sheet body 8 is agitated and damaged, or the first backfilling The rubble section 5 will not collapse. Furthermore, even if air, seawater, etc. with strong pressure near the water surface 4 at a low water level flows into the first backfilling rubble section 5, the first sheet body 8 will not be able to protect the top surface 3 and the wall surface 2 of the embankment body 1.
Since the backfilling rubble part 5 is covered with a gap 12 between the backfilling rubble part 5, it will be ejected from this gap 12 to the landfill side 15, which may damage the first sheet body 8 or damage the first backing. The rubble part 5 does not collapse.

次に第2図に示すように埋立側15に土砂16
を投入して第一の裏込捨石部5の法肩17近傍ま
で埋立た状態では、第一のシート体7は土砂16
によつて第一の裏込捨石部5に圧接されているた
め第一の裏込捨石部5に侵入する空気や海水など
によつて煽られることがない。
Next, as shown in Figure 2, earth and sand 16 are placed on the reclaimed side 15.
When the soil is filled up to the vicinity of the shoulder 17 of the first backfilling rubble section 5, the first sheet body 7 is filled with earth and sand 16.
Since it is in pressure contact with the first back-filling rubble part 5 by the first back-filling rubble part 5, it will not be agitated by air, seawater, etc. entering the first back-filling rubble part 5.

そして、更に埋立作業を進行する場合には、第
3図に示すように第一の裏込捨石部5の頂面3上
に第一のシート体8を挾んで第二の裏込捨石部1
8を形成する。尚、このとき第1,2図に示すよ
うに第一のシート体8の第一の裏込捨石部5の頂
面3に敷設される部分に第一のシート体8と同様
な材質により形成された波形或いは複数の突起を
有する板や複数の管体を並設したものからなる緩
衝部材19を付設しておくことにより、第二の裏
込捨石部18を形成するために捨石を投入する際
に第一のシート体8を破損するのを防止すること
ができる。
When the reclamation work is to proceed further, as shown in FIG.
form 8. At this time, as shown in FIGS. 1 and 2, the portion of the first sheet body 8 to be laid on the top surface 3 of the first backfilling rubble portion 5 is made of the same material as the first sheet body 8. By attaching a buffer member 19 consisting of a plate having a corrugated shape or a plurality of protrusions, or a plurality of tubes arranged side by side, rubble can be thrown in to form the second backfilling rubble section 18. This can prevent the first sheet body 8 from being damaged.

次で、第二の裏込捨石部18の頂面20ならび
に法面21を第二のシート体22で被覆する。こ
の第二のシート体22は第一のシート体8と同材
料により適宜の大きさに形成され、例えばその上
端縁23を堤体1の天端24に鋲25などで固着
することにより止着し、複数枚を第一のシート体
8と同様に堤体1の長手方向へ接続して敷設す
る。このとき、その下端縁が第一のシート体8に
重なるように敷設することが望ましい。また、敷
設直後に埋立が行われる場合は第二のシート体2
2の下端縁はそのままでもよいが、例えば下端部
に固着した複数の係止体26に係止環27を係止
しこれを第一のシート体8の法肩17近くに一列
に固着された係止具28に巻着張設されている係
止ロープ29に連結具30を介して連結すること
により第二のシート体22の下端縁を第一のシー
ト体8に遊動自在に連結しておくのが好ましい。
そして、通常はこの状態を形成した後、比較的短
期間で更にに土砂31を投入して埋立作業を完了
することとなるが、土砂31を投入する間に潮の
満干や強風などの波浪によつて空気や海水などが
第二の裏込捨石部18に流入しても第一のシート
体8の下端縁と第二のシート体22との重なりの
隙間から排出されるため第二のシート体22に生
じる繰返し張力は小さく、大きく煽られて破損す
るということがなく、且つ第二の裏込捨石部18
が崩壊することもない。殊に本実施例のように第
一のシート体8の下端縁と第二のシート体22と
が互いに繋着されている場合には第二のシート体
22の破損ならびに第二の裏込捨石部18の崩壊
を更に有効に防止することができる。
Next, the top surface 20 and slope 21 of the second backfilling rubble section 18 are covered with the second sheet body 22. The second sheet body 22 is made of the same material as the first sheet body 8 and has an appropriate size, and is fixed by, for example, fixing its upper edge 23 to the top end 24 of the embankment body 1 with rivets 25 or the like. Then, like the first sheet body 8, a plurality of sheets are connected and laid in the longitudinal direction of the embankment body 1. At this time, it is desirable to lay it so that its lower edge overlaps the first sheet body 8. In addition, if the landfill is carried out immediately after laying, the second sheet body 2
The lower edge of 2 may be left as it is, but for example, a locking ring 27 is locked to a plurality of locking bodies 26 fixed to the lower end, and these are fixed in a line near the shoulder 17 of the first sheet body 8. The lower end edge of the second sheet body 22 is freely connected to the first sheet body 8 by connecting it via the connecting device 30 to the locking rope 29 which is wound and tensioned around the locking device 28. It is preferable to leave it there.
Normally, after this condition is formed, more earth and sand 31 is thrown in to complete the reclamation work in a relatively short period of time. Therefore, even if air or seawater flows into the second backfilling rubble section 18, it will be discharged from the gap between the overlapping lower edge of the first sheet body 8 and the second sheet body 22, so that the second sheet The repeated tension generated in the body 22 is small, it will not be greatly agitated and damaged, and the second backfilling rubble portion 18
will not collapse. In particular, when the lower edge of the first sheet body 8 and the second sheet body 22 are connected to each other as in this embodiment, damage to the second sheet body 22 and second backing rubble may occur. Collapse of the portion 18 can be further effectively prevented.

[発明の効果] 以上の構成を有する本発明によれば、裏込捨石
部を二回に分けて形成し、それぞれをシート体で
覆うものであるから、埋立完了までに長期間を要
する場合、台風や強風などで波浪の荒い場合など
に堤体の隙間から裏込捨石部へ多量の空気や海水
などが圧入されたとしても、シート体の破損なら
びに裏込捨石部の崩壊などを生じることがなく、
埋立護岸を所定形状に維持できるとともに、埋立
側に投入した土砂の流出や産業廃棄物の有害物質
の流出が防止されるものである。
[Effects of the Invention] According to the present invention having the above configuration, the backfilling rubble part is formed in two parts and each part is covered with a sheet body, so when it takes a long time to complete the reclamation, Even if a large amount of air or seawater is forced into the backfilling rubble from gaps in the embankment body during rough waves due to typhoons or strong winds, damage to the sheet body and collapse of the backfilling rubble may occur. Without,
This makes it possible to maintain the reclaimed seawall in a predetermined shape, and also prevents the outflow of earth and sand thrown into the landfill and the outflow of hazardous substances from industrial waste.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の一実施例を示すものであり、第
1図、第2図ならびに第3図は被覆方法を示す工
程図、第4図は第2図の拡大平面部分図である。 1……堤体、3……頂面、4……水面、5……
第一の裏込捨石部、6……法面、8……第一のシ
ート体、17……法肩、18……第二の裏込捨石
部、20……頂面、21……法面、22……第二
のシート体。
The drawings show one embodiment of the present invention, and FIGS. 1, 2, and 3 are process diagrams showing the coating method, and FIG. 4 is an enlarged partial plan view of FIG. 2. 1... Embankment body, 3... Top surface, 4... Water surface, 5...
First backfilling rubble part, 6...Slope, 8...First sheet body, 17...Slope shoulder, 18...Second backfilling rubble part, 20...Top surface, 21...Slope Face, 22...Second sheet body.

Claims (1)

【特許請求の範囲】[Claims] 1 堤体の埋立側に頂面が低水位時の水面とほぼ
同じ高さとなるように第一の裏込捨石部を形成す
ること、前記第一の裏込捨石部の頂面ならびに法
面を堤体側の頂面の一部を残して第一のシート体
で被覆すること、前記第一の裏込捨石部の法肩近
傍まで埋立が行われたとき前記第一のシート体で
被覆されている第一の裏込捨石部の頂面上に第二
の裏込捨石部を形成すること、前記第二の裏込捨
石部の頂面ならびに法面を第二のシート体で被覆
すること、からなることを特徴とする埋立護岸に
おける裏込捨石部の被覆方法。
1. Forming a first backfilling rubble section on the reclaimed side of the embankment body so that the top surface is approximately at the same height as the water surface at low water levels, and forming the top surface and slope of the first backfilling rubble section. Covering with the first sheet body leaving a part of the top surface on the embankment side, and covering with the first sheet body when the reclamation is carried out up to the vicinity of the slope of the first backfilling rubble section. forming a second back-filling rubble section on the top surface of the first back-filling rubble section; covering the top surface and slope of the second back-filling rubble section with a second sheet body; A method for covering a backfilling rubble part in a reclaimed seawall, characterized by comprising:
JP15265683A 1983-08-22 1983-08-22 Covering work of back-filled rubble in landfill side Granted JPS6043512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15265683A JPS6043512A (en) 1983-08-22 1983-08-22 Covering work of back-filled rubble in landfill side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15265683A JPS6043512A (en) 1983-08-22 1983-08-22 Covering work of back-filled rubble in landfill side

Publications (2)

Publication Number Publication Date
JPS6043512A JPS6043512A (en) 1985-03-08
JPS6325124B2 true JPS6325124B2 (en) 1988-05-24

Family

ID=15545201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15265683A Granted JPS6043512A (en) 1983-08-22 1983-08-22 Covering work of back-filled rubble in landfill side

Country Status (1)

Country Link
JP (1) JPS6043512A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168411B (en) * 2010-02-25 2012-06-27 浙江大学 Construction method of rubble mounding for sea-reclamation

Also Published As

Publication number Publication date
JPS6043512A (en) 1985-03-08

Similar Documents

Publication Publication Date Title
US3373568A (en) System for reclamation of land
US5807024A (en) Biodegradable groynes
JP2006144294A (en) Floating dam body sheet
JPS6325124B2 (en)
JPH067047Y2 (en) Cover sheet for reclaimed seawall
JPH0612029Y2 (en) Cover sheet for reclaimed seawall
JPH05311627A (en) Foundation structure for large-scale artificial island
JPS633095B2 (en)
JPS62141209A (en) Artificial underwater rock and its fitting
JPH08144241A (en) Seal material between revetment blocks and its construction method
JP3738101B2 (en) Water bottom laying sheet
JPH0140170B2 (en)
JP3411630B2 (en) Underwater sheet laying method
JPS62276112A (en) Artificial reef and its construction method
JPH0443123B2 (en)
JPH0542113Y2 (en)
JPS6136414A (en) Water pollution preventing film
JPH0426499Y2 (en)
JPH0351410A (en) flexible mound
JP2920795B2 (en) Mortar foundation construction method for offshore structures
JPH0426500Y2 (en)
JPH01304210A (en) Execution of submerged breakwater with flexible construction
JP2535905Y2 (en) Artificial ground
JPS5947765B2 (en) Construction method of simple vertical self-supporting wall for seawall
JPS636684B2 (en)