JPS6272862A - Apparatus for arranging floor inspection port - Google Patents
Apparatus for arranging floor inspection portInfo
- Publication number
- JPS6272862A JPS6272862A JP21007085A JP21007085A JPS6272862A JP S6272862 A JPS6272862 A JP S6272862A JP 21007085 A JP21007085 A JP 21007085A JP 21007085 A JP21007085 A JP 21007085A JP S6272862 A JPS6272862 A JP S6272862A
- Authority
- JP
- Japan
- Prior art keywords
- anchor member
- floor inspection
- auxiliary tool
- inspection port
- outer frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Sink And Installation For Waste Water (AREA)
- Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この発明は、床下に配設される諸設備の配線や配管等を
点検するために設置される床点検口を取り付ける際に用
いられる床点検口の設置装置に関し、特に設置効率の向
上を図った床点検口の設置装置に関するものである。[Detailed Description of the Invention] [Industrial Application Field] This invention is a floor inspection method used when installing a floor inspection port installed to inspect the wiring, piping, etc. of various equipment installed under the floor. This invention relates to an installation device for a floor inspection opening, and in particular to an installation device for a floor inspection opening that is designed to improve installation efficiency.
従来、床点検口を床面に設置するに際しては、第5図に
示すように、コンクリート基盤lに配設される配筋2を
引き出した後、一端部を床点検口3の外枠4に装着した
連結具5の他端部を、該配筋2に溶接固着し、該床点検
口3周囲及び床表面部にモルタル6を充填することが行
われていた。Conventionally, when installing a floor inspection port on the floor, as shown in FIG. The other end of the attached connector 5 was welded and fixed to the reinforcement 2, and the area around the floor inspection opening 3 and the floor surface was filled with mortar 6.
しかし、このような従来例においては、配筋2の引出し
作業に手間を要する上に、溶接作業が必要なので、溶接
作業自体が熟練を要し、かつ、該床点検口の設置に際し
て溶接機等の器材を該設置現場に搬送する必要があり、
その設置作業は容易でないという欠点を有していた。However, in such a conventional example, not only is it time-consuming to pull out the reinforcement 2, but also welding work is required, so the welding work itself requires skill, and when installing the floor inspection opening, a welding machine, etc. equipment must be transported to the installation site,
The drawback is that the installation work is not easy.
さらに、周囲が整理されていない設置現場における火花
の発生を伴う溶接作業は、火災等を発生させるおそれが
高い上に、既設の家屋にあらためて床点検口を設置する
場合や既設の床点検口を新しいものと取り替える場合に
は、該溶接作業用の高電圧の電源が得られないという欠
点をも有するものであった。Furthermore, welding work that generates sparks at an unorganized installation site has a high risk of causing a fire. When replacing it with a new one, it also has the disadvantage that a high voltage power source for the welding work cannot be obtained.
その上、該床点検口3は、その後に行われるモルタル6
の充填作業時の基準面を提供するので、精度の高いレベ
ル出しが一般に要求されるが、従来例においては、この
レベル出しは、上記配筋2への連結具5の溶接高さを調
整することにより行われ、このような作業も全体の設置
効率を低下させる原因となっていた。Moreover, the floor inspection opening 3 is suitable for the subsequent mortar 6.
In order to provide a reference surface during filling work, highly accurate leveling is generally required, but in the conventional example, this leveling involves adjusting the welding height of the connecting tool 5 to the reinforcement 2. This work was also a cause of lowering the overall installation efficiency.
本発明は、このような事情に対処してなされたものであ
って、その設置作業に際して溶接作業を要せず、設置効
率を窩めた床点検口の設置装置を提供することを目的と
する。The present invention has been made in response to these circumstances, and an object of the present invention is to provide a floor inspection port installation device that does not require welding during installation and is efficient in installation. .
本発明は、実施例に対応する第1図に示すように、補助
具7とコンクリート基盤lに植設されるアンカー部材8
とから構成され、上記補助具7を介して床点検口3をア
ンカー部材8に連結するようにされている。The present invention, as shown in FIG.
The floor inspection opening 3 is connected to the anchor member 8 via the auxiliary tool 7.
補助具7は、相互に略直角をなして配置される保持片部
9と取付片部IOとを両端部に有し、保持片部9におい
て床点検口3の外枠4に装着されている。The auxiliary tool 7 has a holding piece part 9 and a mounting piece part IO at both ends thereof, which are arranged at substantially right angles to each other, and is attached to the outer frame 4 of the floor inspection opening 3 at the holding piece part 9. .
アンカー部材8は、杆状に形成され、その上端部近傍に
は鍔部IIが−1−下柱動可能に装着されている。The anchor member 8 is formed into a rod shape, and a flange II is attached to the vicinity of its upper end so as to be movable downward.
そして、上記補助具7は、その取付片部10に穿設した
長孔12をアンカー部材8に挿通させることにより、該
取付片部10をアンカー部材8の鍔部11上に載置して
保持されている。The auxiliary tool 7 places and holds the attachment piece 10 on the collar 11 of the anchor member 8 by inserting the long hole 12 formed in the attachment piece 10 into the anchor member 8. has been done.
したがって、本発明において、床点検口3を設置するに
当たっでは、まず、コンクリート基盤1にアンカー部材
8を適宜数植設した後、このアンカー部材8に装着され
た鍔部IIを上下に移動させて該鍔部11の上面部のレ
ベル出しを行う。Therefore, in the present invention, when installing the floor inspection port 3, first, an appropriate number of anchor members 8 are planted in the concrete base 1, and then the collar part II attached to the anchor member 8 is moved up and down. Then, the upper surface of the flange 11 is leveled.
次いで、アンカー部材8の上端部を補助具7の取付片部
lOに穿設した長孔12に挿通させ、該取付片部1oを
鍔部11上に載置して保持する。Next, the upper end of the anchor member 8 is inserted into the elongated hole 12 formed in the attachment piece lO of the auxiliary tool 7, and the attachment piece Io is placed on the collar 11 and held.
このような状態において、床点検口3は、設置すべき位
置に仮設置されるので、この後肢床点検口3の外枠4周
囲にモルタル6を充填し、床点検口3が設置される。In such a state, the floor inspection port 3 is temporarily installed at the position where it should be installed, so mortar 6 is filled around the outer frame 4 of the hindlimb floor inspection port 3, and the floor inspection port 3 is installed.
この時、アンカー部材8は、コンクリート基盤1に植設
されて装着されるので、コンクリート基盤lがら配筋2
を引き出す手間を省くことができ、かつ補助具7の取付
片部10には長孔12が穿設され、その位置調整を行う
ことができるので、上記アンカー部材8の植設位置を厳
格に設定する必要がなく、設置効率を高めることができ
るのである。At this time, the anchor member 8 is planted and attached to the concrete base 1, so the reinforcement 2 is removed from the concrete base l.
The installation position of the anchor member 8 can be set strictly because the elongated hole 12 is bored in the attachment piece 10 of the auxiliary tool 7 and its position can be adjusted. There is no need to do this, and installation efficiency can be increased.
さらに、アンカー部材8の鍔部11を上下移動させるこ
とにより、容易に床点検口のレベル出しを行うことがで
きるのである。Furthermore, by moving the flange 11 of the anchor member 8 up and down, it is possible to easily level the floor inspection opening.
以下、本発明の望ましい実施例を添付図面に基づいて詳
細に説明する。Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
第1図に示した実施例において、床点検口3は、外枠4
内に蓋体13を開閉可能に装着して構成され、上記外枠
4の外周部には、断面略C字状の収納溝14が形成され
ている。In the embodiment shown in FIG.
A lid body 13 is attached therein so as to be openable and closable, and a storage groove 14 having a substantially C-shaped cross section is formed on the outer periphery of the outer frame 4 .
この実施例における補助具7は、第2図に示すように、
鋼板を折曲してその一端部に保持片部9を、他端部に取
付片部10を形成したもので、保持片部9の中央部には
、バーリング加圧が施され、該保持片部9を床点検口3
の外枠4に確実に装着するための止めねじ15が螺入さ
れている。The auxiliary tool 7 in this embodiment is, as shown in FIG.
A steel plate is bent and a holding piece 9 is formed at one end and a mounting piece 10 is formed at the other end.The center of the holding piece 9 is pressurized by burring, and the holding piece Part 9 is floor inspection hole 3
A set screw 15 is screwed into the outer frame 4 for secure attachment.
また、この実施例において保持片部9の上下端部にはア
ール部16が形成され、該補助具7を一旦左右いずれが
の方向に回転させて上記外枠4の収納溝14内に保持片
部9を嵌入させた後、反射力へ回転させることにより容
易にこの補助具7を外枠4に装着できるようにされてい
る。Further, in this embodiment, rounded portions 16 are formed at the upper and lower ends of the holding piece portion 9, and when the auxiliary tool 7 is rotated once in either the left or right direction, the holding piece 9 is inserted into the storage groove 14 of the outer frame 4. After the part 9 is fitted, the auxiliary tool 7 can be easily attached to the outer frame 4 by rotating it with a reflective force.
一方、取付片部IOに穿設される長孔12は、材端の一
端部に開口する切欠状に形成され、該開口部17がら後
述するアンカー部材8に挿通させることができるように
されている。On the other hand, the elongated hole 12 bored in the attachment piece IO is formed in the shape of a notch that opens at one end of the material, so that an anchor member 8, which will be described later, can be inserted through the opening 17. There is.
このように、長孔12を切欠状に形成することにより、
例えば、外枠4の重量が重い時には、第3図に示すよう
に、外枠4を傾けて該開口部17からアンカー部材8に
長孔12を挿通させることかできるので、その設置作業
をより向上させることができるようになる。By forming the elongated hole 12 in a notch shape in this way,
For example, when the outer frame 4 is heavy, as shown in FIG. 3, it is possible to tilt the outer frame 4 and insert the elongated hole 12 into the anchor member 8 through the opening 17, making the installation work easier. be able to improve.
また、この実施例におけるアンカー部材8は、先端部に
噛み込み部8aを形成するとともに、他端部にねじ部8
bを形成した、いわゆるオールアンカーと呼ばれるもの
が使用され、予めコンクリート基lX1iに穿設された
孔18に噛み込み部8aを打ち込んで、その先端に装着
された楔状のチップ8cにより該噛み込み部8aを押し
開き、コンクリート基盤1に植設できるようにされてい
る。Further, the anchor member 8 in this embodiment has a biting part 8a formed at the tip and a threaded part 8 at the other end.
A so-called all-anchor with a shape b is used, and the biting part 8a is driven into the hole 18 previously drilled in the concrete base lX1i, and the biting part 8a is fixed with a wedge-shaped tip 8c attached to the tip of the hole 18. 8a can be pushed open and planted on the concrete base 1.
そして、上記アンカー部材8のねし部8bには、鍔部1
1を形成するナツトが螺装され、上下移動可能とされて
いる。The neck portion 8b of the anchor member 8 has a collar portion 1.
The nut forming part 1 is threaded and is movable up and down.
なお、第1図において19は、締め付はナツトを示すも
ので、上記補助具7の取付片部10を鍔部11上に載置
した後、該取付片部10の上方からこの取付片部1oを
締め付け、取付片部1oの浮き上がり等を防止するため
に使用される。In FIG. 1, reference numeral 19 indicates a tightening nut, and after placing the mounting piece 10 of the auxiliary tool 7 on the flange 11, the mounting piece 10 is tightened from above. It is used to tighten the mounting piece 1o and prevent the mounting piece 1o from lifting up.
このように、締め付はナツトI9を使用することにより
、モルタル6を充填する際に、外枠4のずれ等を気にす
る必要がなくなるので、よりその設置作業の効率を向上
させることができる。In this way, by using the nut I9 for tightening, there is no need to worry about the displacement of the outer frame 4 when filling the mortar 6, so the efficiency of the installation work can be further improved. .
次に、この実施例における床点検口の設置装置を用いて
床点検口を設置する方法について説明すると、まず、床
点検口を設置すべく穿設されたコンクリート基盤1の開
口20周囲の適宜位置に孔18を複数個穿設し、この孔
18にアンカー部材8を打ち込む。Next, a method for installing a floor inspection port using the floor inspection port installation device in this embodiment will be explained. First, the appropriate position around the opening 20 of the concrete base 1 drilled to install the floor inspection port will be described. A plurality of holes 18 are bored in the hole 18, and the anchor member 8 is driven into the hole 18.
次いで、鍔Nilとなるナツトを該アンカー部材8のね
じ部8b上で調整し、複数のアンカー部材8の鍔部11
が同一平面上に配置されるようにレベル出しを行う。Next, the nut serving as the flange Nil is adjusted on the threaded part 8b of the anchor member 8, and the flange 11 of the plurality of anchor members 8 is adjusted.
Level them so that they are placed on the same plane.
一方、補助具7の保持片部9を床点検口3の外枠4の収
納溝14に嵌入させた後、上記アンカー部材8の植設ピ
ッチに合わせて該補助具7を外枠4の長手方向に摺動さ
せ、所定の位置において該補助具7を止めねじ15を締
め付けて外枠4に固定する。On the other hand, after fitting the holding piece 9 of the auxiliary tool 7 into the storage groove 14 of the outer frame 4 of the floor inspection opening 3, the auxiliary tool 7 is inserted along the longitudinal direction of the outer frame 4 in accordance with the planting pitch of the anchor members 8. At a predetermined position, the auxiliary tool 7 is fixed to the outer frame 4 by tightening the set screw 15.
そして、外枠4の一辺部を第3図のように傾けて、補助
具7の取付片部10に穿設した開口17からアンカー部
材8を挿通し、上記−辺部に対向する部位を下方に引き
下げて全ての補助具7,7・・・・・・の長孔12.1
2・・・・・・にアンカー部材8を挿通させる。Then, tilt one side of the outer frame 4 as shown in FIG. 3, insert the anchor member 8 through the opening 17 made in the mounting piece 10 of the auxiliary tool 7, and lower the part opposite the side. Pull all the auxiliary tools 7, 7... into the elongated holes 12.1.
2. Insert the anchor member 8 through.
この後、上記アンカー部材8の鍔部11と締め付はナツ
トI9とにより補助具7の取付片部IOを挾みつけるよ
うに締め付はナツト19を螺入し、床点検口3とアンカ
ー部材8とを強固に連結した後、該床点検口3周囲にモ
ルタル6を充填し、床点検口3が設置される。After that, the tightening nut 19 is screwed into the flange 11 of the anchor member 8 and the tightening nut I9 so as to sandwich the mounting piece IO of the auxiliary tool 7, and the tightening nut 19 is inserted between the floor inspection hole 3 and the anchor member 8. After firmly connecting the floor inspection opening 3, mortar 6 is filled around the floor inspection opening 3, and the floor inspection opening 3 is installed.
なお、第1図乃至第3図に示した実施例においては、締
め付はナツト■9により補助具7を固定する場合を示し
たが、この締め付はナツト■9を使用することなく、例
えば、モルタル等により仮止めしても良く、またアンカ
ー部材8はいわゆるオールアンカーに限られず、例えば
、孔18に単なる杆状体を打ち込んでも良く、この場合
第」図に示すように、鍔部1■として合成樹脂製のワッ
シャー状のものを圧挿すると共に接着剤を併用して適宜
位置に固定するようにしても良い。In addition, in the embodiments shown in FIGS. 1 to 3, the case where the auxiliary tool 7 is fixed by the nut 9 is shown for tightening, but this tightening can be done without using the nut 9, for example. In addition, the anchor member 8 is not limited to a so-called all-anchor, and for example, a simple rod-shaped body may be driven into the hole 18. In this case, as shown in FIG. As (2), a washer-like thing made of synthetic resin may be press-fitted and an adhesive may be used in combination to fix it in an appropriate position.
以上の説明から明らかなように、本発明による床点検口
の設置装置によれば、従来例の如く溶接作業を要しない
ので、上記溶接作業に伴う様々の欠点を解消することが
できる。As is clear from the above description, the floor inspection port installation device according to the present invention does not require welding work as in the conventional example, and thus can eliminate various drawbacks associated with the welding work described above.
また、アンカー部材は、コンクリート基盤に植設されて
装着されるので、コンクリート基盤から配筋を引き出す
手間を省くことができ、かつ補助具の取付片部には長孔
が穿設され、その位置調節を行うことができるので、上
記アンカー部材の植設位置を厳格に設定する必要がなく
、さらに、アンカー部材の鍔部を上下移動させることに
より、容易に床点検口のレベル出しを行うことができる
ので、設置効率を高めることができる。In addition, since the anchor member is installed by planting it in the concrete base, it is possible to save the effort of pulling out the reinforcement from the concrete base, and the mounting piece of the auxiliary tool has a long hole drilled in it, so that it can be positioned easily. Since the anchor member can be adjusted, there is no need to strictly set the installation position of the anchor member, and furthermore, by moving the flange of the anchor member up and down, the floor inspection opening can be easily leveled. Therefore, installation efficiency can be increased.
第1図は本発明の実施例を示す断面図、第2図は補助具
を示す斜視説明図、
第3図は床点検口の設置作業を示す側面図、第4図はア
ンカー部材及び鍔部の変形例を示す断面図。
第5図は従来例を示す部分断面図である。
■・・・コンクリート基盤 3・・・床点検口4・
・・外枠 7・・・補助具8・・・ア
ンカー部材 9・・・保持片部10・・・取付
片部 11・・・鍔部12・・・長孔
第1図
嬉2図
第3図
第4図
第5図Fig. 1 is a sectional view showing an embodiment of the present invention, Fig. 2 is a perspective explanatory view showing an auxiliary tool, Fig. 3 is a side view showing the installation work of a floor inspection port, and Fig. 4 is an anchor member and a flange. FIG. FIG. 5 is a partial sectional view showing a conventional example. ■...Concrete foundation 3...Floor inspection port 4.
... Outer frame 7 ... Auxiliary tool 8 ... Anchor member 9 ... Holding piece part 10 ... Mounting piece part 11 ... Flange part 12 ... Long hole Figure 1, Figure 2, Figure 3 Figure 4 Figure 5
Claims (1)
を両端部に有し、上記保持片部において床点検口の外枠
に装着される補助具と、 コンクリート基盤に略垂直に植設され、その上端部近傍
に上下移動可能な鍔部を形成してなる杆状のアンカー部
材とからなり、 上記補助具の取付片部に穿設した長孔に上記アンカー部
材を挿通して該取付片部をアンカー部材の鍔部上に載置
保持したことを特徴とする床点検口の設置装置。[Scope of Claims] An auxiliary tool having a holding piece part and a mounting piece part arranged at substantially right angles to each other at both ends, and being attached to the outer frame of a floor inspection opening at the holding piece part; It consists of a rod-shaped anchor member that is planted approximately vertically on a concrete base and has a flange that can move up and down near its upper end, and the long hole drilled in the mounting piece of the auxiliary tool is connected to the rod-shaped anchor member. 1. An installation device for a floor inspection port, characterized in that an anchor member is inserted through the attachment piece and the mounting piece is placed and held on a flange of the anchor member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21007085A JPS6272862A (en) | 1985-09-25 | 1985-09-25 | Apparatus for arranging floor inspection port |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21007085A JPS6272862A (en) | 1985-09-25 | 1985-09-25 | Apparatus for arranging floor inspection port |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6272862A true JPS6272862A (en) | 1987-04-03 |
JPH0311348B2 JPH0311348B2 (en) | 1991-02-15 |
Family
ID=16583319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP21007085A Granted JPS6272862A (en) | 1985-09-25 | 1985-09-25 | Apparatus for arranging floor inspection port |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6272862A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7382850B2 (en) * | 2020-02-21 | 2023-11-17 | ナカ工業株式会社 | Floor inspection port and construction method for floor inspection port |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52142757U (en) * | 1976-04-24 | 1977-10-28 | ||
JPS54133745A (en) * | 1978-04-08 | 1979-10-17 | Mizuochi Kensetsu Kk | Installation adjusting method of iron frame in manhole |
JPS57123853U (en) * | 1981-01-21 | 1982-08-02 | ||
JPS6012044U (en) * | 1983-07-04 | 1985-01-26 | 三菱重工業株式会社 | fuel oil transfer device |
-
1985
- 1985-09-25 JP JP21007085A patent/JPS6272862A/en active Granted
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52142757U (en) * | 1976-04-24 | 1977-10-28 | ||
JPS54133745A (en) * | 1978-04-08 | 1979-10-17 | Mizuochi Kensetsu Kk | Installation adjusting method of iron frame in manhole |
JPS57123853U (en) * | 1981-01-21 | 1982-08-02 | ||
JPS6012044U (en) * | 1983-07-04 | 1985-01-26 | 三菱重工業株式会社 | fuel oil transfer device |
Also Published As
Publication number | Publication date |
---|---|
JPH0311348B2 (en) | 1991-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2772560A (en) | Pick-up device for pre-cast concrete slabs | |
US7744316B2 (en) | Apparatus for lifting building foundations | |
US5836132A (en) | Anchor template | |
US3605361A (en) | Tendon anchorage | |
US6298618B1 (en) | Constructional support | |
US5228262A (en) | Anchor assembly | |
JPS6272862A (en) | Apparatus for arranging floor inspection port | |
JP4563243B2 (en) | Column base foundation construction method and positioning device | |
JPS63197736A (en) | Pin connection method of pc beam | |
JPS5920489Y2 (en) | Anchor bolt mounting structure | |
CN221440142U (en) | Overlength track installation built-in fitting on roof beam | |
JP2516066B2 (en) | Manhole cover height adjustment device | |
JPH0220778B2 (en) | ||
JPS62107132A (en) | House anchoring apparatus | |
JPH10299004A (en) | Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column | |
JPH0358023B2 (en) | ||
JP3354749B2 (en) | Composite anchor bolt for equipment installation | |
JPH0781324B2 (en) | Anchor bolt set jig | |
JP2829626B2 (en) | Structure of concrete block and method of stacking concrete block on slope | |
DE3926146A1 (en) | Electrical cable distributor housing foundation - has anchored platform providing sunken horizontal support surface for distributor housing | |
JPH10195892A (en) | Settled support frame restoring method and apparatus | |
JPH08135070A (en) | Underfloor construction method by steel post | |
JPH05125816A (en) | Jig for leveling of bundle base | |
JPS5853499Y2 (en) | Connection structure of pipe pillow for piping | |
JPH08319624A (en) | Execution method of anchor bolt |