Prior art keywords
work
construction
chamber
torus
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55066759A
Other languages
Japanese (ja)
Other versions
JPS56162091A (en
Inventor
Yorio Oda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP6675980A priority Critical patent/JPS56162091A/en
Publication of JPS56162091A publication Critical patent/JPS56162091A/en
Publication of JPS6244635B2 publication Critical patent/JPS6244635B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Description

【発明の詳細な説明】 本発明は自立型の原子炉格納容器のうち、ドラ
イウエル部を球形とし且つサプレツシヨンチヤン
バーをドーナツ形として原子炉建家マツト上に据
付けるタイプの原子炉において、サプレツシヨン
チヤンバー設置部分のトーラス室の建設工法に関
するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a self-supporting nuclear reactor containment vessel in which the dry well portion is spherical and the suppression chamber is donut shaped and is installed on a reactor building mat. , concerning the construction method of the torus chamber where the suppression chamber is installed.

サプレツシヨンチヤンバーをドーナツ形として
ドライウエルの外側に配設し、ドライウエル内部
とサプレツシヨンチヤンバー内とを複数のベント
管で接続してなる形式の原子炉格納容器を採用し
ている沸騰水型原子炉においては、従来、第1図
の如く、サプレツシヨンチヤンバーaの組み立て
と、原子炉建家におけるトーラス室壁bとの構築
とを別々に行つている。そのため、トーラス室壁
bの構築のための専用の作業足場cをトーラス室
内に仮設し、該室壁bの構築後は作業足場cを撤
去させていた。しかも、サプレツシヨンチヤンバ
ーaの組立と、トーラス室壁bの構築とは全く異
なる作業であるため、従来は、作業時期をずらし
ていた。dはドライウエル、eは原子炉建家マツ
トである。
A reactor containment vessel is adopted in which the suppression chamber is shaped like a doughnut and is placed outside the drywell, and the inside of the drywell and the suppression chamber are connected by multiple vent pipes. Conventionally, in a boiling water reactor, as shown in FIG. 1, the suppression chamber a and the torus chamber wall b in the reactor building are assembled separately. Therefore, a dedicated work scaffold c for constructing the torus room wall b was temporarily installed in the torus room, and the work scaffold c was removed after the construction of the torus room wall b. Furthermore, since the assembly of the suppression chamber a and the construction of the torus chamber wall b are completely different operations, conventionally the timing of the operations has been staggered. d is a dry well, and e is a reactor building mat.

従つて、現場での工事に多くの時間を要し、結
局、原子炉建設自体の工期の長期化につながり、
又、トーラス室壁bの構築用の作業足場cの現場
での仮設作業、撤去作業も必要であるため、現場
での作業時間の延長の原因となつていた。
Therefore, on-site construction takes a lot of time, which ultimately leads to a longer construction period for the reactor construction itself.
Furthermore, it is necessary to temporarily construct and remove the work scaffold c for constructing the torus chamber wall b on site, which causes an extension of the work time on site.

本発明は、サプレツシヨンチヤンバーとトーラ
ス室壁との建設を並行して行い、原子炉建設工程
の短縮化を図ろうとするもので、サプレツシヨン
チヤンバーを構成する各分割ブロツクを工場で製
作するとき、または現地の地上でこのブロツク
に、現場での作業時の仕切壁となる仕切とトーラ
ス室壁構築作業に用いる作業足場とを取り付け、
上記ブロツクを現場で組み立ててサプレツシヨン
チヤンバーの据付けを行うときに上記足場を利用
して並行してトーラス室壁の構築を行うことを特
徴とするものである。
The present invention aims to shorten the reactor construction process by constructing the suppression chamber and the torus chamber wall in parallel. At the time of manufacturing or on the ground at the site, a partition that will serve as a partition wall during work on site and a work scaffold used for construction of the torus room wall are attached to this block.
The present invention is characterized in that when the blocks are assembled on site and the suppression chamber is installed, the torus chamber wall is constructed in parallel using the scaffold.

以下、本発明の実施例を図面を参照して説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

第2図及び第3図は本発明の実施例図を示すも
ので、工場において、サプレツシヨンチヤンバー
1を複数のブロツク1aとして製作し、このチヤ
ンバー1のブロツク1aを現場にて組み立ててサ
プレツシヨンチヤンバー1を建設するに際し、本
発明は、ブロツク1aの製作時に、各ブロツク1
aの外側面に、該ブロツク1aを現場で組立てる
作業とトーラス室壁2の構築作業とが並行して行
えるようにするための養生仕切3を、取り付ける
と共に、該仕切3の外側にトーラス室壁2の構築
作業用の作業足場4を取り付ける。このようにし
て仕切3及び作業足場4を工場にて一体的にブロ
ツク1aに取り付けてブロツク1aの製作が行わ
れると、次に、このブロツク1aを現場に搬送
し、各ブロツク1aを第3図の如く順次接合して
組み立てて脚部5を介し原子炉建家マツト6上に
据付けて行く。この組み立て作業と並行させて、
各ブロツク1aに既に取り付けられている作業足
場4を利用して同時にトーラス室壁2の構築作業
を進行させる。又サプレツシヨンチヤンバー1の
ブロツク1aとドライウエル7とはベント管8で
接続させる。上記ブロツク1aの組み立て作業と
トーラス室壁2の構築作業とは全く異質の作業で
あり、これら作業を近接したところで行うことか
ら危険性ならびに互の作業への影響等の弊害が生
じるが、養生仕切3があるので、かかる弊害を防
止でき、且つサプレツシヨンチヤンバー1の保護
が図れ、両作業を並行して行うことができる。
2 and 3 show examples of the present invention, in which the suppression chamber 1 is manufactured as a plurality of blocks 1a in a factory, and the blocks 1a of the chamber 1 are assembled on site to suppress the suppression chamber 1. When constructing the tension chamber 1, the present invention provides that each block 1a is
A curing partition 3 is attached to the outside surface of the block 1a so that the on-site assembly of the block 1a and the construction of the torus chamber wall 2 can be carried out in parallel. Attach work scaffolding 4 for the construction work in step 2. When the partition 3 and the work scaffold 4 are integrally attached to the block 1a at the factory and the block 1a is manufactured in this way, the block 1a is then transported to the site and each block 1a is assembled as shown in FIG. They are sequentially joined and assembled as shown in the figure, and then installed on the reactor building mat 6 via the legs 5. In parallel with this assembly work,
The construction work of the torus chamber wall 2 is simultaneously progressed using the work scaffold 4 already attached to each block 1a. Further, the block 1a of the suppression chamber 1 and the dry well 7 are connected through a vent pipe 8. The work of assembling the block 1a and the work of constructing the torus chamber wall 2 are completely different works, and since these works are performed in close proximity, there are dangers and adverse effects such as affecting each other's work. 3, such adverse effects can be prevented, the suppression chamber 1 can be protected, and both operations can be performed in parallel.

上記のようにして順次搬入されるブロツク1a
の組み立て作業と同時に、順次組み立てられて行
くブロツク1aに取り付けられた作業足場4を利
用しての室壁2の構築作業を行うことにより、ド
ーナツ状のサプレツシヨンチヤンバー1の据付工
事と並行してトーラス室壁2の構築工事が進行す
るので、効率よく原子炉格納容器トーラス室の建
設が行われることになる。
Blocks 1a are carried in sequentially as described above.
Simultaneously with the assembly work of the chamber wall 2 using the work scaffold 4 attached to the blocks 1a that are being assembled in sequence, the construction work of the donut-shaped suppression chamber 1 can be done in parallel. As the construction work of the torus chamber wall 2 progresses, the reactor containment vessel torus chamber can be constructed efficiently.

以上説明したように、本発明の建設工法によれ
ば、工場でサプレツシヨンチヤンバーのブロツク
を製作するときに、該ブロツクに仕切と作業足場
を取り付け、現場での上記ブロツクの組み立ての
作業と並行して作業足場を利用したトーラス室壁
構築を行わせるので、現場では何ら予備作業を必
要とすることなく即座に上記の両工事に並行して
取りかかることができて工期の短縮が図れ、原子
炉全体の建設工事の短縮化を図ることができ、又
トーラス室壁構築作業用の作業足場の仮設作業が
省略できて建設工期の短縮、作業の安全性、等が
図れる。
As explained above, according to the construction method of the present invention, when a suppression chamber block is manufactured in a factory, partitions and work scaffolding are attached to the block, and the work of assembling the block at the site is completed. Since the construction of the torus chamber walls using work scaffolding is carried out in parallel, both of the above works can be started immediately in parallel without any preliminary work required on site, shortening the construction period and reducing the It is possible to shorten the construction work of the entire furnace, and also to omit the work of temporarily constructing a work scaffold for the torus chamber wall construction work, thereby shortening the construction period and improving work safety.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の建設方式を示す原子炉格納容器
トーラス室部の断面図、第2図は本発明の建設工
法の実施例を示す断面図、第3図は第2図の平面
図である。 1……サプレツシヨンチヤンバー、1a……ブ
ロツク、2……トーラス室壁、3……養生仕切、
4……作業足場、7……ドライウエル。
Figure 1 is a sectional view of the torus chamber of the reactor containment vessel showing a conventional construction method, Figure 2 is a sectional view showing an embodiment of the construction method of the present invention, and Figure 3 is a plan view of Figure 2. . 1... Suppression chamber, 1a... Block, 2... Torus chamber wall, 3... Curing partition,
4...Work scaffold, 7...Dry well.

Claims (1)

【特許請求の範囲】[Claims] 1 サプレツシヨンチヤンバーを構成する各分割
ブロツクを工場で製作するとき、または現地の地
上でこのブロツクに、現場での作業時の仕切壁と
なる仕切とトーラス室壁構築作業に用いる作業足
場とを取り付け、上記ブロツクを現場で組み立て
てサプレツシヨンチヤンバーの据付けを行うとき
に上記足場を利用して並行してトーラス室壁の構
築を行うことを特徴とする原子炉格納容器トーラ
ス室の建設工法。
1. When manufacturing the divided blocks that make up the suppression chamber in a factory or on the ground at the site, these blocks are fitted with partitions that will serve as partition walls during on-site work and work scaffolding used for torus chamber wall construction work. construction of a reactor containment vessel torus chamber, characterized in that when the blocks are assembled on site and the suppression chamber is installed, the torus chamber wall is constructed in parallel using the scaffolding. Construction method.
JP6675980A 1980-05-20 1980-05-20 Method of constructing torus room of nuclear reactor container Granted JPS56162091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6675980A JPS56162091A (en) 1980-05-20 1980-05-20 Method of constructing torus room of nuclear reactor container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6675980A JPS56162091A (en) 1980-05-20 1980-05-20 Method of constructing torus room of nuclear reactor container

Publications (2)

Publication Number Publication Date
JPS56162091A JPS56162091A (en) 1981-12-12
JPS6244635B2 true JPS6244635B2 (en) 1987-09-21

Family

ID=13325125

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6675980A Granted JPS56162091A (en) 1980-05-20 1980-05-20 Method of constructing torus room of nuclear reactor container

Country Status (1)

Country Link
JP (1) JPS56162091A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57160091A (en) * 1981-03-27 1982-10-02 Tokyo Shibaura Electric Co Method of fixing nuclear reactor container

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54124188A (en) * 1978-03-20 1979-09-26 Hitachi Ltd Building method of reactor container

Also Published As

Publication number Publication date
JPS56162091A (en) 1981-12-12

Similar Documents

Publication Publication Date Title
JPS6244635B2 (en)
US4627213A (en) Method of constructing a nuclear power station
JPH04158297A (en) Cutting out of large sized block of activation part in biological shielding structure of nuclear reactor
JPS63274897A (en) Cask cleaning pit in common use as depot for head of nuclear reactor pressure vessel
JPS6151751B2 (en)
JPS6324276B2 (en)
JPS5926095A (en) Method of constructing reactor building
JP3110059B2 (en) Containment vessel construction method for nuclear power plants
JPS6331076B2 (en)
JPS63272690A (en) Construction of lining tank
JPS62159093A (en) Method of construction of housing for nuclear reactor
JPS6410795B2 (en)
JPS62157589A (en) Method of construction of housing for nuclear reactor
JPS6322278B2 (en)
JPS6338674B2 (en)
JPH04252997A (en) Constructing method for containment vessel of nuclear reactor in nuclear power station
JPH0326798B2 (en)
JPS60122390A (en) Method of constructing diaphragm floor of nuclear reactor container
JPS6291895A (en) Method of constructing housing of nuclear reactor
JPS6156474B2 (en)
JPS6346818B2 (en)
JPH0631864B2 (en) Reactor processing method
JPH0471478B2 (en)
JPH06186377A (en) Suppression chamber and construction method thereof
JPS6135395A (en) Method of constructing torus chamber in nuclear power plant