JPS6226481Y2 - - Google Patents

Info

Publication number
JPS6226481Y2
JPS6226481Y2 JP1982159623U JP15962382U JPS6226481Y2 JP S6226481 Y2 JPS6226481 Y2 JP S6226481Y2 JP 1982159623 U JP1982159623 U JP 1982159623U JP 15962382 U JP15962382 U JP 15962382U JP S6226481 Y2 JPS6226481 Y2 JP S6226481Y2
Authority
JP
Japan
Prior art keywords
small
steel
flat
steel frame
reinforcing bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1982159623U
Other languages
Japanese (ja)
Other versions
JPS5963127U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP15962382U priority Critical patent/JPS5963127U/en
Publication of JPS5963127U publication Critical patent/JPS5963127U/en
Application granted granted Critical
Publication of JPS6226481Y2 publication Critical patent/JPS6226481Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【考案の詳細な説明】 この考案は鉄骨、鉄筋コンクリート構造の大梁
と小梁の接合部構造に関するものである。
[Detailed description of the invention] This invention relates to a joint structure between large beams and small beams in a steel frame or reinforced concrete structure.

鉄骨、鉄筋コンクリート構造においては、柱、
大梁は鉄骨、鉄筋の先組をしている。
In steel frame and reinforced concrete structures, columns,
The girders are pre-assembled with steel frames and reinforcing bars.

しかし小梁は各階床コンクリートの打設後下階
床より足場を立てるかまたは床型枠を組み上げ後
で配筋作業を行なつている。したがつて大梁の鉄
骨、鉄筋と小梁の鉄骨、鉄筋の現場での接合が必
要となる。また小梁主鉄筋のたれ下がりを防ぐた
め仮設補強が必要となる。
However, for the small beams, reinforcement work is carried out after concrete is poured for each floor and scaffolding is erected from the lower floor or the floor formwork is assembled. Therefore, it is necessary to connect the steel frames of the large beams, the steel frames of the reinforcing bars and the small beams, and the reinforcing bars on site. In addition, temporary reinforcement will be required to prevent the main reinforcing bars of the small beams from sagging.

この考案は前記問題点を解消し、大梁と小梁の
鉄骨の接合を容易かつ確実とするとともに小梁の
プレハブを可能ならしめる構造を案出したもの
で、以下その詳細を図示した実施例によつて説明
する。
This idea solves the above-mentioned problems and devises a structure that makes it easy and reliable to connect the steel frames of the main beam and the small beam, and also enables the prefabrication of the small beam. Let me explain.

図においてAは大梁、Bは小梁を示す。小梁B
はその断面の四隅部に所要のかぶり厚さを残して
平鋼1を縦に配置し、中間に上下梁鉄筋2と梁せ
いの中間に鉄筋3が配筋してある。なお第3図に
おいて下端梁鉄筋2は梁長の中央部において配筋
本数を増加させてある。以上の平鋼1および梁鉄
筋2,3の外周にはスパイラル鉄筋等からなるス
タラツプ筋4が配筋してある。大梁Aは梁鉄骨5
の周辺に大梁鉄筋7、スタラツプ筋8が配筋して
ある。
In the figure, A indicates a large beam and B indicates a small beam. Small beam B
Flat bars 1 are arranged vertically with a required cover thickness left at the four corners of the cross section, and reinforcing bars 3 are arranged between upper and lower beam reinforcing bars 2 and between the beams. In FIG. 3, the number of lower end beam reinforcing bars 2 is increased at the center of the beam length. Stamp reinforcements 4 made of spiral reinforcing bars or the like are arranged around the outer peripheries of the flat bar 1 and the beam reinforcing bars 2 and 3. Beam A is beam steel frame 5
The girder reinforcing bars 7 and stirrup bars 8 are arranged around the area.

以上の小梁Bを大梁Aに架渡すに際しては小梁
Bの上端の平鋼1を延長しておき、大梁Aの梁鉄
骨5上に載置し、梁鉄骨5のフランジ上に突設し
たガセツトプレート10と重ねて結合する。また
下端の平鋼1も梁鉄骨5の側面から突設したガセ
ツトプレート6と結合する。以上の平鋼1,梁鉄
筋2等はコンクリート9中に埋設される。
When constructing the above-mentioned small beam B over the main beam A, the flat steel 1 at the upper end of the small beam B was extended, placed on the beam steel frame 5 of the main beam A, and protruded onto the flange of the beam steel frame 5. It is overlapped and combined with the gusset plate 10. Further, the flat steel 1 at the lower end is also connected to a gusset plate 6 protruding from the side surface of the beam steel frame 5. The above-mentioned flat steel 1, beam reinforcing bars 2, etc. are buried in concrete 9.

この考案は以上の構成からなり、大梁および小
梁をプレハブ化して現場施工を省力化できる。ま
た鉄骨建方時に大梁と小梁を略同時に取付けられ
るので施工性が向上する。特に小梁の平鋼を延長
しておくことにより、大梁鉄骨との結合を容易と
するとともに大梁の上端梁鉄筋を小梁の平鋼で受
けることができるので配筋作業が容易となる。
This idea consists of the above-mentioned structure, and the large beams and small beams can be prefabricated to save labor during on-site construction. Furthermore, since the large beams and small beams can be installed almost simultaneously when constructing the steel frame, construction efficiency is improved. In particular, by extending the flat steel of the small beam, it is easier to connect it to the large beam steel frame, and the reinforcing bars at the top of the large beam can be supported by the flat steel of the small beam, making reinforcement work easier.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの考案の梁と大梁の接合部の断面
図、第2図,第3図は小梁の断面図である。 A……大梁、B……小梁、1……平鋼、2,3
……梁鉄筋、4……スタラツプ筋、5……梁鉄
骨、6……ガセツトプレート、7……大梁鉄筋、
8……スタラツプ筋、9……コンクリート、10
……ガセツトプレート。
Figure 1 is a cross-sectional view of the joint between the beam and the girder of this invention, and Figures 2 and 3 are cross-sectional views of the small beam. A...Large beam, B...Small beam, 1...Flat steel, 2,3
... Beam reinforcing bar, 4... Stirrup bar, 5... Beam steel frame, 6... Gusset plate, 7... Beam reinforcing bar,
8...Start muscle, 9...Concrete, 10
...Gusset plate.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 小梁断面の四隅部に平鋼を縦に配置し、上端の
平鋼の延長端部を大梁の梁鉄骨に載置して梁鉄骨
のフランジ上に突設したガセツトプレートと結合
し、下端の平鋼を大梁の梁鉄骨の側面から突設し
たガセツトプレートと結合し、かつ大梁の上端梁
鉄筋を平鋼の延長端部で支持し、小梁の平鋼およ
び大梁の梁鉄骨の周囲にスタラツプ筋を配筋して
コンクリート中に埋設してあることを特徴とする
大梁と小梁の接合部構造。
Flat bars are placed vertically at the four corners of the cross section of the small beam, and the extended end of the top flat bar is placed on the beam steel frame of the girder and connected to the gusset plate protruding from the flange of the beam steel frame. The flat steel of the small beam is connected to a gusset plate protruding from the side of the beam steel frame of the large beam, and the top beam reinforcing bar of the large beam is supported by the extended end of the flat steel, and the surroundings of the flat steel of the small beam and the beam steel frame of the large beam are connected. A structure at the joint between a large beam and a small beam, characterized by having starp bars arranged and buried in concrete.
JP15962382U 1982-10-21 1982-10-21 Joint structure of major and minor beams Granted JPS5963127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15962382U JPS5963127U (en) 1982-10-21 1982-10-21 Joint structure of major and minor beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15962382U JPS5963127U (en) 1982-10-21 1982-10-21 Joint structure of major and minor beams

Publications (2)

Publication Number Publication Date
JPS5963127U JPS5963127U (en) 1984-04-25
JPS6226481Y2 true JPS6226481Y2 (en) 1987-07-07

Family

ID=30351320

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15962382U Granted JPS5963127U (en) 1982-10-21 1982-10-21 Joint structure of major and minor beams

Country Status (1)

Country Link
JP (1) JPS5963127U (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2862323B1 (en) * 2003-11-18 2006-03-10 Soc Civ D Brevets Matiere METHOD FOR PRODUCING A CONCRETE PIECE AND PIECE PRODUCED THEREBY

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS529227U (en) * 1975-07-09 1977-01-22
JPS5210172U (en) * 1975-07-10 1977-01-24
JPS5216716B2 (en) * 1973-01-29 1977-05-11
JPS5716973U (en) * 1980-07-03 1982-01-28

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5216716U (en) * 1975-07-24 1977-02-05

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5216716B2 (en) * 1973-01-29 1977-05-11
JPS529227U (en) * 1975-07-09 1977-01-22
JPS5210172U (en) * 1975-07-10 1977-01-24
JPS5716973U (en) * 1980-07-03 1982-01-28

Also Published As

Publication number Publication date
JPS5963127U (en) 1984-04-25

Similar Documents

Publication Publication Date Title
JP3069753B2 (en) Construction method of framed reinforced concrete structure
JPS6226481Y2 (en)
JPH02300439A (en) Prefabricating method
JPH04222742A (en) Composite beam
JPH0122827Y2 (en)
JP2522708B2 (en) Reinforcing bar tip assembly beam with formwork and reinforcing bar tip assembly method with formwork
JP2518568Y2 (en) Connection structure of steel beams to concrete columns
JPH067125Y2 (en) Structure of the stigma of the flat slab
JPH044091Y2 (en)
JPH0447737B2 (en)
JP2757032B2 (en) Construction method of underground building with pillars with capital by reverse hitting method
JPH01214641A (en) Construction of steel-pipe precast concrete pole
JPH0546561Y2 (en)
JPH0443526Y2 (en)
JPS6134468Y2 (en)
JPS5925931Y2 (en) Composite girder using π-shaped steel
JPH05230935A (en) Precase concrete made beam frame member
JPS6335773B2 (en)
JPS6232303B2 (en)
JPH04144B2 (en)
JP2651506B2 (en) How to apply underground beams
JPH0765339B2 (en) Concrete pillar construction method
JPS645134B2 (en)
JPS6134549B2 (en)