JPS6215169Y2 JP2261783U JP2261783U JPS6215169Y2 JP S6215169 Y2 JPS6215169 Y2 JP S6215169Y2 JP 2261783 U JP2261783 U JP 2261783U JP 2261783 U JP2261783 U JP 2261783U JP S6215169 Y2 JPS6215169 Y2 JP S6215169Y2
Authority
JP
Japan
Prior art keywords
pipe
spacer
holding
pipes
guide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2261783U
Other languages
Japanese (ja)
Other versions
JPS59129776U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP2261783U priority Critical patent/JPS59129776U/en
Publication of JPS59129776U publication Critical patent/JPS59129776U/en
Application granted granted Critical
Publication of JPS6215169Y2 publication Critical patent/JPS6215169Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Packages (AREA)
  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)
  • Package Frames And Binding Bands (AREA)

Description

【考案の詳細な説明】 〔技術分野〕 本考案は小径、中径寸法のパイプを複数本結束
するためのパイプ結束枠に関する。
[Detailed Description of the Invention] [Technical Field] The present invention relates to a pipe bundling frame for bundling a plurality of small-diameter and medium-diameter pipes.

〔考案の背景〕[Background of the idea]

従来、シームレスパイプなどの小径、中径のパ
イプを船積みする際の梱包手段は、単に複数本の
パイプを束ね、数本のバンドによつて固定して
た。ところが、この梱包手段では、輸送途中にお
ける船から岸壁へ、岸壁からトレーラなどへの積
み換え作業時に、パイプとパイプの間にフオーク
リフトの爪を差し込むことができず、またクレー
ン作業の際のワイヤー取り付けも困難であつた。
したがつて、荷の積み降しの作業に時間がかか
り、滞船時間も長引いて輸送コストの増大につな
がつていた。また、バンドで結束したパイプの荷
形状が不安定であるため、荷積みが不安定であ
る。よつて、積載スペースにも無駄が生じてい
た。さらに、開梱の際に結束バンドを切断する
と、一度に荷崩れし、非常に危険でもあつた。ま
た、結束時にパイプどうしが接触しているので、
互いに傷を付け合うことがあり、さらに、保管時
にパイプの接合部に水やほこりが溜りやすいなど
の欠点があつた。
Conventionally, the packaging method for shipping small-diameter and medium-diameter pipes such as seamless pipes has been to simply bundle multiple pipes and secure them with several bands. However, with this packaging method, it is not possible to insert the claws of a forklift between the pipes during transfer from a ship to a quay, or from a quay to a trailer, etc., and wires during crane work cannot be inserted. Installation was also difficult.
Therefore, it took time to load and unload the cargo, and the time spent on the ship was prolonged, leading to an increase in transportation costs. In addition, the shape of the pipes bound with bands is unstable, making loading unstable. As a result, loading space was also wasted. Furthermore, if the cable ties were cut when unpacking, the package would collapse all at once, which was extremely dangerous. Also, since the pipes are in contact with each other when tying,
They could damage each other, and they also had the disadvantage that water and dust tended to accumulate at the joints of the pipes during storage.

〔考案の目的〕[Purpose of invention]

本考案は、上記従来のパイプ結束手段の欠点を
解消するものであり、複数本のパイプを規則的に
配列して結束でき、且つ枠組作業も簡単であり、
且つ結束強度が高いパイプ結束枠を提供すること
を目的としている。
The present invention eliminates the drawbacks of the conventional pipe bundling means described above, and allows multiple pipes to be arranged and bound in a regular manner, and the framing work is simple.
Another object of the present invention is to provide a pipe binding frame with high binding strength.

〔考案の構成〕[Structure of the idea]

本考案は、複数本のパイプを上下から挾む角材
による保持材と、この保持材間に介装され且つパ
イプ間を仕切る仕切材と、保持材どうしを固定す
る固定部材とを備えているパイプ結束枠におい
て、前記仕切材は、保持材とほぼ同じ厚さの角材
によるスペーサと、スペーサの表裏2面に添装さ
れ且つスペーサの上下左右各端部から突出する大
きさの一対のガイド板とから成り、このガイド板
のスペーサから左右方向へ突出する部分にパイプ
の側面と嵌合する凹部が形成され、且つガイド板
のスペーサから上下方向へ突出する部分によつて
前記保持材が挾持されていることを特徴とするも
のである。
The present invention is a pipe that is equipped with a holding member made of square members that sandwiches multiple pipes from above and below, a partitioning member that is interposed between the holding members and partitions between the pipes, and a fixing member that fixes the holding members to each other. In the binding frame, the partitioning material includes a spacer made of square material having approximately the same thickness as the holding material, and a pair of guide plates attached to the front and back sides of the spacer and protruding from the top, bottom, right, left, and right ends of the spacer. A concave portion that fits with the side surface of the pipe is formed in a portion of the guide plate that protrudes from the spacer in the left-right direction, and the holding material is held by the portion of the guide plate that protrudes from the spacer in the vertical direction. It is characterized by the presence of

本考案では、仕切材を保持材に取付けるにあた
り、表裏面のガイド板によつて保持材を挾持する
ようにしているため、仕切材を保持材に対して確
実に固定できるようになる。また、仕切材のスペ
ーサが角材にあつてもガイド板の凹部によつてパ
イプの側面が確実に位置決めできるようになる。
In the present invention, when attaching the partitioning material to the holding material, the holding material is held between the front and back guide plates, so that the partitioning material can be reliably fixed to the holding material. Furthermore, even if the spacer of the partition material is a square piece of material, the side surface of the pipe can be reliably positioned by the recessed portion of the guide plate.

〔考案の実施例〕[Example of idea]

以下、本考案の実施例を図面によつて説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

第1図は、本考案によるパイプ結束枠1によ
り、複数本のパイプPを結束した状態を示す斜視
図である。
FIG. 1 is a perspective view showing a state in which a plurality of pipes P are bound by a pipe binding frame 1 according to the present invention.

このパイプ結束枠1は、パイプPを上下から挾
持する保持材11、隣り合うパイプP間に介在さ
せる仕切材12、ならびに各保持材11どうしを
固定する固定部材13、さらに結束状態を補強す
る帯体14の各部材から構成されている。保持材
11、仕切材12ならびに固定部材13は各々木
材製である。第1図に示す結束例では、保持材1
1が上方へ3段使用されている。第2図に拡大し
て示すように、最上段に位置する保持材11の上
面および最下段に位置する保持材11の下面に
は、長手方向へ延びる溝11aが形成されてい
る。この溝11aは、帯体14が適合する幅に成
形されている。また、第3図に示すように、仕切
材12は、保持材11とほぼ同じ厚さを有し、且
つ、パイプPの直径とほぼ同じ長さを有する角柱
状のスペーサ12aと、このスペーサ12aの前
後面に釘、接着剤などによつて添設された合板な
どからなるガイド板12bとからなつている。ガ
イド板12bは、スペーサ12aの上下および両
側から突出するように、スペーサ12aよりも大
きな横幅および長さを有している。また、ガイド
板12bの両側にはパイプPの外周形状に沿う円
弧状の切込み12cが形成されており、切込み1
2cの底部はスペーサ12aの側面と同一面にな
つている。なお、スペーサ12aの横幅は、保持
材11の長さ、すなわち横に配列するパイプPの
数ならびにパイプPの径に応じて設定される。固
定部材13は、この実施例の場合、最上段および
最下段の保持材11にわたる長さを有する平板か
らなり、その上下端部が各保持材11の両端部に
対し釘打ちされ固定されている。帯体14は、帯
状の鉄板から形成されている。この帯体14の一
端に留め具15が取付けられており、この留め具
15に帯体14の他端部を挿通して引つ張り、留
め具15を圧着することにより、帯体14にて保
持材11を固定できるようになつている。
This pipe binding frame 1 includes a holding material 11 that holds the pipes P from above and below, a partitioning material 12 that is interposed between adjacent pipes P, a fixing member 13 that fixes the holding materials 11 to each other, and a band that reinforces the bundling state. It is composed of each member of the body 14. The holding material 11, the partition material 12, and the fixing member 13 are each made of wood. In the bundling example shown in FIG.
1 is used in three stages upwards. As shown in an enlarged view in FIG. 2, grooves 11a extending in the longitudinal direction are formed on the upper surface of the holding member 11 located at the uppermost stage and the lower surface of the retaining member 11 located at the lowermost stage. This groove 11a is formed to have a width that fits the band 14. Further, as shown in FIG. 3, the partitioning material 12 includes a prismatic spacer 12a having approximately the same thickness as the holding material 11 and approximately the same length as the diameter of the pipe P, and this spacer 12a. The guide plate 12b is made of plywood or the like and is attached to the front and rear surfaces with nails, adhesive, or the like. The guide plate 12b has a larger width and length than the spacer 12a so as to protrude from above and below and on both sides of the spacer 12a. Further, arc-shaped cuts 12c are formed on both sides of the guide plate 12b along the outer circumferential shape of the pipe P.
The bottom of the spacer 2c is flush with the side surface of the spacer 12a. Note that the width of the spacer 12a is set according to the length of the holding member 11, that is, the number of pipes P arranged laterally and the diameter of the pipes P. In the case of this embodiment, the fixing member 13 is made of a flat plate having a length spanning the uppermost and lowermost holding members 11, and its upper and lower ends are nailed to both ends of each holding member 11 and fixed. . The band body 14 is formed from a band-shaped iron plate. A fastener 15 is attached to one end of the band 14, and by inserting the other end of the band 14 through the fastener 15 and pulling it, and crimping the fastener 15, the band 14 is attached. The holding material 11 can be fixed.

次に、上記各部材によつてパイプPを結束する
作業手順を説明する。
Next, a working procedure for bundling the pipes P using each of the above-mentioned members will be explained.

第4図に示すように、まず、作業場の床面に最
下段の保持材11を置く。この保持材11は、パ
イプPの長さに応じて、必要な結束箇所の数だけ
設置する。そして、保持材11の一方の端部の両
側面に固定部材13の下端を釘16にて固定す
る。次に第1段のパイプPを最下段の保持材11
上に並べる。このとき、最初のパイプP(第4図
にてイで示すもの)は、保持材11の端部に固定
されている固定部材13に当接する位置へ設置す
る。次に、仕切材12(第4図にてロで示すも
の)に添装されているガイド板12bの下縁部で
保持材11を挾持させるようにして仕切材12を
保持材11上に設置し、且つ、その側部にある切
込み12cをイの位置にあるパイプPに当接させ
る。その後、パイプP(第4図にてハで示すも
の)と、仕切材12(第4図にてニで示すもの)
を順に並べて、第1段のパイプPと仕切材12の
配列を完了する。そして、各パイプPと仕切材1
2上に、次の段の保持材11(第4図にてホで示
すもの)を設置する。このとき、仕切材12に添
装された一対のガイド板12bの上縁部間に保持
材11を挿入する。また、保持材11の一端を2
枚の固定部材板13の間に挿入し、釘16によつ
て、保持材11と固定部材13を互いに固定す
る。以上の作業を順次繰返し、所定段数のパイプ
Pと保持材11を設置する。このときには、各保
持材11の一端が片側の2枚の固定部材13によ
つて互いに固定された状態になる。次に、他方の
側の固定部材13を各保持材11の他端に取り付
ける。このとき、固定部材13によつてパイプP
を、既に固定されている固定部材13側へ押し、
パイプPと仕切材12の隙間をなくす。そして、
各保持材11と固定部材13を釘16によつて固
定する。最後に帯体14を、最下段の保持材11
の下面溝11aと、最上段の保持材11の上面溝
11aに嵌入して、パイプ結束枠1の外周に張り
渡し、留め具15によつて結束する。この帯体1
4は、木材製の上記部材間の固定を確実にするた
めの補助固定手段である。さらに、仕切材12の
ガイド板12bの上下端部、すなわちスペーサ1
2aから突出している部分と保持材11とを釘に
よつて固定することにより、パイプ結束枠1をさ
らに強固にすることができる。また、帯体14に
よつて、パイプ結束枠1以外の部分、例えば、第
1図のA部、B部において、パイプPを直接的に
結束してもよい。
As shown in FIG. 4, first, the lowermost holding material 11 is placed on the floor of the workplace. This holding material 11 is installed according to the length of the pipe P as many as the required number of binding points. Then, the lower end of the fixing member 13 is fixed to both side surfaces of one end of the holding member 11 with nails 16. Next, the first stage pipe P is attached to the lowest stage holding material 11.
Arrange on top. At this time, the first pipe P (indicated by A in FIG. 4) is installed at a position where it contacts the fixing member 13 fixed to the end of the holding member 11. Next, the partitioning material 12 is installed on the holding material 11 so that the holding material 11 is held between the lower edges of the guide plates 12b attached to the partitioning material 12 (indicated by B in FIG. 4). Then, the notch 12c on the side thereof is brought into contact with the pipe P at the position A. After that, pipe P (indicated by C in Fig. 4) and partition material 12 (indicated by D in Fig. 4)
are arranged in order to complete the arrangement of the first-stage pipes P and partitioning materials 12. Then, each pipe P and partition material 1
2, the next stage of holding material 11 (indicated by E in FIG. 4) is installed. At this time, the holding material 11 is inserted between the upper edges of the pair of guide plates 12b attached to the partitioning material 12. In addition, one end of the holding material 11 is
The holding member 11 and the fixing member 13 are inserted between the two fixing member plates 13 and fixed to each other with the nails 16. The above operations are repeated one after another to install a predetermined number of stages of pipes P and holding materials 11. At this time, one end of each holding member 11 is fixed to each other by two fixing members 13 on one side. Next, the fixing member 13 on the other side is attached to the other end of each holding member 11. At this time, the pipe P is fixed by the fixing member 13.
to the side of the fixing member 13 that is already fixed,
Eliminate the gap between the pipe P and the partition material 12. and,
Each holding member 11 and fixing member 13 are fixed with nails 16. Finally, attach the band 14 to the lowermost holding material 11.
They are fitted into the lower surface groove 11a of the pipe binding member 11 and the upper surface groove 11a of the uppermost holding member 11, stretched around the outer periphery of the pipe binding frame 1, and bound with the fasteners 15. This band 1
Reference numeral 4 denotes auxiliary fixing means for ensuring the fixation between the above-mentioned wooden members. Further, the upper and lower ends of the guide plate 12b of the partition member 12, that is, the spacer 1
The pipe binding frame 1 can be further strengthened by fixing the portion protruding from 2a and the holding member 11 with nails. Further, the pipes P may be bound directly by the band member 14 at a portion other than the pipe binding frame 1, for example, at portions A and B in FIG.

第5図は、他の実施例によるパイプ結束枠1を
斜視図によつて示したものである。この実施例で
は、固定部材21を、仕切材12と同様に、スペ
ーサ21aと、このスペーサ21aの前後面に添
設された一対のガイド板21bとから構成されて
いる。そして、ガイド板21bのパイプPが当接
する片側部分にはパイプPの外周に沿つた切込み
21cが形成されている。この固定部材21は、
仕切板12と同様に、保持材11をガイド板21
bの上下縁部で挾持するようにして取付け、釘1
6によつてガイド板21bの上下縁部を保持材1
1に固定するようになつている。したがつて、こ
の固定部材21は各段ごとに設けられることにな
り、段数の変更がし易い利点がある。また、の場
合も帯体14によつて固定状態の補強を行なう。
FIG. 5 shows a perspective view of a pipe binding frame 1 according to another embodiment. In this embodiment, the fixing member 21, like the partition member 12, is composed of a spacer 21a and a pair of guide plates 21b attached to the front and rear surfaces of the spacer 21a. A notch 21c along the outer periphery of the pipe P is formed in one side of the guide plate 21b that the pipe P contacts. This fixing member 21 is
Similar to the partition plate 12, the holding material 11 is connected to the guide plate 21.
Attach by holding it between the upper and lower edges of b, and then tighten nail 1.
6 to hold the upper and lower edges of the guide plate 21b with the holding material 1.
It is set to be fixed at 1. Therefore, this fixing member 21 is provided for each stage, which has the advantage that the number of stages can be easily changed. Also, in the case of (1), the band 14 is used to reinforce the fixed state.

第6図はプラント輸出などに際し、通常のパイ
プPとともに、フランジ付きパイプPa、ならび
に部品23,24が取付けられている加工パイプ
Pa,Pbを一緒に結束する実施例を示している。
この場合には、第7図、第8図に示すように、幅
が小寸法Baである仕切材12′と、大寸法Bbの仕
切材12″が使用されている。管部品23,24
を有していないパイプPあるいはフランジ付きパ
イプPaの中間には小寸法Baの仕切材12′を介在
させ、加工パイプPb,Pcの側面には大寸法Bbの
仕切材12″を当接させ、管部品23,24が隣
りのパイプに当らないようにしている。なお、こ
の場合、小寸法の仕切材12′と大寸法の仕切材
12″にて、同じ寸法のスペーサ12aを使用す
ることができ、ガイド板12bの幅寸法だけを変
えることによつて異なる幅寸法の仕切材を構成で
きる。
Figure 6 shows a processed pipe to which a flanged pipe Pa and parts 23 and 24 are attached together with a normal pipe P when exporting a plant.
An example of binding Pa and Pb together is shown.
In this case, as shown in FIGS. 7 and 8, a partition member 12' whose width is a small dimension Ba and a partition material 12'' whose width is a large dimension Bb are used. Pipe parts 23, 24
A partition material 12' with a small dimension Ba is interposed between the pipe P which does not have a pipe P or a pipe Pa with flanges, and a partition material 12'' with a large dimension Bb is brought into contact with the sides of the processed pipes Pb and Pc. The pipe parts 23 and 24 are prevented from hitting adjacent pipes. In this case, it is possible to use spacers 12a of the same size for the small-sized partition member 12' and the large-sized partition member 12''. By changing only the width of the guide plate 12b, partition members with different widths can be constructed.

次に第9図は他の実施例による仕切材31を示
すものである。スペーサ31aの両側面の上下部
には4枚のガイド板31bが添装されている。各
ガイド板31bの上下端部はスペーサ31aから
突出している。また、ガイド板31bの左右端部
は斜めに切欠かれており、この切欠き部分が向い
合つてスペーサ31aの側方へ突出しており、上
下のガイド板31bの中間に前記切込み12cに
相当する凹部31cが形成されている。この凹部
31cにパイプPの側面が嵌合するものである。
Next, FIG. 9 shows a partition member 31 according to another embodiment. Four guide plates 31b are attached to the upper and lower portions of both sides of the spacer 31a. The upper and lower ends of each guide plate 31b protrude from the spacer 31a. Further, the left and right ends of the guide plate 31b are notched diagonally, and these notched portions face each other and protrude to the sides of the spacer 31a, and a recess corresponding to the notch 12c is formed between the upper and lower guide plates 31b. 31c is formed. The side surface of the pipe P fits into this recess 31c.

なお、図の実施例では、木材に対する補助固定
手段として帯体14を使用しているが、この帯体
14の代わりに保持材11間を挿通するボルトと
ナツトを使用してもよい。
In the illustrated embodiment, the band 14 is used as an auxiliary fixing means for the wood, but instead of the band 14, bolts and nuts inserted between the holding members 11 may be used.

〔考案の効果〕[Effect of idea]

以上のように、本考案によれば以下に列記する
効果を奏するようになる。
As described above, according to the present invention, the following effects can be achieved.

(1) パイプを規則的に、且つ強固に結束できるの
で、輸送時の荷積みが楽であり、また、解梱時
のパイプ崩れなどが生じなくなる。
(1) Since the pipes can be tied regularly and firmly, it is easy to load during transportation, and the pipes do not collapse when unpacking.

(2) ガイド板をスペーサの上下縁部から突出さ
せ、このガイド板によつて保持材を挾持させて
いるので、梱包作業時において仕切材を保持材
に対して簡単で且つ確実に位置決めできるよう
になる。よつてパイプの設置、保持材の積み重
ねの際に、仕切材が保持材から脱落せず、枠の
組立てと梱包作業が楽になる。
(2) Guide plates are made to protrude from the upper and lower edges of the spacer, and the holding material is held between the guide plates, so that the partition material can be easily and reliably positioned relative to the holding material during packing work. become. Therefore, when installing pipes and stacking holding materials, the partitioning material does not fall off from the holding materials, making frame assembly and packing operations easier.

(3) スペーサの上下端部から突出するガイド板に
よつて保持材を挾持し、このガイド板と保持材
を釘などによつて固定できるので、仕切材と保
持材の固定強度が増し、結束枠全体の強度を増
すことができるようになる。
(3) The guide plates protruding from the upper and lower ends of the spacer can sandwich the holding material, and the guide plates and the holding material can be fixed with nails, etc., increasing the strength of fixing the partitioning material and the holding material. This will increase the strength of the entire frame.

(4) 仕切材は、スペーサを単なる角材とし、この
スペーサ表裏面に添設されているガイド板のス
ペーサから左右方向へ突出している部分にパイ
プが嵌合する凹部を形成している。すなわち、
角材のスペーサに凹部を形成する必要はなく薄
いガイド板に凹部を形成すればよいので、仕切
材の加工が非常に簡単なものとなる。
(4) In the partitioning material, the spacer is simply a square piece, and a recess into which the pipe fits is formed in the portion of the guide plate attached to the front and back surfaces of the spacer that protrudes from the spacer in the left-right direction. That is,
Since there is no need to form a recess in the square spacer and it is sufficient to form the recess in the thin guide plate, processing of the partition material becomes extremely simple.

(5) 第7図、第8図に示すように、同じ大きさの
角材によるスペーサ12aを使用しても、ガイ
ド板12bの幅寸法を変えることによつて、実
質的に異なる幅寸法の仕切材を構成できること
になる。よつて、スペーサ12aを共通部品と
して使用でき、しかもガイド板12bの幅を変
えることによつてパイプの間隔を自由に設定で
きるようになり、パイプの配列を任意に変える
ことが可能となる。
(5) As shown in FIGS. 7 and 8, even if spacers 12a made of square timbers of the same size are used, partitions with substantially different widths can be created by changing the width of the guide plate 12b. This means that the materials can be constructed. Therefore, the spacer 12a can be used as a common component, and by changing the width of the guide plate 12b, the interval between the pipes can be freely set, and the arrangement of the pipes can be arbitrarily changed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案によるパイプ結束枠を使用して
パイプを結束した状態を示す斜視図、第2図は同
パイプ結束枠を拡大して示す斜視図、第3図は同
パイプ結束枠に用いた仕切材を示す斜視図、第4
図は同パイプ結束枠の組立手順を示す分解斜視
図、第5図は他の実施例によるパイプ結束枠の一
部を示す斜視図、第6図は加工パイプの結束例を
示す斜視図、第7図、第8図は、第6において使
用する仕切材の斜視図、第9図は仕切材の他の実
施例を示す斜視図である。 1……パイプ結束枠、11……保持材、12,
31……仕切材、12a,31a……スペーサ、
12b,31b……ガイド板、12c……凹部と
なる切欠き、13,21……固定部材、P……パ
イプ。
Fig. 1 is a perspective view showing pipes bound using the pipe bundling frame according to the present invention, Fig. 2 is an enlarged perspective view of the same pipe bundling frame, and Fig. 3 is a perspective view showing the state in which pipes are tied together using the pipe bundling frame according to the present invention. Perspective view showing the partition material, No. 4
The figure is an exploded perspective view showing the assembly procedure of the same pipe binding frame, FIG. 5 is a perspective view showing a part of a pipe binding frame according to another embodiment, FIG. 6 is a perspective view showing an example of binding processed pipes, 7 and 8 are perspective views of the partitioning material used in the sixth embodiment, and FIG. 9 is a perspective view showing another example of the partitioning material. 1... Pipe binding frame, 11... Holding material, 12,
31... Partition material, 12a, 31a... Spacer,
12b, 31b...Guide plate, 12c...Notch serving as a recess, 13, 21...Fixing member, P...Pipe.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 複数本のパイプを上下から挾む角材による保持
材と、この保持材間に介装され且つパイプ間を仕
切る仕切材と、保持材どうしを固定する固定部材
とを備えているパイプ結束枠において、前記仕切
材は、保持材とほぼ同じ厚さの角材によるスペー
サと、スペーサの表裏2面に添装され且つスペー
サの上下左右各端部から突出する大きさの一対の
ガイド板とから成り、このガイド板のスペーサか
ら左右方向へ突出する部分にパイプの側面と嵌合
する凹部が形成され、且つガイド板のスペーサか
ら上下方向へ突出する部分によつて前記保持材が
挾持されていることを特徴とするパイプ結束枠。
A pipe bundling frame that includes a holding member made of square members that sandwich a plurality of pipes from above and below, a partitioning member that is interposed between the holding members and partitions the pipes, and a fixing member that fixes the holding members to each other, The partitioning material consists of a spacer made of a square material with approximately the same thickness as the holding material, and a pair of guide plates attached to the front and back sides of the spacer and protruding from the top, bottom, left and right ends of the spacer. A concave portion that fits with the side surface of the pipe is formed in a portion of the guide plate that protrudes from the spacer in the left-right direction, and the holding material is held between the portions of the guide plate that protrude from the spacer in the vertical direction. pipe binding frame.
JP2261783U 1983-02-18 1983-02-18 pipe binding frame Granted JPS59129776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2261783U JPS59129776U (en) 1983-02-18 1983-02-18 pipe binding frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2261783U JPS59129776U (en) 1983-02-18 1983-02-18 pipe binding frame

Publications (2)

Publication Number Publication Date
JPS59129776U JPS59129776U (en) 1984-08-31
JPS6215169Y2 true JPS6215169Y2 (en) 1987-04-17

Family

ID=30153710

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2261783U Granted JPS59129776U (en) 1983-02-18 1983-02-18 pipe binding frame

Country Status (1)

Country Link
JP (1) JPS59129776U (en)

Also Published As

Publication number Publication date
JPS59129776U (en) 1984-08-31

Similar Documents

Publication Publication Date Title
US7458756B2 (en) Method for loading tube bundles on railcars and tube packs for railcars
US4501402A (en) Metal skid for bundling
CA2238157C (en) Cable tray packaging
US2896808A (en) Box-like structure
US4730732A (en) Pallet and top frame for scrolled drum palletized package
US4142471A (en) Pallet having reinforced gypsum structural members
JPS6215169Y2 (en)
JP3370911B2 (en) Integrated body of LP insulator and method of integrating the same
US6488150B1 (en) Bulk packaging system and method
US7381021B1 (en) Method for loading tube bundles on railcars
JP2529939B2 (en) Packing method for plate volume stack block
US20020000073A1 (en) Masonry block
JP4286976B2 (en) Band pallet
JPS5914349Y2 (en) Binding structure for members to be bound
JPH0642988Y2 (en) Shipping container
JPS5919025Y2 (en) packing tools for pipes
US3251170A (en) Method of producing a shipping container
JPH0128038Y2 (en)
JPH0732503Y2 (en) Load collapse prevention tool
JPS6340446Y2 (en)
JPH0635957Y2 (en) Tire tie
JP2002104411A (en) Packing pad
JP2596059Y2 (en) Flat pallet
JPS627579Y2 (en)
JP2593227Y2 (en) Packaging structure for decorative board