JPS62105267U - - Google Patents
Info
- Publication number
- JPS62105267U JPS62105267U JP19881385U JP19881385U JPS62105267U JP S62105267 U JPS62105267 U JP S62105267U JP 19881385 U JP19881385 U JP 19881385U JP 19881385 U JP19881385 U JP 19881385U JP S62105267 U JPS62105267 U JP S62105267U
- Authority
- JP
- Japan
- Prior art keywords
- metal fittings
- supporting
- overhanging metal
- beams
- placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 claims 4
- 238000009415 formwork Methods 0.000 claims 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
第1図はこの考案の一実施例に係るスラブ下の
支保装置を使用してコンクリート型枠を組立てた
状態の要部の縦断正面図、第2図は同上支保梁支
保部の分解斜面図、第3図はその張出し金物の拡
大正面図、第4図は平面図、第5図は従来の支保
梁を使用してコンクリート型枠を組立てた状態の
要部の正断面図である。
1……支保梁、a……張出し金物、2……受け
ばた、3……サポート、4……底堰板。
Fig. 1 is a vertical sectional front view of the main parts of a concrete form assembled using a supporting device under a slab according to an embodiment of this invention, Fig. 2 is an exploded slope view of the supporting beam support part of the same; FIG. 3 is an enlarged front view of the overhanging hardware, FIG. 4 is a plan view, and FIG. 5 is a front sectional view of the main part of a concrete form assembled using conventional support beams. 1...Support beam, a...Overhanging hardware, 2...Socket, 3...Support, 4...Bottom weir board.
Claims (1)
に外側へ突出させて着脱可能に嵌着し、数個の上
記張出し金物付き支保梁を適当間隔に並列し、そ
れらの両側の張出し金物の中間部を両側の受けば
た上にそれぞれ載置して該受けばたをサポートに
より支保し、その数個の張出し金物付き支保梁上
にわたし底堰板を載置してなるコンクリート型枠
におけるスラブ下の支保装置。 At both ends of the supporting beam, overhanging metal fittings are appropriately projected outward and removably fitted, and several of the above-mentioned supporting beams with overhanging metal fittings are arranged in parallel at appropriate intervals, and the middle part of the overhanging metal fittings on both sides is installed. The bottom of the slab in a concrete formwork is made by placing the following on the support beams on both sides, supporting the support beams with supports, and placing the bottom weir board on the several supporting beams with overhanging metal fittings. shoring equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19881385U JPS62105267U (en) | 1985-12-24 | 1985-12-24 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19881385U JPS62105267U (en) | 1985-12-24 | 1985-12-24 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS62105267U true JPS62105267U (en) | 1987-07-04 |
Family
ID=31159850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19881385U Pending JPS62105267U (en) | 1985-12-24 | 1985-12-24 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS62105267U (en) |
-
1985
- 1985-12-24 JP JP19881385U patent/JPS62105267U/ja active Pending