JPS6198821A - Method of pulling off hollow concrete pile - Google Patents
Method of pulling off hollow concrete pileInfo
- Publication number
- JPS6198821A JPS6198821A JP22015884A JP22015884A JPS6198821A JP S6198821 A JPS6198821 A JP S6198821A JP 22015884 A JP22015884 A JP 22015884A JP 22015884 A JP22015884 A JP 22015884A JP S6198821 A JPS6198821 A JP S6198821A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- crusher
- hollow concrete
- concrete pile
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、既設の中空コンクリート杭を引抜く工法に関
する。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a construction method for pulling out existing hollow concrete piles.
便米、既設の中仝コンクリート杭を引抜く工法としては
、バイフロノ・ンマエ法等が知られている。バイフロ・
・ンマエ法は、起振機の一種であるパイフロハンマを用
いて杭に垂直振動を与え、周辺摩伜刀等kg少させ、ク
レー7等:〔:り杭を引抜く工法である。Bifurono-Nmae method is known as a construction method for pulling out existing central concrete piles. Bifro・
・The Nmae method is a construction method in which a pie float hammer, which is a type of vibrator, is used to apply vertical vibration to the pile, reduce the weight of surrounding machinets, etc., and then pull out the clay pile.
〔発明が解決しようとする問題点]
上記パイプロハンマ工法による場合は、犬さな撮動、騒
音が発生する問題があるとともに、揚重能力の大きいク
レーンを必要とする等の問題がある。[Problems to be Solved by the Invention] In the case of the pipe hammer method described above, there are problems such as the generation of dog-like photography and noise, and there are also problems such as the need for a crane with a large lifting capacity.
本発明は、上記問題点を解決するため、既設の中空コン
クリート杭の中空部内に破砕機を吊下し、前記破砕機を
杭先から所定位置まで1ド1人的に引上げながら破砕機
に工9杭壁を順次破壊し破砕機を中空部内から取出しt
後、前記宋窒コンクリート杭の上端に突出した鋼線ま之
な鋼 。In order to solve the above problems, the present invention suspends a crusher in the hollow part of an existing hollow concrete pile, and works the crusher while manually pulling the crusher from the tip of the pile to a predetermined position. 9 Destroy the pile walls one by one and take out the crusher from inside the hollow part.
After that, there is a straight steel wire protruding from the top of the Song Ni concrete pile.
セメを連結具に工って中空コンクリート抗を1玖ぐもの
である。A hollow concrete shaft is constructed by using cement as a connecting tool.
中空コンクリート杭の杭壁の破壊が中空部内Vこ吊下し
た破砕似によって行なわれるので、大きな騒音や振動の
発生がなく、また、中仝コンクリート杭と周辺地盤との
摩擦力が低減する。Since the destruction of the pile wall of the hollow concrete pile is carried out by a crushing device suspended in the hollow part, there is no generation of large noise or vibration, and the frictional force between the hollow concrete pile and the surrounding ground is reduced.
以下、本発明の一実施例を図面に基づいて説明する。 Hereinafter, one embodiment of the present invention will be described based on the drawings.
第1図および第2図はそれぞれ本発明に係る引抜き工法
の破壊工程および引抜き工程を示す側断面図である。FIG. 1 and FIG. 2 are side sectional views showing the breaking process and the pulling process, respectively, of the drawing method according to the present invention.
図において地盤lに打設し7’vPC杭の如き中空コン
クリート杭2を引抜くには、まず、第1図に示すように
、中空コンクリート杭2の中空部3内に専用の破砕機4
をワイヤーロープ5やクレーン等(図示せず)を用いて
吊下し、この破砕機4を中空部3内の杭先付近から上方
の所定位置まで、例えば下部のくいつきのきつい範囲に
亘って間欠的に引上げ、かつ各停止位置で破砕機4を作
動し杭壁2aを破壊する。In order to pull out a hollow concrete pile 2 such as a 7'v PC pile after being driven into the ground L in the figure, first, as shown in FIG.
is suspended using a wire rope 5, a crane, etc. (not shown), and the crusher 4 is intermittently operated from the vicinity of the tip of the pile in the hollow part 3 to a predetermined position above, for example, over the area where the pile is tightly bound at the bottom. The pile wall 2a is pulled up and the crusher 4 is operated at each stop position to destroy the pile wall 2a.
上記杭壁2aの破壊により、周辺の地盤lと中空コンク
リート杭2との摩擦力が大幅に低減する。By destroying the pile wall 2a, the frictional force between the surrounding ground l and the hollow concrete pile 2 is significantly reduced.
破砕機4を中空部3内から取出し、嬉2図に示すように
、中空コンクリート杭2の上端に突出した鋼線または鋼
棒2bにワイヤーロープ6を連結具7を用いて連結しt
後、ワイヤーロー16をクレーン等(図示せず)により
引張り、中空コンクリート杭2を引抜き、撤去する。The crusher 4 is taken out from inside the hollow part 3, and as shown in Figure 2, a wire rope 6 is connected to the steel wire or steel bar 2b protruding from the upper end of the hollow concrete pile 2 using a connector 7.
Thereafter, the wire row 16 is pulled by a crane or the like (not shown), and the hollow concrete pile 2 is pulled out and removed.
なお、中空コンクリート杭2の杭壁2aの円周方向の破
壊個所を複数個所とし、杭壁2aの長手方向の破壊範囲
は、杭先から所定位置までの長さに限らず、全長に及ん
でもよいのは勿論である。In addition, there are multiple failure points in the circumferential direction of the pile wall 2a of the hollow concrete pile 2, and the failure range in the longitudinal direction of the pile wall 2a is not limited to the length from the pile tip to a predetermined position, but extends over the entire length. Of course, that's fine.
第3図は、中空コンクリート杭2の杭壁2aを中空部3
内から破壊する破砕機4の正面図でろる。Figure 3 shows the pile wall 2a of the hollow concrete pile 2 in the hollow part 3.
This is a front view of the crusher 4, which is destroyed from the inside.
図においてビット9を下端外側に取付けた1対のアーム
lOの上端をそ几ぞれビン11にLり枢支した支持体8
には、このアーム支持体8をワイヤーロープ5により吊
下するため、互いに直角な2方向へ揺動自在に遅鮎し之
2個の吊金具12.13が装着さnている。1対のアー
ムlOの下端を開閉する油圧ジヤツキ14fl、’/’
) ンター14 a fビン15によりアーム支持体8
に取−付け、また、ラム14bをトラブルリンク16を
用いて各アーム10とdtaしである0破砕機4は、ホ
ースl’ 7により油圧ジヤツキ14の7リンダー14
8に作動油を給排し、ラム14bが引込まれると、1対
のアームIOの下端がトラブルリンク16により開き、
また、ラム14bが突出されると、1対のアーム10の
下端が閉じ、アームlOO圀作動により中空コンクリー
ト杭2の杭9.2aをビット9によって破壊する。In the figure, a support 8 has a pair of arms 10 with a bit 9 attached to the outside of the lower end, and the upper ends of each arm 10 are pivoted to a bottle 11.
In order to hang the arm support 8 by the wire rope 5, two hanging fittings 12 and 13 are attached so as to be swingable in two directions perpendicular to each other. Hydraulic jack 14fl, '/' that opens and closes the lower ends of a pair of arms lO
) arm support 8 by center 14 a f bin 15
The ram 14b is connected to each arm 10 using a trouble link 16.
When hydraulic oil is supplied and discharged to 8 and the ram 14b is retracted, the lower ends of the pair of arms IO are opened by the trouble link 16.
Further, when the ram 14b is projected, the lower ends of the pair of arms 10 are closed, and the pile 9.2a of the hollow concrete pile 2 is destroyed by the bit 9 by the action of the arm lOO.
第4図お工び第5図は、それぞれ中空コンクリート杭2
の上端に突出しfc鋼線または鋼棒2bとワイヤーロー
プ6とを連結する連結具7を鋼線または鋼棒2bに取付
は良状態を示す正面図および平面図である。Figure 4 shows hollow concrete piles 2 and 5 respectively.
2A and 2B are a front view and a plan view showing a good state in which a connecting tool 7 which protrudes from the upper end of the FC steel wire or steel rod 2b and connects the wire rope 6 is attached to the steel wire or steel rod 2b.
図において連結具7の一部を栴成する方形の剛板18は
、中空コンクリート杭2の上端に突出した複数の銅線″
またはス(11棒2bを貫装させ、剛板18から突出し
た銅線または鋼棒2bに雄コーンl 9 a>工び雌コ
ーン19bを装着することにより締着される。また、剛
板18の中央部には、ワイヤーロープ6を取付ける吊金
具20が固着されている。In the figure, a rectangular rigid plate 18 forming a part of the connector 7 has a plurality of copper wires protruding from the upper end of the hollow concrete pile 2.
Alternatively, the rod 2b is inserted through the rigid plate 18, and the male cone 19a>is attached to the female cone 19b to the copper wire or steel rod 2b protruding from the rigid plate 18. A hanging fitting 20 to which the wire rope 6 is attached is fixed to the central part of.
以上の如く本発明によれば、従来技術に比し、騒音およ
び振動を大幅に低減できるとともに、バイプロノ・ンマ
等の荷重がクレーン等に載荷さtLないので、クレーン
等の小形化が図ら九かつ゛引抜きに要する力を小さくす
ることができる等の効果を有する。As described above, according to the present invention, noise and vibration can be significantly reduced compared to the conventional technology, and since the load of the bipronominal, etc. is not loaded on the crane, etc., the size of the crane, etc. can be reduced. This has effects such as being able to reduce the force required for pulling out.
第1図お工び第2図はそれぞ八本発明に係る引抜き工法
の破壊工程および引抜き工程を示す側断面図、第3図は
破砕機の正面図、第4[mお工び第5図はそれぞれ連結
具の鋼線等に対する取付は状態を示す正面図お工び平面
図である。
■・・・地盤 2・・・中空コンクリート杭2a・・
・杭壁 2b・・・鋼線ま友は針4棒 3・・・中
空部 4・・・破砕機 5,6・・・ワイヤー口−
プ 7・・・連結具
出 願 人 株式会社 間 組第1図
第2図Figure 1 is a side sectional view showing the breaking process and pulling process of the pulling method according to the present invention, Figure 3 is a front view of the crusher, Figure 4 is a front view of the crusher, Each figure is a front view and a plan view showing how the connector is attached to the steel wire, etc. ■...Ground 2...Hollow concrete pile 2a...
・Pile wall 2b... Steel wire has 4 needles 3... Hollow part 4... Crusher 5, 6... Wire port -
7... Connector Applicant Hazama Co., Ltd. Figure 1
Figure 2
Claims (1)
、前記破砕機を杭先から所定位置まで間欠的に引上げな
がら破砕機により杭壁を順次破壊し破砕機を中空部内か
ら取出した後、前記中空コンクリート杭の上端に突出し
た鋼線または鋼棒を連結具によつて中空コンクリート杭
を抜去する中空コンクリート杭の引抜き工法。A crusher is suspended in the hollow part of an existing hollow concrete pile, and the pile wall is sequentially destroyed by the crusher while being intermittently pulled up from the tip of the pile to a predetermined position, and the crusher is taken out from inside the hollow part. A hollow concrete pile extraction method in which a steel wire or steel rod protruding from the upper end of the hollow concrete pile is pulled out using a connecting tool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22015884A JPS6198821A (en) | 1984-10-19 | 1984-10-19 | Method of pulling off hollow concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22015884A JPS6198821A (en) | 1984-10-19 | 1984-10-19 | Method of pulling off hollow concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6198821A true JPS6198821A (en) | 1986-05-17 |
Family
ID=16746794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP22015884A Pending JPS6198821A (en) | 1984-10-19 | 1984-10-19 | Method of pulling off hollow concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6198821A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0678726U (en) * | 1993-04-08 | 1994-11-04 | 木村工機株式会社 | Water purifier with pressure reducing valve |
CN105133613A (en) * | 2015-08-21 | 2015-12-09 | 徐州徐工随车起重机有限公司 | Antiskid clamp for guardrail breakdown van |
CN105604101A (en) * | 2015-12-16 | 2016-05-25 | 上海市城市建设设计研究总院 | Device for searching pile bottom of pile to be pulled and using method thereof |
-
1984
- 1984-10-19 JP JP22015884A patent/JPS6198821A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0678726U (en) * | 1993-04-08 | 1994-11-04 | 木村工機株式会社 | Water purifier with pressure reducing valve |
CN105133613A (en) * | 2015-08-21 | 2015-12-09 | 徐州徐工随车起重机有限公司 | Antiskid clamp for guardrail breakdown van |
CN105604101A (en) * | 2015-12-16 | 2016-05-25 | 上海市城市建设设计研究总院 | Device for searching pile bottom of pile to be pulled and using method thereof |
CN105604101B (en) * | 2015-12-16 | 2018-01-02 | 上海市城市建设设计研究总院(集团)有限公司 | The application method of the device at pile pulling stake bottom is intended in search |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4248550A (en) | Pile extraction apparatus | |
DE102012223992B3 (en) | Apparatus and method for soil compaction and / or soil compaction | |
US2684577A (en) | Expansible pile-driving core | |
CN212295160U (en) | Prefabricated assembled concrete shear force wall | |
KR20170002355A (en) | Drawing apparatus for phc pile and drawing method for for phc pile thereof | |
JPS6198821A (en) | Method of pulling off hollow concrete pile | |
CN110004915B (en) | Cut-pff wall rapid construction device and method | |
KR20160109674A (en) | Drawing apparatus for phc pile and drawing method for for phc pile thereof | |
JPH02503583A (en) | Method and device for destroying reinforced concrete piles and exposing reinforcing bars | |
CN211922619U (en) | Pile head breaking device | |
CN206916744U (en) | A kind of pile extracting clamp of simple and efficient | |
JP3480914B2 (en) | Sand and sand-like granular material introduction device | |
JP4362842B2 (en) | Pull-out casing for underground concrete piles | |
CN211949622U (en) | Template removing tool | |
CN210315545U (en) | Highway engineering fixed column pulls out device fast | |
JP3755935B2 (en) | Solid block | |
JP4555788B2 (en) | Pile holding device | |
CN214495429U (en) | Height-adjustable hopper for construction site | |
CN214301740U (en) | Device for moving pile head of deep-buried engineering pile into reserved expansion hole in static crushing mode | |
CN2198388Y (en) | Expanding pre-stress anchor cable | |
CN220013820U (en) | Hammer base convenient for tamping pit reaming | |
JPS622085B2 (en) | ||
JPH11217831A (en) | Ground cutting device of steel material | |
JP2532575Y2 (en) | Construction jig for stress material | |
CN201473949U (en) | Reusable steel casing |