JPS61193135U - - Google Patents

Info

Publication number
JPS61193135U
JPS61193135U JP7756085U JP7756085U JPS61193135U JP S61193135 U JPS61193135 U JP S61193135U JP 7756085 U JP7756085 U JP 7756085U JP 7756085 U JP7756085 U JP 7756085U JP S61193135 U JPS61193135 U JP S61193135U
Authority
JP
Japan
Prior art keywords
main body
steel pipe
composite pile
concrete
view
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7756085U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP7756085U priority Critical patent/JPS61193135U/ja
Publication of JPS61193135U publication Critical patent/JPS61193135U/ja
Pending legal-status Critical Current

Links

Description

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案複合杭の一実施例を示す斜面図
、第2図は同側断面図、第3図は同杭頭処理の状
態を示す要部側断面図である。 A……円柱状本体部、B……尖鋭部、C……角
柱部、4……コンクリート、5……軸鉄筋、6…
…らせん形ブレード。
FIG. 1 is a slope view showing one embodiment of the composite pile of the present invention, FIG. 2 is a side sectional view of the same, and FIG. 3 is a side sectional view of the main part showing the condition of the pile cap treatment. A...Cylindrical main body part, B...Sharp part, C...Prismatic part, 4...Concrete, 5... Axial reinforcing bar, 6...
...spiral blade.

補正 昭60.9.5 図面の簡単な説明を次のように補正する。Correction 1986.9.5 The brief description of the drawing has been amended as follows.

【図面の簡単な説明】 第1図は本考案複合杭の一実施例を示す斜面図
、第2図は同側断面図、第3図は同杭頭処理の状
態を示す要部側断面図、第4図は他の実施例を示
した要部側断面図である。 A……円柱状本体部、B……尖鋭部、C……角
柱部、4……コンクリート、5……軸鉄筋、6…
…らせん形ブレード。
[Brief Description of the Drawings] Fig. 1 is a slope view showing one embodiment of the composite pile of the present invention, Fig. 2 is a side sectional view of the same, and Fig. 3 is a side sectional view of the main part showing the condition of the pile head treatment. , FIG. 4 is a side cross-sectional view of a main part showing another embodiment. A...Cylindrical main body part, B...Sharp part, C...Prismatic part, 4...Concrete, 5... Axial reinforcing bar, 6...
...spiral blade.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 鋼管内にコンクリートを充填してなる鋼管コン
クリートの複合杭において、円柱状をなす本体部
の先端側外周に1〜数巻のらせん形ブレードを突
設し、本体部の基端側には角柱部を設けたことを
特徴とする、複合杭。
In a steel pipe concrete composite pile made by filling a steel pipe with concrete, one to several spiral blades are provided protruding from the outer periphery of the distal end of a cylindrical main body, and a prismatic section is provided on the proximal end of the main body. A composite pile characterized by being provided with.
JP7756085U 1985-05-24 1985-05-24 Pending JPS61193135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7756085U JPS61193135U (en) 1985-05-24 1985-05-24

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7756085U JPS61193135U (en) 1985-05-24 1985-05-24

Publications (1)

Publication Number Publication Date
JPS61193135U true JPS61193135U (en) 1986-12-01

Family

ID=30620735

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7756085U Pending JPS61193135U (en) 1985-05-24 1985-05-24

Country Status (1)

Country Link
JP (1) JPS61193135U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016089597A (en) * 2014-10-30 2016-05-23 光弘 南馬越 Reinforced concrete filled quadrangular steel pipe pile column

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59192125A (en) * 1983-04-15 1984-10-31 Daido Concrete Kogyo Kk Settlement work of concrete pile with screw

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59192125A (en) * 1983-04-15 1984-10-31 Daido Concrete Kogyo Kk Settlement work of concrete pile with screw

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016089597A (en) * 2014-10-30 2016-05-23 光弘 南馬越 Reinforced concrete filled quadrangular steel pipe pile column

Similar Documents

Publication Publication Date Title
JPS61193135U (en)
JPS61184121U (en)
JPS61205518U (en)
JPH02128811U (en)
JPS6299551U (en)
JPS638341U (en)
JPS62143743U (en)
JPH01101727U (en)
JPS6230090U (en)
JPS63136285U (en)
JPS627435U (en)
JPS63162119U (en)
JPS6353564U (en)
JPS62155914U (en)
JPS6331530U (en)
JPS63132190U (en)
JPS62143742U (en)
JPS6321007U (en)
JPH02129446U (en)
JPS62153865U (en)
JPS63181631U (en)
JPH036429U (en)
JPS63100592U (en)
JPH02117874U (en)
JPS61124307U (en)