JPS6117306B2 - - Google Patents

Info

Publication number
JPS6117306B2
JPS6117306B2 JP53120902A JP12090278A JPS6117306B2 JP S6117306 B2 JPS6117306 B2 JP S6117306B2 JP 53120902 A JP53120902 A JP 53120902A JP 12090278 A JP12090278 A JP 12090278A JP S6117306 B2 JPS6117306 B2 JP S6117306B2
Authority
JP
Japan
Prior art keywords
gas
container
gas container
disconnector
test method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP53120902A
Other languages
Japanese (ja)
Other versions
JPS5546186A (en
Inventor
Masaharu Matsuyama
Seizo Nakano
Koji Sasaki
Takeshi Takahashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP12090278A priority Critical patent/JPS5546186A/en
Publication of JPS5546186A publication Critical patent/JPS5546186A/en
Publication of JPS6117306B2 publication Critical patent/JPS6117306B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)

Description

【発明の詳細な説明】 本発明はガスしや断器に係り、特にガスしや断
器の試験方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to gas cylinders and disconnectors, and particularly to a method for testing gas cylinders and disconnectors.

従来、SF6ガスしや断器においては、投入及び
しや断時間あるいは、抵抗装置等の動作特性をチ
エツクする操作試験を行なう場合に、一担ガスを
封入して運転状態と同じ状態にしたうえで操作特
性を測定し、その結果により、特性が規定値を外
れた場合には、ガスを抜いて抵抗装置などの再調
整を行なつていた。
Conventionally, when performing operation tests to check the on-off and on-off times or the operating characteristics of resistance devices, etc., SF 6 gas insulators and disconnectors have been filled with a single charge gas to maintain the same operating conditions. Then, the operating characteristics were measured, and if the results showed that the characteristics deviated from the specified values, the gas was vented and the resistance device etc. were readjusted.

しかし、SF6ガスは、空気等の他のガスが混入
した場合、絶縁性能が低下するので、ガス容器の
真空引等を十分を行なう必要があり、ガス排気、
ガス充填などに時間がかかるばかりでなく、高価
なSF6を放散してしまうという欠点があつた。
However, when SF 6 gas is mixed with other gases such as air, its insulation performance deteriorates, so it is necessary to thoroughly vacuum the gas container,
Not only did it take time to fill the gas, but it also had the disadvantage of emitting expensive SF 6 .

本発明の目的は、ガスの排気及び充填時間を短
縮し試験時間を短縮した試験方法を提供するにあ
る。
An object of the present invention is to provide a test method that shortens the gas evacuation and filling time, thereby shortening the test time.

本発明は、SF6ガスしや断器の操作試験を行な
う場合に、ガス容器内に運転状態と同状態のSF6
ガスではなく他の安価で管理の容易気体を封入し
操作を行なうものである。
In the present invention, when performing an operation test of an SF 6 gas tank or disconnection switch, the SF 6
Instead of gas, other inexpensive and easily managed gases are sealed and operated.

以下、本発明を図面に示す実施例により説明す
る。
The present invention will be explained below with reference to embodiments shown in the drawings.

図面は、一般のガスしや断器の接点構成を示す
模式図である。図においては接点1,2は投入抵
抗接点3,4と並列に配置されて開閉部6を構成
し、ガス容器5の中に収納されている。ガスしや
断器においては、上述した主接点及び投入抵抗接
点の開極及び投入時間がある範囲内にあることが
要求されるため、組立後開閉部6の操作試験を実
〓〓〓〓〓
施し時間の協調を確認する。本操作試験方法は、
ガス容器内に、しや断部を構成し運転状態と同じ
状態に、SF6ガスを充填する前に次のような異種
ガスを充填し操作試験を行なうものである。
The drawing is a schematic diagram showing the contact configuration of a general gas shield and disconnector. In the figure, contacts 1 and 2 are arranged in parallel with closing resistance contacts 3 and 4 to constitute an opening/closing section 6, which is housed in a gas container 5. For gas cylinders and disconnectors, the opening and closing times of the main contact and closing resistance contact described above are required to be within a certain range, so an operation test of the opening/closing part 6 is carried out after assembly.
Check the coordination of almsgiving times. This operation test method is
The gas container is constructed with a shear section, and before being filled with SF 6 gas, an operation test is performed by filling the container with the following different gases in the same state as the operating condition.

例えば、SF6に比べて安価で管理の容易な空
気、ちつそ窒素フレオンガス等を充填しておこな
う。
For example, fill with air, nitrogen, freon gas, etc., which is cheaper and easier to manage than SF 6 .

操作試験を完了した後は、これらのガスを上記
ガス容器から回収又は大気中に放出し、真空引を
行ない運転状態のSF6ガスを例えば5気圧充填す
る。
After the operation test is completed, these gases are collected from the gas container or released into the atmosphere, and the container is evacuated and filled with SF 6 gas of, for example, 5 atmospheres in the operating state.

この場合、運転状態つまりSF6ガスを5気圧充
填した場合と他のガスを充填した場合の操作特性
をあらかじめ把握しておくことにより、操作特性
の適否を容易に判定できる。
In this case, by knowing in advance the operating conditions, that is, the operating characteristics when filling with 5 atmospheres of SF 6 gas and when filling with other gases, it is possible to easily determine whether the operating characteristics are appropriate.

この断定を容易にするには、空気、窒素ガス、
フレオンガス等のガスを単種で用い、圧力を管理
すれば良い。これらのガスについては、他種のガ
スの多少の混入があつても特性が変化せず、充填
及び回収の時間が非常に短かい。
To facilitate this assertion, air, nitrogen gas,
It is sufficient to use a single type of gas such as Freon gas and control the pressure. The characteristics of these gases do not change even if a certain amount of other gases are mixed in, and the filling and recovery time is very short.

以上説明したように、本発明は運転状態とは異
なる気体を用いて操作試験を行なうようにしたた
め、この試験に要する時間を短縮できる。
As explained above, since the present invention conducts the operation test using a gas different from that used in the operating state, the time required for this test can be shortened.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はガスしや断器の接点構成を示す模式図で
ある。 5……ガス容器、6……開閉部。 〓〓〓〓〓
The drawing is a schematic diagram showing the contact configuration of the gas shield and disconnector. 5...Gas container, 6...Opening/closing part. 〓〓〓〓〓

Claims (1)

【特許請求の範囲】 1 SF6ガスを所定の圧力で充填したガス容器内
に、しや断部を含む開閉部を収納したガスしや断
器の試験方法において、上記ガス容器内に上記し
や断部を組立てた状態で、異種ガスを上記ガス容
器内に充填し、この状態で上記開閉部の操作試験
を行ない、その後上記ガス容器内のガスを排出
し、上記ガス容器内を真空引きして上記運転状態
のSF6ガスを所定圧力で充填することを特徴とす
るガスしや断器の試験方法。 2 上記特許請求の範囲第1項記載のものにおい
て、上記ガス容器へ充填するガスに、大気圧の空
気を用いたガスしや断器の試験方法。
[Claims] 1. In a test method for a gas shield disconnector in which an opening/closing section including a shield section is housed in a gas container filled with SF 6 gas at a predetermined pressure, Fill the gas container with a different type of gas with the gas container assembled, and test the operation of the opening/closing part in this state.Then, the gas in the gas container is discharged, and the gas container is evacuated. 1. A test method for a gas tank and disconnector, characterized by filling it with SF 6 gas at a predetermined pressure in the above-mentioned operating state. 2. A test method for a gas tank or disconnector according to claim 1, in which atmospheric pressure air is used as the gas to be filled into the gas container.
JP12090278A 1978-09-29 1978-09-29 Test method for gas circuit breaker Granted JPS5546186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12090278A JPS5546186A (en) 1978-09-29 1978-09-29 Test method for gas circuit breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12090278A JPS5546186A (en) 1978-09-29 1978-09-29 Test method for gas circuit breaker

Publications (2)

Publication Number Publication Date
JPS5546186A JPS5546186A (en) 1980-03-31
JPS6117306B2 true JPS6117306B2 (en) 1986-05-07

Family

ID=14797817

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12090278A Granted JPS5546186A (en) 1978-09-29 1978-09-29 Test method for gas circuit breaker

Country Status (1)

Country Link
JP (1) JPS5546186A (en)

Also Published As

Publication number Publication date
JPS5546186A (en) 1980-03-31

Similar Documents

Publication Publication Date Title
CN106287229B (en) A kind of insulative gas mix body inflation system and inflation method
US4458119A (en) Hybrid circuit breaker
US3059044A (en) Terminal-bushing constructions
RU2015149988A (en) METHOD FOR PRODUCING A REDUCING POLLUTION OF A COMPONENT FOR AN ELECTRICAL APPARATUS
EP0026231A4 (en) Method of manufacturing gas-filled electric switch.
US3281521A (en) Electrical apparatus insulated with a mixture of insulating gases
GB232808A (en) Electric switches
US4016383A (en) Sealing device for an assembly of elements of high-voltage cut-out devices
US2842644A (en) Hermetically sealed switch assembly
GB1469146A (en) Method of detecting a leak in a vacuum interrupter
JPS6117306B2 (en)
JP2005027439A (en) Gas insulated switchgear
US10514395B2 (en) Method and system for insulating an RC voltage divider with an active part in oil and an outer part in gas
US3356808A (en) Circuit-interrupting devices having pressure-operated contacts
JP4637708B2 (en) Insulating gas sealing method for gas insulated switchgear and method for manufacturing gas insulated switchgear
CN216205275U (en) Auxiliary sealing device for resistor type vacuum powder sintering
JPH0652769A (en) Relay
JP2000059935A (en) Gas filling method of gas-insulated electric apparatus, and its foreign-matter inspecting method
CN113945816A (en) Test device for simulating fault gas in electrical equipment and control method thereof
US3066823A (en) Sealing constructions
US3090112A (en) Method of determining leaks in lightning arresters and the like
Collins et al. Evolution and absorption of gases in electron tubes
Cooper Moisture exclusion from encapsulation of long-life transistors
JPH0525373U (en) Gas filled container
US3023291A (en) Compressed gas circuit interrupter