JPS61166328A - Roll baler - Google Patents

Roll baler

Info

Publication number
JPS61166328A
JPS61166328A JP765885A JP765885A JPS61166328A JP S61166328 A JPS61166328 A JP S61166328A JP 765885 A JP765885 A JP 765885A JP 765885 A JP765885 A JP 765885A JP S61166328 A JPS61166328 A JP S61166328A
Authority
JP
Japan
Prior art keywords
bale
twine
clutch
shaft
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP765885A
Other languages
Japanese (ja)
Other versions
JPH072060B2 (en
Inventor
中村 雅宣
小野 允久
泰治 水倉
松木 隆尚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanmar Co Ltd
Yanmar Agribusiness Co Ltd
Original Assignee
Seirei Industry Co Ltd
Yanmar Agricultural Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seirei Industry Co Ltd, Yanmar Agricultural Equipment Co Ltd filed Critical Seirei Industry Co Ltd
Priority to JP60007658A priority Critical patent/JPH072060B2/en
Publication of JPS61166328A publication Critical patent/JPS61166328A/en
Publication of JPH072060B2 publication Critical patent/JPH072060B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は圃場に散在する牧草や藁などの藁草をピックア
ップ部で拾い上げてベール形成室でロール状のベール形
成すると共に、このベールの外周を結束装置から供給さ
れるトワインによって結束するようにしたロールベーラ
に関する。
Detailed Description of the Invention "Industrial Application Field" The present invention picks up straw grass such as grass and straw scattered in a field with a pick-up section and forms a roll-shaped bale in a bale-forming chamber. The present invention relates to a roll baler that binds together by twine supplied from a binding device.

「従来の技術」 従来ベールの中央部及び端部とも一様にトワインが巻き
付けられている。
"Prior Art" Conventionally, twines are wrapped uniformly around both the center and ends of a bale.

「発明が解決しようとする問題点」 このため端部のトワインが弛みやすくベールの全体形状
が良好に保てない欠点があった。
``Problems to be Solved by the Invention'' For this reason, the twine at the end tends to loosen and the overall shape of the bale cannot be maintained well.

「問題点を解決するための子役」 したがって1本発明は左右移動時順次ベールの外周にト
ワインを螺旋状に巻き付けていくトワイン案内体を備え
、前記トワイン案内体を左右移動終端で一時停止させ、
ベール左右両端部のトワイ二ノを多+4さとするように
構成したものである。
"Children's Actor for Solving Problems" Accordingly, one aspect of the present invention is to provide a twine guide body that sequentially wraps the twine spirally around the outer periphery of the bale during left-right movement, and to temporarily stop the twine guide body at the end of the left-right movement;
It is constructed so that the number of points at both left and right ends of the veil is set to +4.

「作用」 而して本発明によれば、ベールの両端部のトワインが極
めて強固に巻き付けられたものとなってベールの形状崩
れなどが解消されベールの取扱いが良好となり後工程の
例えば収集作業での能率向上を図ることができる。
``Function'' According to the present invention, the twines at both ends of the bale are wrapped extremely tightly, eliminating deformation of the bale, etc., and making it possible to handle the bale easily in subsequent processes, such as collection work. It is possible to improve efficiency.

「実施例」 以下本発明の一実施例を図面に基づいて詳述する。"Example" An embodiment of the present invention will be described below in detail with reference to the drawings.

第1図はベール形成部の説明図、第2図は全体側面図、
第3図は同平面図であり、図中(1)は走行うローラ(
2)を有する機台、(3)は前記機台(1)に搭・成す
るベーラ部、(4)は前記ベーラ部前方にPI降可能に
装設してピックアップフィンガー(5)を有するピック
アップ部、(6)は前記機台(1)後方に装設してエン
ジン(7)を内設するエンジン部、(8)は前記エンジ
ン部(6)後方の機体左右中央に配設する操作パネル(
9)を有する運転操作部であり、前記ベーラ部(3)に
結束装置(lO)及び作業クラッチレバ−(11)を有
すると共に、前記操作パネル(9)に走行うラッチレバ
ー(12)及び左右サイドクラッチレバ−(13)(+
3)並びに変速クラッチレバ−(+4)を有する。
Figure 1 is an explanatory diagram of the veil forming part, Figure 2 is an overall side view,
Figure 3 is a plan view of the same, and (1) in the figure shows the running roller (
2), a baler section (3) mounted on the baler section (1), and (4) a pickup installed in front of the baler section so as to be able to lower the PI and having a pickup finger (5). , (6) is an engine section that is installed behind the machine base (1) and has an engine (7) therein, and (8) is an operation panel that is installed at the left and right center of the machine behind the engine section (6). (
9), the baler part (3) has a binding device (lO) and a working clutch lever (11), and a latch lever (12) running on the operation panel (9) and a left and right Side clutch lever (13) (+
3) and a transmission clutch lever (+4).

前記ベーラ部(3)のベール形成室(15)内には上部
パイプコンベア(1B)及び下部パイプコンベア(17
)を対向状に配設するもので、第4図にも示す如く上部
パイプコンベア(1B)は駆動スプロケット(18)と
アイドラ(19)間にチェンカイド(20)を介し左右
の上部エンドレスチェン(21)(21)を張架させ、
これらチェノ(21)(21)間にボルト(22)を介
し等間隔に複数のベール形成上部パイプ(23)・・・
を横架させている。また第5図乃至第8図にも示す如く
、前記下部パイプコンベア(17)は前記ベール形成室
(15)に設ける駆動スプロケット(24)と前記ピッ
クアップ部(4)に設けるアイドルスプロケット(25
)と間にチェノガイド(2B)(27)及びテンション
ローラ(2日)を介し左右の下部エンドレスチェン(2
9)(29)を張架させ、これらチェノ(29)(29
)間にボルト(30)を介し等間隔に複数のベール形成
下部パイプ(31)・・・を横架させている。
An upper pipe conveyor (1B) and a lower pipe conveyor (17) are installed in the bale forming chamber (15) of the baler section (3).
) are arranged facing each other, and as shown in Fig. 4, the upper pipe conveyor (1B) has left and right upper endless chains (21 ) (21),
A plurality of veil-forming upper pipes (23) are arranged at equal intervals through bolts (22) between these chains (21) (21).
is placed horizontally. Further, as shown in FIGS. 5 to 8, the lower pipe conveyor (17) includes a driving sprocket (24) provided in the bale forming chamber (15) and an idle sprocket (25) provided in the pickup section (4).
) and the left and right lower endless chains (2
9) (29) and these Cheno (29) (29)
) A plurality of veil forming lower pipes (31) are horizontally suspended at equal intervals through bolts (30).

さらに、前記チェノガイド(27)の前端にピックアッ
プ回動支点軸(32)を備え、該支点軸(32)に前記
ピックアップ部(4)のピックアップケース(33)基
端を上下動自在に支持させている。前記アイドルスプロ
ケット(25)はビー7クアツプケース(33)前端に
固設する支軸(34)に遊転軸支させると共に、前記支
軸(34)に一体固設する偏心軸(35)に各ピックア
ップフィンガー(36)の基端を枢支させ、且つ各フィ
ンガー(36)の先端を前記スプロケット(25)に一
体連設するフィンガー胴(37)の各開口(38)より
外側に突出させて、前記胴(37)の回転によるフィン
ガー(36)の回動時その突出長さを適宜可変させて圃
場の乾草を拾い上げ前記下部パイプコンベア(17)に
より直接的にベール形成室(15)内に取入れ、上下部
パイプコンベア(16) (17)の回転でもってこの
形成室(15)内の乾草をロール状のベールに形成する
ように構成している。
Furthermore, a pickup rotation fulcrum shaft (32) is provided at the front end of the chino guide (27), and the base end of the pickup case (33) of the pickup portion (4) is supported on the fulcrum shaft (32) so as to be vertically movable. There is. The idle sprocket (25) is rotatably supported on a support shaft (34) fixed to the front end of the bee 7 cup case (33), and each pickup is supported on an eccentric shaft (35) integrally fixed to the support shaft (34). The base ends of the fingers (36) are pivotally supported, and the tips of each finger (36) are made to protrude outside from each opening (38) of the finger body (37) integrally connected to the sprocket (25). When the finger (36) rotates due to the rotation of the barrel (37), its protrusion length is appropriately varied to pick up hay from the field and directly take it into the bale forming chamber (15) by the lower pipe conveyor (17); The hay in the forming chamber (15) is formed into a rolled bale by the rotation of the upper and lower pipe conveyors (16) and (17).

第9図乃至第12図に示す如く、前記ピックアンプケー
ス(33)は支持ホルダ(39)及びワイヤ(40)を
介しピックアップ昇降装置(41)に連結させるもので
、ボ1記昇降装置!(41)はピックアップ操作ボック
ス(42)にピックアップ高さ調節用操作ハンドル(4
3)と、該ハンドル(43)に一体連結する回転ネジ軸
(40と、これらハンドル(43)及びネジ軸(44)
を支持する受台(45)と、該受台(45)を回動軸(
4B)及び受金A (47)を介し前記ボックス(42
)に支持する支軸(48)と、前記ネジ軸(44)に結
合連結する摺動体(49)と、該摺動体(49)に揺動
ピン(50)を介し一端を連結させ他端を前記ワイヤ(
40)に連結するワイヤリンク(51)と、前記軸(4
6)を中心に/\ンドル(43)に反時計方向の持上げ
力と付勢するバネ(52)とを備え、前記ハンドル(4
3)による摺動体(49)のスライド操作でもって前記
ピックアップ部(4)の昇降量調節を行う一方、第9図
及び第12図のピックアップ部(4)の上げ及び下げ位
置よりボックス(42)のガイド溝(53)に沿わせ前
記軸(48)を中心にハンドル(43)を反時計方向に
回動させ同図仮想線状態に収納したとき、前記ワイヤリ
ンク(51)を介してワイヤ(40)を引張りピックア
ップ部(0を最上昇位置に持上げるように構成している
。またこの際第9図の上げ調節位置或いは第12図の下
げ調節位置より最上昇位置に持上げた状態のとき前記ワ
イヤ(40)のアウタ受は金具(54)のボックス枢支
軸(55)とワイヤ(40)とリンク(51)の連結ピ
ン(56)間の距離(見1)(見こ)を略同等(愛、ζ
交z)とさせ、ピックアップ部(4)の何れの調節位置
にあっても前記ハンドル(43)を同図仮想線状態に収
納状態とさせたとき常に略同−最上昇高さ位置にピック
アップ部(4)を持上げ保持するように構成している。
As shown in FIGS. 9 to 12, the pick amplifier case (33) is connected to a pickup lifting device (41) via a support holder (39) and a wire (40). (41) is a pickup height adjustment operation handle (4) attached to the pickup operation box (42).
3), a rotating screw shaft (40) integrally connected to the handle (43), and the handle (43) and the screw shaft (44).
a pedestal (45) that supports the pedestal (45), and a rotating shaft (45) that supports the pedestal (45);
4B) and the box (42) via the receiver A (47).
), a sliding body (49) coupled and connected to the screw shaft (44), one end of which is connected to the sliding body (49) via a swing pin (50), and the other end The wire (
a wire link (51) connected to the shaft (40);
The handle (43) is provided with a counterclockwise lifting force and a spring (52) that biases the handle (43).
3), the lifting amount of the pickup section (4) is adjusted by sliding the sliding body (49), and the box (42) is adjusted from the raised and lowered positions of the pickup section (4) in FIGS. 9 and 12. When the handle (43) is rotated counterclockwise around the shaft (48) along the guide groove (53) of the wire and housed in the phantom line in the figure, the wire ( 40) is configured to lift the tension pickup part (0) to the highest position.At this time, when it is lifted to the highest position from the raised adjustment position shown in Figure 9 or the lowered adjustment position shown in Figure 12. The outer holder of the wire (40) is approximately the distance (see 1) between the box pivot shaft (55) of the metal fitting (54) and the connecting pin (56) of the wire (40) and link (51). Equivalent (love, ζ
When the handle (43) is stored in the imaginary line state in the figure, no matter which adjustment position the pickup part (4) is in, the pickup part is always at approximately the same - highest height position. (4) is configured to lift and hold.

第13図乃至第14図に示す如く、前記上部パイプコン
ベア(IB)を支持するチェンガイド(20)は前端を
前記駆動スプロケッ) (18)の駆動軸(57)に往
動自在に支持させ、ベーラ部(3)側板(3a)に回動
支点ピン(58)を介し揺動可能に枢支する支点越えリ
ンク(58)に、前記ガイド(20)後端をピン(GO
)(61)及び支点越えバネ(62)を介し支持させて
いる。
As shown in FIGS. 13 to 14, the front end of the chain guide (20) supporting the upper pipe conveyor (IB) is supported by the drive shaft (57) of the drive sprocket (18) so as to be freely reciprocatable; The rear end of the guide (20) is attached to a pin (GO
) (61) and a fulcrum crossing spring (62).

また前記側板(3a)にはベール(A)の形成直径が一
定以上大となったときその外周圧力を検出するベール圧
検出装置である検出スイッチ(83)と、該スイッチ(
63)を操作するスイッチ操作板(B4)とを備えるも
ので、前記操作板(80を支点軸(65)を介し側ai
i (3a)に支持させ、前記操作板(84)と側板(
3a)間に張架する支点越えバネ(6B)によって操作
板(64)のjjiWIボルト(87)を前記チェンガ
イド(20)の固定ピン(88)に常時は当接保持させ
、ベール(A)径が一定以上となりその接触圧によって
前記チェンガイド(20)が軸(57)を中心に一定角
度(α)上方に開いたとき、前記ピン(68)及びポル
) (87)を介し操作板(B4)を支点軸(65)を
中心にバネ(86)力でもって支点越えさせ前記スイッ
チ(63)をオン作動させて警報装置を駆動し作業者に
ベール形成完了を報知せしめるように構成している。ま
た前記操作板(84)とチェンガイド(20)の固定ピ
ン(81)間に復帰用板バネ(69)を調節していて、
チェンガイド(20)が元の常態位置に戻ったとき操作
板(B4)も復帰させスイッチ(B3)の作動解除を行
うように構成している。さらに前記側板(3a)には前
記ピン(61)の移動範囲を規制するガイド規制板(7
0)を設けていて、前記軸(57)を中心にチェンガイ
ド(20)が定常位置より一定角度(β)上方に開いた
状態のとき軸(57)及びピン(58)を結ぶライン(
b)よりバネ(62)を支点越えさせて規制板(70)
の一端側に前記ピン(81)を当接係止させ、これらガ
イド(20)及びリンク(59)を第13図仮想線状態
に位置保持させ上部パイプコンベア(1B)を開状態と
させるように構成している。またさらに左右側板(3a
) (3a)に枢支する左右の支点越えリンク(59)
 C3B)には長孔(71) (71)を介し左右のロ
ッド(72) (72)を連結していて、前記ベール形
成室(15)の左側を開放する側方ドア(73)の連結
リンク(70に左側の前記ロー2ド(72)他端を直接
的に、また右側の前記ロッド(72)他端をリンク(7
5) (78)を介し連結させて、上部パイプコンベア
(!8)と側方ドア(73)とを連動させて開放状態と
するように構成している。
Further, the side plate (3a) is provided with a detection switch (83) which is a bail pressure detection device that detects the outer circumferential pressure of the bale (A) when the formed diameter of the bale (A) becomes larger than a certain value.
63), and a switch operation plate (B4) for operating the operation plate (80) on the side ai via the fulcrum shaft (65).
i (3a), and the operation plate (84) and the side plate (
3a) The jjiWI bolt (87) of the operation plate (64) is always held in contact with the fixing pin (88) of the chain guide (20) by the fulcrum cross-over spring (6B) stretched between the bails (A) When the diameter exceeds a certain level and the contact pressure causes the chain guide (20) to open upward at a certain angle (α) about the shaft (57), the operation plate ( B4) is moved over the fulcrum shaft (65) by the force of a spring (86), and the switch (63) is turned on to drive an alarm device and notify the operator of the completion of bale formation. There is. Further, a return leaf spring (69) is adjusted between the operation plate (84) and the fixing pin (81) of the chain guide (20),
When the chain guide (20) returns to its original normal position, the operation plate (B4) is also returned to release the switch (B3). Further, the side plate (3a) is provided with a guide regulating plate (7) that regulates the movement range of the pin (61).
0), and when the chain guide (20) is opened at a certain angle (β) above the normal position with the shaft (57) as the center, a line (
b) Move the spring (62) over the fulcrum and remove the regulation plate (70).
The pin (81) is abutted and locked on one end side, and the guide (20) and link (59) are held in the imaginary line state in FIG. 13 to open the upper pipe conveyor (1B). It consists of Furthermore, the left and right side plates (3a
) Left and right fulcrum crossing links (59) pivoted to (3a)
C3B) is connected to left and right rods (72) (72) through long holes (71) (71), and is a connecting link of a side door (73) that opens the left side of the veil forming chamber (15). (Connect the other end of the rod (72) on the left side directly to the link (70), and connect the other end of the rod (72) on the right side to the link (70).
5) The upper pipe conveyor (!8) and the side door (73) are connected to each other via (78) so as to be in an open state.

第I5図乃至第21図に示す如く、前記結束装!(10
)はベール形成室(15)内後部の上部パイプコンベア
(1B)のアイドラ(19)と下部パイプコンベア(1
7)の駆動スズロケット(24)の略中間位置に設けて
いて、前記側板(3a)に駆動入力ケース(77)を介
し連結固定する結束ケース(78)と、前記ケース(7
8)に各スプロケット軸(79) (8G)を介し軸支
する駆動及び従動スプロケッ) (81)(82)と、
これらスプロケット(81)(82)間に張架するチェ
7(83)と。
As shown in FIG. I5 to FIG. 21, the binding device! (10
) is the idler (19) of the upper pipe conveyor (1B) at the rear of the bale forming chamber (15) and the lower pipe conveyor (1).
A binding case (78) is provided approximately in the middle of the drive tin rocket (24) of 7) and is connected and fixed to the side plate (3a) via the drive input case (77);
8) with driving and driven sprockets (81) (82) pivotally supported via each sprocket shaft (79) (8G),
A chain 7 (83) is stretched between these sprockets (81) and (82).

前記入力ケース(77)に内設してこの人力スプロケッ
ト(84)からの回転を一対のウオームギヤ(85)を
介し前記駆動スプロケッ) (81)に継断自在に伝達
する結束クラッチ(88)と、前記チェ7(83)にス
プロケット(87)及び回転軸(88)を介し連動連結
するトワイン繰出し用主回転体(89)と、該回転体(
89)に引張バネ(30)を介し圧接させその圧接力で
もってトワイン(91)を順次前方の送出し口(92)
より繰出すトワイン繰出し用副回転体(93)と、前記
チェ7(83)に一体取付けする係1ピン(90に四角
形状の係合孔(95)を介し連結し回転子(78a)を
介するその左右移動時前記送出しO(92)より繰出さ
れるトワイン(31)をガイド金具(9B)より前方に
送出させベール(A)外周に左及び右方向より螺旋状に
巻き付けていくトワイン案内体であるランナ(97)と
a binding clutch (88) that is installed inside the input case (77) and connectably transmits rotation from the human-powered sprocket (84) to the drive sprocket (81) via a pair of worm gears (85); A twine payout main rotating body (89) interlockingly connected to the chain 7 (83) via a sprocket (87) and a rotating shaft (88);
89) via a tension spring (30), and the twine (91) is sequentially moved to the front delivery port (92) by the pressure force.
The secondary rotating body (93) for feeding out the twine is connected to the engaging pin (90) integrally attached to the chain 7 (83) through a square engagement hole (95), and is connected through the rotor (78a). During its left and right movement, the twine guide body sends out the twine (31) from the delivery O (92) forward from the guide fitting (9B) and wraps it around the outer circumference of the bale (A) in a spiral form from the left and right directions. With Ranna (97).

案内板(98)とを備え、前記結束クラッチ(86)の
入動作によるランチ(97)の左右移動時前記送出し口
(92)より繰出されるトワイン(91)をガイド金具
(9B)の案内により形成されるベール(A)外周部I
で螺旋状に巻き付けていくように構成している。なお前
記主回転体(88)のスプロケット(87)には一方向
クラッチ(87a)が内設されていてベール(A)にト
ワイン(91)が巻き付いて以後トワイン(91)の繰
出し速度が増大したとき主回転体(89)をフリー回転
させるように構成したものである。
A guide plate (98) is provided, and a guide metal fitting (9B) guides the twine (91) fed out from the delivery port (92) when the launch (97) moves left and right due to the engagement operation of the binding clutch (86). Veil (A) outer peripheral part I formed by
It is structured so that it is wound in a spiral. In addition, a one-way clutch (87a) is installed in the sprocket (87) of the main rotating body (88), and after the twine (91) is wrapped around the bail (A), the feeding speed of the twine (91) increases. The main rotating body (89) is configured to freely rotate when the main rotating body (89) is rotated.

また、前記回転体(89)(93)前方の結束ケース(
78) ii’if面にトワイン切断用のカッタ(99
)を回動支点軸(100)を介し取付けていて、ベール
(A)に対するトワイン(91)の1回の巻き付は完了
の都度前記ランチ(97)に植設するビン(101)を
カッタ(99)のカム状突起部(99a)に当接させる
ことにより。
In addition, the binding case (
78) A cutter for twine cutting (99
) is attached via a rotation fulcrum shaft (100), and each time one winding of the twine (91) around the bale (A) is completed, the bottle (101) to be planted in the launch (97) is removed with a cutter ( 99) by bringing it into contact with the cam-shaped protrusion (99a).

カッタ(99)の切断部を持上げ動作させ前記ガイド金
具(96)に保持するトワイン(91)を切断するよう
に構成している。
The cutting portion of the cutter (99) is lifted up to cut the twine (91) held by the guide fitting (96).

さらに、前記結束クラッチ(88)は走行うラッチに連
動させるもので、結束クラッチ(8G)のクラッチアー
ム(102)に一端を連結するクラッチ操作板(103
) 、!?、該操作板(103) ニビン(104a)
 (104b) ヲ介し常時クラッチ入方向側のパネカ
を付勢するクラッチバネ(104)と、前記ランナ(9
7)に支点ピン(+05)を介し中間を支持させて常時
は捩りバネ(10B)力でもって一端側のビン(107
)側を起立させ前記操作板(103)の傾斜クラッチ作
用面(103a)に当接させてバネ(104)力に抗し
操作板(103)を切状態に保持するクラッチ切換アー
ム(10B)と、一端をワイヤ(109)を介し走行う
ラッチレバ−(12)に連結させ走行うラッチ切状態の
ときビン(110a)(110b)間のバネ(110)
力に抗し傾斜作用面(+11a)を前記アーム(108
)の解除ビン(+12)に当接させて前記ビン(107
)による操作板(103)の抑圧解除を行う作動開始板
(111)と、前記バネ(106)に対し切換アーム(
108)を定常位置に保持するストツバ−(113)と
を備え、作業クラッチレバ−(11)の入状態で走行う
ラッチレバー(12)を切操作したとき前記ワイヤ(1
09)を介し開始板(itt)を第20図実線矢印方向
に引張って前記作用面(llla)時計方向の同図仮想
線状態に切換えて操作板(103)に対するビン(10
7)の抑圧解除を行って操作板(103)を左実線矢印
方向にスライドさせ前記結束クラッチ(8日)を人とす
るように構成している。
Further, the binding clutch (88) is interlocked with a running latch, and one end of the binding clutch (88) is connected to the clutch arm (102) of the binding clutch (8G).
),! ? , the operation plate (103), the nibbin (104a)
(104b) A clutch spring (104) that constantly biases the panel on the clutch engagement direction side through the clutch spring (104), and the runner (9).
7) is supported in the middle via a fulcrum pin (+05), and the bottle (107) on one end side is normally supported by the force of a torsion spring (10B).
) side upright and in contact with the inclined clutch action surface (103a) of the operating plate (103) to resist the force of a spring (104) and hold the operating plate (103) in the disengaged state; , one end is connected to the running latch lever (12) via a wire (109), and the spring (110) runs between the bins (110a and 110b) when the latch is off.
The inclined action surface (+11a) is moved against the force by the arm (108).
) and press it against the release bottle (+12) of the bottle (107).
) to release the suppression of the operation plate (103), and the switching arm (
a stop bar (113) for holding the wire (108) in a steady position, and when the latch lever (12), which runs when the working clutch lever (11) is in the engaged state, is disconnected, the wire (1
09) in the direction of the solid line arrow in FIG.
7) is released and the operation plate (103) is slid in the direction of the solid line arrow on the left, so that the binding clutch (8th) is operated.

第22図乃至第23図に示す如く、前記開始板(lil
)と走行うラッチレバ−(12)との間には手動結束ク
ラッチレバ−(114)とカム部材(115)とを備え
、レバーボックス(lie)の固定軸(117)に前記
レバー(114)とカム部材(115)の各基端を軸支
させるもので、前記カム部材(115)は先端を前記ワ
イヤ(109)に連結させ前記クラッチレバ−(114
)の係合面(114a)に当接係止させるクラッチピン
(11B)を中間に備えると共に、前記軸(117)の
固定ピン(119)に係合するカム溝(120)と該部
材(115)をし/<−(+14)方向に押圧する圧縮
バネ(121)とを基端に備え、前記レバー(114)
が走行うラッチレバー(12)に連動して或いは単独操
作によって第22図仮想線位置の走行うラッチ切方向側
に回動したとき一定回動範囲は前記ビン(118)との
係合でもってカム部材(115)を軸(117)を中心
に反時計方向に回動させると共に、前記カム溝(12Q
)の案内でバネ(121)に抗しカム部材(115)が
第23図実線矢印方向に一定以上後退してビン(+18
)と係合面(114a)との係合解除が行われる一定回
動範囲以上回動するとき前記開始板(111)のバネ(
110)力でもってカム部材(115) Q元の位置つ
まり開始板(111)がビン(l 1Oa)に当接しク
ラッチビン(118)が元の定常位置に戻る状態に復帰
させるように構成している。つまり前記開始板(111
)は前記レバー(+2)(114)の切操作のとき操作
直後のみ第20図仮想線位置までスライドさせ前記ビン
(+07)による操作板(103)の抑圧解除を行い。
As shown in FIGS. 22 and 23, the starting plate (lil
) and the moving latch lever (12) are provided with a manual binding clutch lever (114) and a cam member (115), and the lever (114) and the cam member (115) are provided on the fixed shaft (117) of the lever box (lie). Each proximal end of the cam member (115) is pivotally supported, and the cam member (115) has its tip connected to the wire (109) and is connected to the clutch lever (114).
) is provided in the middle with a clutch pin (11B) that contacts and locks the engagement surface (114a) of the member (115), and a cam groove (120) that engages with the fixing pin (119) of the shaft (117) and the member (115). ) is provided at the base end with a compression spring (121) that presses in the <-(+14) direction, and the lever (114)
When the latch lever (12) is rotated in conjunction with the running latch lever (12) or independently operated in the direction of the running latch off at the imaginary line position in Fig. 22, a certain range of rotation is achieved by engagement with the bottle (118). While rotating the cam member (115) counterclockwise around the shaft (117), the cam groove (12Q)
), the cam member (115) resists the spring (121) and retreats by a certain amount in the direction of the solid arrow in FIG.
) of the starting plate (111) when the starting plate (111) rotates beyond a certain rotation range in which the engagement surface (114a) is disengaged from the engagement surface (114a).
110) The configuration is such that the cam member (115) Q returns to its original position, that is, the start plate (111) comes into contact with the bottle (11Oa) and the clutch pin (118) returns to its original steady position by force. There is. In other words, the starting plate (111
) is slid to the imaginary line position in FIG. 20 only immediately after the lever (+2) (114) is turned off to release the suppression of the operation plate (103) by the bottle (+07).

それ以後開始板(111)を元の状態位置に復帰させる
もので、前記操作板(103)の押圧解除によって結束
クラッチ(86)が入となりランナ(97)が−往復動
作して元の位置に戻ったとき前記ビン(107)によっ
て操作板(103)を押圧して結束クラ−2千(86)
を再び切とするように構成したものである。
Thereafter, the starting plate (111) is returned to its original position, and when the pressure on the operating plate (103) is released, the binding clutch (86) is engaged, and the runner (97) reciprocates and returns to its original position. When returning, press the operation plate (103) with the bottle (107) and bind the 2,000 yen (86).
It is configured so that it is turned off again.

第24図乃至第25図に示す如く、前記側方ドア(73
)はブラケット(122)及び回動支点軸(123)を
介し側板(3a)に開閉自在に取付けたもので、−偶に
固定板(I20及び軸(125)を介し把手(t211
1)を一体付設すると共に、前記軸(125)にバネ(
127)力を付勢するフック(128)を取付けて、前
記側板(3a)に一体固設するロック部材(129)に
前記フッり(128)を適宜係合させてドア(73)の
ロックを行う一方、前記軸(125)を中心に把手(1
2B)を回動させロック部材(1213)とフック(1
28)の係合解除を行ったときドア(73)を開放する
ように構成している。
As shown in FIGS. 24 and 25, the side door (73
) is attached to the side plate (3a) via a bracket (122) and a rotation fulcrum shaft (123) so as to be openable and closable.
1) is integrally attached, and a spring (
127) Attach a hook (128) that applies force, and properly engage the hook (128) with a locking member (129) that is integrally fixed to the side plate (3a) to lock the door (73). While doing so, hold the handle (1) around the shaft (125).
2B) and lock member (1213) and hook (1
The door (73) is configured to be opened when the engagement of the door (73) is released.

第26図に示す如く、前記エンジン(7)の出力軸(1
30)に走行ミッション部の入力軸(131)をプーリ
(132)(133)及びベルト(130並びにテンシ
ョンローラである走行うラッチ(135)を介し連動連
結させている。また前記出力軸(130)にカウンタ軸
(138)をプーリ(132)(137)及びベルト(
138)並びにテンションローラである作業クラッチ(
139)を介し連動連結させている。さらに前記カウン
タ4d(t3s) ニT[パイプコンベア(17)の駆
動スプロケット軸(140)をスプロケット(141)
(142)及びチェ7(+43)を介し連動連結すると
共に、前記スプロケット軸(140)に上部パイプコン
ベア(1B)の前記駆動軸(57)及び結束装置(10
)の駆動入力軸(144)をスプロケット(145)(
14B)(84)及びチェ7(147)並びにテンショ
ンスプロケット(148)を介し連動連結させ、前記作
業クラッチ(139)の入操作によって上下部パイプコ
ンベア(1B)(17)及び結束装置(lO)を駆動す
るように構成している。
As shown in FIG. 26, the output shaft (1) of the engine (7)
30), the input shaft (131) of the traveling transmission section is interlocked and connected to the output shaft (130) via pulleys (132) (133), a belt (130), and a running latch (135) which is a tension roller. Attach the counter shaft (138) to the pulleys (132) (137) and belt (
138) as well as a working clutch which is a tension roller (
139). Further, the counter 4d (t3s)
(142) and chain 7 (+43), and the drive shaft (57) of the upper pipe conveyor (1B) and the binding device (10) are connected to the sprocket shaft (140).
) of the drive input shaft (144) of the sprocket (145) (
14B) (84), chain 7 (147), and tension sprocket (148), and the upper and lower pipe conveyors (1B) (17) and the binding device (lO) are connected by engaging the work clutch (139). It is configured to be driven.

第27図乃至第28図に示す如く、前記ベール形成室(
15)内にベール(A)の外部取出し装置(149)を
内設するもので、前記側板(3a)のベール形成五側壁
(150)に形成する凹部溝(151)にベール横送り
装置であるベール引出し板(152)を埋設させ、鎖板
(152)をロッド(153)及びロッドガイド(15
0を介し左側板(3a)外側の引出し用ハンドル(15
5)に連結させ、前記ドア(73)の開放時ハンドル(
155)を引出し操作することによりベール(A)の右
側面を前記引出し板(152)で押圧してベール形成室
(15)左外側にベール(A)左側部を突出させるよう
に構成している。また、第16図乃至乃至第17図及び
第29図に示す如く、前記ランチ(97)が中央位置に
位置するときこれを検知する常閉の中央検出スイッチ(
15111)と、前記作業クラッチ(139)の人を検
知する常開の作業クラッチスイッチ(157)とを備え
、手動スイッチ(+58)及び常開の前記べ(+80)
を直列接続させ、ベール圧一定置上となったとき前記警
報ブザ−(180)を作動させるように構成している。
As shown in FIGS. 27 to 28, the veil forming chamber (
15) A bale (A) external take-out device (149) is installed inside the bale (A), and a bale cross-feeding device is installed in a concave groove (151) formed in the bale-forming fifth side wall (150) of the side plate (3a). The bail drawer plate (152) is buried, and the chain plate (152) is connected to the rod (153) and rod guide (15).
0 to the left side plate (3a) outside drawer handle (15
5), and when the door (73) is opened, the handle (
155), the right side of the bale (A) is pressed by the pull-out plate (152), and the left side of the bale (A) protrudes to the left outside of the bale forming chamber (15). . Further, as shown in FIGS. 16 to 17 and 29, a normally closed central detection switch (
15111) and a normally open work clutch switch (157) that detects a person in the work clutch (139), and a manual switch (+58) and a normally open work clutch switch (+80).
are connected in series, and the warning buzzer (180) is activated when the bail pressure reaches a certain level.

なお第1図中(4a)は拾い上げられた乾草をベール形
成室(15)迄ガイド杆に(4h)に沿って案内する取
付位置変更可能に設けるピックアップガイド板Z“石ろ
In addition, (4a) in FIG. 1 is a pick-up guide plate Z, which guides the picked up hay along the guide rod (4h) to the bale forming chamber (15) and is installed so that its mounting position can be changed.

本実施例は上記の如く構成するものにして、ピックアッ
プ部(0によって拾い上げられた乾草は下部パイプコン
ベア(17)によってベール形成室(15)内に搬入さ
れ、上下部パイプコンベア(1B)(17)でもってロ
ール状のベール(A)に形成される。
The present embodiment is constructed as described above, and the hay picked up by the pickup section (0) is carried into the bale forming chamber (15) by the lower pipe conveyor (17), and the hay is carried into the bale forming chamber (15) by the upper and lower pipe conveyor (1B) (17). ) to form a roll-shaped veil (A).

そして今ベール(A)の直径が設定の一定直径以上に形
成される状態のとき、そのベール(A)圧によって上部
パイプコンベア(1B)の前記チェンガイド(20)が
支点越えバネ(82)に抗し軸(57)を中心に一定角
度(α)上方に押し上げられて前記スイッチ(83)を
オン作動させ警報装置を駆動しベール(A)形成完了を
作業者に報知する。
Now, when the diameter of the bale (A) is larger than a predetermined diameter, the chain guide (20) of the upper pipe conveyor (1B) is moved over the fulcrum spring (82) by the pressure of the bale (A). It is pushed upward by a certain angle (α) about the resisting shaft (57), turning on the switch (83) and driving the alarm device to notify the operator that the veil (A) has been formed.

而して前記走行うラッチレバー(12)を介して走行う
ラッチ(130を切操作するとき前記開始板(111)
、切換アーム(108)並びに操作板(103)を介し
結束クラッチ(8B)が入状態となってトワイン(9り
による結束が開始する。即ち結束ケース(78)の略中
央位置にある前記ランナ(97)がチェ7(83)の駆
動によって第161mの矢印方向に示す如く、中央より
右側に、右側より左側に、左側より中央に一往復する間
にベール(A)外周に送出し口(92)より繰出される
トワイン(91)をガイド金具(9B)を介し第30図
の(1)〜(5)に示す如く螺旋状に巻き付けていくも
ので、ランチ(97)が左右移動端に至って折り返すと
き、第18図仮想線に示す如くチェノ(83)に連結す
る係止ピン(90が係合孔(35)の一端縁(95a)
より他端縁(95b)に接当する迄の間ランナ(97)
の移動を停止させ、ベール(A)の両端部のトワイン(
91)の巻き付けを多毛とさせベール(A)の形成期れ
の防1トを図るものである。モしてランナ(97)が再
び中央位置に戻るトワイン(91)の巻き付は完了時に
あっては、ランナ(97)に植設する前記ピン(101
)がカッタ(99)のカム状突起部(99a)に当接し
てカッタ(99)の切断部を持上げトワイン(81)を
切断する。
When the running latch (130) is turned off via the running latch lever (12), the starting plate (111)
, the binding clutch (8B) is turned on via the switching arm (108) and the operation plate (103), and binding by twine (9-ri) begins. In other words, the runner ( As shown in the direction of the arrow 161m by the drive of the checker 7 (83), the delivery port (92) is reciprocated from the center to the right, from the right to the left and from the left to the center. ), the twine (91) is wound spirally through the guide fitting (9B) as shown in (1) to (5) in Fig. 30, until the launch (97) reaches the left and right end of movement. When folding back, the locking pin (90 is one end edge (95a) of the engagement hole (35)) connected to the chino (83) as shown in the imaginary line in FIG.
The runner (97) until it comes into contact with the other edge (95b)
The movement of the veil (A) is stopped, and the twine (
91) is wrapped in a thick layer to prevent the formation period of the veil (A) from being delayed. When the runner (97) returns to the center position again and the winding of the twine (91) is completed, the pin (101) installed on the runner (97)
) comes into contact with the cam-shaped protrusion (99a) of the cutter (99) and lifts the cutting part of the cutter (99) to cut the twine (81).

つまり今走行うラッチレバ−(12)が切状態に切換わ
ると、前記クラッチレバ−(114)が第22図仮想線
位置に揺動変位し前記係合面(l14a)に係合するク
ラッチピン(118)を介しカム部材(115)が軸(
117)を中心に反詩計方向に回動してワイヤ(109
)が引張られ前記開始板(111)が入方向にスライド
するもので、この途中カム部材(115)が一定範囲以
上回動するとき前記ピン(119)に対するカム1A(
120)の案内によってカム部材(115)が後退しク
ラッチビン(118)とクラッチレバ−(114)との
係合解除が行われて前記開始板(111)がバネ(+1
0)力で元の切状態位器に戻る。このように前記開始板
(111)は走行うラッチレバー(12)が切操作され
た直後の一動作だけ第20図仮想線位置までスライドす
るもので常時は同図実線位置に位置保持されるもので、
このスライド操作時その作用面(llla)でもって解
除ピン(112)を押し上げて切換アーム(108)を
切換え、前記操作板(103)に対するピン(107)
の押圧解除を行って結束クラッチ(86)を入とする。
In other words, when the latch lever (12) for the current running is switched to the disengaged state, the clutch lever (114) swings to the imaginary line position in FIG. 22, and the clutch pin (114) engages with the engagement surface (114a) The cam member (115) connects to the shaft (118) via the shaft (118).
The wire (109) is rotated in the opposite direction around the wire (117).
) is pulled and the start plate (111) slides in the entry direction, and when the cam member (115) rotates over a certain range during this period, the cam 1A (
120), the cam member (115) retreats, the clutch pin (118) and the clutch lever (114) are disengaged, and the starting plate (111) is moved by the spring (+1
0) Force returns to the original cut position. In this way, the start plate (111) slides to the position shown in the phantom line in Fig. 20 by one action immediately after the running latch lever (12) is turned off, and is normally held at the position shown in the solid line in Fig. 20. in,
During this slide operation, push up the release pin (112) with its action surface (lla) to switch the switching arm (108), and press the pin (107) against the operation plate (103).
The binding clutch (86) is turned on by releasing the pressure.

そしてこのクラッチ(8B)の人によってランチ(37
)が切換アーム(108)とともに中央より右側に、右
側より左側に、左側より中央に一往復移動するもので、
このランチ(97)の移動中にあっては前記切換アーム
(108)は捩りハネ(+06)力でもって定常姿勢を
維持させ再びランチ(97)が左側より中央位置に戻る
状態のとき前記クラッチビン(107)を操作板(10
3)の作用面(103a)にち接させて操作板(103
)をスライドさせ結束クラッチ(86)を切とすると共
にランチ(97)の移動を停止させる。また結束クラッ
チ(8B)の人時にあっては、主副回転体(89)(9
3)が回転しトワイン(91)が送出し口(92)及び
前記案内板(98)を介し前方に繰出されるもので、前
記案内板(98)上に繰出されたトワイン(91)はラ
ンチ(97)の右移動時(第19図においては左)前記
ガイド金具(9B)の斜面部(Ha)を滑ってガイド孔
部(98b)に導入され、以後該孔部(98b)を介し
ベール(A)外周にトワイン(81)が供給され、前記
ランチ(S7)が左側より中央位置に戻ってランチ(9
7)のピン(101)がカッタ(99)のカム状突起部
(Ha)に当接し該カッタ(98)を持上げたときトワ
イン(91)を切断し結束が完了する一方、走行うラッ
チレバー(12)の切状態中にあってトワイン(91)
による結束を行いたいような場合には前記レバー(11
4)操作を行うもので、この場合第22図仮想線位置に
レバー(114)はあって結束作業を行う場合一旦同図
実線位置にレバー(114)を戻し再び元の仮想線位置
に引上げ操作することにより前述動作同様結束クラッチ
(8B)が入となって結束が開始される。
And lunch (37) by this clutch (8B) person
) moves back and forth once from the center to the right side, from the right side to the left side, and from the left side to the center together with the switching arm (108),
During the movement of the launch (97), the switching arm (108) maintains a steady posture with a torsion spring (+06) force, and when the launch (97) returns to the center position from the left side, the clutch pin (107) on the operation board (10
3) in contact with the operating surface (103a) of the operation plate (103).
) to disengage the binding clutch (86) and stop the movement of the launch (97). Also, when the binding clutch (8B) is engaged, the main and sub rotating bodies (89) (9
3) rotates and the twine (91) is fed forward through the delivery port (92) and the guide plate (98), and the twine (91) fed out onto the guide plate (98) is the launcher. When (97) moves to the right (left in FIG. 19), it slides on the slope (Ha) of the guide fitting (9B) and is introduced into the guide hole (98b), and thereafter the bail is passed through the hole (98b). (A) A twine (81) is supplied to the outer periphery, and the launch (S7) returns to the center position from the left side and the launch (9
When the pin (101) of the cutter (99) comes into contact with the cam-shaped projection (Ha) of the cutter (99) and lifts the cutter (98), the twine (91) is cut and the bundling is completed, while the latch lever ( 12) is in the off state and twine (91)
If you want to perform bundling using the lever (11),
4) In this case, the lever (114) is located at the imaginary line position in Figure 22, and when performing binding work, the lever (114) is returned to the solid line position in the figure and pulled up again to the original imaginary line position. As a result, the binding clutch (8B) is turned on and binding is started in the same way as in the above-mentioned operation.

次に前記把手(12B)を操作しロック部材(129)
に対するフック(12B)の係合解除を行ってドア(7
3)を開放するとき、前記リンク(74)(7507B
)及びロッド(72)を介してチェノガイド(20)を
一定角度(β)上動させ、上部パイプコンベア(16)
とベール(A)との間に隙間を開成させ、ベール(A)
を横方向にスライドさせて取出す場合の容易化を図って
いる。
Next, operate the handle (12B) and lock the lock member (129).
The hook (12B) is disengaged from the door (7).
3), when opening the link (74) (7507B
) and rod (72) to move the cheno guide (20) upward by a certain angle (β), and then move the upper pipe conveyor (16) upward.
A gap is created between the veil (A) and the veil (A).
This makes it easier to take out by sliding it laterally.

またこのベール(A)の左外側に取出しの際にあっては
、第30図(5)の左破線矢印方向のベール(A)の取
出しに対しトワイン(91)の巻き終り方向が右方向と
なっているため、取出し時にこのトワイン(91)の巻
き終り端に接触抵抗が加わっても締まり方向となってト
ワイン(91)が弛むような不都合が防1トされる。
Also, when taking out the bale (A) on the left outer side, the winding end direction of the twine (91) is in the right direction when the bale (A) is taken out in the direction of the left broken line arrow in Fig. 30 (5). Therefore, even if contact resistance is applied to the winding end of the twine (91) during unloading, the inconvenience that the twine (91) becomes loose due to tightening direction is prevented.

一方、作業終了時などにおいて前記操作ハンドル(43
)操作によってピックアップ部(0を最上昇位置に持上
げる場合にあっては、ピックアップ部(4)の何れの調
節位置にあっても前記ハンドル(43)を略直立状態の
収納位置に位置させることにより常に略同−の表土昇高
1偉置に安定保持させることができる。
On the other hand, when the work is finished, etc., the operation handle (43
) When the pickup unit (0) is to be lifted to the highest position by operation, the handle (43) must be located in the storage position in an approximately upright state regardless of the adjustment position of the pickup unit (4). This allows the topsoil to be stably maintained at approximately the same level of height.

また2作業中ピックアップ部(0で拾い上げられた乾草
はベール形成を兼ねる単一の下部パイプコノベア(!7
)によってベール形成室(15)に搬入されるため、途
中乾草が受継ぎ不良で詰ったりすることなくスムーズに
搬入される。さらにピックアップフィンガー(36)の
回転と下部パイプコンベア(17)の回転が同期するた
め回転差がなく良好に拾い上げてコンベア(17)に受
継ぎすることができる。
In addition, the hay picked up by the pick-up section (0) during the 2 operation is transferred to a single lower pipe conovea (!7) which also serves as bale formation.
), the hay is carried into the bale forming chamber (15) smoothly without clogging due to poor transfer. Furthermore, since the rotation of the pick-up finger (36) and the rotation of the lower pipe conveyor (17) are synchronized, there is no difference in rotation, and the items can be picked up and handed over to the conveyor (17).

「発明の効果」 以上実施例からも明らかなように本発明は、ピックア・
ツブ部(4)で拾い上げた藁草をベール形成室(15)
でロール状のベール(A)に形成すると共に。
“Effects of the Invention” As is clear from the above examples, the present invention
The straw picked up in the whelk part (4) is transferred to the bale forming room (15).
At the same time, it is formed into a roll-shaped bale (A).

このベール(A)の外周を結束装置(10)から供給さ
れるトワイン(91)によって結束する構造において、
左右移動時順次ベール(A)の外周にトワイン(91)
を螺旋状に巻き付けていくトワイン案内体(37)を備
え、前記トワイン案内体(87)を左右移動終端で一時
停止←させ、ベール(A)左右両端部のトワイン(91
)を多重巻きとするものであるから、ベール(A)の両
端部のトワイン(9I)が極めて強固に巻き付けられた
ものとなってベールの形成期れなどが確実に解消され、
この結果ベール(A)の取扱いが良好となって後工程の
例えば収集作業での能率向上が図れるなど顕著な効果を
奏する。
In a structure in which the outer periphery of this bale (A) is bound by twine (91) supplied from a binding device (10),
Twine (91) is placed on the outer periphery of the veil (A) sequentially when moving from side to side.
The twine guide body (37) is provided with a twine guide body (37) for spirally winding the twine guide body (87), and the twine guide body (87) is temporarily stopped at the end of left and right movement, and the twine guide body (91) at both left and right ends of the bale (A) is temporarily stopped.
) is wound multiple times, so the twine (9I) at both ends of the veil (A) are wrapped extremely tightly, and delays in the formation of the veil are reliably eliminated.
As a result, the bale (A) can be handled better, resulting in significant effects such as improved efficiency in subsequent processes, such as collection work.

【図面の簡単な説明】 第1図はベール形成部の説明図、第2図は全体の側面図
、第3図は開平面図、第4図は上部パイプコンベア部の
平面説明図、第5図は第1図の■−n線視固視図6図は
同■−■線視図、第7図はピックアップ部の平面説明図
、第8図は同側面説明図、第9図はピックアー、プ昇降
装置部の断面説明図、第10図は同縦断面図、第11図
は開部分平面図、第12図は第1θ図の作動状態説明図
、第13図は上部パイプコンベア部の説明図、第14図
は同平面説明図、第15図は結束装Wt部の断面説明図
、第16図は同平面説明図、第17図は間部分拡大説明
図、第18図はランナ部の底面説明図、第19図は同正
面説明図、第20図は結束クラッチ部の背面説明図、第
21図は同平面説明図、第22図は結束クラッチ操作部
の拡大説明[−4、第23図は同平面説明図、第24図
はドア部の平面説明図、第25図は同部分拡大説明図、
第26図は駆動系統説明図、第27図はベール引出(4
)・・・ ピックアップ部 (10)・・・   結   束   装   置(1
5)・・・ ベール形成室 (91)・・・      ト      ワ    
  イ      ン(97)・・・  トワイン案内
体 (A)  ・・・   ベ      −      
ル出願人   ヤンマー農機株式会社 セイレイ工業株式会社 代理人   藤  原  忠  治 纂 10 1D 緊 II  I!] z 阜 18 凹 q7 素 tq  It ネ 227 隼 23 凶 第 501刀 A(3)
[Brief explanation of the drawings] Fig. 1 is an explanatory diagram of the bale forming section, Fig. 2 is an overall side view, Fig. 3 is an open plan view, Fig. 4 is a plan explanatory diagram of the upper pipe conveyor section, and Fig. 5 is an explanatory diagram of the upper pipe conveyor section. The figures are the ■-n line fixation view of Figure 1. Figure 6 is the same ■-■ line view of Figure 1. Figure 7 is an explanatory plan view of the pickup section. Figure 8 is an explanatory side view of the same. Figure 9 is the pickup section. , FIG. 10 is a longitudinal sectional view of the upper pipe conveyor section, FIG. 11 is a plan view of the open part, FIG. 12 is an explanatory diagram of the operating state in Fig. 14 is an explanatory plan view of the same, FIG. 15 is an explanatory cross-sectional view of the binding device Wt section, FIG. 16 is an explanatory plan view of the same, FIG. 17 is an enlarged explanatory view of the intermediate part, and FIG. 18 is an explanatory view of the runner section. 19 is an explanatory front view of the same, FIG. 20 is an explanatory rear view of the binding clutch section, FIG. 21 is an explanatory plan view of the same, and FIG. 22 is an enlarged explanation of the binding clutch operating section [-4, Fig. 23 is an explanatory plan view of the same, Fig. 24 is an explanatory plan view of the door section, Fig. 25 is an enlarged explanatory view of the same part,
Figure 26 is an explanatory diagram of the drive system, Figure 27 is the bale drawer (4
)... Pickup part (10)... Binding device (1
5)... Veil formation chamber (91)...
In (97)... Twine guide (A)... Ba -
Applicant Yanmar Agricultural Machinery Co., Ltd. Seirei Kogyo Co., Ltd. Agent Tadashi Fujiwara 10 1D Kiki II I! ] z 阜 18 dented q7 element tq It ne 227 Hayabusa 23 Kyodai 501 sword A (3)

Claims (1)

【特許請求の範囲】[Claims] ピックアップ部で拾い上げた藁草をベール形成室でロー
ル状のベールに形成すると共に、このベールの外周を結
束装置から供給されるトワインによって結束する構造に
おいて、左右移動時順次ベールの外周にトワインを螺旋
状に巻き付けていくトワイン案内体を備え、前記トワイ
ン案内体を左右移動終端で一時停止させ、ベール左右両
端部のトワインを多重巻きとするように構成したことを
特徴とするロールベーラ。
In this structure, the straw picked up by the pick-up section is formed into a rolled bale in the bale forming chamber, and the outer periphery of this bale is bound by twines supplied from a binding device.As the bale moves left and right, the twines are sequentially spirally wrapped around the outer periphery of the bale. A roll baler comprising a twine guide for winding the bale in a shape, the twine guide being temporarily stopped at the end of left and right movement, and the twine at both left and right ends of the bale are wound multiple times.
JP60007658A 1985-01-18 1985-01-18 Roll bearer Expired - Lifetime JPH072060B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60007658A JPH072060B2 (en) 1985-01-18 1985-01-18 Roll bearer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60007658A JPH072060B2 (en) 1985-01-18 1985-01-18 Roll bearer

Publications (2)

Publication Number Publication Date
JPS61166328A true JPS61166328A (en) 1986-07-28
JPH072060B2 JPH072060B2 (en) 1995-01-18

Family

ID=11671914

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60007658A Expired - Lifetime JPH072060B2 (en) 1985-01-18 1985-01-18 Roll bearer

Country Status (1)

Country Link
JP (1) JPH072060B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60217825A (en) * 1984-04-13 1985-10-31 クレツクナ−−フンボルト−ドイツ・アクチエンゲゼルシヤフト・ツバイヒニ−ダ−ラツスング・フア−ル Roll ball tieing apparatus of agricultural crops

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60217825A (en) * 1984-04-13 1985-10-31 クレツクナ−−フンボルト−ドイツ・アクチエンゲゼルシヤフト・ツバイヒニ−ダ−ラツスング・フア−ル Roll ball tieing apparatus of agricultural crops

Also Published As

Publication number Publication date
JPH072060B2 (en) 1995-01-18

Similar Documents

Publication Publication Date Title
JPS6239970B2 (en)
JPS61166328A (en) Roll baler
JPH051243Y2 (en)
JPH051245Y2 (en)
JPH0420183Y2 (en)
JPS61170316A (en) Roller baler
JPH0454767Y2 (en)
JPH0522049Y2 (en)
JPS61166324A (en) Roll baler
JPS61166325A (en) Roll baler
JPS61166329A (en) Roll baler
JPS61170317A (en) Roller baler
JPS61166321A (en) Roll baler
US5437226A (en) Twine cutter for a round baler
JP2521089B2 (en) Roll-baler baler discharging device
JPS61271920A (en) Bale take-out method of roll baler
JP2947493B2 (en) Self-propelled roll baler
JPS61202630A (en) Roll baler
JPS61268108A (en) Bundling apparatus of roll baler
JPH0742282Y2 (en) Roll baler discharge device
JPH0543649Y2 (en)
JPS63173524A (en) Method for discharging bale of roll baler
JPS61268107A (en) Bundling apparatus of roll baler
JPS63222619A (en) Discharge apparatus of roll baler
JPH0210911Y2 (en)

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term