JPS61112055U - - Google Patents
Info
- Publication number
- JPS61112055U JPS61112055U JP19631384U JP19631384U JPS61112055U JP S61112055 U JPS61112055 U JP S61112055U JP 19631384 U JP19631384 U JP 19631384U JP 19631384 U JP19631384 U JP 19631384U JP S61112055 U JPS61112055 U JP S61112055U
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing material
- steel plate
- view
- band
- expanded metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000012779 reinforcing material Substances 0.000 claims description 13
- 239000002184 metal Substances 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 2
- 238000003780 insertion Methods 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000004567 concrete Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Description
第1図ないし第4図はこの考案の第1実施例を
示すものであつて、第1図はこの考案の杭頭補強
材を示す斜視図、第2図はその平面図、第3図は
帯状部分付きエキスパンドメタルの斜視図、第4
図は補強材ユニツトの斜視図である。第5図は第
1実施例の杭頭補強材をボルトの頭部にセツトし
た状態を示す一部縦断側面図、第6図は杭頭補強
材に対する底板取付部と杭との関係を示す縦断側
面図、第7図は第1実施例の杭頭補強材を鋼管杭
の頭部にセツトした状態を示す側面図である。第
8図はこの考案の第2実施例に係る杭頭補強材を
示す平面図、第9図はこの考案の第3実施例に係
る杭頭補強材を示す斜視図である。第10図ない
し第12図はこの考案の第4実施例を示すもので
あつて、第10図は帯状部分付きエキスパンドメ
タルの斜視図、第11図は補強材ユニツトの斜視
図、第12図はこの考案の杭頭補強材の斜視図で
ある。
図において、1はエキスパンドメタル部分、2
は帯状部分、3は帯状部分付きエキスパンドメタ
ル、4は連結具挿通孔、5は補強材ユニツト、6
および7は連結具、8は杭頭補強材、12はプレ
キヤストコンクリート杭、14は基礎コンクリー
ト、15は鋼管杭である。
Figures 1 to 4 show a first embodiment of this invention, in which Figure 1 is a perspective view showing the pile cap reinforcing material of this invention, Figure 2 is a plan view thereof, and Figure 3 is a Perspective view of expanded metal with strip, 4th
The figure is a perspective view of the reinforcement unit. Fig. 5 is a partially vertical side view showing the pile cap reinforcing material of the first embodiment set on the head of the bolt, and Fig. 6 is a longitudinal cross-sectional view showing the relationship between the bottom plate attachment part and the pile to the pile cap reinforcing material. FIG. 7 is a side view showing a state in which the pile cap reinforcing material of the first embodiment is set on the head of a steel pipe pile. FIG. 8 is a plan view showing a pile cap reinforcing material according to a second embodiment of this invention, and FIG. 9 is a perspective view showing a pile cap reinforcing material according to a third embodiment of this invention. Figures 10 to 12 show a fourth embodiment of this invention, in which Figure 10 is a perspective view of the expanded metal with a band-shaped portion, Figure 11 is a perspective view of the reinforcing material unit, and Figure 12 is a perspective view of the reinforcing material unit. It is a perspective view of the pile cap reinforcing material of this invention. In the figure, 1 is the expanded metal part, 2
is a band-shaped part, 3 is expanded metal with a band-shaped part, 4 is a connector insertion hole, 5 is a reinforcing material unit, 6
7 is a connector, 8 is a pile cap reinforcement, 12 is a precast concrete pile, 14 is a foundation concrete, and 15 is a steel pipe pile.
Claims (1)
成すると共にその鋼板の両側に鋼板非加工による
帯状部分2を設けてなる帯状部分付きエキスパン
ドメタル3が溝形に弯曲され、かつその帯状部分
2に連結具挿通孔4が設けられて、溝形の補強材
ユニツト5が構成され、複数の補強材ユニツト5
が筒体を構成するように接合されると共に連結具
により連結されていることを特徴とする杭頭補強
材。 An expanded metal part 3 with a band-shaped part is formed by forming an expanded metal part 1 in the middle part of a steel plate and providing a band-shaped part 2 made of unprocessed steel plate on both sides of the steel plate. An insertion hole 4 is provided to form a groove-shaped reinforcing material unit 5, and a plurality of reinforcing material units 5 are formed.
A pile cap reinforcing material characterized in that the two are joined to form a cylinder and are connected by a connecting tool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19631384U JPS61112055U (en) | 1984-12-27 | 1984-12-27 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19631384U JPS61112055U (en) | 1984-12-27 | 1984-12-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS61112055U true JPS61112055U (en) | 1986-07-15 |
Family
ID=30754025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19631384U Pending JPS61112055U (en) | 1984-12-27 | 1984-12-27 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61112055U (en) |
-
1984
- 1984-12-27 JP JP19631384U patent/JPS61112055U/ja active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS61112055U (en) | ||
JPS6172160U (en) | ||
JPS639610Y2 (en) | ||
JPH0411816U (en) | ||
JPS6281630U (en) | ||
JPS6361446U (en) | ||
JPH0278698U (en) | ||
JPS59158654U (en) | Connecting fittings for foundation stone masonry in graveyards | |
JPS6193536U (en) | ||
JPH0141791Y2 (en) | ||
JPS6162936U (en) | ||
JPS6281631U (en) | ||
JPS6162998U (en) | ||
JPS6281629U (en) | ||
JPS5833551U (en) | Earthquake-proof and waterproof foundation for machinery using bundles | |
JPS5962078U (en) | Automobile cross member connection structure | |
JPS6275120U (en) | ||
JPS5869617U (en) | Ribbed iron plate for rebar truss assembly for synthetic floor slabs | |
JPS62190797U (en) | ||
JPS63151539U (en) | ||
JPH0289028U (en) | ||
JPH01164332U (en) | ||
JPS6162937U (en) | ||
JPS6255680U (en) | ||
JPS63126500U (en) |