JPS609621B2 JP9904577A JP9904577A JPS609621B2 JP S609621 B2 JPS609621 B2 JP S609621B2 JP 9904577 A JP9904577 A JP 9904577A JP 9904577 A JP9904577 A JP 9904577A JP S609621 B2 JPS609621 B2 JP S609621B2
Authority
JP
Japan
Prior art keywords
columns
column
reinforcing bars
precast concrete
protruding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9904577A
Other languages
Japanese (ja)
Other versions
JPS5433333A (en
Inventor
慎一 向笠
靖 竹本
要七 沼本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP9904577A priority Critical patent/JPS609621B2/en
Publication of JPS5433333A publication Critical patent/JPS5433333A/en
Publication of JPS609621B2 publication Critical patent/JPS609621B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明はプレキャストコンクリート柱の接合方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for joining precast concrete columns.

上下のプレキャストコンクリート柱の接合方法には各種
の継手構造が工夫されて、それなりの効果を奏している
Various joint structures have been devised to connect the upper and lower precast concrete columns, and these have achieved certain effects.

しかしながら、これらの接合構造はいずれのものも、プ
レキヤストコンクリート上柱をプレキヤストコンクリー
ト下柱上に接続するためには、特殊の金物とか、サポー
トもしくは袷具といった複雑な仮受手段を講じなければ
ならない欠点があった。
However, with all of these joint structures, in order to connect the precast concrete upper column to the precast concrete lower column, complicated temporary support methods such as special hardware, supports, or slings must be used. There were some drawbacks.

このようなことから、本発明はプレキヤストコンクリー
ト柱間の接合は上下の鉄筋を重ね継手とし、強固な安定
した構造性能をうると)もに、プレキャストコンクリ−
ト柱の施工を合理的にするべく工夫して創作したもので
ある。以下、本発明を添付の図面の実施例について説明
すれば、1なちびに2はプレキヤストコンクリート下柱
ならびに上桂を示し、3,4,5,6はプレキャストコ
ンクリート下柱より延長突出させた柱主筋の突出鉄筋で
、この突出鉄筋の長さは重ね継ぎに必要な長さとし、こ
のうち特に隅部に位置する突出鉄筋4は雄螺子を刻設し
たものであり、この雄螺子には短尺の雌螺管7を螺合せ
しめたものである。
For this reason, the present invention proposes that the connection between precast concrete columns is made by using a lap joint between the upper and lower reinforcing bars to obtain strong and stable structural performance.
It was devised and created to streamline the construction of the pillars. Hereinafter, the present invention will be described with reference to the embodiments shown in the attached drawings. 1 and 2 indicate a precast concrete lower column and an upper column, and 3, 4, 5, and 6 extend and protrude from the precast concrete lower column. The length of the protruding reinforcing bars of the column main reinforcement is the length required for lap joints, and the protruding reinforcing bars 4 located at the corners in particular have male screws carved into them, and these male screws have short lengths. The female screw tube 7 is screwed together.

8,9,10,11はプレキヤストコンクリ一ト上桂2
の下端面より延長突出せしめた柱主筋の上柱突出鉄筋で
ある。
8, 9, 10, 11 are precast concrete Kamikatsura 2
This is an upper column protruding reinforcing bar that extends and protrudes from the lower end face of the column.

このように構成したプレキャストコンクリート柱を用い
て上下の柱を接合するものであり七次に、この施工過程
について説明すれば、所定の位置及び高さに鉛直方向に
下柱1を建立し、ついで、プレキャストコンクリート上
柱2を上方より降下し、上柱の突出鉄筋が下柱の突出鉄
筋にそれぞれ相し、隣接するように降下し「上柱の下底
面を下柱の突出鉄筋上に薮暦する。
The precast concrete columns constructed in this way are used to connect the upper and lower columns.The construction process is explained below by erecting the lower column 1 vertically at a predetermined position and height. , the precast concrete upper column 2 is lowered from above, and the protruding reinforcing bars of the upper column meet and adjoin the protruding reinforcing bars of the lower column. do.

しかるのち、隅部に位置する突出鉄筋4に螺合した短尺
の雌螺管7の螺入具合を調節して、プレキャストコンク
リート上柱の高さを調節すると)もに、同時に上柱の鉛
直性をも調整する。
After that, when the height of the precast concrete upper column is adjusted by adjusting the screwing degree of the short female screw pipe 7 screwed into the protruding reinforcing bar 4 located at the corner, the verticality of the upper column is also adjusted at the same time. Also adjust.

次に、梁の主筋ならびに柱の灘断補強筋を配してのち、
所要の型枠を組んでt この接合部分にコンクリートを
打設して、硬化をまって上下のプレキャストコンクリー
ト柱は完成されるものである。
Next, after placing the main reinforcement for the beam and the reinforcement reinforcement for the column,
After assembling the required formwork, concrete is poured into this joint, and after it has hardened, the upper and lower precast concrete columns are completed.

なお、実施例では下柱の突出鉄筋に短尺の雌螺管を螺合
した場合について記述したが、もう一つの発明は、下柱
の上端面上に柱主筋を延長して突出鉄筋を設けた下柱の
柱主筋上に、下端面より柱主筋を延長して突出鉄筋を設
け、隅部に位置する突出鉄筋は雄螺子を刻設し、この雄
螺子に短尺の雌螺管を螺合した上柱を降下して、それぞ
れの上下柱の突出鉄筋を相し、隣接せしめ、上柱の高さ
ならびに鉛直性を短尺の雌螺管で調整し、以後はさきと
同様の施工過程によってプレキャストコンクリート柱を
完成させる方法である。本発明になるプレキヤストコン
クリート柱の接合方法は上記のような過程により施工さ
れるので、上柱の高さ調整ならびに鉛直性の調整は短尺
の雌螺管7の螺入具合によって調整されるので、その調
整動作は微細で、かつ、円滑であり、接合強度は重ね継
手による接合であるので確実で、そのうえ強固である効
果を奏する。また「本工法によると、従来欠点とされて
いた接合部の仮受手段である、特殊金物、サポートもし
くは治具等を用いることなく施工中の振動によるずれ、
動きなどを防止でき、確実にしかも簡単に施工できる。
In addition, in the example, a case was described in which a short female spiral pipe was screwed to the protruding reinforcing bar of the lower column, but in another invention, a protruding reinforcing bar was provided by extending the column main bar on the upper end surface of the lower column. A protruding reinforcing bar was installed on the column main bar of the lower column by extending the column main bar from the lower end face, and a male screw was carved into the protruding reinforcing bar located at the corner, and a short female screw pipe was screwed to this male screw. The upper columns are lowered, the protruding reinforcing bars of the upper and lower columns are aligned and adjoined, the height and verticality of the upper columns are adjusted using short female spiral pipes, and the precast concrete is then constructed using the same construction process as before. This is the way to complete the pillar. Since the method of joining precast concrete columns according to the present invention is carried out by the process described above, the height adjustment and verticality of the upper column are adjusted by the degree of screwing of the short female screw pipe 7. The adjustment operation is minute and smooth, and the joining strength is reliable because it is joined by a lap joint, and it is also strong. In addition, ``This construction method eliminates the need for special hardware, supports, or jigs to temporarily hold joints, which has been considered a drawback in the past, and eliminates misalignment due to vibration during construction.
It can prevent movement, etc., and can be installed reliably and easily.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明になるプレキャスト柱の接合方法を説明す
るもので、第1図は側面図、第2図は第1図A部の拡大
断面図「第3図は第2図のB−B断面図を示す。 1……プレキャストコンクリート下柱、2…・・・プレ
キヤストコンクリート上柱、3,4,5,6・・…・下
柱の柱主筋の突出鉄筋、4……雄螺子を刻設した突出鉄
筋、7・・・・・・短尺の雌螺管、8,9,10,11
……上柱の社主筋の突出鉄筋。 舟1図 舟2図 瀞3図
The drawings are for explaining the method of joining precast columns according to the present invention. Fig. 1 is a side view, Fig. 2 is an enlarged sectional view of section A in Fig. The figure shows: 1... Precast concrete lower column, 2... Precast concrete upper column, 3, 4, 5, 6... Protruding reinforcing bars of the main column reinforcement of the lower column, 4... Male screws carved. Protruding reinforcing bars installed, 7...Short female spiral pipes, 8, 9, 10, 11
...Protruding reinforcing bars of the main pillar of the upper column. Boat 1 figure Boat 2 figure 3 figure

Claims (1)

【特許請求の範囲】 1 上下のプレキヤストコンクリート柱の端面より延長
突出させた主鉄筋で、上下柱を連結する接合方法におい
て、下柱の上端面上に柱主筋を延長して突出鉄筋を設け
、隅部に位置する突出鉄筋は雄螺子を刻設し、この雄螺
子に短尺の雌螺管を螺合した下柱の柱主筋上に、下端面
より柱主筋を延長して突出鉄筋を設けた上柱を降下して
、それぞれの上下の柱の突出鉄筋を相い隣接せしめ、上
柱の高さならびに鉛直性を短尺の雌螺管で調整したのち
、所要の鉄筋を配し、型枠を組んで、コンクリートを打
設することを特徴とするプレキヤストコンクリート柱の
接合方法。 2 上下のプレキヤストコンクリート柱の端面より延長
突出させた主鉄筋で、上下柱を連結する接合方法におい
て、下柱の上端面上に柱主筋を延長して突出鉄筋を設け
た下柱の柱主筋上に、下端面より柱主筋を延長して突出
鉄筋を設け、隅部に位置する突出鉄筋は雄螺子を刻設し
、この雄螺子に短尺の雌螺管を螺合した上柱を降下して
、それぞれの上下の柱の突出鉄筋を相い隣接せしめ、上
柱の高さならびに鉛直性を短尺の雌螺管で調整したのち
、所要の鉄筋を配し、型枠を組んで、コンクリートを打
設することを特徴とするプレキヤストコンクリート柱の
接合方法。
[Scope of Claims] 1. In a joining method for connecting upper and lower columns with main reinforcing bars extending and protruding from the end faces of upper and lower precast concrete columns, a protruding reinforcing bar is provided by extending the column main reinforcing bars on the upper end faces of the lower columns. The protruding reinforcing bars located at the corners are provided with male threads, and the protruding reinforcing bars are installed on the main column bars of the lower column with short female threaded pipes screwed onto these male threads by extending the column main bars from the lower end surface. After lowering the upper column and aligning the protruding reinforcing bars of the upper and lower columns adjacent to each other, adjusting the height and verticality of the upper column using short female spiral pipes, placing the required reinforcing bars and building the formwork. A method for joining precast concrete columns, which is characterized by assembling and pouring concrete. 2 Main reinforcing bars of lower columns that extend and protrude from the end faces of the upper and lower precast concrete columns, and in the connection method that connects the upper and lower columns, the main reinforcing bars of the lower columns are extended and protruded from the upper end faces of the lower columns. At the top, a protruding reinforcing bar is provided by extending the column main reinforcement from the lower end face, and the protruding reinforcing bar located at the corner has a male thread cut into it, and the upper column with a short female threaded pipe screwed into this male thread is lowered. Then, the protruding reinforcing bars of the upper and lower columns are placed adjacent to each other, and the height and verticality of the upper columns are adjusted using short female spiral pipes.Then, the required reinforcing bars are placed, the formwork is constructed, and the concrete is poured. A method for joining precast concrete columns characterized by pouring.
JP9904577A 1977-08-18 1977-08-18 How to join precast concrete columns Expired JPS609621B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9904577A JPS609621B2 (en) 1977-08-18 1977-08-18 How to join precast concrete columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9904577A JPS609621B2 (en) 1977-08-18 1977-08-18 How to join precast concrete columns

Publications (2)

Publication Number Publication Date
JPS5433333A JPS5433333A (en) 1979-03-12
JPS609621B2 true JPS609621B2 (en) 1985-03-12

Family

ID=14236534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9904577A Expired JPS609621B2 (en) 1977-08-18 1977-08-18 How to join precast concrete columns

Country Status (1)

Country Link
JP (1) JPS609621B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63114902U (en) * 1987-01-19 1988-07-25

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6044105B2 (en) * 2012-04-24 2016-12-14 株式会社大林組 Construction method of concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63114902U (en) * 1987-01-19 1988-07-25

Also Published As

Publication number Publication date
JPS5433333A (en) 1979-03-12

Similar Documents

Publication Publication Date Title
JP2008502822A (en) Architectural elements and construction methods
US3999735A (en) Concrete pouring forms for uniting building units
JPS6047140A (en) Steel plate concrete structure
JPS609621B2 (en) How to join precast concrete columns
JP2600961B2 (en) Connection structure between reinforced concrete columns and steel beams
JPS59192145A (en) Fixing of iron pillar
JP2981691B2 (en) Joint method and joint structure of box-shaped column in steel frame construction
JPH0217049Y2 (en)
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
JPH0453223B2 (en)
JPH04353135A (en) Joint of precast reinforced concrete construction
JPH11141055A (en) Method of jointing slab reinforcement and beam main reinforcement to core wall
JPH04371635A (en) Connection of floorslab and post
JPS5939581B2 (en) How to join precast concrete columns
JPH01137032A (en) Method of lap joint construction of main reinforcement in post and beam joining section
JPH0371535B2 (en)
JPH0123614B2 (en)
JPH07247557A (en) Foundation, column mold, and underground beam made of precast reinforced concrete
JP2585064Y2 (en) Anchor bolt and sheath tube positioning jig for foundation
JP2831514B2 (en) Joining method for hollow PC members on upper and lower floors
JPH0130482Y2 (en)
JPH028467A (en) Fixed structure of concrete plate
JPH0234353Y2 (en)
JPS58204258A (en) Pc member
JPS649426B2 (en)