JPS609412B2 - Demand power monitoring device - Google Patents

Demand power monitoring device

Info

Publication number
JPS609412B2
JPS609412B2 JP54000477A JP47779A JPS609412B2 JP S609412 B2 JPS609412 B2 JP S609412B2 JP 54000477 A JP54000477 A JP 54000477A JP 47779 A JP47779 A JP 47779A JP S609412 B2 JPS609412 B2 JP S609412B2
Authority
JP
Japan
Prior art keywords
power
demand
time
predicted
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54000477A
Other languages
Japanese (ja)
Other versions
JPS5592535A (en
Inventor
汪 石川
功 阿久津
博久 水原
祥三 北村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Mitsubishi Electric Corp filed Critical Tokyo Electric Power Co Inc
Priority to JP54000477A priority Critical patent/JPS609412B2/en
Publication of JPS5592535A publication Critical patent/JPS5592535A/en
Publication of JPS609412B2 publication Critical patent/JPS609412B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Description

【発明の詳細な説明】 本発明は需要電力が契約電力を超過しないようにある時
点でいくらの電力を軽減すれば良いかを表示し、かつ超
過するおそれのある場合は警報信号を発生する需要電力
監視装置に関するものである。
[Detailed Description of the Invention] The present invention displays how much power needs to be reduced at a certain point so that the demand power does not exceed the contract power, and generates an alarm signal if there is a risk of the power demand exceeding the contract power. This invention relates to a power monitoring device.

一般に需要電力が契約電力を通過するとその超過分に対
して割高な違約金を支払わねばならないため、需要電力
が契約電力を超過するおそれがある場合は禾然にそれを
知り超過を防止する必要がある。
Generally, if the demand power passes the contract power, you will have to pay a relatively high penalty fee for the excess amount, so if there is a risk that the demand power will exceed the contract power, it is necessary to be aware of it and prevent the excess. be.

このために発信装置付電力量計の発信パルスを計数し、
現時点の需要電力および一定時間における需要電力の増
加量、需要時限の残り時間から予測需要電力を算出し、
この値と目標需要電力の差を前記需要時限の残り時間で
除算して調整電力を算出し、これを表示する需要電力監
視装贋があった。さらにこの調整電力に対し警報値を設
定し前記調整電力が警報値を超過すると警報を発生し、
負荷制御を行なうことを知らせる警報付装置もあった。
しかるにこれらの従来の装置によれば警報発生と同時に
負荷を遮断しないと需要電力が契約電力を超過するおそ
れがあるために需要電力が異常に増加したりあるいは警
報を発生した場合は直ちに負荷遮断をすることができる
よう需要電力の監視者は常時待機状態にあらねばならな
かった。
For this purpose, the emitted pulses of the electricity meter with a transmitter are counted,
Calculate the predicted power demand from the current power demand, the amount of increase in the power demand over a certain period of time, and the remaining time of the demand period,
There has been a power demand monitoring system that calculates the adjusted power by dividing the difference between this value and the target power demand by the remaining time of the demand time limit and displays this. Furthermore, an alarm value is set for this regulated power, and when the regulated power exceeds the alarm value, an alarm is generated,
There were also devices with alarms to notify when load control was to be carried out.
However, with these conventional devices, if the power demand is not cut off at the same time as the alarm occurs, there is a risk that the power demand will exceed the contract power, so if the power demand increases abnormally or an alarm is generated, the load should be cut off immediately. The power demand monitor had to be on standby at all times so that the power demand could be monitored.

そのために監視者は食事や用便などにも時間的制約を受
けることが多く、常時緊張状態にあることを要求される
ためにその精神的、肉体的疲労ははかりしれないものが
あった。本発明はかかる点に鑑みてなされたものであっ
て、現時点からある一定時間後における調整電力を予測
演算し、これを表示すると共に警報を発生することによ
り需要電力監視者に対し調整電力の将来における値を知
らせることにより負荷制御の目安をあらかじめ立てられ
ることができる装置を提供することを目的とする。
As a result, supervisors were often subject to time constraints on things such as eating and using the toilet, and were required to be in a constant state of tension, causing immeasurable mental and physical fatigue. The present invention has been made in view of this point, and it predicts and calculates the regulated power after a certain period of time from the present time, displays this and generates an alarm, thereby informing the demand power monitor of the future of regulated power. An object of the present invention is to provide a device that can set a guideline for load control in advance by informing the value of .

以下本発明の一実施例を図面にもとづき説明する。An embodiment of the present invention will be described below based on the drawings.

第1図は本発明により予測調整電力を算出する原理を示
すタイムチャートである。
FIG. 1 is a time chart showing the principle of calculating predicted adjusted power according to the present invention.

本図において機軸は時間で需要時限をT、需要時限の経
過時間をtとする。縦軸は需要電力でQ,は目標需要電
力例えば契約電力であり、Pは経過時間tにおける需要
電力、すなわち現在需要電力である。また原点○から点
Aを結ぶ曲線は需要電力の増加曲線である。さて経過時
間tにおいて、それよりさかのぼって一定時間△tをと
り、その時間内における需要電力の増分を△Pとする。
In this figure, the key axis is time, where the demand time limit is T and the elapsed time of the demand time limit is t. The vertical axis is the power demand, Q is the target power demand, for example, the contract power, and P is the power demand at the elapsed time t, that is, the current power demand. Further, the curve connecting the origin ○ to the point A is an increase curve of power demand. Now, at the elapsed time t, a certain time Δt is taken retroactively from that time, and the increase in the demand power within that time is set as ΔP.

ここで△P/△tなる演算をすれば需要電力の増加率が
求まり「 この値に需要電力の残り時間を秦算し「現在
需要電力の値を加算すると需要電力の予測値、すなわち
予測需要電力が求められる。この値をRとお仇ま次式で
表わされる。R=P+巽(T−t)・・.・・・(1)
この値は第1図において点Aから伸びる破線と需要時限
Tから縦軸に平行に延ばす直線との交点Rであらわされ
る。
Here, by calculating △P/△t, the rate of increase in power demand can be found. Adding the remaining time of power demand to this value and adding the value of current power demand yields the predicted value of power demand, that is, the predicted demand. The electric power is calculated. This value is expressed as R by the following formula: R = P + Tatsumi (T-t) (1)
This value is represented by the intersection R of the broken line extending from point A and the straight line extending parallel to the vertical axis from the demand time limit T in FIG.

次に予測需要電力Rと目標需要電力Q,との差を残り時
間T−tで除算した値に、需要時限の値を乗算すると現
時点における調整電力が求められる。
Next, by multiplying the value obtained by dividing the difference between the predicted power demand R and the target power demand Q by the remaining time Tt by the value of the demand time limit, the adjusted power at the present time is obtained.

この調整電力をUとすれば次式のようにあらわされる。
U=T章三事‐‐‐‐‐‐■ 調整電力とは第1図によれば点Aを通り縦軸に平行な直
線を引き、これがQ,に達する点Bをとり、この点Bと
Rを結ぶ直線の傾きを示すものである。
If this adjusted power is U, it can be expressed as follows.
U = T Chapter Three - - - - ■ What is regulated power? According to Figure 1, draw a straight line parallel to the vertical axis through point A, take point B where it reaches Q, and draw this point B. It shows the slope of the straight line connecting R.

すなわち需要電力の超過分R−Q.を低減するために残
に時間T−tの間にどれだけの負荷を制御すればよいか
を示す量である。これは需要電力の超過分を電力量に換
算すると(R−Q.)/帯斜となり・残り時間T−t(
分)を時間に換算すると縞辰妻茨護持であるから、よっ
て調整電力は、U=義手事ノT家t−圭三弓1T となる。
In other words, the excess amount of power demand R−Q. This is the amount that indicates how much load should be controlled during the remaining time Tt in order to reduce the This means that when the excess amount of power demand is converted into electric energy, it becomes (R-Q.)/band slope・Remaining time T-t(
Minutes) is converted into hours, so the adjusted power is U = Prosthetic Techniques T - Kei Miyumi 1T.

第1図において角度二R8Q,をの,とおけば‘2}式
はさらに次式のように表現できる。
In FIG. 1, if the angle 2R8Q is set as , then the '2} equation can be further expressed as the following equation.

U:T章三手=Ttahの・‐‐‐‐‐‐‘3}すなわ
ち、調整電力とは需要電力の超過予測値夕(R−Q,)
と残り時間(T−t)でつくられる三角形の正俊を需要
時限倍した値で、図中では直線BRの傾きである。
U: T Chapter 3 = Ttah's・-----'3} In other words, adjusted power is the predicted excess value of demand power (R-Q,)
It is the value obtained by multiplying the demand time by the triangular Masatoshi created by the remaining time (T-t) and the remaining time (Tt), and is the slope of the straight line BR in the figure.

この考えをもとにして現時点からさらにある一定時間後
の調整電力を求めることができる。
Based on this idea, it is possible to obtain the adjusted power after a certain period of time from the current point.

すなわち経過時間tよりさらに△t後の時間をt+△t
とし、縦軸に平行な直線を引いて目標需要電力Q,に達
する点をCとすれば直角三角形△CQ,Rがつくられる
。この三角形において角度くRCQ,をの2とすればこ
の時点における調整電力URは次式となる。UR=TT
卓岸ききt):Ttanの2…‐‐‐{4}(4’式が
t十△tにおいて達する予測調整電力である。
In other words, the time △t after the elapsed time t is t + △t
If a straight line parallel to the vertical axis is drawn and the point where the target power demand Q is reached is C, a right triangle ΔCQ,R is created. If the angle RCQ in this triangle is 2, then the adjusted power UR at this point is expressed as follows. UR=TT
t): Ttan's 2...--{4} (Equation 4' is the predicted adjusted power reached at t+Δt.

本発明は{4)式で表わされる予測調整電力を算出し表
示すると共に、これが所定の警報値をこえたとき警報を
発生するものであって、その一実施例を第2図により説
明する。
The present invention calculates and displays the predicted adjusted power expressed by equation {4), and generates an alarm when the predicted adjusted power exceeds a predetermined alarm value.One embodiment thereof will be described with reference to FIG.

図において、1は使用電力量に比例したパルス数を発信
する発信装置付電力量計である。2は前記発信装置付電
力量計1の発信パルスを計数する現在需要電力カウンタ
であり、時計部4の信号により需要時限T毎にリセット
される。
In the figure, reference numeral 1 denotes a power meter with a transmitter that transmits a number of pulses proportional to the amount of power used. Reference numeral 2 denotes a current demand power counter that counts the transmitted pulses of the electricity meter 1 with a transmitting device, and is reset every demand time period T by a signal from the clock section 4.

3は需要電力増分力ウンタで、一定時間△tの間のパル
スを計数し、時計部4からの信号により一定時間△t毎
にリセットされる。
Reference numeral 3 denotes a demand power incremental force counter that counts pulses during a certain period of time Δt, and is reset every certain period of time Δt by a signal from the clock section 4.

4は時計部であって、需要時限Tおよび一定時間tを計
測し、各時間間隔で前記2つのカゥンタをリセツトする
信号を出力する。
Reference numeral 4 denotes a clock unit that measures the demand time limit T and the fixed time t, and outputs a signal for resetting the two counters at each time interval.

5は残り時間カウンタで、前記時計部4からの基準信号
により需要時限の残り時間T−tを計測する。
A remaining time counter 5 measures the remaining time Tt of the demand time limit based on the reference signal from the clock section 4.

6は第一の演算回路で、上誌1)式の予測需要電力Rを
現在需要電力カウンタ2、需要電力増分力ウンタ3およ
び残り時間カウンタ5の出力コード信号と一定時間△t
の値により演算する。
Reference numeral 6 denotes a first arithmetic circuit, which calculates the predicted power demand R from the above formula 1) and the output code signals of the current demand power counter 2, the demand power incremental power counter 3, and the remaining time counter 5 and a fixed time Δt.
Calculate based on the value of.

7は目標需要電力設定器で、目標とする需要電力、例え
ば契約電力を手動で設定する。
Reference numeral 7 denotes a target power demand setting device for manually setting a target power demand, for example, contract power.

8は第二の演算回路で、前記第一の演算回路6、目標需
要電力設定器7および残り時間カウンタ5の出力コード
信号と需要電力時限Tの値により上記{4’式であらわ
される予測調整電力URを演算する。
Reference numeral 8 denotes a second arithmetic circuit, which performs predictive adjustment expressed by the above equation {4' based on the output code signals of the first arithmetic circuit 6, the target power demand setter 7, and the remaining time counter 5, and the value of the demand power time limit T. Calculate power UR.

9は表示器で、前記第この演算回路の出力、すなわち予
測調整電力を表示する。
Reference numeral 9 denotes a display for displaying the output of the arithmetic circuit, that is, the predicted adjusted power.

1川ま警報設定器で、予測調整電力に対する警報値を設
定するものである。
This is the alarm setting device for setting the alarm value for the predicted adjusted power.

12は前記警報値と予測調整電力とを比較する比較回路
で、前者を後者が超過すると警報出力を発生し警報回路
12を動作させ監視者の注意を換起する。
Reference numeral 12 denotes a comparison circuit that compares the alarm value with the predicted adjusted power, and when the latter exceeds the former, an alarm output is generated and the alarm circuit 12 is activated to draw the attention of the supervisor.

なお、第一及び第二の演算回路6,8は汎用ICを使用
して構成できるが、例えばマイクロコンピュータを使用
すればこれにおきかえることが可能であり、回路構成を
極めて簡単にすることができる。
Note that the first and second arithmetic circuits 6 and 8 can be configured using general-purpose ICs, but they can be replaced by using, for example, a microcomputer, and the circuit configuration can be extremely simplified. .

また需要電力の増分△Pを計測する一定時間を可変しう
るよう設定器を設けることも可能である。本発明は以上
のようにある一定時限後における予測調整電力を表示す
ると共に、これが所定の警報値をこえると警報を発生す
るように構成されているために、従来装置のように監視
者に無用の束縛や緊張感を与えることなく、適切にして
かつ円滑な需要電力の監視を行なえる利点があり、エネ
ルギー危機から電力の合理的使用の必要性が要請されて
いる昨今の状勢に鑑みれば本発明の果す効果は極めて顕
著である。
Further, it is also possible to provide a setting device so that the fixed time for measuring the increment ΔP of the power demand can be varied. As described above, the present invention is configured to display the predicted adjusted power after a certain period of time and to issue an alarm when this exceeds a predetermined alarm value, so it is useless to the supervisor unlike conventional devices. It has the advantage of being able to appropriately and smoothly monitor power demand without being constrained or creating a sense of tension. The effects of the invention are extremely remarkable.

【図面の簡単な説明】 第1図は本発明の動作原理を説明するタイムチャートで
ある。 第2図は本発明の一実施例を示すフロック図である。図
中1は発信装置付電力量計、2は現在需要電力カウンタ
、3は需要電力増分力ウンタ、4は時計部、5は残り時
間カウンタ、6は第一の演算回路、7は目標需要電力設
定器、8は第二の演算回路、9は表示器、10は警報設
定器、11は比較回路、12は警報回路である。なか図
中同一符号は同一または相当部分を示す。第1図 第2図
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a time chart illustrating the operating principle of the present invention. FIG. 2 is a block diagram showing one embodiment of the present invention. In the figure, 1 is a power meter with a transmitter, 2 is a current demand power counter, 3 is a demand power incremental power counter, 4 is a clock section, 5 is a remaining time counter, 6 is a first calculation circuit, and 7 is a target power demand 8 is a second arithmetic circuit, 9 is a display, 10 is an alarm setting device, 11 is a comparison circuit, and 12 is an alarm circuit. The same reference numerals in the figures indicate the same or corresponding parts. Figure 1 Figure 2

Claims (1)

【特許請求の範囲】[Claims] 1 発信装置付電力量計の発信パルスを計数する第1の
手段と、この第1の手段の出力である計数値と一定時間
における前記計数値の増分と需要時限の残り時間とから
予測需要電力を求める第2の手段と、前記予測需要電力
と目標需要電力との差をある一定時間後における需要時
限の残り時間で除算しかつこの除算値に需要時限を乗算
して予測調整電力を求める第3の手段と、前記予測調整
電力を表示する第4の手段と、前記予測調整電力が所定
の警報値を超過すると警報を発生する第5の手段とを備
えたことを特徴とする需要電力監視装置。
1. A first means for counting the transmitted pulses of a power consumption meter with a transmitting device, and a predicted power demand based on the count value which is the output of this first means, the increment of said count value over a certain period of time, and the remaining time of the demand time period. and a second means for calculating the predicted adjusted power by dividing the difference between the predicted power demand and the target power demand by the remaining time of the demand time limit after a certain period of time, and multiplying this division value by the demand time limit. 3, a fourth means for displaying the predicted adjusted power, and a fifth means for generating an alarm when the predicted adjusted power exceeds a predetermined alarm value. Device.
JP54000477A 1979-01-05 1979-01-05 Demand power monitoring device Expired JPS609412B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP54000477A JPS609412B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP54000477A JPS609412B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Publications (2)

Publication Number Publication Date
JPS5592535A JPS5592535A (en) 1980-07-14
JPS609412B2 true JPS609412B2 (en) 1985-03-09

Family

ID=11474851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54000477A Expired JPS609412B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Country Status (1)

Country Link
JP (1) JPS609412B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0253168U (en) * 1988-10-08 1990-04-17

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0253168U (en) * 1988-10-08 1990-04-17

Also Published As

Publication number Publication date
JPS5592535A (en) 1980-07-14

Similar Documents

Publication Publication Date Title
EP0317571A1 (en) Transformer life consumption indicator.
JPS609412B2 (en) Demand power monitoring device
EP3256881B1 (en) Method of detecting and outputting radiation dose rate information
US4199817A (en) Digital averager
JPH11206015A (en) Method and apparatus for monitoring demand
JPS5944856B2 (en) Demand power monitoring device
KR830000688Y1 (en) Demand controller
JPH03120475A (en) Demand control device
JPS5939804Y2 (en) Demand control device
GB1512407A (en) Apparatus for monitoring the consumption of electricity
US4277308A (en) Count-doubling time safety circuit
JPS5944855B2 (en) Demand power control device
JPS63240326A (en) Power demand monitor
JPS5944857B2 (en) Demand power monitoring device
JPS63240325A (en) Power demand monitor
JPS6118770B2 (en)
JPH05111159A (en) Demand controller
JPH0365023A (en) Demand controller
JP2013072675A (en) Radiation monitor
JPS6016131A (en) Demand power monitor controller
JPH04140021A (en) Power demand monitor
JPS5960273A (en) Monitoring of radiation
JPS58223776A (en) Radiation monitoring device
JPS60125123A (en) Demand power monitor
JPS5826442A (en) Controller for life of counter tube