JPS609181B2 - Assembly method of reinforcing bars in cast-in-place reinforced concrete construction - Google Patents
Assembly method of reinforcing bars in cast-in-place reinforced concrete constructionInfo
- Publication number
- JPS609181B2 JPS609181B2 JP16780979A JP16780979A JPS609181B2 JP S609181 B2 JPS609181 B2 JP S609181B2 JP 16780979 A JP16780979 A JP 16780979A JP 16780979 A JP16780979 A JP 16780979A JP S609181 B2 JPS609181 B2 JP S609181B2
- Authority
- JP
- Japan
- Prior art keywords
- wall
- reinforcing bar
- cast
- reinforced concrete
- bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Description
【発明の詳細な説明】
この発明は場所打壁式鉄筋コンクリート造における鉄筋
の組立工法に関するもので、現場施工の簡略化、施工精
度の向上、工費低減等を目的とし、主として中高層建築
物の施工に利用する。[Detailed Description of the Invention] This invention relates to a method for assembling reinforcing bars in cast-in-place reinforced concrete construction, and is aimed at simplifying on-site construction, improving construction accuracy, and reducing construction costs, and is mainly used for construction of mid-to-high-rise buildings. Make use of it.
従釆中高層建築物の施工においては現場で配筋を行ない
コンクリートを打設する場所打ちの方法やプレハブのパ
ネルを使用する方法等が採用されている。しかし現場で
の配筋作業は非常に手間がかかり、またパネルを使用す
る場合もパネルどうしの接合方法を工夫しなければなら
ない等、両者とも経済性あるいは設計において必ずしも
合理的でない場合があり、施工が容易でかつ耐力の面で
もより優れた方法が要望されている。この発明の場所打
撃式鉄筋コンクリート造における鉄筋の組立工法は上述
のような事情から発明されたもので、以下図示した実施
例に基づいて説明する。In the construction of medium- and high-rise buildings, methods such as the cast-in-place method, in which reinforcement is arranged and concrete is poured on-site, and the method of using prefabricated panels, etc., are adopted. However, reinforcing work on site is very time-consuming, and when using panels, it is necessary to devise a method for joining the panels together, which may not necessarily be economical or reasonable in terms of design. There is a need for a method that is easier to perform and has better yield strength. The method of assembling reinforcing bars in a hammer-in-place type reinforced concrete construction according to the present invention was invented in view of the above-mentioned circumstances, and will be explained below based on the illustrated embodiments.
第1図ははり間方向の耐力壁Aと桁行方向の壁柱Bとの
接合における配筋の横断面を示し、また第2図はその上
方に位置する壁梁C部分での横断面を示している。Figure 1 shows a cross section of reinforcement at the connection between load-bearing wall A in the beam direction and wall column B in the column direction, and Figure 2 shows a cross section at the wall beam C located above it. ing.
なお壁柱Bは壁状に形成された細長い長方形断面を有す
る柱部材であり、やはり壁状に形成された梁部材である
壁梁Cとともに壁式ラーメンを形成し、全体として壁構
造による鉄筋コンクリート造を与える。図中1は鉄筋格
子を示し、縦筋2と横筋3を予め溶接その他によりメッ
シュ状に組んで形成してある。The wall pillar B is a column member formed in the shape of a wall and has an elongated rectangular cross section, and together with the wall beam C, which is also a beam member formed in the shape of a wall, forms a wall-type rigid frame, and the entire wall structure is made of reinforced concrete. give. In the figure, reference numeral 1 indicates a reinforcing bar grid, in which vertical bars 2 and horizontal bars 3 are assembled in advance into a mesh shape by welding or other means.
耐力壁Aおよび壁柱Bはこの鉄筋格子1を二板向い合わ
せて配置して鉄筋館を形成する。このとき肇柱Bの端部
は第1図に示すようにコ字状に形成した小口塞ぎ筋4に
より結合する。また耐力壁Aと壁柱Bとの取合部につい
てはへャピン形の定着筋5または棒状のジョイント筋6
を使用して耐力壁Aと壁柱Bの定着を行なう。すなわち
、耐力壁Aと壁柱BがT字状に交差する箇所においては
へャピン形の定着筋5を壁柱Bを貫通させて耐力壁Aの
横筋3と結合し、また十字状に交差する箇所においては
棒状のジョイント筋6により耐力壁Aどうしの横筋3を
結合して壁柱Bを貫通させて定着を行なっている。なお
壁柱Bの鉄筋格子1の縦筋2は泰象応、力に対処するた
め端部で密に配し、中央部では広い間隔をとっている。
また壁梁Cの配筋は予め工場あるし、はャ一日こおいて
製作した梁主筋8および梁スターラップ9からなるプレ
ハブの鉄筋龍7を利用する。The load-bearing wall A and the wall pillar B form a reinforcing bar building by arranging two reinforcing bar grids 1 facing each other. At this time, the ends of the armrest B are connected by a fore closing muscle 4 formed in a U-shape as shown in FIG. In addition, for the joint between the load-bearing wall A and the wall pillar B, a hairpin-shaped anchoring bar 5 or a bar-shaped joint bar 6 is used.
Fix the load-bearing wall A and wall pillar B using. That is, at the location where the load-bearing wall A and the wall pillar B intersect in a T-shape, the pin-shaped anchoring bars 5 pass through the wall pillar B and connect with the horizontal reinforcements 3 of the load-bearing wall A, and also intersect in a cross shape. At certain locations, the transverse reinforcements 3 of the load-bearing walls A are connected by rod-shaped joint reinforcements 6, and the wall pillars B are penetrated to achieve fixation. The vertical bars 2 of the reinforcing bar lattice 1 of the wall pillar B are densely arranged at the ends to cope with stress and force, and are spaced widely in the center.
Further, the reinforcement for the wall beam C is already prepared in the factory, and a prefabricated reinforcing bar 7 consisting of the beam main reinforcement 8 and the beam stirrup 9, which were manufactured after one day, is used.
このプレハブ鉄筋龍7の長さは1スパンすなわち隣り合
う壁柱B間の長さとし、両端に所要の定着長を設けてお
く。なおこの定着長が不足する場合は梁主筋8の端部に
フックを設けて補うこともできる。また壁梁Cの断面は
縦長となるため必要に応じ腹筋10等を設け形状を保つ
ようにする。第3図は上述のように隣り合う壁柱B間に
壁梁Cのプレハブ鉄筋館7を蓬込んだ状態を示したもの
である。The length of this prefabricated reinforcing bar dragon 7 is one span, that is, the length between adjacent wall pillars B, and a required anchoring length is provided at both ends. If this anchoring length is insufficient, it can be compensated for by providing hooks at the ends of the main beam reinforcements 8. Further, since the cross section of the wall beam C is vertically elongated, abdominal muscles 10 or the like are provided as necessary to maintain the shape. FIG. 3 shows a state in which the prefabricated reinforcing bars 7 of wall beams C are hung between adjacent wall pillars B as described above.
次にこの発明の方法を使用した建築物の施工手順につい
て説明すると、まず壁柱Bおよび耐力壁Aの鉄筋格子1
を蓬込み、小口塞ぎ筋4、定着筋5、ジョイント筋6お
よび適宜幅止め筋を取り付ける。Next, to explain the construction procedure of a building using the method of this invention, first, the reinforcing bar grid 1 of wall pillar B and load-bearing wall A
Then, attach the edge closing bars 4, fixing bars 5, joint bars 6, and width stop bars as appropriate.
続いて予め組み立てられた壁梁Cのプレハブ鉄筋館7を
各スパンごと壁柱の上部に取り付ける。その後壁型枠、
床型枠を建込み、床の配筋を行なってコンクリートを打
設する。なおこの床の配筋も前述の鉄筋格子1を使用し
て行ない、コンクリートの強度発現後は型枠を脱型して
上階の施工に移る。この発明は以上の構成からなり、壁
柱および耐力壁の配筋作業が鉄筋格子を利用することに
より合理化、省力化され、また壁梁の配筋についてもス
パンごとのプレハブ鉄筋龍を使用することにより各部材
の取合部の構造も単純となり、迅速かつ精度の高い施工
が可能である。Subsequently, the prefabricated reinforcing bars 7 of the wall beams C, which have been assembled in advance, are attached to the tops of the wall pillars for each span. Then the wall formwork,
The floor formwork is erected, floor reinforcement is arranged, and concrete is poured. The reinforcement for this floor is also arranged using the above-mentioned reinforcing bar grid 1, and after the concrete has developed its strength, the formwork is removed and construction begins on the upper floor. This invention has the above-mentioned configuration, and the reinforcement work for wall columns and load-bearing walls is streamlined and labor-saving by using a reinforcing bar grid, and prefabricated reinforcing bars for each span are also used for reinforcing wall beams. This simplifies the structure of the connecting parts of each member, allowing for quick and highly accurate construction.
図面はこの発明の実施例を示したもので、第1図は耐力
壁と壁柱との接合における配筋の横断面図、第2図はそ
の上方の壁梁位置における横断面図、第3図は壁梁と壁
柱の接合部分の配筋を示す正面図である。
A・・・・・・耐力壁、B・・・・・・壁柱、C・・・
…壁梁「 1・・・…鉄筋格子、2・…・・縦筋、3・
・・・・・横筋、4・・・・・・小口塞ぎ筋、5・・・
…定着筋、6・・・・・・ジョイント筋、7・・・・・
0プレハブ鉄筋龍、8・・・…梁主筋、9…・・・梁ス
ターラップ、10・・…・腹筋。
節1鰯
第2関
鎌3図The drawings show an embodiment of the present invention, and FIG. 1 is a cross-sectional view of reinforcement at the connection between a load-bearing wall and a wall column, FIG. 2 is a cross-sectional view at the position of the wall beam above it, and FIG. The figure is a front view showing the reinforcement arrangement at the joint between a wall beam and a wall column. A...Load-bearing wall, B...Wall pillar, C...
...Wall beam 1...Reinforcement grid, 2...Vertical bars, 3.
...Transverse muscle, 4...Lotus occludens muscle, 5...
...Anchor muscle, 6...Joint muscle, 7...
0 Prefabricated reinforcing bar dragon, 8... Beam main reinforcement, 9... Beam stirrup, 10... Abdominal muscle. Section 1 Sardine 2 Sekigama 3
Claims (1)
は縦筋と横筋をメツシユ状に組んでなる鉄筋格子を二枚
向い合わせて配置して鉄筋篭を構成し、前記壁柱ととも
に壁式ラーメンを形成する壁梁については予め組み立て
た梁主筋と梁スターラツプとからなるプレハブ鉄筋篭を
前記壁柱のスパンごとに定着させることを特徴とする場
所打壁式鉄筋コンクリート造における鉄筋の組立工法。1 For load-bearing walls in the beam direction and wall pillars in the girder direction, two reinforcing bar lattices made of vertical and horizontal reinforcements arranged in a mesh shape are arranged facing each other to form a reinforcing bar cage, and together with the wall pillars, a wall-type rigid frame is constructed. A method for assembling reinforcing bars in cast-in-place type reinforced concrete construction, characterized in that for the wall beams forming the wall beams, a prefabricated reinforcing bar cage consisting of pre-assembled beam main bars and beam stirrups is fixed for each span of the wall columns.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16780979A JPS609181B2 (en) | 1979-12-24 | 1979-12-24 | Assembly method of reinforcing bars in cast-in-place reinforced concrete construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16780979A JPS609181B2 (en) | 1979-12-24 | 1979-12-24 | Assembly method of reinforcing bars in cast-in-place reinforced concrete construction |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5689641A JPS5689641A (en) | 1981-07-21 |
JPS609181B2 true JPS609181B2 (en) | 1985-03-08 |
Family
ID=15856498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16780979A Expired JPS609181B2 (en) | 1979-12-24 | 1979-12-24 | Assembly method of reinforcing bars in cast-in-place reinforced concrete construction |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS609181B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0345971B2 (en) * | 1985-09-03 | 1991-07-12 | Tokyo Denryoku Kk | |
JPH0412629Y2 (en) * | 1985-12-17 | 1992-03-26 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5974214U (en) * | 1982-11-11 | 1984-05-19 | 株式会社竹中工務店 | Beam reinforcement structure in RC wall type rigid frame |
JPS59224748A (en) * | 1983-05-31 | 1984-12-17 | 鹿島建設株式会社 | Arrangement of reinforcing iron of reinforced concrete wall |
-
1979
- 1979-12-24 JP JP16780979A patent/JPS609181B2/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0345971B2 (en) * | 1985-09-03 | 1991-07-12 | Tokyo Denryoku Kk | |
JPH0412629Y2 (en) * | 1985-12-17 | 1992-03-26 |
Also Published As
Publication number | Publication date |
---|---|
JPS5689641A (en) | 1981-07-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH02136444A (en) | Construction of composite structure consisting of precast reinforced concrete column and steel structural beam | |
JPS609181B2 (en) | Assembly method of reinforcing bars in cast-in-place reinforced concrete construction | |
JP2977798B1 (en) | Construction method of steel frame / RC composite structure building and formwork thereof | |
JPH05311747A (en) | Pole-beam structure | |
JP2926149B2 (en) | Column and beam joining method and its structure | |
JPS6020541B2 (en) | Reinforcement assembly method for reinforced concrete frame structures | |
JPH0726624A (en) | Joint method of steel encased reinforced concrete column in precast method | |
JPH06185111A (en) | Precast concrete beam and column and construction method of earthquake-proof wall using them | |
JPS603844Y2 (en) | reinforced concrete structure | |
JPH0366878A (en) | Construction method for precast column and beam and precast anti-seismic wall | |
JPH06193133A (en) | Mixed structure of building mainly made of reinforced concrete | |
JP3187618B2 (en) | How to assemble beam reinforcement | |
JPH06158863A (en) | Method for constructing concrete frame | |
JPH01214641A (en) | Construction of steel-pipe precast concrete pole | |
JP3364426B2 (en) | How to build pillars | |
JPH0781307B2 (en) | How to build a skyscraper | |
JPH0450721Y2 (en) | ||
JP2978011B2 (en) | U-shaped beam formwork and method of constructing beam and beam joint using the same | |
JPS5923135Y2 (en) | wall beam structure | |
JP2001020383A (en) | Composite structure of building using sc construction beam | |
JP2022163290A (en) | Structure | |
CN114809323A (en) | Steel structure column transformation steel concrete column building node structure and construction method | |
JPH04261944A (en) | Structure for earthquake resisting wall and beam | |
JPS628246Y2 (en) | ||
JPH0588331B2 (en) |