JPS6032065Y2 - Load balance monitoring device for heavy lifting and unloading equipment - Google Patents

Load balance monitoring device for heavy lifting and unloading equipment

Info

Publication number
JPS6032065Y2
JPS6032065Y2 JP14190580U JP14190580U JPS6032065Y2 JP S6032065 Y2 JPS6032065 Y2 JP S6032065Y2 JP 14190580 U JP14190580 U JP 14190580U JP 14190580 U JP14190580 U JP 14190580U JP S6032065 Y2 JPS6032065 Y2 JP S6032065Y2
Authority
JP
Japan
Prior art keywords
lifted
wires
lifting
pointer
load balance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14190580U
Other languages
Japanese (ja)
Other versions
JPS5767081U (en
Inventor
芳明 深澤
Original Assignee
日本通運株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本通運株式会社 filed Critical 日本通運株式会社
Priority to JP14190580U priority Critical patent/JPS6032065Y2/en
Publication of JPS5767081U publication Critical patent/JPS5767081U/ja
Application granted granted Critical
Publication of JPS6032065Y2 publication Critical patent/JPS6032065Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、重量物吊り揚げ、卸し装置における荷重平衡
監視装置に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a load balance monitoring device in a heavy object lifting and unloading device.

〔従来の技術〕[Conventional technology]

例えば大型重量物を吊り揚げる場合、該被吊り揚げ物体
の両端部をイコライザービームにて吊り揚げるときは、
左右の平均がとれて安定はしているが、被吊り物体の底
面とイコライザービームの上面との距離(吊り代)が大
きく、その分だけ建屋の高さが要求され、低い建屋内の
作業は不向きである。
For example, when hoisting a large heavy object, when hoisting both ends of the object to be hoisted using an equalizer beam,
Although the left and right sides are averaged and stable, the distance (hanging allowance) between the bottom of the suspended object and the top of the equalizer beam is large, and the height of the building is required accordingly, making it difficult to work in low buildings. Not suitable.

従って、建屋内で発電機やプレス機械などを据付けると
き、建屋の小屋組の高さの制限、機械の吊耳の位置など
からして、機械の両端を少なくとも2本の巻きワイヤに
て別個の吊り揚げ装置にて吊り揚げる手段をとらざるを
得ない場合が多い。
Therefore, when installing a generator, press machine, etc. in a building, due to the height restrictions of the building's roof frame and the position of the hanging ears of the machine, it is necessary to separate both ends of the machine with at least two wrapped wires. In many cases, it is necessary to use a lifting device.

この場合、建屋の低いところで作業可能となる利点があ
るが、各巻きワイヤの張力が不均等となり、作業を安全
に行うことができない欠点がある。
In this case, there is an advantage that the work can be done at a low place in the building, but there is a disadvantage that the tension of each winding wire becomes uneven, making it impossible to perform the work safely.

この欠点を補うために従来では、例えば吊耳の位置と支
点間にある巻きワイヤに夫々張力計をとりつけ、該各張
力計の指針を目視しながら荷重平行を監視していたもの
であるが、このように張力計などの計器類を使用するこ
とはその監視自体に無理があり、作業性のよいものでは
ない。
In order to compensate for this drawback, in the past, for example, a tension meter was attached to each winding wire between the position of the hanging ear and the fulcrum, and the load parallelism was monitored by visually checking the pointer of each tension meter. The use of instruments such as tension meters in this way makes monitoring itself difficult and does not provide good work efficiency.

また、実開昭51−436峰公報に示されるような重量
物吊り揚げ装置が提案されている。
Further, a heavy object hoisting device as shown in Japanese Utility Model Publication No. 436/1983 has been proposed.

この装置は、偏重心貨物の上側に配設した方形状の吊り
枠に対して上記偏重心貨物をロープにて接続し、この吊
り枠の上面に互いに直交する方向に2個の不平衡検知器
を設け、更にこの吊り枠の上方に配設した不平衡矯正装
置と吊り枠とを、互いに直交する方向に設けたショート
リンクチエンにて結合し、各ショートリンクチエンの中
央部をブレーキモータによって回転する鎖車に噛合連結
し、上記2個の不平衡検知器の傾斜検知信号によってブ
レ−キモータを各別に駆動させ、ショートリンクチエン
の左右および前後移動によりバランスをとるようにした
ものである。
This device connects the unbalanced cargo with a rope to a rectangular suspension frame placed above the unbalanced cargo, and installs two unbalance detectors on the upper surface of the suspension frame in directions orthogonal to each other. Furthermore, the unbalance correction device placed above the hanging frame and the hanging frame are connected by short link chains installed in directions orthogonal to each other, and the central part of each short link chain is rotated by a brake motor. The brake motors are individually driven by the tilt detection signals from the two unbalance detectors, and balance is maintained by moving the short link chain horizontally and longitudinally.

この種のものは、偏重心貨物のバランスを自由的に制限
し、クレーン機構によって運行するには良結果が得られ
るが、貨物と吊り装置支点との間に吊り枠、ショートリ
ンクチエン、不平衡矯正装置が介在され吊り代が大きく
、建屋天井が高い場合には有効であるが、本考案が対象
とする高さ制限とうける吊り揚げ装置としてはきわめて
不向きであるし、また構造を複雑で設備費が嵩むという
問題点がある。
This kind of thing can freely limit the balance of the eccentric cargo, and good results can be obtained for operation by the crane mechanism, but there is a lifting frame, short link chain, unbalanced Although this is effective when a straightening device is involved and the lifting allowance is large and the building ceiling is high, it is extremely unsuitable as a lifting device subject to the height restrictions targeted by this invention, and the structure is complex and the equipment is difficult to use. The problem is that the cost increases.

〔考案の目的〕[Purpose of invention]

本考案は、このような実情に対応すべくなされたもので
、簡単な構成と手段とによって従来技術の欠点を除去せ
しめ、両巻きワイヤ間に水平に結合されたロッドの移動
量を、指針と目盛板とによって遠隔位置より監視し、各
巻きワイヤに印加される偏荷重を修正しつつ荷重の平衡
を行い、平均した巻き揚げ、吊り卸し作業を安全に行わ
せることを目的とするものである。
The present invention has been developed in response to these circumstances, and uses a simple structure and means to eliminate the drawbacks of the prior art, and allows the amount of movement of a rod horizontally connected between both wires to be adjusted using a guideline. The purpose is to monitor from a remote location using a scale plate, balance the load while correcting the uneven load applied to each winding wire, and safely perform average hoisting and unloading work. .

〔問題点を解決するための手段〕[Means for solving problems]

従来技術の問題点を解決する本考案の重量物吊り揚げ、
卸し装置における荷重平衡監視装置は、被吊り揚げ物体
の上部に下端が連結され、かつ、上記被吊り揚げ物体よ
り上方に設けた支点を各別に通るか、あるいは、直接上
端が各別にウィンチなどの巻揚装置に連結された少なく
とも左右2本の巻きワイヤを設け、数周巻きワイヤの上
記被吊り揚げ物体への連結点と、上記支点(巻揚装置)
との間に張設される上記両巻きワイヤの同高位置部位を
、数周巻きワイヤの被吊り揚げ物体に対する連結点間の
距離より短く、而も略中央部に下向きの指針を備えた水
平状のロッドにて結合した吊り揚げ装置と、上記被吊り
揚げ物体の上面略中央部に載置され、かつ、前面に上記
ロッドに設けた指針に適合する指示目盛板とよりなるも
のである。
The invention for lifting heavy objects solves the problems of the conventional technology.
The load balance monitoring device in the unloading device has its lower end connected to the upper part of the object to be lifted, and passes separately through a fulcrum set above the object to be lifted, or the upper end directly connects to the upper part of the object by a winch or the like. At least two left and right winding wires connected to the hoisting device are provided, and the connecting point of the several-turn winding wire to the object to be lifted and the fulcrum (the hoisting device) are provided.
The same height parts of the above-mentioned both winding wires stretched between the wires are connected to a horizontal wire that is shorter than the distance between the connection points of the several winding wires to the object to be lifted, and that has a downward pointing pointer approximately in the center. The device is comprised of a lifting device connected by a shaped rod, and an indicator scale plate placed approximately in the center of the upper surface of the object to be lifted and adapted to a pointer provided on the rod on the front surface.

〔実施例〕〔Example〕

本考案の実施例を図面について説明すると、第1図は本
考案の基本的構成を示すもので、1は被吊り揚げ(吊り
卸し)物体であり、該被吊り揚げ物体1の上面両端部左
右側に各々巻きワイヤ2゜3の下端を連結し、該巻きワ
イヤ2,3の他端をを天井に設けたウィンチ4,5に夫
々結合させる。
An embodiment of the present invention will be explained with reference to the drawings. Fig. 1 shows the basic configuration of the present invention. Reference numeral 1 denotes an object to be lifted (unloaded), and the upper surface of both ends of the object 1 is left and right. The lower ends of the winding wires 2 and 3 are connected to the sides, respectively, and the other ends of the winding wires 2 and 3 are respectively connected to winches 4 and 5 provided on the ceiling.

そして上記巻きワイヤ2,3の被吊り揚げ物体1への連
結点a、b間の距離より短いロッド6端を、上記連結点
a、 bとウィンチ4,5間の巻きワイヤの略同高位置
C,dに連結させ、ウィンチ4.5とを結ぶ線と、く字
形に屈折した巻きワイヤ2,3とにより三角形を構成さ
せる。
Then, the ends of the rods 6, which are shorter than the distance between the connection points a and b of the wound wires 2 and 3 to the object 1 to be lifted, are placed at approximately the same height of the wound wires between the connection points a and b and the winches 4 and 5. A triangle is formed by the line connecting C and d and the winch 4.5, and the wound wires 2 and 3 bent in a dogleg shape.

そして上記ロッド6の略中央部には下向きの指針7を設
ける。
A downward pointing pointer 7 is provided approximately at the center of the rod 6.

一方、上記被吊り揚げ物体1の上面中央部には、前面に
基準目盛8を備えた目盛り板9を載置し、左右の巻きワ
イヤ2,3の張力が平行状態にあるときのロッド6の指
針7を上記目盛板9の中心基準目盛8に適合させる。
On the other hand, a scale plate 9 having a reference scale 8 on the front surface is placed in the center of the upper surface of the object 1 to be lifted, so that when the tension of the left and right winding wires 2 and 3 is parallel, the rod 6 is The pointer 7 is adapted to the center reference scale 8 of the scale plate 9.

被吊り揚げ物体1に示したGは重心位置を示し、上記目
盛板9の基準目盛8及び指針7をこの重心Gを通る垂直
線上に一致させることが望ましい。
G shown on the object to be lifted 1 indicates the position of the center of gravity, and it is desirable to align the reference scale 8 of the scale plate 9 and the pointer 7 on a vertical line passing through the center of gravity G.

この第1図において、一方のウィンチ巻取りが大きく巻
きワイヤ3に大きな張力が生ずると、左右の巻きワイヤ
2,3の張力がバランスが崩れ、実線で示された三角形
a、 C,4と、三角形す。
In FIG. 1, when one winch winds up too much and a large tension is generated on the winding wire 3, the balance of tension between the left and right winding wires 2 and 3 is lost, resulting in triangles a, C, and 4 shown by solid lines. Triangle.

d、5が仮想線で示すように変形し、連結点C9dが右
方に移動し、指針7が基準目盛8から外れた目盛を指示
することになる。
d and 5 are deformed as shown by the imaginary line, the connection point C9d moves to the right, and the pointer 7 points to a scale that is off the reference scale 8.

このような場合、巻きワイヤ3に連なるウィンチ5によ
る吊り揚げを停止させ、他方のウィンチ4のみを駆動す
ることにより巻きワイヤ2に大きな張力がかかり、仮想
線で示された三角形が実線で示した三角形に戻るまで、
即ち、指針7が基準目盛8を指示するまで他方のウィン
チ4を駆動させ、両者の平衡が得られたところで、両ウ
ィンチ4.5を同時に駆動し、被吊り揚げ物体1をバラ
ンスよく吊り揚げまたは吊り卸しするものである。
In such a case, by stopping lifting by the winch 5 connected to the winding wire 3 and driving only the other winch 4, a large tension is applied to the winding wire 2, and the triangle shown by the imaginary line is shown by a solid line. until it returns to a triangle.
That is, the other winch 4 is driven until the pointer 7 indicates the reference scale 8, and when both winches are balanced, both winches 4.5 are driven simultaneously to lift or lift the object 1 in a well-balanced manner. It is to be hung and unloaded.

第2図は、上記第1図の実施例を示したウィンチ4,5
を滑車とし、両巻きワイヤ2,3を図示していないウィ
ンチに連結させた実施例を示し、作用は上記第1図実施
例と全く同じであるので、その説明は省略する。
FIG. 2 shows winches 4 and 5 showing the embodiment shown in FIG. 1 above.
An embodiment is shown in which a pulley is used and both winding wires 2 and 3 are connected to a winch (not shown).Since the operation is exactly the same as the embodiment in FIG. 1 described above, a description thereof will be omitted.

第3図は上記実施例における巻きワイヤ2,3の連結点
a、 bから外側方に夫々等しい距離1□離れた位置に
別の隔意e、fを設け、これに連結した支持具12.1
3の複数滑車14,15、および建屋天井に吊架した支
持具16.17の複数滑車18,19に、上記各巻きワ
イヤ2,3の端末の夫々ウィンチ(図示略)に連結した
ものである。
FIG. 3 shows other spacings e and f located outwardly from the connection points a and b of the winding wires 2 and 3, respectively, at equal distances of 1 □, and supports 12.f connected thereto. 1
The multiple pulleys 14 and 15 of No. 3 and the multiple pulleys 18 and 19 of a support 16 and 17 suspended from the ceiling of the building are connected to winches (not shown) at the ends of each of the winding wires 2 and 3, respectively. .

尚上記弔意e、fは、重心Gを通る垂直線から等しい距
離1゜に存在する。
Note that the condolences e and f are located at an equal distance of 1° from a vertical line passing through the center of gravity G.

尚この第3図に示した実施例は実用装置に相当するもの
であるが、その作用は上記第1図に示した基本的構成と
同一であるので、その説明は省略する。
The embodiment shown in FIG. 3 corresponds to a practical device, but its operation is the same as the basic configuration shown in FIG. 1, so a description thereof will be omitted.

また第4図は、目盛板9の詳細を示し、基準目盛8を境
として、その両側に比較的な安全目盛り20を、更にそ
の両側に注意目盛21を、更にその両側に危険目盛22
を夫々色別に配設し、色別により偏荷重を目視し、即刻
対応処理しうるようにしたものである。
FIG. 4 shows details of the scale plate 9, with comparative safety scales 20 on both sides of the reference scale 8, caution scales 21 on both sides, and danger scales 22 on both sides.
are arranged in different colors so that unbalanced loads can be visually observed and immediate countermeasures can be taken.

〔効 果〕〔effect〕

本考案は上述のように構成したので、次のような効果が
得られる。
Since the present invention is configured as described above, the following effects can be obtained.

(a) 両巻きワイヤの下端を被吊り揚げ物体の吊耳
に連結することにより、連結点a、 bと支点を結ぶ線
と、ロッドの連結点c、 dによる巻きワイヤの屈折に
より三角形を構成することができ、各巻きワイヤに作用
する張力の不平衡作用にて上記三角形が変形することに
より、ロッドが左または右方向に移動せしめられ、この
ロッドの左右移動によって目盛板の基準目盛を指示して
いた指針も移動し、遠隔位置から両巻きワイヤの偏荷重
が複動しうるとともに、装置がきわめて簡単である。
(a) By connecting the lower ends of both wound wires to the hanging ears of the object to be lifted, a triangle is formed by the bending of the wound wire at the connecting points a and b and the fulcrum and the bending of the wound wire at the connecting points c and d of the rod. By deforming the above triangle due to the unbalanced tension acting on each winding wire, the rod is moved to the left or right, and the left and right movement of this rod indicates the reference scale of the scale plate. The pointer that was previously used can also be moved, and the unbalanced loads of both winding wires can be moved double from a remote position, and the device is extremely simple.

(b) 被吊り揚げ物体の上面と、支点(または巻揚
装置)との間にはロッドのみしか介在しておらず、従来
技術に比べ吊り代が小さくて済むことから低い建屋内で
の作業に好適である。
(b) Only the rod is interposed between the top surface of the object to be hoisted and the fulcrum (or hoisting device), and the lifting allowance is smaller than with conventional technology, making it possible to work in low-rise buildings. suitable for

(e) 従来のように複動確認し難い張力計などの計
器類を用いるよりも、ウィンチによる偏荷重の発見が容
易、かつ、正確に行われ、その構成も簡単で、かつ、現
場で容易に設定しうる。
(e) It is easier and more accurate to detect unbalanced loads using a winch than with conventional instruments such as tension meters that are difficult to confirm double action, and its configuration is simple and easy to use on site. Can be set to

【図面の簡単な説明】[Brief explanation of drawings]

第1図は基本型を示す装置の正面図、第2図及び第3図
は夫々性の例を示す正面図、第4図は目盛板の正面図で
ある。 1・・・・・・被吊り揚げ(卸し)物体、2,3・・・
・・・巻きワイヤ、4,5・・・・・・ウィンチ、6・
・・・・・ロッド、7・・・・・・指針、訃・・・・・
基準目盛、9・・・・・・目盛板。
FIG. 1 is a front view of the device showing the basic type, FIGS. 2 and 3 are front views showing examples of each type, and FIG. 4 is a front view of the scale plate. 1... Object to be lifted (wholesale), 2, 3...
... Wound wire, 4, 5... Winch, 6.
...Rod, 7...Pointer, Death...
Standard scale, 9... Scale plate.

Claims (1)

【実用新案登録請求の範囲】 (a) 被吊り揚げ物体の上部に下端が連結され、か
つ上記被吊り揚げ物体より上方に設けた支点を各別に通
るか、あるいは、直接上端が各別にウィンチなどの巻揚
装置に連結された少なくとも左右2本の巻きワイヤを設
け、該両巻きワイヤの上記被吊り揚げ物体への連結点と
、上記支点(巻揚装置)との間に張設される上記両巻き
ワイヤの同高位置部位を、該両巻きワイヤの被吊り揚げ
物体に対する連結点間の距離より短く、而も略中央部に
下向きの指針を備えた水平状のロッドにて連合した吊り
揚げ装置と、 (b) 上記被吊り揚げ物体の上面略中央部に載置さ
れ、かつ、前面に上記ロッドに設けた指針に適合する指
示目盛板とよりなる重量物吊り揚げ、卸し装置における
荷重平衡監視装置。
[Scope of Claim for Utility Model Registration] (a) The lower end is connected to the upper part of the object to be lifted, and each passes through a fulcrum provided above the object to be lifted, or the upper end is directly connected to the upper part of the object, such as a winch, etc. At least two left and right winding wires connected to the hoisting device are provided, and the winding wire is stretched between the connection point of the two winding wires to the object to be hoisted and the fulcrum (the hoisting device). Lifting in which the parts of both wires at the same height are connected by a horizontal rod that is shorter than the distance between the connection points of both wires to the object to be lifted, and that has a downward pointing pointer approximately in the center. (b) Load balance in a heavy object lifting and unloading device, which is comprised of an indicator scale plate that is placed approximately at the center of the upper surface of the object to be lifted and that is compatible with the pointer provided on the rod on the front side. Monitoring equipment.
JP14190580U 1980-10-03 1980-10-03 Load balance monitoring device for heavy lifting and unloading equipment Expired JPS6032065Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14190580U JPS6032065Y2 (en) 1980-10-03 1980-10-03 Load balance monitoring device for heavy lifting and unloading equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14190580U JPS6032065Y2 (en) 1980-10-03 1980-10-03 Load balance monitoring device for heavy lifting and unloading equipment

Publications (2)

Publication Number Publication Date
JPS5767081U JPS5767081U (en) 1982-04-22
JPS6032065Y2 true JPS6032065Y2 (en) 1985-09-25

Family

ID=29501733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14190580U Expired JPS6032065Y2 (en) 1980-10-03 1980-10-03 Load balance monitoring device for heavy lifting and unloading equipment

Country Status (1)

Country Link
JP (1) JPS6032065Y2 (en)

Also Published As

Publication number Publication date
JPS5767081U (en) 1982-04-22

Similar Documents

Publication Publication Date Title
JP6673085B2 (en) crane
CN112520579A (en) Multi-lifting-point self-balancing lifting device with adjustable interval
US4249474A (en) Load-carrying slings
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN102351129B (en) Super-lifting device for improving lifting performance of crane and crane
US11136225B1 (en) Monitoring and measuring apparatuses able to display actual deflection angle of lifting-hook , and crane
JPS6032065Y2 (en) Load balance monitoring device for heavy lifting and unloading equipment
CN111559713A (en) Hoisting system
JP2016199997A (en) Simple crane
JP2756466B2 (en) Method for controlling lifting posture of curved plate and hanging tool for curved plate
CN211594850U (en) Lifting device for building
JP2001089078A (en) Crane overload preventive device, and its regulating method
JPH0417874B2 (en)
JP2017036114A (en) Method for hoisting pump system and pump system
CN212374701U (en) Large-scale member turnover assembly under single gantry crane working condition
CN108249281B (en) Overload protection device for lifting
RU2006447C1 (en) Crane boom load hanger
KR20190096087A (en) Apparatus for detecting inclination of object to be moved by tower crane
CN217417871U (en) Adjustable numerical control material lifting mechanism based on PLC control
CN217126778U (en) Dynamic line pressing structure in winch structure
CN216190491U (en) Device for visually measuring amplitude of tower crane trolley
JPS6225515Y2 (en)
JPS6124309B2 (en)
JPS6019107Y2 (en) Crane lifting balancer device
CN204737621U (en) Hoist stopper support