JPS6026500A - National land construction project - Google Patents

National land construction project

Info

Publication number
JPS6026500A
JPS6026500A JP13418783A JP13418783A JPS6026500A JP S6026500 A JPS6026500 A JP S6026500A JP 13418783 A JP13418783 A JP 13418783A JP 13418783 A JP13418783 A JP 13418783A JP S6026500 A JPS6026500 A JP S6026500A
Authority
JP
Japan
Prior art keywords
equipment
construction
new
seawater
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13418783A
Other languages
Japanese (ja)
Inventor
飯尾 淳二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13418783A priority Critical patent/JPS6026500A/en
Publication of JPS6026500A publication Critical patent/JPS6026500A/en
Pending legal-status Critical Current

Links

Landscapes

  • Medicines Containing Material From Animals Or Micro-Organisms (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (1) 電気塔は、3万メートル余の高塔設備であり、
発電、天候の変換、国土建設を致します。北陸、東北、
北海道等の豪雪地方には、該設備による天候変換を致し
無降雪地域とすることができます。該塔に設備の風力発
電所、海水中発電所、重力発電所等から電力を供給、工
業を興します。本地域の冬季生活は、部会への出かせぎ
、という厳しい困難を解消し潤を得たものとなります。
[Detailed description of the invention] (1) An electric tower is a high tower facility of over 30,000 meters,
We will generate electricity, change the weather, and construct the country. Hokuriku, Tohoku,
In areas with heavy snowfall such as Hokkaido, this equipment can transform the weather to make it a snow-free area. Power will be supplied to these towers from equipment such as wind power plants, underwater power plants, and gravity power plants to develop industry. Winter life in this area is enriched by eliminating the severe difficulties of having to go to subcommittees.

豪雪地域開発に貢献いたすものと信じます。自給自足社
会、優れた管理の家内工場制は、社会の荒廃、救済政策
と思慮致すものでございます。
We believe that this will contribute to the development of areas that experience heavy snowfall. I believe that a self-sufficient society and a well-managed cottage factory system are the devastation of society and are a relief policy.

設 備、1 電気塔。Equipment, 1. Electric tower.

2 土星型夢橋(ロケット式エンジン 設備燃料不要。大鏡装置。増殖袋 )。太陽光熱エネルギーを常時(7 7524時間)吸収、反射、増殖、 送光熱、出来る高度位置に設備。2 Saturn type Yumehashi (rocket type engine) No equipment fuel required. Large mirror device. proliferation bag ). Constant solar thermal energy (7 7524 hours) absorption, reflection, proliferation, Equipment at an altitude that transmits heat.

電気塔の建設設備並びに建設方式 別記(2)シップシャベル方式並びに別記(3)海水中
建物建設方式に記載。
Electric tower construction equipment and construction methods are listed in Appendix (2) Ship shovel method and Appendix (3) Seawater building construction method.

(,2) シップシャベル方式とは、小規模、小型国土
建設方式であります。大型シップシャベル船舶により海
底の土、砂、れき、岩 石、/IX島を掘削、人工岩石
と共に運搬、諸島の領海を埋設、連結させ建国上する方
策であります。掘削方法は一般の海部掘削、炭筑掘削、
トンネル建設工事と同様であるが、本案は削岩用掘削機
、新型原動機、新型機械等等装福の新型燃料不要原動機
複数設備の大型船舶シップシャベル(型式、縦長/キロ
メー トル以上、横長/キロメートル以上、深長/キロ
メートルの金属製大型船)による掘削である。大海工事
に大型機械施工方式並びに大型機関燃料不要という経済
は、該建設工事しゅん工に秀でた方策と考えます。
(,2) The ship shovel method is a small-scale, small-scale national land construction method. The plan is to use large ship shovels to excavate the soil, sand, rubble, and rocks on the seabed and transport them along with the artificial rocks, burying and connecting the territorial waters of the islands to establish a new nation. Drilling methods include general offshore drilling, coal dust drilling,
Although it is similar to tunnel construction work, this project involves a large ship shovel with multiple equipment such as a rock drilling machine, a new type of prime mover, a new type of machinery, etc. The above is excavation using a large metal ship with a depth/kilometer. We believe that the economy of not requiring large-scale mechanical construction methods or large-scale engine fuel for large-scale construction is an excellent strategy for construction work.

シップシャベル船舶の構格舷は左右両舷、前彼部舷、船
底の各部門、上下、左右、前緩等自在方向に鰍動、移動
、回転 運動式、複よ装置等設備であります。
The structure of a ship shovel vessel includes equipment such as port and starboard, foreboard, and bottom sections, which can move, move, rotate, and double in any direction such as up and down, left and right, and forward.

(建設機関、機械、機付等設備) 原動機種 1.燃料不要原動機。2.電動機。(Construction machinery, machinery, equipment, etc.) Motor type 1. Fuel-free prime mover. 2. Electric motor.

3、ジーゼルエンジン。3. Diesel engine.

船 舶 1.新型船。2.スクリュー船。Ship 1. A new ship. 2. screw ship.

3、潜水艇。3. Submersible.

機 械 1.起重機。2.新スピンドル。Machine 1. Hoist. 2. New spindle.

3、新型ギヤー。4.増力装置。3. New gear. 4. Power booster.

5、各種−掘削機。6.架線運搬設備。5. Various - Excavator. 6. Catenary transport equipment.

建 羽 1.新型ジヨイント、2.新型金属管。Kenba 1. New joint, 2. New metal tube.

3、i型金属棒。4.新金属筋コンクリート。5.新金
属骨コンクリート。
3. I-type metal rod. 4. New metal reinforced concrete. 5. New metal frame concrete.

6、火薬、ダイナマイト。6. Gunpowder, dynamite.

電気設備 10発電機。2.pス。3.送受電設備 4
.電気盤。
Electrical equipment 10 generators. 2. ps. 3. Power transmission and reception equipment 4
.. Electric board.

航空機 1.新型飛行機。2.プロペラ機。3 ジェッ
ト礪 4.ヘリコプタ−機 (新生国土の地勢 )(+)、新山地、金属筋コンクる
、人工岩9人工石を使用、重力発電所、粗鉱倉庫、建物
、すい道、電気等共同管路、監査筑、管理廠械 機具室
、等設備。 (2) (新山岳地表 ) 現在の天然山岳地表と同型地表であ
ります。貯水池が存し、淋地表は農業に利用、一部工業
工場に活用、山頂等に良質水路を建設、濁水の無い治山
治水施工、防風淋、防風車発電所は、重力発電所と併設
、大規模公園設置、であります。当該地方は自給自足社
会、建設の方策地方であります。
Aircraft 1. A new airplane. 2. propeller plane. 3 Jet row 4. Helicopter aircraft (terrain of the new national land) (+), new mountains, metal reinforcement, 9 artificial stones used, gravity power plant, rough ore warehouse, buildings, roads, common electrical pipelines, inspection building , management machinery, equipment room, etc. equipment. (2) (New mountain surface) This is the same type of surface as the current natural mountain surface. There is a reservoir, the surface of the ground is used for agriculture, some are used for industrial factories, high-quality waterways are constructed on mountain tops, etc., mountain and flood control construction is carried out without muddy water, windbreaks are built, windmill power plants are attached to gravity power plants, large A scale park has been established. The region is a self-sufficient society and a construction policy region.

(3ン 新河用。 水路式、管路式 総合開発式、防風
杯、防風車発電所、新型機り;よう設備。
(3 types for Shinkawa. Waterway type, pipe type, comprehensive development type, windbreak cup, windbreak car power plant, new type of equipment; etc.)

(4) 新海圏。 海水中建設方式、発電所設備、港、
湾、海、浜、等に津波、洪水防止設備。防風車発電所、
新型機りょう、大規模海水中公園、海峡、海水道等等設
備。
(4) Shinkai area. Undersea construction methods, power plant equipment, ports,
Tsunami and flood prevention equipment for bays, oceans, beaches, etc. windmill power plant,
Facilities such as new aircraft, large-scale underwater parks, straits, sea channels, etc.

(5) 新地こく圏。 ゴミ廃棄句太処理倉庫、粗鉱倉
庫、発電所、地震探査設備、監査縦横抗が建設されます
(5) Shinchikoku area. Garbage disposal warehouses, crude ore warehouses, power plants, seismic exploration equipment, and inspection shafts will be constructed.

コ5) 新平野、平たん地。 700階以上の建物建設
方策、(/戸建家屋と同利用度高層住宅)、要地要所大
公開設置方策、新耕地高層方策、防音、防濡、太陽光熱
エネルギー有効利用、重力軽減装置、を建物、建設物、
交通機関等等に装備、設置、設備方策。
5) New plains, flat land. Strategies for constructing buildings with 700 floors or more, (high-rise residential buildings with the same level of utilization as single-family houses), measures for public installation at key locations, high-rise measures for new cultivated land, soundproofing, moisture proofing, effective use of solar thermal energy, gravity reduction devices, buildings, constructions,
Equipment, installation, and facility measures for transportation, etc.

(シップシャベル船舶の船体型式 ) 本船は 長刀だ円型、縦長自/キロメートル至20キロ
メートル、横長自/キロメートル至70式、復層、運搬
船を設備。船翼は、本船船推進機関設備部門、転覆、沈
没、防止こうがん梁により本船に安全設備切離できる型
式の救命釦機能。鉛製は、本船の安全固定機能並びに船
腹及び船体の工場設備等により海底掘削土砂/キロ立方
メートル引上設備があります。設備工場は、管理部門に
掘削現場とのコンピューター管理、動力部門は、原動機
が複数設備、燃料不要エンジン、電動機、内燃機関、新
型クレーン、新型ポンプ、掘削機修理設備、発電機設備
、電気設備、増力設備、新型金属筋、金属骨コンクリー
ト骨材、建材生産設備等等完備であり 船員、業務員の
宿泊室、食堂、が設備であります。
(Hull type of the ship shovel vessel) The vessel is long-sword-elliptic, vertically long to 20 km/km, horizontally long to 70 km/km, and is equipped with a double layer and a carrier. The wing is a type of life-saving button that can disconnect safety equipment from the ship's propulsion engine equipment section, capsizing, sinking, and prevention of overturning and sinking. Lead-made materials are equipped with equipment for pulling up seabed excavation and sand/kilometer cubic meters due to the ship's safety fixing function and factory equipment on the ship's torso and hull. In the equipment factory, the management department has computer management with the excavation site, and the power department has multiple prime movers, engines that do not require fuel, electric motors, internal combustion engines, new cranes, new pumps, excavator repair equipment, generator equipment, electrical equipment, It is fully equipped with power boosting equipment, new metal reinforcing bars, metal-framed concrete aggregate, building material production equipment, etc., as well as accommodation rooms for sailors and business staff, and a cafeteria.

(3) 海水中建物建設方式 本建設方式は、領海の海水中に発電所、住宅、倉庫、監
査機械室等建物、港湾等行政施設を建設する政策事業で
ある。当該海水上位置に生活本店の国土を建設する事業
の基礎部門である( 建設方5!S) 第1.#水中組立建設式。 第2.海水中、地上開式建
設式。 第3.海水排除シ ャッター内建設式。 第+、S水部埋設後建設式。 第
5.海水固型後 建設式。
(3) Undersea building construction method This construction method is a policy project to construct buildings such as power plants, houses, warehouses, inspection machinery rooms, and administrative facilities such as ports under seawater in territorial waters. This is the basic division of the project to construct the land of the main store at the sea level location (Construction method 5!S) 1st. # Underwater assembly construction ceremony. Second. Seawater, above-ground construction type. Third. Construction ceremony inside the seawater exclusion shutter. Construction ceremony after burying the No. + and S water sections. Fifth. Construction ceremony after seawater solidification.

(建設現場設備) l、大型起重機複数設備。2.固定、業務員用潜水締。(Construction site equipment) l、Multiple large hoist equipment. 2. Fixed, diving lock for business personnel.

3.輸送用潜水艇。4.架線運搬設備。3. Transport submersible. 4. Catenary transport equipment.

5、ポンプ設備。6.増力装置。7.新型機関68、新
型機械、機具。9.シップシャベル船舶。
5. Pump equipment. 6. Power booster. 7. New engine 68, new machinery and equipment. 9. Ship shovel vessel.

10、送受電設備並びに発電設備。10. Power transmission and reception equipment and power generation equipment.

(海水中組立建設建物方式 ) 海圏の国土建設位置の海水中に建設建物の基礎、構格、
建物組立の建設をする。
(Seawater assembly construction building method) The foundation, structure,
Construct building assembly.

基礎建設、 第1工期。構格、各階建設式、第2工期。Foundation construction, first phase. Structure, construction ceremony for each floor, second construction period.

構格複数階建設式。第2工期期。構格全階建設式、第2
工期。構格背後固定施工、第2工期。個別建物、分割建
物、区分建物、海水中組立建設 第3工期。建設建物固
定施工、第3工期。
Structured multi-story construction ceremony. Second construction period. Construction ceremony for all floors of the structure, 2nd
Construction period. Fixed construction behind the structure, second construction period. Third construction period for individual buildings, divided buildings, compartmentalized buildings, and underwater assembly construction. Construction building fixed construction, 3rd construction period.

削海水加工防海水M建設、第を工期。建設建物背後埋設
固定施工、第1工期。建設建物内部淀水排除施工。第5
工期。エレベータ−0通気等内装施工、第5工期、建設
建物完成施工、第5工期。
Seawater cutting, seawater protection M construction, 1st construction period. First stage of fixed construction buried behind the construction building. Construction work to eliminate stagnant water inside a construction building. Fifth
Construction period. Elevator-0 interior construction including ventilation, 5th construction period, completed building construction, 5th construction period.

(Il) 海水改良固型方式。(Il) Seawater improved solid method.

海開海7Xの温度が 自摂氏O度から至30度、100
度昇華程度と高温度流体の性質でないことから海開海水
を電気冷凍固型式並びに薬剤冷凍固型式、電気塔(3万
メートルの高名)か冷らの極寒気、冷気エネルギーによ
る固型式等により新国土基礎部門を建設する。当該海開
冷凍氷結11L礎並びに溝路設備は本小業上国策並びに
経済効果効用を創造すると思慮致すものである。 (新
国土の構成 ) 】、海底地こく圏基礎部門。 (1)固定基礎。
The temperature of Kai Kaikai 7X is from 0 degrees Celsius to 30 degrees, 100 degrees.
Due to the degree of sublimation and the nature of high-temperature fluids, seawater can be frozen using solid electrolytic refrigeration systems, solid refrigeration systems using chemical refrigeration systems, and extremely cold air from electric towers (30,000 meters high), solid refrigeration systems using cold air energy, etc. Build a new national land foundation department. We believe that the sea-open frozen 11L foundation and ditch equipment will create national policy as well as economic benefits in this small industry. (Construction of the New National Land) ], Submarine geological sphere basic division. (1) Fixed foundation.

(2)海開水結固型構格固定基礎。(3)地震等監査縦
横坑。(4)本基礎部門背後固定部。
(2) Sea-open water consolidation type structural fixed foundation. (3) Earthquake inspection vertical and horizontal shafts. (4) Rear fixed part of this basic section.

2、海開海中海水固型部門。 (1)固型、固定、安定
構格部。(2)外壁部門。(3)管理設備。(4)監査
縦横坑設備。(5)海開固型部門の安定、固定部門。(
6)電気氷結 薬剤氷結、電気塔から送る太陽光熱エネ
ルギー、極寒冷気のマイナスエネルギーによる氷結設備
。(7)耐111J震設備(重力発電所調圧設備)。(
8)地上基硼第/冷凍氷結設備。(9) ft1l上基
礎第2、地勢、国土建設基礎部門−あ、新型金属筋コン
クリート製並びに金属骨コンクリート製山地。い、平野
2. Kaikai Midsea Seawater Solid Division. (1) Solid, fixed, stable structural parts. (2) Exterior wall section. (3) Management equipment. (4) Audit vertical and horizontal shaft equipment. (5) Stable and fixed sector of sea-open solid sector. (
6) Electrical freezing: Freezing equipment using chemical freezing, solar thermal energy sent from an electric tower, and negative energy from extremely cold air. (7) 111J earthquake resistant equipment (gravity power plant pressure regulation equipment). (
8) Ground base/refrigeration equipment. (9) ft1l upper foundation No. 2, topography, national land construction basics division - ah, new metal reinforced concrete and metal frame concrete mountains. Yes, Hirano.

う、新型河川区域。え1港湾、お3重力軽減式百階以上
高層広域−団建物(/戸建家屋間利用度)等最有効利用
度の科学建設方策。
Uh, new river area. Scientific construction policy for the most effective utilization of ports, O3 gravity-reducing high-rise buildings of 100 floors or more, wide-area buildings (utilization of single-family houses), etc.

3、建設現場の設備。別記(2)シップシャペル方、式
並びに別記(3)海水中建物建設方式に記載(5) 改
良イカダ方式。
3. Construction site equipment. Described in Appendix (2) Ship-Chapelle method, formula and Appendix (3) Seawater building construction method (5) Improved raft method.

本方式は、海開、海水中部に構格を建設、当該構格部門
の上部即ち、海開の海面上部に、安定、設備の改良イカ
ダを設備建設する。当該イカダには機関、調圧装置、截
械等が設備されており基礎地盤に設備の重力発電所と共
働して建設新地こくに対し、無振動創設の設備である。
In this method, a structure is constructed in the middle of the open sea, and a stable and improved raft is constructed above the structure, that is, above the sea surface of the open sea. The raft is equipped with an engine, a pressure regulating device, a cutting machine, etc., and is a vibration-free facility that works in conjunction with a gravity power plant installed on the foundation ground.

当イカダ部門の上部同第1に、国土建設の基礎地盤の建
設。上部同第2には、地勢の創造建設をする。該海商上
部地域国土の地勢は、重力軽減方式を執るが、本方式は
オランダ国に、えん堤内の海面以下の地域が存在するよ
うに、他地方の地勢と創造が特別方式である。地こく圏
の基礎部門の建設、海開海水伯う中における基礎、構格
部門の建設方式せ並びに建設設備は、別記(2)電気答
建設方式に記載並びに別記(3)海水中建物建設方式に
記載。
First of all, the upper part of this raft section is the construction of the foundation ground for national land construction. The second part of the upper part involves creating and constructing the topography. The topography of the country in the upper maritime region follows the gravity reduction method, but this method is a special method for creating the topography of other regions, such as the existence of areas below sea level within the dams in the Netherlands. The construction methods and construction equipment for the foundation sector in the underground area, the foundations and structural sectors in the sea-opening sea-water area are described in Appendix (2) Electric construction method and Appendix (3) Seawater building construction method. Described in.

(り災防止設備 ) 1、暴風雨対策 防風杯、防風車発電所、重力発電所併
設。
(Disaster prevention equipment) 1. Storm countermeasures: Windbreak cup, windbreak car power plant, and gravity power plant attached.

2、洪水対策 洪水り災防止水車設備、新型河川方式。2. Flood countermeasures: Flood disaster prevention water turbine equipment, new river system.

3、律波対策 大水車(直径2000メートル)設備、
水中発電所設備。
3. Measures against waves Large water wheel (2000 meters in diameter) equipment,
Underwater power plant equipment.

4、地震対策 重力発電所 調圧装置、縦横地震対策地
下監査側。地こく 調査機関、綴械設備。地下地 域探査自動車。
4. Earthquake countermeasures Gravity power plant Pressure regulating device, underground inspection side for vertical and horizontal earthquake countermeasures. Earthquake investigation agency, binding machine equipment. Underground area exploration vehicle.

5、火災対策 各家庭類焼防火壁、屋根 羽目、天井、
床、建具等金属板 製防穴建わ方式。
5. Fire prevention measures Fire prevention walls, roof panels, ceilings,
Hole-proof construction method for floors, fittings, etc. made of metal plates.

(物質変換方式) 本理論は、電気塔設備の太−光熱エネルギー集光熱装置
、増光熱装置等により超高温度創出物質を融解、原子の
変換をなす方式。原子変換適当温度の位置に時間を固定
、必要目的物質に変換致す方式。原子創造、サイクロト
ン、シンクロ1−ロン設備、増殖設備等の理論(中性子
にる (′原子変理論等)の応用、太陽エネルギーを利
用しただ新方式の理論で耐座屈ます。
(Matter conversion method) This theory is a method in which ultra-high temperature materials are melted and atoms are converted using the electric tower equipment's large photothermal energy concentrator, light intensifier, etc. Atom conversion method that fixes the time at a position at an appropriate temperature and converts it into the required target substance. Buckling resistance is achieved through the application of theories such as atomic creation, cyclotons, synchrotron facilities, breeding facilities, etc. (such as neutron theory (atomic change theory, etc.), and new theories that utilize solar energy.

(時間原動機関設備) 本理論は、物質、物体の変化力、運行力等のエネルギー
により機関、設備が回転、区駆動方法であります。変化
力並びに運行力等を増殖、減衰の存しない回転力、駆動
力とする。太陽系の運行力に対し増殖、強力化した当該
力(エネルギー)を原動力とする方式の原動機理論で耐
座屈ます。
(Time-driven engine equipment) This theory is a method in which engines and equipment are rotated and driven by the energy of matter, the changing force of objects, the driving force, etc. Change force, driving force, etc. are multiplied and turned into rotational force and driving force that do not attenuate. Buckling resistance is achieved using the prime mover theory of a method in which the driving force is the force (energy) that has multiplied and become stronger in response to the operating force of the solar system.

?) 土星型夢感。? ) Saturn-type dream feeling.

不要1喬は、太陽光熱エネルギーを常時永年(7日24
時間)吸収出来る位置に設備する。該太陽エネルギーを
必要地点へ増殖、反射、送光熱装置をして送る。地上の
気候変換設備、電気塔が収納。該電気塔の高名から該光
熱エネルギーを気圏、地 御上圏、海開の機関、設備が収納。共働して天候を変換
する。本事業は 豪雪地域 地方の貧困から無降雪の温
暖な気候で興業、会社が存立し、財政の潤う地域、地方
の社会とする改革であり、該夢櫛は、天候変換等政治政
策上の機関設備であります。
Unnecessary 1 qiao uses solar thermal energy at all times (7 days 24 days)
Install the equipment in a position where it can absorb time). The solar energy is multiplied, reflected, and sent to the required point using a light and heat transmitting device. It houses the above-ground climate conversion equipment and electric tower. The light and heat energy from the electric tower is stored in the air, earth, and sea systems and equipment. Working together to transform the weather. This project aims to transform poverty in regions with heavy snowfall into regions and local societies where industries and companies can survive in warm climates with no snowfall, and where finances are abundant. It's the equipment.

(設備機関 ) 1、ロケット式エンジン(燃料不要)。2.太陽エネル
ギー光熱吸収、増殖、送光熱装置。3.サイクロトン。
(Equipment engine) 1. Rocket engine (no fuel required). 2. Solar energy photothermal absorption, multiplication, phototransmission device. 3. Cycloton.

4.大鏡集光熱装置。5.夢橋機関、機械、機具設備。4. Large mirror heat concentrator. 5. Yumehashi engine, machinery, equipment and equipment.

6.宛′@機−7.電気設備。6. To'@machine-7. electrical equipment.

(#J海水等酸化防止施工 ) 海底、地こく、海水中における建設建物、発電所等の建
設物が海水等に侵され酸化等により崩壊建物、破壊建物
となる。これは、生活者の生活、生存を脅します、新時
代の科学は耐海水施工、防水、酸化防止施工の技術、新
技術を産み当弊害を除去致し生活基盤の安全、安定、安
心を計り生活を豊に致します。
(#J Oxidation prevention construction for seawater, etc.) Buildings constructed on the seabed, underground, in seawater, power plants, and other structures are attacked by seawater, etc., and become collapsed or destroyed buildings due to oxidation, etc. This threatens the lives and survival of consumers.The science of the new era has created seawater-resistant construction, waterproofing, anti-oxidation construction technology, and new technologies to eliminate these harmful effects and ensure the safety, stability, and security of the infrastructure of our lives. I will enrich you.

鉄鋼材に#海水酸化防止施工 (1)塗 装、(ア)ホーロー。(イ)金属塗装。 (
舷つ)ライニング塗装。(1 )合成樹脂。(オ)ペイント。(力)ガラス。
#Seawater oxidation prevention construction (1) painting on steel materials, (a) enamel. (a) Metal painting. (
Boat) Lining painting. (1) Synthetic resin. (e) Paint. (power) glass.

2丘 ルタル。2 hills Rutaru.

(3)被 覆、(ア)アスファルト。(イ)モ郭 (4)鉄鋼材、丸鋼。異形棒鋼。構造丸tI4゜鉄筋等
金属筋、金属骨コンクリ−1ル柱等建設羽。
(3) Covering, (a) Asphalt. (a) Moguo (4) Steel materials, round steel. Deformed steel bar. Structural circle tI4゜Metal bars such as reinforcing bars, metal bones concrete 1, construction wings such as columns.

建 角鋼。pc鋼棒。平鋼。形鋼。軽量形鋼。鋼板。Ken Square steel. pc steel rod. Flat steel. Shaped steel. Lightweight section steel. steel plate.

嗣官。鋼管くい。鋼管矢板。鋼矢板。鋼矢木。Heir. Steel pipe pile. Steel pipe sheet piles. Steel sheet pile. Steel Yagi.

(5)耐海水、防水、酸化防止施工鉄鋼材による新鉄筋
コンクリー1−柱等建設資材。
(5) Construction materials such as new reinforced concrete pillars made of seawater-resistant, waterproof, and anti-oxidation construction steel materials.

(ア)復層式。第1、酸化防上鉄鋼。第2、アスファル
ト。第3 新プラスチック、新合成ゴム。第t、防水コ
ンクリート。第5、耐海水モ水、防水、酸化防止施工、
塗装、被膜、被覆
(a) Multilayer type. First, oxidation-resistant steel. Second, asphalt. 3. New plastics, new synthetic rubber. No. t. Waterproof concrete. Fifth, seawater resistance, waterproofing, anti-oxidation construction,
Painting, coating, coating

【図面の簡単な説明】[Brief explanation of drawings]

☆ 第1図 シップシャベル船舶 平面図 第2図 シップシャベル船舶 側面図 第3図 運搬船 平面口 筒を図 海底掘削設備1回転型式、能力/キロ立方メー
トル掘削 立面図 第、5図 海底掘削設備第2平行a型式 立面図第乙図
 海底掘削設備第3上下動型式 平面図第7図 海底掘
削設備第4上下動9回転式。 平面図 第g図 架線運搬船式 側面図 第9図 重力発電所 立面図 第柑図 重力発電所 平面図 0 第11図 新型金属筋コンクリート柱、梁等骨格建設材
 縦断面図 第12図 新型金属筋コンクリート円柱横断面図第13
図 新型金属筋コンクリトゲ角柱横断面図第14図 新
型金属骨コンクリート≠角柱第1横断面図 第15図新型金属骨コンクリート≠角柱第2横断面図 横断面図 第16図 新型金属骨コンクリート円柱横断面図第17
図 新型金属筋アスファルト耐海水、防水、酸化防止施
工コンクリート材積断面図。 /、燃料不要新型エンジン第1゜!、ム燃料平不要新型
エンジン。 3.内燃機関。 t、電動機関。 S1発
電設備。 乙、電気設備。 7、新型起重機、ざ、新型ポンプ。 ワ。 新型増力設備。 10.船体型式縦長ト卸キロメ;ヤ2
0キロメートル。横長lOキロメートル、深長lOキロ
メートル、航行前後、左右、回転自在式。 //、船翼。 /2.海底掘削工場設備。 /3:掘削現場等管理コンピューター設備室。 /1.甲板コンクリ−1−@B 、建材生産工場。 /3.複層移動式舷。 /乙、複層開閉式船腹。 /7
.安全固定機能船側。 7g、船倉。 /9.船員、業
務員、宿泊食堂至。 20、掘削部第1゜ ノ/、掘削部第2゜22、自動掘
削設備。 23.自動、半自動式ドリル型掘削設備。 
、2を自動、半自動式半自動式側盤備。 、2S、自動
、半自動式フライス盤式掘削設備。 2乙、自動半自動
式大型、中型、小型、シャペル機関。 、27゜自動ベ
ルトコンベヤ一式搬送設備。 、、2.!i’。 架線式自動搬送設備。 29.排水、給水、送水ポンプ
設備。 301重力調節装置。 3/。 空気調節装置。 32.海底等回転掘削設備先端中間、
中心回転移m滅動力装置。 33.掘削完了後水圧浮上
設備。 3’4.万力キリン型7キロトン引上設備。 
35.工場設備。 3乙、架線運搬設備橋脚。37.耐
海水、防水、酸化防止施工被覆ワイヤーロープ。 3g
、運搬船第1゜39、運搬船第2゜ グ0.海底地こく
。 t/、海水中。 ≠!、海上。 グ3.喫水線。 /I
<Z、a上建物、建設物。 4’5地下地こぐ。741
重力発電所。 /17.圧力流体。 qg、調圧設備。 t9.圧力流体管。 SO1建物地下室。 、!;/、地下建物柱。 5.2.保護コンクリート壁。 53.運物柱元部連結
梁6 5t、建物基礎。 SS、建wIJ基イ鍔固定柱
。 5g3M碕固定柱運結粱。 57、監査縦横坑、昇降設備。 5g0強力組合スプリ
ング。 591重力発電所用施工床屋。 乙0.地震等調査設備。 乙/、耐海水、防水、酸化防
止施工鉄筋、鉄骨等金属筋、金属骨コンクリート柱等建
設資材。 乙2.耐海水、防水、酸化防止施工鉄筋、鉄
骨等鉄鋼側。 乙3゜耐海水、防水、酸化防止流エアス
フアルド部。 乙+、耐海水、防水、酸化防止新プラスチック、新合成
ゴム部。 乙S、削海水 防水、酸化防止施工コンクリ
ート部。 /3乙、耐海水、酎 防水、施工ホーロー等塗装部。 乙7.′a水耐 、防水、酸化防止塗装。 乙に、海水、防水耐 、酸化防止被膜。乙?、海水、防水、酸化防止施工被覆
。 70、鉄筋、鉄骨等金属筋、金属骨アスファルト中
心柱の外側部門金属筋等コンクリート部門との接続、固
定用孔並びに金属筋等。 第 7 図 −522− 第g図
☆ Fig. 1 Ship shovel ship Plan view Fig. 2 Ship shovel ship Side view Fig. 3 Carrier ship Plane mouth diagram Submarine drilling equipment 1 rotation type, capacity/kilometer cubic meter drilling Elevation view Fig. 5 Submarine drilling equipment No. 2 Parallel A type Elevation view (Figure 2) Submarine drilling equipment No. 3 vertical movement type Plan view Figure 7 Submarine drilling equipment No. 4 vertical movement 9 rotation type. Plan view Figure G Catenary carrier type Side view Figure 9 Gravity power plant Elevation view Figure Gravity power plant Plan view 0 Figure 11 New metal reinforced concrete columns, beams, and other skeletal construction materials Longitudinal cross-sectional view Figure 12 New metal Reinforced concrete cylinder cross section No. 13
Figure 14 New type of metal reinforced concrete prismatic column cross section Figure 14 New metal frame concrete ≠ Square column 1st cross section Figure 15 New metal frame concrete ≠ Square column 2nd cross section Cross section Figure 16 New metal frame concrete cylindrical cross section Figure 17
Figure: Cross-sectional view of new metal-reinforced asphalt seawater-resistant, waterproof, and oxidation-resistant concrete. /, The first new engine that does not require fuel! , a new type of engine that requires no fuel. 3. Internal combustion engine. t. Electric engine. S1 power generation equipment. B, electrical equipment. 7. New hoist, new pump. Wow. New power boosting equipment. 10. Hull type: Longitudinal and unloading kilometers: 2
0 kilometers. Horizontal length 10 kilometers, depth length 10 kilometers, forward and backward navigation, left and right, rotatable. //, wing. /2. Subsea drilling factory equipment. /3: Excavation site management computer equipment room. /1. Deck Concrete 1-@B, building materials production factory. /3. Multi-layer movable ship. / Otsu, multi-layer open/close type ship. /7
.. Safety fixed function ship side. 7g, hold. /9. Sailors, office workers, lodging and dining halls. 20, Excavation Department No. 1゜/, Excavation Department No. 2゜22, Automatic excavation equipment. 23. Automatic and semi-automatic drilling equipment.
, 2 are equipped with automatic and semi-automatic semi-automatic side panels. , 2S, automatic, semi-automatic milling machine drilling equipment. 2. Automatic semi-automatic large, medium, small, Chapelle engines. , 27° automatic belt conveyor complete conveyance equipment. ,,2. ! i'. Catenary automatic transport equipment. 29. Drainage, water supply, water pump equipment. 301 Gravity adjustment device. 3/. Air conditioning device. 32. Intermediate tip of rotary drilling equipment such as undersea, etc.
Center rotary transfer m depower device. 33. Hydraulic flotation equipment after excavation is completed. 3'4. Vise Kirin type 7 kiloton lifting equipment.
35. Factory equipment. 3B, overhead wire transport equipment pier. 37. Seawater resistant, waterproof, anti-oxidation coated wire rope. 3g
, Carrier ship No. 1゜39, Transport ship No. 2゜G0. Undersea ground. t/, in seawater. ≠! ,Sea. 3. waterline. /I
<Z, a building, construction. 4'5 underground row. 741
Gravity power plant. /17. pressure fluid. qg, pressure regulating equipment. t9. Pressure fluid pipe. SO1 building basement. ,! ;/, underground building pillar. 5.2. Protective concrete wall. 53. 65 tons of connecting beams at the base of cargo columns, building foundation. SS, construction wIJ basic tsuba fixed pillar. 5g3M 碕fixed pillar untied 粱. 57. Inspection shafts, lifting equipment. 5g0 strong union spring. Construction barber for 591 gravity power plant. Otsu 0. Earthquake investigation equipment. Construction materials such as seawater-resistant, waterproof, anti-oxidation construction reinforcing bars, metal bars such as steel frames, metal-framed concrete columns, etc. Otsu 2. Seawater resistant, waterproof, anti-oxidation construction reinforcing bars, steel frames, etc. on the steel side. Otsu 3゜Seawater resistant, waterproof, anti-oxidation airflow part. Otsu+, seawater resistant, waterproof, oxidation-resistant new plastic, new synthetic rubber part. Otsu S, seawater cutting, waterproofing, oxidation prevention construction concrete department. /3 Otsu, seawater resistant, shochu waterproofing, construction enamel, etc. painting section. Otsu 7. 'a Water resistant, waterproof, anti-oxidation coating. Second, seawater, waterproof, and anti-oxidation coating. Otsu? , seawater, waterproof, anti-oxidation construction coating. 70. Reinforcing bars, metal bars such as steel frames, connections with concrete sections such as metal bars in the outer section of the metal frame asphalt center column, fixing holes, metal bars, etc. Figure 7-522- Figure g

Claims (1)

【特許請求の範囲】 (1) 電気描建設方式。 (,2) ジーツブ、シャベル方式。 (3) 海水中建物建設方式。 (ゲ) 海水改良固型方式。 (J’) 改良イカダ方式。 (乙) 物質変換方式こ (7) 土m型妹JiIi0 (J’) り災防止設(イIi0 ′7) 時間原動機。[Claims] (1) Electric drawing construction method. (,2) Jeetbu, shovel method. (3) Seawater building construction method. (Ge) Seawater improved solid method. (J’) Improved raft method. (B) Material conversion method (7) Earth m type sister JiIi0 (J’) Disaster prevention equipment (Ii0 '7) Time prime mover.
JP13418783A 1983-07-21 1983-07-21 National land construction project Pending JPS6026500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13418783A JPS6026500A (en) 1983-07-21 1983-07-21 National land construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13418783A JPS6026500A (en) 1983-07-21 1983-07-21 National land construction project

Publications (1)

Publication Number Publication Date
JPS6026500A true JPS6026500A (en) 1985-02-09

Family

ID=15122468

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13418783A Pending JPS6026500A (en) 1983-07-21 1983-07-21 National land construction project

Country Status (1)

Country Link
JP (1) JPS6026500A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5132171A (en) * 1990-07-06 1992-07-21 Sanwa Kako Company Limited Non-flammable open-cell cross-linked polyolefin foam and method for production thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5132171A (en) * 1990-07-06 1992-07-21 Sanwa Kako Company Limited Non-flammable open-cell cross-linked polyolefin foam and method for production thereof

Similar Documents

Publication Publication Date Title
AU2022201203B2 (en) Mechanical energy storage
US20180170489A1 (en) Devices and methods for producing a large-size floating structure
CA2397850A1 (en) Sun&#39;s energy converter
US20230361714A1 (en) Construction method and system of a solar cell power plant
KR20160132349A (en) Manufacturing of the ship corresponding to the ship and the par Bull jet capital of lifesaving entanglement preventing
GB2445284A (en) A hydro-electric generator arrangement for underwater placement
KR20170043487A (en) Marine steel works with metal smelting furnaces and construction machinery
CN101851933B (en) Submergible underwater landscape tunnel
CN201826327U (en) Submersible subaqueous landscape tunnel
KR20200099259A (en) Tsunami disaster prevention dispensing device
KR20190089483A (en) Treatment of nuclear waste exclusively for ocean won Pressurized water double structure nuclear reactor equipment
JPS6026500A (en) National land construction project
CN102134933B (en) Stereoscopic level building
KR102452262B1 (en) Dependent Poisoning System for Earthquake Tsunami Prevention
CN106256964A (en) Multipurpose over-water platform
Antonina et al. Construction of low-rise buildings in the coastland and water areas
Bernshtein Kislaya guba experimental tidal power plant and problem of the use of tidal energy
KR20230045588A (en) Offshore building structure and its construction method
Rehman FLOATING ARCHITECTURE
Lawton Tidal power in the Bay of Fundy
RU2415047C2 (en) Inhabited floating platform by kuschenkov
US11746495B2 (en) Floating foundation
WO2024171201A1 (en) Novel prefabricated amphibious building, system and methods thereof
Reddy BHASKAR INSTITUTE OF TECHNOLOGY AND SCIENCE
Диашев et al. Erection of Prefabricated Structures in the Arctic Region