JPS60245428A - Maximum demand power monitor controller - Google Patents

Maximum demand power monitor controller

Info

Publication number
JPS60245428A
JPS60245428A JP59099864A JP9986484A JPS60245428A JP S60245428 A JPS60245428 A JP S60245428A JP 59099864 A JP59099864 A JP 59099864A JP 9986484 A JP9986484 A JP 9986484A JP S60245428 A JPS60245428 A JP S60245428A
Authority
JP
Japan
Prior art keywords
power
demand
load
predicted
power demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP59099864A
Other languages
Japanese (ja)
Inventor
一郎 鎌田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP59099864A priority Critical patent/JPS60245428A/en
Publication of JPS60245428A publication Critical patent/JPS60245428A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔発明の技術分野〕 この発明は、電力需要家が電力供給会社と契約している
最大需要電力を監視制御する最大需要電力監視制御装置
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a maximum power demand monitoring and control device that monitors and controls the maximum power demand contracted by an electric power consumer to a power supply company.

〔従来技術〕[Prior art]

一般に、電力需要家は電力供給会社と契約している最大
需要電力、すなわち契約電力を監視し、超過しないよう
に負荷を調整している。すなわち、需要家の負荷容量が
契約電力を超過する場合は、全負荷を稼動させると使用
電力が超過してしまうため、超過する恐れのある時点で
、一部の遮断可能な負荷を遮断することにより、使用電
力を契約電力内におさえていた。
Generally, electric power consumers monitor the maximum demand power contracted with the power supply company, that is, the contracted power, and adjust the load so as not to exceed the contracted power. In other words, if the customer's load capacity exceeds the contracted power, operating the full load will cause the power consumption to exceed, so it is necessary to shut off some of the load that can be shut off at the point where there is a risk of exceeding the power consumption. As a result, the power consumption was kept within the contracted power.

その手段としては、あらかじめ負荷を遮断する値を決め
ておき、一定周期毎(例えば80秒間隔)に、その時点
の需要電力と遮断する値との比較を行い、需要電力がそ
の値を上回ると負荷の遮断指令を出力していた。
One way to do this is to decide in advance the value at which the load is to be cut off, and then at regular intervals (for example, every 80 seconds), compare the current demand power with the value at which the load is cut off, and if the demand power exceeds that value, A load cutoff command was being output.

しかしながら、この遮断指令は上記比較結果によって出
力されるため、超過するやいなや直ちに負荷を遮断する
という状態になり、その直後に別の負荷が停止した場合
など、遮断する必要のない負荷を遮断してしまう欠点が
あった。
However, since this cutoff command is output based on the above comparison result, the load will be cut off immediately as soon as it exceeds the limit, and if another load stops immediately after that, the load that does not need to be cut off will be cut off. There was a drawback.

〔発明の概要〕[Summary of the invention]

この発明は上記のような従来のものの欠点を除去するた
めになされたもので、あらかじめ運転。
This invention was made in order to eliminate the above-mentioned drawbacks of the conventional ones, and it does not require pre-operation.

停止が予測できる負荷の状態と、遮断指令とを比較して
、負荷の停止が予測される場合には、負荷の遮断を見あ
わせる等の判断を行うことにより、遮断する必要のない
負荷を遮断しないようにした最大需要電力監視制御装置
を提供することを目的としている。
Compare the state of the load that can be predicted to stop with the shedding command, and if the load is expected to stop, make a decision such as postponing load shedding, and then cut off the load that does not need to be cut off. The object of the present invention is to provide a maximum power demand monitoring and control device that prevents

〔発明の実施例〕[Embodiments of the invention]

以下、この発明の一実施例を図について説明する。第1
図はこの発明に係る最大需要電力監視制御装置の一実施
例を示すブロック線図である。第1図において、第1の
入力端子(1)には使用電力量の単位電力量ごとに発生
する電力量パルスが入力され、第1の積算回路に)に時
刻tまでの需要電力用された単位電力△pを算出するも
のである。第2の入力端子(4)には単位時間ごとに発
生する時間パルス信号が入力され、第3の積算回路(5
)にて単位時間△tが積算される。第1の演算回路(6
)は第2の積算回路13)の出力の単位電力△pと第3
の積算回路+51の出力の単位時間△t とにより、時
刻tでの単位平均電力Wt−△P/△t を演算するも
のである。第3の入力端子(7)は希望の最大需要電力
値、すなわち目標需要電力Qが設定されて入力されるも
のである。第4の入力端子(8)は遮断される負荷容量
が設定されて入力されるものである。第5の入力端子(
9)は遮断される負荷の状態が入力されるものである。
An embodiment of the present invention will be described below with reference to the drawings. 1st
The figure is a block diagram showing an embodiment of the maximum demand power monitoring and control device according to the present invention. In Fig. 1, the first input terminal (1) is inputted with an electric energy pulse generated for each unit of electric energy used, and the electric energy pulse generated for each unit of electric energy used is inputted to the first integration circuit (). This is to calculate the unit power Δp. A time pulse signal generated every unit time is input to the second input terminal (4), and the third integration circuit (5
), the unit time Δt is integrated. First arithmetic circuit (6
) is the unit power △p of the output of the second integration circuit 13) and the third
The unit average power Wt-ΔP/Δt at time t is calculated from the integration circuit + unit time Δt of the output of 51. A desired maximum power demand value, that is, a target power demand Q is set and input to the third input terminal (7). The fourth input terminal (8) is used to set and input the load capacity to be cut off. The fifth input terminal (
9) is where the state of the load to be cut off is input.

第2の演算回路UO+は、第1の演算回路(6)の出力
の単位平均電力Wt、第1の積算回路(2)の出力の需
要電力値、第2の入力端子(4)からの時間パルス信号
組3の入力端子(7)からの目標需要電力Q、第4の入
力端子(8)からの遮断対象負荷容量が入力され、需要
時限終了時における予測需要電力Rを算出するものであ
る。第1の表示器+II)は、第2の演算回路σ■で演
算した予測需要電力Rを表示するものである。第3の演
算回路121は第2の演算回路叫の予測需要電力Rと第
3の入力端子(7)からの目標需要電力Qと第5の入力
端子(9)からの遮断負荷容量が入力され、予測需要電
力Rの目標需要電力Qに対する超過分が、遮断負荷容量
を上回っている場合に、出力端子11急に負荷の遮断指
令を出力するものである。第4の演算回路0滲は第2の
入力端子(4)からの単位時間パルスが入力され、需要
時限終了までの残り時間Tr を演算するものである。
The second arithmetic circuit UO+ includes the unit average power Wt of the output of the first arithmetic circuit (6), the demand power value of the output of the first integration circuit (2), and the time from the second input terminal (4). The target power demand Q from the input terminal (7) of the pulse signal set 3 and the load capacity to be cut off from the fourth input terminal (8) are input, and the predicted power demand R at the end of the demand period is calculated. . The first display +II) displays the predicted power demand R calculated by the second calculation circuit σ■. The third arithmetic circuit 121 receives the predicted power demand R from the second arithmetic circuit, the target power demand Q from the third input terminal (7), and the breaking load capacity from the fifth input terminal (9). , when the excess of the predicted power demand R over the target power demand Q exceeds the cutoff load capacity, the output terminal 11 suddenly outputs a load cutoff command. The fourth arithmetic circuit 0 receives the unit time pulse from the second input terminal (4) and calculates the remaining time Tr until the end of the demand time period.

第2の表示器US+は第4の演算回路(141で演算し
た残り時間Tr を表示するものである。
The second display US+ is for displaying the remaining time Tr calculated by the fourth calculation circuit (141).

次にこの発明の動作を第2図を用いて説明する。Next, the operation of the present invention will be explained using FIG. 2.

第2図(a)において今、第1の積算回路(2)は第1
の入力端子(1)からの電力量パルスを積算しており、
需要時限を内の任意の時点t1での現在需要電力をPと
すると(A点)、このA点での第2の演算回路uO)で
演算される予測需要電力Rは、R=P十S話−(1−1
,) となり(0点)、この予測需要電力Rは第3の入力端子
(7)から入力され、目標需要電力Qを上回っており、
この差が第3の演算回路(1りで演算されて遮断負荷容
量を越えると、出力端子りに出力を生じて負荷を遮断し
なければならない。ところが第2図(b)に示すように
あらかじめ運転、停止の予測のつく負荷W1が、需要時
限を内において、時点t2から時点t8まで停止すると
すれば、このA点での第2の演算回路σαで演算される
予測需要電力R1はとなり (01点)、この予測需要
電力R1は目標需要電力Qを下回るので、負荷の遮断は
しなくてよいことになる。従って遮断する必要のない負
荷を遮断し、また投入するという、むだな動作が発生し
なくなる。
In FIG. 2(a), the first integration circuit (2) is now connected to the first integration circuit (2).
The power pulses from the input terminal (1) are integrated,
Assuming that the current power demand at any time t1 within the demand time period is P (point A), the predicted power demand R calculated by the second calculation circuit uO) at this point A is R = P + S. Story-(1-1
, ) (0 points), this predicted power demand R is input from the third input terminal (7) and exceeds the target power demand Q,
This difference is calculated by the third calculation circuit (1), and if it exceeds the breaking load capacity, an output is generated at the output terminal and the load must be broken. However, as shown in Figure 2 (b), If the load W1, whose operation and stoppage can be predicted, stops from time t2 to time t8 within the demand time limit, the predicted power demand R1 calculated by the second calculation circuit σα at this point A is as follows. 01 point), this predicted power demand R1 is lower than the target power demand Q, so there is no need to cut off the load.Therefore, there is no need to cut off and turn on loads that do not need to be cut off, which is a wasteful operation. It will no longer occur.

次に逆の場合を第3図を用いて説明する。第3図(a)
のA点での予測需要電力Rは、同様にR=P十蕪(1−
1、) となり(0点)、この予測需要電力Rは目標需要電力Q
を下回り、また、この差が遮断(投入)負荷容量を越え
ると負荷を投入することができる。
Next, the opposite case will be explained using FIG. Figure 3(a)
Similarly, the predicted power demand R at point A of
1,) (0 points), and this predicted power demand R is the target power demand Q
When the difference exceeds the cut-off (turn-on) load capacity, the load can be turned on.

ところがあらかじめ運転停止の予測のつく負荷W1が需
要時限を内において時点t2から時点t8まで停止し、
そして現在その停止中であるとすれば、ことなり (C
3点)、この予測需要電力R7が目標需要省力Qに接近
するので、負荷の投入はできないことになる。従って投
入することのできないはずの負荷を投入して、またすぐ
遮断するというむだな動作が発生しなくなる。
However, the load W1, whose operation can be predicted to stop in advance, stops from time t2 to time t8 within the demand time limit,
And if it is currently stopped, then it is different (C
3) Since this predicted power demand R7 approaches the target demand power saving Q, the load cannot be applied. Therefore, the wasteful operation of turning on a load that should not be turned on and immediately cutting it off again will not occur.

なお、マイクロコンピュータ等の演算装置を使用すれば
、第1図の回路構成は簡単となり、演算も容易に行える
Note that if an arithmetic device such as a microcomputer is used, the circuit configuration shown in FIG. 1 can be simplified, and calculations can be easily performed.

〔発明の効果〕〔Effect of the invention〕

以上のようにこの発明によれば、負荷制御を行う上で投
入してまたすぐに遮断する、あるいは遮断した負荷を亨
ぐまた投入するということがなくなり、安全上および運
用上の不都合がなく、電力の契約内での最大限の活用が
可能となる効果がある。
As described above, according to the present invention, there is no need to turn on and immediately cut off again when performing load control, or to exceed the cut off load and then turn on again, and there is no inconvenience in terms of safety and operation. This has the effect of making it possible to make maximum use of electricity within the contract.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明に係る最大需要電力監視制御装置の一
実施例を示すブロック線区、第2図及び第3図はこの発
明の動作説明図である。 図において、(1)は第1の入力端子、(2)は第1の
積算回路、(3)は第2の積算回路、(4)は第2の入
端子、(5)は第3の積算回路、(6)は第1の演算回
K(7)は第3の入力端子、(8)は第4の入力端子、
(9)は第5の入力端子、Uαは第2の演算回路、(1
1)は第1の表示器、1121は第3の演算回路、報は
出力端子、(141は第4の演算回路、[151は第2
の表示器である。 代理人 弁理士 大 岩 増 雄 第1図 第2図(0)
FIG. 1 is a block diagram showing an embodiment of the maximum demand power monitoring and control device according to the present invention, and FIGS. 2 and 3 are diagrams illustrating the operation of the present invention. In the figure, (1) is the first input terminal, (2) is the first integration circuit, (3) is the second integration circuit, (4) is the second input terminal, and (5) is the third integration circuit. Integration circuit, (6) is the first calculation circuit K (7) is the third input terminal, (8) is the fourth input terminal,
(9) is the fifth input terminal, Uα is the second arithmetic circuit, (1
1) is the first display, 1121 is the third arithmetic circuit, information is the output terminal, (141 is the fourth arithmetic circuit, [151 is the second
This is an indicator. Agent: Masuo Oiwa, Patent Attorney Figure 1 Figure 2 (0)

Claims (1)

【特許請求の範囲】[Claims] (1)遮断可能な負荷貞)とあらかじめ運転、停止の予
測がつく負荷とを有する全負荷の最大需要電力を、契約
電力以下におさえるように監視制御する最大需要電力監
視制御装置において、現在時点での現在電力と単位時間
の平均電力とを算出する手段と、前記現在電力と前記平
均電力と残り時間とにより予測需要電力を算出する手段
と、前記予測需要電力と前記運転、停止の予測がつく負
荷の状態とにより補正された予測需要電力を算出する手
段を備えたことを特徴とする最大需要電力監視制御装置
(1) Maximum demand power monitoring and control equipment that monitors and controls the maximum power demand of all loads, which have loads that can be shut off (loads that can be cut off) and loads that can be predicted to start or stop in advance, to below the contract power. means for calculating the current power and the average power per unit time; means for calculating the predicted power demand from the current power, the average power and the remaining time; A maximum power demand monitoring and control device characterized by comprising means for calculating predicted power demand corrected based on the state of the load being applied.
JP59099864A 1984-05-16 1984-05-16 Maximum demand power monitor controller Pending JPS60245428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59099864A JPS60245428A (en) 1984-05-16 1984-05-16 Maximum demand power monitor controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59099864A JPS60245428A (en) 1984-05-16 1984-05-16 Maximum demand power monitor controller

Publications (1)

Publication Number Publication Date
JPS60245428A true JPS60245428A (en) 1985-12-05

Family

ID=14258667

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59099864A Pending JPS60245428A (en) 1984-05-16 1984-05-16 Maximum demand power monitor controller

Country Status (1)

Country Link
JP (1) JPS60245428A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0458057U (en) * 1990-09-20 1992-05-19

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172936A (en) * 1982-03-31 1983-10-11 株式会社日立製作所 Predicting computing system for demand monitor controller

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172936A (en) * 1982-03-31 1983-10-11 株式会社日立製作所 Predicting computing system for demand monitor controller

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0458057U (en) * 1990-09-20 1992-05-19

Similar Documents

Publication Publication Date Title
JP3459692B2 (en) Power supply
US4707760A (en) Mains protection device
JPS60245428A (en) Maximum demand power monitor controller
JP3430890B2 (en) Power management device
JP2791928B2 (en) Inverter control device
JP2827263B2 (en) Voltage detection method
JP2659758B2 (en) Parallel operation control method
JP2500592B2 (en) Uninterruptible power system
JPS6369415A (en) Abnormal voltage protecting circuit
JP2002090398A (en) Electronic watt-hour meter
JP2792109B2 (en) Automatic calculation method of cut-off power for demand controller
JPH0545086Y2 (en)
JPS61221535A (en) Selection load control system for security power system
JP2002218658A (en) Reverse tidal current preventive device
JPH0247182B2 (en)
JPH0353483A (en) Heater failure alarm
JPH044654Y2 (en)
JPS5914327A (en) Load control system for demand power monitor
JPH04156228A (en) System for controlling demand for electric power
JP2956845B2 (en) Power converter
CA1280160C (en) Mains protection device
JPS62168204A (en) Digital controller
JPS5951210B2 (en) Electricity consumption control device
JPS63170713A (en) Electronic apparatus
JPS63171114A (en) Overload relay