JPS6015794Y2 JP9444880U JP9444880U JPS6015794Y2 JP S6015794 Y2 JPS6015794 Y2 JP S6015794Y2 JP 9444880 U JP9444880 U JP 9444880U JP 9444880 U JP9444880 U JP 9444880U JP S6015794 Y2 JPS6015794 Y2 JP S6015794Y2
Authority
JP
Japan
Prior art keywords
embedded
electrical equipment
equipment
base
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9444880U
Other languages
Japanese (ja)
Other versions
JPS5720118U (en
Inventor
輝雄 滝沢
Original Assignee
株式会社東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社東芝 filed Critical 株式会社東芝
Priority to JP9444880U priority Critical patent/JPS6015794Y2/en
Publication of JPS5720118U publication Critical patent/JPS5720118U/ja
Application granted granted Critical
Publication of JPS6015794Y2 publication Critical patent/JPS6015794Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)
  • Foundations (AREA)

Description

【考案の詳細な説明】 本考案は例えば変圧器やりアクドル等の電気機器を屋内
に設置する場合の据付装置に関する。
[Detailed Description of the Invention] The present invention relates to an installation device for installing electrical equipment such as a transformer or an accelerator indoors.

従来、この種の電気機器を屋内に設置する場合、機器据
付面(床面)は第1図に示す如く埋込ベース1を設置(
図では1個のみ示しているが、一般には複数個が例えば
紙面方向に設置される)する部分を除いてコンクリート
で打設施工する。
Conventionally, when installing this type of electrical equipment indoors, the equipment installation surface (floor surface) is equipped with an embedded base 1 (as shown in Figure 1).
Although only one is shown in the figure, generally multiple pieces are installed, for example, in the direction of the page, except for the parts where concrete is poured.

6はコンクリート部に埋込まれた水平方向の鉄筋を示す
6 shows horizontal reinforcing bars embedded in the concrete part.

コンクリートを打設しない部分を箱抜という。The part where concrete is not poured is called box removal.

ついで複数個の埋込ベース1を前記箱抜きされた床内部
に挿入し、埋込ベース1の上面(機器据付面)が水平に
また全ての埋込ベース1が同一レベルになるように設置
する。
Then, a plurality of embedded bases 1 are inserted into the boxed-out floor and installed so that the upper surface (equipment installation surface) of the embedded bases 1 is horizontal and all embedded bases 1 are at the same level. .

コンクリート床面ば、これを水平にしかも機器据付面全
域にわたって同一レベルに施工することは非常に困難な
ので、一般には埋込ベース1を調整ボルト8で水平レベ
ルを出してから機器を水平に据付けている。
Since it is extremely difficult to level a concrete floor and maintain the same level over the entire equipment installation surface, generally the embedded base 1 is leveled with adjustment bolts 8, and then the equipment is installed horizontally. There is.

埋込ベース1の設置が完了した後これら埋込ベース1を
コンクリートで埋め固着する。
After the installation of the embedded bases 1 is completed, these embedded bases 1 are filled with concrete and fixed.

ついで電気機器3を電気機器ベース4を介して埋込ベー
ス1上に載置し、箱抜き部の最深部9にアンカーボルト
2を挿入して、前記電気機器ベース4とアンカーボルト
2を締付用ボルト5で締付は固定する。
Next, the electrical equipment 3 is placed on the embedded base 1 via the electrical equipment base 4, the anchor bolt 2 is inserted into the deepest part 9 of the box cutout, and the electrical equipment base 4 and the anchor bolt 2 are tightened. Tighten with bolt 5.

然る後、箱抜き最深部9内にコンクリートを打設して電
気機器3の基礎まわりの据付けを完了する。
After that, concrete is poured into the deepest part 9 of the box cutout to complete the installation around the foundation of the electrical equipment 3.

このような機器据付において、前述のアンカーボルト2
は地震による機器3の転倒や横すべりを防ぐためかなり
の長さになるので、アンカーボルト2を挿入する箱抜き
部の深さは相当深くする必要があり、機器3の大きさに
よっては、1mを越える場合がある。
In such equipment installation, the aforementioned anchor bolt 2
is quite long to prevent the device 3 from falling or sliding due to an earthquake, so the depth of the box cutout where the anchor bolt 2 is inserted needs to be considerably deep, and depending on the size of the device 3, it may be 1 m or more. It may be exceeded.

このため床の厚さは、このアンカーボルト2の長さのた
め建屋圧強度の設計値以上に厚くしなければならず、コ
ンクリートや鉄筋を多量に必要とするばかりでなく地下
室の場合はさらに地下を深く掘らなければならないなど
の欠点があった。
For this reason, the thickness of the floor must be made thicker than the design value of the building compressive strength due to the length of the anchor bolt 2, which not only requires a large amount of concrete and reinforcing steel, but also in the case of a basement. There were disadvantages such as having to dig deeply.

本考案は上述の欠点を除去するためになされたもので、
地震による機器の転倒や横すべりに耐え、しかも床の厚
さを必要以上に厚くすることがなく従って建屋を経済的
に建築できる電気機器の据付装置を得ることを目的とす
る。
This invention was made to eliminate the above-mentioned drawbacks.
To provide an installation device for electrical equipment that can withstand overturning and skidding of equipment due to earthquakes, and can economically construct a building without making the floor thicker than necessary.

以下本考案の一実施例を第2図を参照して説明する。An embodiment of the present invention will be described below with reference to FIG.

尚、第2図で従来第1図と同一部分は同一符号で示す。Incidentally, in FIG. 2, the same parts as in FIG. 1 are indicated by the same reference numerals.

本考案においては、従来におけるアンカーポル12位置
に相当する箇所に、埋込ベース1と略同−面となる埋込
プレート10を複数個配置しておく。
In the present invention, a plurality of embedding plates 10 that are substantially flush with the embedding base 1 are arranged at locations corresponding to the positions of the conventional anchor poles 12.

次に建家床内部には床の強度をもたせるため水平方向鉄
筋6を全面にわたって縦横に配置する。
Next, inside the floor of the building, horizontal reinforcing bars 6 are arranged in length and breadth over the entire surface in order to give the floor strength.

ついでこれら鉄筋6上にコンクリートを打設して床面を
仕上げるのであるが、この時、埋込ベース1および埋込
プレート10の外周の片側50mm 〜100rrvn
程度あけてコンクリートを打設する。
Next, concrete is placed on these reinforcing bars 6 to finish the floor surface. At this time, 50 mm to 100 rrvn of the outer periphery of the embedded base 1 and the embedded plate 10 is placed on one side.
Concrete is poured with sufficient clearance.

また、埋込プレート10を設置する箇所の水平方向鉄筋
6に複数本の垂直方向鉄筋7を溶接しておく。
Further, a plurality of vertical reinforcing bars 7 are welded to the horizontal reinforcing bars 6 at the location where the embedded plate 10 is installed.

なおこの垂直方向鉄筋7の大きさおよび本数は地震時に
おける電気機器3の転倒や横すべりに耐えうるように決
定する。
Note that the size and number of the vertical reinforcing bars 7 are determined so as to withstand overturning and side-sliding of the electrical equipment 3 during an earthquake.

埋込ベース1および埋込プレート10部の箱抜き11以
外の床面のコンクリート打設が完了した後、前記箱抜き
11部に埋込ベースを挿入し、調整ボルト8で埋込ベー
ス1の水平レベルを出すとともに埋込プレート10に予
め設けられた穿孔部に前記垂直方向鉄筋7を挿入する。
After completing the concrete pouring of the floor surface other than the box cutout 11 of the embedded base 1 and the embedded plate 10, insert the embedded base into the box cutout 11, and use the adjustment bolt 8 to level the embedded base 1. While leveling, the vertical reinforcing bars 7 are inserted into the perforations previously provided in the embedded plate 10.

この時、埋込プレート10の穿孔位置に垂直方向鉄筋7
が合致しない場合は垂直方向鉄筋7を適宜折り曲げれば
良い。
At this time, the vertical reinforcing bar 7 is placed at the drilling position of the embedded plate 10.
If they do not match, the vertical reinforcing bars 7 may be bent appropriately.

各埋込プレート10の上面のレベルを埋込ベース1の上
面レベルと合せた後、垂直方向鉄筋7を埋込プレート1
0の穿孔部に溶接する。
After aligning the top surface level of each embedded plate 10 with the top surface level of the embedded base 1, vertical reinforcing bars 7 are attached to the embedded plate 1.
Weld to the hole 0.

このようにして埋込プレート10を床内部の鉄筋6と溶
接により一体にした後、箱抜き11部をコンクリートで
打設して床面を仕上げる。
After the embedded plate 10 is integrated with the reinforcing bars 6 inside the floor by welding in this manner, the box cutouts 11 are poured with concrete to finish the floor surface.

床面のコンクリートが固まった後、電気機器3を埋込ベ
ース1および埋込プレート10上に載置して機器ベース
4と埋込プレート10を溶接により固着するか、あるい
は図では示してないが埋込プレート10に予めメネジを
設けておき、機器ベース4からボルトで締付固定するか
して電気機器3を埋込プレート10に機械的に結合する
After the concrete on the floor hardens, the electrical equipment 3 is placed on the embedded base 1 and the embedded plate 10, and the equipment base 4 and the embedded plate 10 are fixed by welding, or, although not shown in the figure, A female thread is provided in the embedded plate 10 in advance, and the electric device 3 is mechanically coupled to the embedded plate 10 by tightening and fixing it from the device base 4 with bolts.

このような構成であると、電気機器3の重量は埋込ベー
ス1がうけもち、地震時による機器の転倒や横すべりの
力に対しては埋込プレート10がうけもつことになるが
、埋込プレート10は床内部の鉄筋6,7と一体になっ
ていて電気機器3は前記埋込プレート10に溶接により
固着またはボルトにより固定されているので、地震によ
る転倒や横すべりに対して全く心配がなく、従って従来
のような長いアンカーボルトを必要としないので床の厚
さをうずくでき、鉄筋やコンクリート等建築資材の劣質
がはかれる。
With such a configuration, the embedded base 1 bears the weight of the electrical equipment 3, and the embedded plate 10 bears the weight of the equipment from falling or sliding due to an earthquake. 10 is integrated with the reinforcing bars 6 and 7 inside the floor, and the electrical equipment 3 is fixed to the embedded plate 10 by welding or bolts, so there is no worry about it falling over or skidding due to an earthquake. Therefore, since there is no need for long anchor bolts as in the past, the thickness of the floor can be increased, and the inferior quality of building materials such as reinforcing bars and concrete can be measured.

以上詳述したように本考案によれば、電気機器を設置す
る建家の床の厚さは建屋設計で定る厚さで済み、また地
震による電気機器の転倒や横すべりの心配もなくなる等
、優れた効果を有する電気機器の据付装置を提供するこ
とができる。
As detailed above, according to the present invention, the thickness of the floor of the building where electrical equipment is installed can be determined by the building design, and there is no need to worry about electrical equipment falling over or sliding due to an earthquake. It is possible to provide an installation device for electrical equipment that has excellent effects.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来における電気機器の据付装置を示す縦断面
図、第2図は本考案における電気機器の据付装置を示す
縦断面図である。 1・・・・・・埋込ベース、2・・・・・・アンカーボ
ルト、3・・・・・・電気機器、4・・・・・・電気機
器ベース、6・・・・・・水平方向鉄筋、7・・・・・
・垂直方向鉄筋、8・・・・・・調整ボルト、10・・
・・・・埋込プレート、11・・・・・・箱抜。
FIG. 1 is a longitudinal sectional view showing a conventional electrical equipment installation device, and FIG. 2 is a longitudinal sectional view showing an electrical equipment installation device according to the present invention. 1...Embedded base, 2...Anchor bolt, 3...Electrical equipment, 4...Electrical equipment base, 6...Horizontal Directional reinforcing bar, 7...
・Vertical reinforcing bar, 8...adjustment bolt, 10...
...Embedded plate, 11... Box removed.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 屋内の床に設置した埋込ベース上に電気機器を据付ける
ものにおいて、前記埋込ベースと略同−面に埋込プレー
トを設け、この埋込プレートを縦方向の鉄筋にて前記床
に埋設されている水平方向鉄筋に機械的に結合し、埋込
ベース上に載置された電気機器をこの埋込プレートに機
械的に結合することにより電気機器を固定することを特
徴とした電気機器の据付装置。
In a device in which electrical equipment is installed on an embedded base installed on the floor indoors, an embedded plate is provided on approximately the same plane as the embedded base, and this embedded plate is embedded in the floor using vertical reinforcing bars. The electrical equipment is fixed by mechanically coupling the electrical equipment to the horizontal reinforcing bars placed on the embedded base, and mechanically coupling the electrical equipment mounted on the embedded base to the embedded plate. Installation equipment.
JP9444880U 1980-07-04 1980-07-04 Electrical equipment installation equipment Expired JPS6015794Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9444880U JPS6015794Y2 (en) 1980-07-04 1980-07-04 Electrical equipment installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9444880U JPS6015794Y2 (en) 1980-07-04 1980-07-04 Electrical equipment installation equipment

Publications (2)

Publication Number Publication Date
JPS5720118U JPS5720118U (en) 1982-02-02
JPS6015794Y2 true JPS6015794Y2 (en) 1985-05-17

Family

ID=29456378

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9444880U Expired JPS6015794Y2 (en) 1980-07-04 1980-07-04 Electrical equipment installation equipment

Country Status (1)

Country Link
JP (1) JPS6015794Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62175741U (en) * 1986-04-23 1987-11-07

Also Published As

Publication number Publication date
JPS5720118U (en) 1982-02-02

Similar Documents

Publication Publication Date Title
RU2082853C1 (en) Method of construction of foundation
US2081380A (en) Brick veneering structure
JPS6015794Y2 (en) Electrical equipment installation equipment
JPH0475966B2 (en)
JPS6410837A (en) Box pulling basket retaining mold of iron pillar fixing part in s building
JP3622472B2 (en) Steel column base drop construction method
JP2733560B2 (en) Slab construction method
JPS6035492B2 (en) Electrical equipment installation equipment
JPS6039816B2 (en) Anchor bolt burial method
JPS6410838A (en) Box pulling basket retaining mold of iron pillar fixing part in src building
JPS5925969Y2 (en) basic hardware
JP2780861B2 (en) Block structure for foundation construction
JPS6145240Y2 (en)
JPS6118094Y2 (en)
JPH10292390A (en) Installing method of anchor bolt for vibration isolation device
JPH0336967B2 (en)
JPS6326379Y2 (en)
JPS6233778Y2 (en)
JPS60164517A (en) Construction of foundation for wooden house and block therefor
JPH04238918A (en) Construction of high-floor type housing base
JPS6035639Y2 (en) Hardware for installing foundations of tower-like structures
JP2538469B2 (en) Cable floor penetration fire protection method and slab pot
JPS6133089Y2 (en)
JPS6032211Y2 (en) Foundation for equipment installation
JP2596589Y2 (en) Foundation structure