JPS60126409A - Temporary construction of bridge beam - Google Patents

Temporary construction of bridge beam

Info

Publication number
JPS60126409A
JPS60126409A JP23363883A JP23363883A JPS60126409A JP S60126409 A JPS60126409 A JP S60126409A JP 23363883 A JP23363883 A JP 23363883A JP 23363883 A JP23363883 A JP 23363883A JP S60126409 A JPS60126409 A JP S60126409A
Authority
JP
Japan
Prior art keywords
bridge
girder
bridge girder
erection
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23363883A
Other languages
Japanese (ja)
Other versions
JPH0415845B2 (en
Inventor
大村 茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ORIENTAL CONCRETE CO
ORIENTARU CONCRETE KK
Original Assignee
ORIENTAL CONCRETE CO
ORIENTARU CONCRETE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ORIENTAL CONCRETE CO, ORIENTARU CONCRETE KK filed Critical ORIENTAL CONCRETE CO
Priority to JP23363883A priority Critical patent/JPS60126409A/en
Publication of JPS60126409A publication Critical patent/JPS60126409A/en
Publication of JPH0415845B2 publication Critical patent/JPH0415845B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は橋桁を橋脚の所定位置に架設する方法に関す
るものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a bridge girder at a predetermined position on a bridge pier.

従来、橋桁の架設方法としては、エレクションガーダ−
を使用する方法が大半を占め、ガーダ−2連使用による
抱込み架設およびガーダ−1連使用による吊込み架設等
が行なわれているが、何れの場合も、橋桁を架設したの
ち橋座上で橋桁を据付位置まで横移動する必要があり、
この横移動作I Ar 業は非常に危険な作業である。
Conventionally, the erection girder method was
The majority of methods involve using two girders to carry the bridge, and one girder to suspend the bridge, but in both cases, after the bridge girder has been erected, It is necessary to move the bridge girder laterally to the installation position.
This lateral movement work is extremely dangerous.

またガーダ−をデツキとして橋桁を引出したのち、橋脚
上に予め設置した2基の門型クレーンにより橋桁の架設
据付けを行なう方法もあるが、この場合、門型クレーン
の設置には捜索を必要とし、現場の立地条件によっては
、捜索用アンカーの設置場所に制約を受ける場合が多く
、また門型クレーンの移動時等に多くの危険な作業を伴
なうのが現状である。
Another method is to use the girder as a deck to pull out the bridge girder, and then use two gate-type cranes pre-installed on the bridge piers to erect and install the bridge girder, but in this case, a search is required to install the gate-type cranes. Depending on the location of the site, there are often restrictions on where search anchors can be installed, and the current situation is that many dangerous operations are involved when moving a portal crane.

また−万、橋梁の設計は、一般に下部構造である橋脚の
天端中を上部構造の橋面中とほぼ同じにすることが常態
であることから、上部構造を構成する橋桁を架設する場
合、橋桁を所定の据付位置まで横移動する作業の安全性
に苦慮する場合が多い。
In addition, when designing a bridge, it is common practice to make the top of the pier, which is the substructure, almost the same as the bridge surface of the superstructure, so when constructing the bridge girder that makes up the superstructure, There are often concerns about the safety of the work involved in moving bridge girders laterally to a predetermined installation location.

この発明は、前述の問題を有利に解決できる橋桁の架設
方法を提供することを目的とするものであって、この発
明の要旨とするところは、橋脚1の左右両側の上部にブ
ラケット2を着脱自在に固定し、橋軸方向に隣り合うブ
ラケット2にわたつ2− てエレクションガータ−6を架設固定し、左右のエレク
ションガーダ−6に自走式門型クレーン4を載架し、次
にその門型クレーン4により橋桁5を引き出したのち所
定位置に下ろして据付けることを特徴とする橋桁の架設
方法にある。
The purpose of the present invention is to provide a method for constructing a bridge girder that can advantageously solve the above-mentioned problems. A self-propelled gate type crane 4 is mounted on the left and right erection girders 6, and then the self-propelled gate type crane 4 is mounted on the left and right erection girders 6. The method for constructing a bridge girder is characterized in that the bridge girder 5 is pulled out by a gate type crane 4, and then lowered and installed at a predetermined position.

次にこの発明を図示の例によって詳細に説明する。Next, the present invention will be explained in detail using illustrated examples.

図面はこの発明の一実施例を示すものであって、橋桁架
設径間の前後橋脚1における左右方向の両側に、橋脚天
端に載置される支承下面と橋脚上部側面に当接される支
承側面とを備えている鋼製ブラケット2が係合され、か
つ橋脚1の天端の上部に配置されたPC鋼棒からなる連
結部材6は左右のブラケット2に挿通され、その連結部
材6の突出端部に座金7が嵌設されると共にナツト8が
螺合され、その連結部材6およびナツト8により各ブラ
ケット2が橋脚1に締付固定されている。
The drawing shows an embodiment of the present invention, in which a lower surface of a support placed on the top of the pier and a support that abuts the side surface of the upper part of the pier are provided on both sides of the front and rear piers 1 of the bridge girder construction span in the left and right direction. A connecting member 6 made of a PC steel rod, which is engaged with a steel bracket 2 having side surfaces and arranged at the upper part of the top of the pier 1, is inserted through the left and right brackets 2, and the connecting member 6 protrudes. A washer 7 is fitted to the end and a nut 8 is screwed together, and each bracket 2 is fastened and fixed to the pier 1 by the connecting member 6 and the nut 8.

前記ブラケット2の外面に作業用足場9が固定され、か
つ前後方向(橋軸方向)に並ぶブラケット2にわたって
鋼製エレクションガーダ−6が架設されてボルト等によ
り着脱自在に固定され、さらに各エレクションガーダ−
ろの上面にはクレーン用レール10が敷設固定され、走
行用駆動装置11′f!:備えている複数台の自走式門
型クレーン4の車輪は前記レール10に載置されている
。!、た門型クレーン4におけるガーダ−12の上面に
、左右方向に延長するトロリー用レール16が敷設固定
され、そのレール16上を走行する自走式l・01J 
−14には検数の巻上機15が固定され、各巻上機15
により昇降される昇降部材16には、橋桁5の下面を支
持する支持部材17と橋桁5の上部に配置される吊り部
材18と支持部材17および吊り部材18の左右両側に
着脱自在に連結された吊り杆19とからなる桁吊り具2
0における前記吊り部材18の中央部が着脱自在に連結
され、前記トロリー14および巻上機15により架設機
21が構成されている。
A work scaffold 9 is fixed to the outer surface of the bracket 2, and a steel erection girder 6 is constructed across the brackets 2 arranged in the longitudinal direction (bridge axis direction) and is detachably fixed with bolts, etc., and each erection girder −
A crane rail 10 is laid and fixed on the upper surface of the roller, and a traveling drive device 11'f! : The wheels of the plurality of self-propelled gate type cranes 4 provided are placed on the rails 10. ! , A trolley rail 16 extending in the left and right direction is laid and fixed on the upper surface of the girder 12 in the gate type crane 4, and the self-propelled type L-01J runs on the rail 16.
A counting hoist 15 is fixed to -14, and each hoist 15
The elevating member 16, which is lifted and lowered by Girder hanging tool 2 consisting of hanging rod 19
The central portions of the hanging members 18 at 0 are removably connected, and the trolley 14 and hoisting machine 15 constitute an erection machine 21.

橋桁5を架設する場合は、前後2基の門型クレーン4に
おける架設機21により、桁吊り具2゜を介して橋桁5
の前後両端部を支持してその橋桁57il−吊上げ、次
いで各門型クレーン4を走行させて橋桁を橋軸方向の所
定位置1で引出し、次に架設機21を横行移動させて、
橋桁5を左右方向の所定位置まで移動したのち、架設機
21の巻上機15を巻下方向に運転して橋桁5を下降さ
せ、その橋桁5を橋脚1上の所定位置に設置されたシュ
ー22の上に据付ける。
When constructing the bridge girder 5, the construction machines 21 of the two front and rear gate cranes 4 are used to erect the bridge girder 5 via the girder hanging tools 2°.
The bridge girder 57il is lifted by supporting both front and rear ends of the bridge girder 57il, then each gate type crane 4 is run to pull out the bridge girder at a predetermined position 1 in the bridge axis direction, and then the erection machine 21 is moved laterally,
After moving the bridge girder 5 to a predetermined position in the left and right direction, the hoisting machine 15 of the erection machine 21 is operated in the lowering direction to lower the bridge girder 5, and the bridge girder 5 is moved to a shoe installed at a predetermined position on the pier 1. Install it on top of 22.

この発明によれば、橋脚1の左右両側の上部にブラケッ
ト2を着脱自在に固定し、橋軸方向に隣り合うブラケッ
ト2にわたってエレクションガーダ−3f:架設固定し
、左右のエレクションガーダ−乙に自走式門型クレーン
4を載架するので、橋脚1の天端から側方に外れた位置
にエレクションガーダ−を据付けることができ、かつ据
付けた左右のエレクションガーダ−6の間隔をゲージと
する2基の自走式門型クレーン4により橋桁5を吊って
引き出して所定位置に直接据付けるので、橋脚1上で橋
桁5を横移動する必要がなく、そのため橋桁5の据付は
作業を安全にかつ高能率で行なうことができ、さらに捜
索を必要としないので、5− 如何なる架橋現場にも採用することができる等の効果が
得られる。
According to this invention, the brackets 2 are removably fixed to the upper parts of the left and right sides of the bridge pier 1, and the erection girders 3f: are erected and fixed across the brackets 2 adjacent to each other in the bridge axis direction, and are self-propelled to the left and right erection girders B. Since the gate-type crane 4 is mounted, the erection girder can be installed at a position laterally away from the top of the pier 1, and the distance between the installed left and right erection girders 6 is used as a gauge. Since the bridge girder 5 is hoisted and pulled out using the base self-propelled gate type crane 4 and installed directly in a predetermined position, there is no need to move the bridge girder 5 laterally on the pier 1, and therefore the installation of the bridge girder 5 can be carried out safely and easily. Since it can be carried out with high efficiency and does not require searching, it has the following effects: 5- It can be applied to any bridge construction site.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明の実施例ケ示すものであって、第1図は
橋桁の架設を行なっている状態を示す正面図、第2図は
その一部切欠側面図、第6図はブラケットおよびエレク
ションガーダ−付近を拡大して示す正面図、第4図はそ
の側面図である。 図において、1は橋脚、2はブラケット、6はエレクシ
ョンガータ゛−14は自走式門型クレーン、5は橋桁、
6は連結部材、8はナツト、10はクレーン用レール、
16はトロリー用レール、14は自走式トロリー、15
は巻上機、20は桁吊り具、21は架設機である。
The drawings show an embodiment of the present invention, in which Fig. 1 is a front view showing a state in which a bridge girder is being constructed, Fig. 2 is a partially cutaway side view thereof, and Fig. 6 shows a bracket and an erection girder. - A front view showing an enlarged view of the vicinity, and FIG. 4 is a side view thereof. In the figure, 1 is a bridge pier, 2 is a bracket, 6 is an erection garter, 14 is a self-propelled gate type crane, 5 is a bridge girder,
6 is a connecting member, 8 is a nut, 10 is a crane rail,
16 is a trolley rail, 14 is a self-propelled trolley, 15
20 is a hoisting machine, 20 is a girder hoist, and 21 is an erection machine.

Claims (1)

【特許請求の範囲】[Claims] 橋脚1の左右両側の上部にブラケット2を着脱自在に固
定し、橋軸方向に隣り合うブラケット2に+)たってエ
レクションガーダ−6を架設固定し、左右のエレクショ
ンガーダ−6に自走式門型クレーン4を載架し、次にそ
の門型クレーン4により橋桁5を引き出したのち所定位
置に下ろして据付けることを特徴とする橋桁の架設方法
Brackets 2 are removably fixed to the upper parts of the left and right sides of the pier 1, and erection girders 6 are erected and fixed to the brackets 2 adjacent to each other in the direction of the bridge axis. A method for constructing a bridge girder, which is characterized in that a crane 4 is mounted on the bridge, and then the bridge girder 5 is pulled out by the gate type crane 4, and then lowered and installed at a predetermined position.
JP23363883A 1983-12-13 1983-12-13 Temporary construction of bridge beam Granted JPS60126409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23363883A JPS60126409A (en) 1983-12-13 1983-12-13 Temporary construction of bridge beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23363883A JPS60126409A (en) 1983-12-13 1983-12-13 Temporary construction of bridge beam

Publications (2)

Publication Number Publication Date
JPS60126409A true JPS60126409A (en) 1985-07-05
JPH0415845B2 JPH0415845B2 (en) 1992-03-19

Family

ID=16958173

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23363883A Granted JPS60126409A (en) 1983-12-13 1983-12-13 Temporary construction of bridge beam

Country Status (1)

Country Link
JP (1) JPS60126409A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178922A (en) * 1998-12-15 2000-06-27 Ps Corp Erection method and device for extension girder
JP2003213698A (en) * 2002-01-16 2003-07-30 Maeda Corp Bridge and construction method thereof
JP2017002541A (en) * 2015-06-09 2017-01-05 オリエンタル白石株式会社 Bridge construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS535465A (en) * 1976-07-02 1978-01-19 Kubota Ltd Apparatus for dehydrating sifted refuge

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS535465A (en) * 1976-07-02 1978-01-19 Kubota Ltd Apparatus for dehydrating sifted refuge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178922A (en) * 1998-12-15 2000-06-27 Ps Corp Erection method and device for extension girder
JP2003213698A (en) * 2002-01-16 2003-07-30 Maeda Corp Bridge and construction method thereof
JP2017002541A (en) * 2015-06-09 2017-01-05 オリエンタル白石株式会社 Bridge construction method

Also Published As

Publication number Publication date
JPH0415845B2 (en) 1992-03-19

Similar Documents

Publication Publication Date Title
JP4504910B2 (en) Dolly and method of erection of temporary pier using it
JPH09221718A (en) Girder erection method of bridge
JP2918475B2 (en) Pier construction method, pier dismantling method and lift-up / rotation device
JP5184248B2 (en) Construction method of level crossing
JP2009091816A (en) Method and device for constructing bridge
CN112323657A (en) Integrated prefabricated bridge dismantling machine and prefabricated bridge dismantling method
CN210366808U (en) Lifting and dismantling device for rail walking
JPS60126409A (en) Temporary construction of bridge beam
JP3349463B2 (en) How to install additional girder
JPH1181246A (en) Tension jack moving device for precast concrete block construction method
KR200363059Y1 (en) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
CN211645930U (en) Tunnel inverted arch construction trestle
JPH11147690A (en) Low head space reinforcing bar building-in device
CN209922694U (en) Lifting appliance
JP2010007243A (en) Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method
KR100530351B1 (en) Telescopical Trolley Car for Inspection
JP2768281B2 (en) Bridge construction method
CN216889999U (en) Lifting platform for bridge construction
CN214459690U (en) Pushing and positioning device for large-span steel I-beam side beam
CN217458540U (en) Combined gantry crane for dismantling superstructure of navigation bridge
JP3471248B2 (en) Portal crane
CN214087427U (en) Mounting structure of large-tonnage bridge deck crane on high-support small platform
JPH0776932A (en) Method of attaching wall member
JPH0274707A (en) Rising construction device of half-arch for arch bridge
JPH0336362B2 (en)