JPS601169Y2 - Structure of ears for concrete separator - Google Patents

Structure of ears for concrete separator

Info

Publication number
JPS601169Y2
JPS601169Y2 JP8714578U JP8714578U JPS601169Y2 JP S601169 Y2 JPS601169 Y2 JP S601169Y2 JP 8714578 U JP8714578 U JP 8714578U JP 8714578 U JP8714578 U JP 8714578U JP S601169 Y2 JPS601169 Y2 JP S601169Y2
Authority
JP
Japan
Prior art keywords
length
concrete
ear
formwork
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP8714578U
Other languages
Japanese (ja)
Other versions
JPS554267U (en
Inventor
進 亀井
留次郎 吉田
卓史 田辺
Original Assignee
亀井 嘉征
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 亀井 嘉征 filed Critical 亀井 嘉征
Priority to JP8714578U priority Critical patent/JPS601169Y2/en
Publication of JPS554267U publication Critical patent/JPS554267U/ja
Application granted granted Critical
Publication of JPS601169Y2 publication Critical patent/JPS601169Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は、扁平板状で隣接コンクリート型枠め周辺突出
板部間に挾み込み位置させた状態てヒ÷ンを介して係止
固定されるコンクリートセパレータ用耳部の構造の改良
に関する。
[Detailed description of the invention] The present invention is a flat plate-shaped concrete separator ear that is inserted between protruding plate parts around adjacent concrete forms and locked and fixed via hinges. Regarding the improvement of the structure of.

従来のセパレータにあっては、第11:図イ、iに示す
ように、その耳部OAの長さ01:カ、型枠Cの突出板
部14の突出婁さOLよりも相当短かく構成されていだ
In the conventional separator, as shown in Figure 11: A and I, the length of the ear portion OA is considerably shorter than the protruding width OL of the protruding plate portion 14 of the formwork C. It's been done.

これ(まンセパレーダO8が打設コンクリート内に埋殺
しされて転用が効かず、かつコンクリート硬化後の型枠
解体時にコンクリート面から突出する耳部OAが、表面
仕上げのため切断されるものであることに鑑みて、極力
材料節減を図り、コストダウンを遠戚しながらも、耐引
張強度を確保する意図から、必要最小限の長さに設定さ
れいたもので、このことは、従来、常識一般化されてい
た。
This is because the manseparator O8 is buried in the poured concrete and cannot be used for other purposes, and the ears OA protruding from the concrete surface are cut off for surface finishing when the formwork is dismantled after the concrete has hardened. In view of this, the length was set to the minimum necessary in order to save materials as much as possible and to ensure tensile strength while reducing costs. It had been.

しかしながら、ごのようなセパレータosを用いて、第
11図ハのよ:うに多段に型枠C・・・群を積層組付け
する場合には、耳部OA長さolが突出板部14長さよ
りも短く、従って、各対向板部14、」4・・・外端側
に、上位板部14・・・を下位板部14・・・にて支持
し得ない隙間014・・・が生じている1ことに起因し
て、多段積層型枠C・・・群が、自ら〕重量又はUクリ
ップの締め付けによって、仮想線・のように外方に反り
返えり傾倒することがあり、コンクリート躯体が所期の
形状通りのものになもなくなってしまう:おそれがあり
、これを防止するために、相当強度の大きな、従って高
価にっく型枠支り保工(端太材など)を必要と腰却って
1費を11アツプすることになっていた。
However, when assembling formwork C... groups in multiple stages as shown in Fig. 11C using a separator os like this, the length OL of the ear part OA is the length of the protruding plate part 14. Therefore, a gap 014 is created on the outer end side of each opposing plate portion 14, ``4'', in which the upper plate portion 14 cannot be supported by the lower plate portion 14. Due to There is a risk that the shape will not be the same as expected, and to prevent this, it is necessary to use considerably strong and therefore expensive nickel formwork support (such as end pieces). So I decided to go ahead and add 11 more to the cost.

他方、例えば実開昭48−9792咥公開出願明細書並
びに図面にみられるように、コンクリート型枠の周辺突
出板部の長さを等しい長さにまで耳部の長さを全幅にわ
たって形成したセパレータも公知にはなっていたが、か
かる形状とするとセパレータ製造上における材料が最大
限長いものを必要とするためコストアップにつながる欠
点があった。
On the other hand, as can be seen in the specification and drawings of the Japanese Utility Model Publication No. 48-9792, for example, a separator is formed in which the length of the peripheral projecting plate part of the concrete formwork is equal and the length of the ear part is formed over the entire width. However, such a shape requires the longest possible material for separator production, which has the drawback of increasing costs.

本考案は、かかる問題に着眼して、材料節減によるコス
トダウンを可及的に図りながらも、前述型枠多段積層の
場合の型枠群反り返り傾倒を確実に防止できるようにす
ることを目的とするものである。
The present invention focuses on this problem and aims to reduce costs as much as possible by saving materials, while also reliably preventing the warping and tilting of formwork groups in the case of multi-layered formwork stacking. It is something to do.

本考案によるコンクリートセパレータ用耳部の構造は、
扁平板状耳部の軸方向中心位置に、ピン挿通用の孔を穿
設形成腰該孔を穿設形成した部分から外端側部分におい
て、前記コンクリート型枠の周辺突出板部の突出長さと
等しいか、又はほぼ等しい長さを有する拡張部分と、該
部分に対して長さの短小な部分とで形成し、該拡張部分
の形状を前記孔形成部分における幅方向に沿った中心線
と上記拡張部分における長手方向の中間部との交点Pを
中心とする回転対称形に形成しであることを特徴とする
The structure of the ears for concrete separators according to the present invention is as follows:
A hole for pin insertion is bored at the axial center position of the flat plate-like ear. From the part where the hole is drilled to the outer end side, the projecting length of the peripheral protruding plate part of the concrete formwork and It is formed of an extended part having equal or almost equal length and a part shorter and smaller in length than the extended part, and the shape of the extended part is set to the center line along the width direction of the hole forming part and the above. It is characterized by being formed in a rotationally symmetrical shape about the intersection point P with the longitudinal middle part of the expanded part.

即ち、前記板部の突出長さと等しい又はほぼ等しい長さ
を有する部分(以下拡張部分という)の存在により、上
位板部は、その突出長さ方向の全範囲又はほぼ全範囲に
亘って、下位板部に支持されることになるから、型枠を
多段積層した場合でも、従来の如く積層型枠群が外方へ
反り返り傾倒するといったトラブルは、確実に防止さ、
れ、それ故に、支保工の所要強度を低下、しなからも型
枠群を所期の姿勢に保持できて、コンクリート躯体を所
期通りの形状で築造できる。
That is, due to the existence of a portion (hereinafter referred to as an extended portion) having a length equal to or approximately equal to the protrusion length of the plate portion, the upper plate portion can be extended over the entire range or almost the entire range in the direction of its protrusion length. Because it is supported by the plate, even when formwork is stacked in multiple stages, problems such as the stacked formwork group bending outward and tilting as in the past can be reliably prevented.
Therefore, the required strength of the shoring can be reduced, the formwork group can be maintained in the desired posture, and the concrete frame can be constructed in the desired shape.

しかも、前記拡張部分は、傾倒防止作用を発揮するに当
って、少なくとも板部の突出長さ方向において、板部突
出長さと等しく又はほぼ等しく構成しておくだけで良く
て、耳部の巾方向・金山に亘って設ける必要はないから
、材料の増大は可及的に抑える二とができる。
Moreover, in order to exhibit the tilting prevention effect, the expanded portions need only be configured to be equal or approximately equal to the protruding length of the plate portion at least in the protruding length direction of the plate portion, and in the width direction of the ear portion.・Since it is not necessary to provide it across the gold mine, the increase in material can be suppressed as much as possible.

つまり拡張部分を設けるものの、材料節減の効果は十分
に保つことができるのである。
In other words, although an expanded portion is provided, the effect of material savings can be maintained sufficiently.

以上の相乗により、本考案によれば、極めて簡単な構造
改良を施すだけで、型枠多段積層の場合のコンクリート
躯体の築造性能の向上と、耳部における材料節減および
支保工所要強、度の低減に基づく、大巾な工費ダウンと
を構成できるに至った。
As a result of the synergistic effects described above, the present invention can improve the construction performance of concrete structures in the case of multi-layered formwork, reduce the amount of material required for supporting, and increase the Based on this reduction, we have been able to achieve a significant reduction in construction costs.

殊に、本考案は前記拡張部分を形成するに当って、当該
拡張部分の突出長さに相当する長さの扁平帯状板部分を
、その長さ方向の三等分位置で、かつ、その巾方向の中
心線との交点を中心として回転対称形に切断して形成す
ることによって、このような拡張部分を有する耳部を、
二つ、材料を無駄にすることなく(不要で捨て去らなけ
ればならない部分を生じることなく)、極めて合理的に
得ることができるようにしたもので、この切断の仕方に
よる材料節減に基づくコストダウンを図り得る利点があ
る。
In particular, in forming the expanded portion, the present invention provides a flat strip plate portion having a length corresponding to the protruding length of the expanded portion, at three equal positions in the length direction, and at the same time as the width thereof. By cutting and forming a rotationally symmetrical shape around the intersection with the center line of the direction, the ear portion having such an expanded portion is formed.
Second, it is possible to obtain materials in an extremely rational manner without wasting materials (without creating parts that are unnecessary and must be thrown away), resulting in cost reductions based on the savings in materials due to this cutting method. It has the advantage of being able to achieve

以下、本考案の実施例を図面に基づいて説明する。Hereinafter, embodiments of the present invention will be described based on the drawings.

第1図において、1は、上下に隣接する金属製箱形のコ
ンクリート型枠C9Cの、上下に対接する周辺突出板部
14,14間に、その水平扁平板状耳部Aが挿入された
状態で、突出板部14,14、耳部Aに夫々互いに同一
位相箇所に穿設しである孔15,15,1にピン(Uク
リップ)16を共通に挿通係止することにより、突出板
部14.14に固定される鋼製のジヨイント部材で、こ
のジヨイント部材Jの型枠C9C内面側突出部は、縦断
面形状U字形のバー接続部Bに構成されている。
In FIG. 1, 1 is a state in which the horizontal flat plate-shaped ear part A is inserted between the vertically opposing peripheral protruding plate parts 14, 14 of the vertically adjacent metal box-shaped concrete formwork C9C. By commonly inserting and locking pins (U clips) 16 into holes 15, 15, 1 which are bored in the same phase positions in the protruding plate parts 14, 14 and the ear part A, respectively, the protruding plate parts 14. A joint member made of steel is fixed to 14, and the protruding portion on the inner surface of the formwork C9C of this joint member J is configured as a bar connection portion B having a U-shaped vertical cross section.

Mは、その端部分が、前記U字形接続部Bに嵌入された
状態で1.その長手方向に適当間隔隔てて形成された複
数個のピン挿通孔1.1・・・のうちの任意の一つ11
と、接続部Bの長手方向に適当間隔隔てて形成されに複
数個のピン挿通孔8・・・のうちの任意の一つ8とに亘
ってピン19を挿通することにより、接続部Bに連結さ
れる鋼製の中間バーである。
1.M with its end portion fitted into the U-shaped connection part B. Any one of the plurality of pin insertion holes 1.1 formed at appropriate intervals in the longitudinal direction 11.
By inserting the pin 19 through any one of the plurality of pin insertion holes 8 formed at appropriate intervals in the longitudinal direction of the connecting portion B, the pin 19 is inserted into the connecting portion B. This is a steel intermediate bar that is connected.

尚、左右対称であるため図示は左半分のみを示すである
が、セパレータSは、中間バー14と一対のジヨイント
部材J、Jとて構成されるものである。
Although only the left half of the separator S is illustrated because it is symmetrical, the separator S is composed of an intermediate bar 14 and a pair of joint members J, J.

ジヨイント部材Jの複数個のピン挿通孔8・・・および
Uクリップ挿通孔1は、バーリング加工により、筒状部
分9・・・および2を一体的に打出して、この筒状部分
9・・・および2の内部に形成されたものである。
The plurality of pin insertion holes 8 and the U-clip insertion holes 1 of the joint member J are formed by integrally punching out the cylindrical portions 9 and 2 by burring processing.・It is formed inside of and 2.

・3,3は、耳部Aの内方側に、バーリング加工にて筒
状部分4,4を打出して形成した打設コンクリート通過
孔5,5はミシン目状の耳部切断用凹入溝である。
・3, 3 are cast concrete passing holes 5, 5 formed by punching out the cylindrical parts 4, 4 by burring on the inner side of the ear part A. The holes 5, 5 are perforated recesses for cutting the ear part. It's a groove.

中間パー14のピン挿通孔11・・・も、バーリング加
工て筒状部分12・・・を打出して形成されている。
The pin insertion holes 11 of the intermediate par 14 are also formed by punching out the cylindrical portions 12 by burring.

而して、該実施例において、耳部Aに、板部14の突出
長さLと等しい又はほぼ等しい長さ1を有する部分a(
第2図において上半側部分)が一体的に設けられている
In this embodiment, the ear portion A has a portion a(
The upper half (in FIG. 2) is integrally provided.

この部分aは第11図イ9口に示した従来品の耳部の長
さに相等する部分a1を外方に更に延長した構造である
This part a has a structure in which part a1, which is equivalent to the length of the ear part of the conventional product shown in FIG. 11A9, is further extended outward.

この延長された拡張部分a2の巾方向横側部は、切欠き
6が形成された状態となっていて、その長さは前記従来
品の耳部の長さに相当する短小な部分である。
A notch 6 is formed in the lateral side portion in the width direction of this extended expanded portion a2, and the length thereof is a short portion corresponding to the length of the ear portion of the conventional product.

従って、隣接型枠C9Cの互いに対接する両板部14.
14のうち、上位部14は、その突出長さ方向の全範囲
又はほぼ全範囲において下位板部14に支持されること
になる。
Therefore, both plate portions 14 of the adjacent formwork C9C are in contact with each other.
14, the upper part 14 is supported by the lower plate part 14 over the entire range or almost the entire range in the direction of its protruding length.

それ故、型枠C・・・を多段積層した場合には、第11
図ハの実線の如く、積層型枠群C・・・は、鉛直又はほ
ぼ鉛直姿勢を保持することになる。
Therefore, when the formwork C... is stacked in multiple stages, the 11th
As shown by the solid line in Figure C, the stacked formwork group C... will maintain a vertical or nearly vertical posture.

前記耳部Aを有するジヨイント部材Jを製作するに当っ
ては、次のようにすることが好ま毛い。
When manufacturing the joint member J having the ear portion A, it is preferable to proceed as follows.

即ち、第5図に示すように、板部14の突出長さLの二
倍に相当する長さから前記拡張部分a2の長さを引いた
長さ2Lをその中間部に有し、全長が、ジヨイント部材
Jの長さの二倍から前記拡張部分a2の長さを引いた長
さ2Loに相当する扁平帯状板7を、その長さ方向の三
等分位置と、その巾方向に沿った中心線との交点Pを中
心として回転対称形に切断し、かつ、このように分離さ
れた二つの素板7A、7Aにパーリング加工にて、孔1
.3.8・・・を形成し、溝5・・・をつけたのち、接
続部B、 B相当部分をU字形に折曲することによって
、二つのジヨイント部材J、Jを得る方法である。
That is, as shown in FIG. 5, the length 2L, which is obtained by subtracting the length of the extended portion a2 from the length equivalent to twice the protruding length L of the plate portion 14, is provided at the intermediate portion, and the total length is , the flat strip plate 7 corresponding to the length 2Lo obtained by subtracting the length of the expanded portion a2 from twice the length of the joint member J is divided into three equal parts in the length direction and along the width direction thereof. The two raw plates 7A, 7A separated in this way are cut into a rotationally symmetrical shape around the intersection point P with the center line, and a hole 1 is formed by a purring process.
.. After forming 3.8... and attaching grooves 5..., the connecting portion B and the portion corresponding to B are bent into a U-shape to obtain two joint members J and J.

耳部Aの形状としては、上側以外に、第6図の如く、傾
斜直線6′を有するもの、第7図の如く鋸歯形端縁6″
を有するものなど任意である。
The shape of the ear portion A includes, in addition to the upper side, an inclined straight line 6' as shown in Fig. 6, and a sawtooth edge 6'' as shown in Fig. 7.
It is arbitrary, such as having .

これらも、第5図の手段と同様の点対称状の切断によっ
て作製することが好ましい。
It is preferable that these also be produced by point-symmetrical cutting similar to the means shown in FIG.

第8図は、別実施例に係り、セパレータSをして、一枚
の帯板から、両端耳部A、 Aと中間部Mとを一体連結
状態にプレス加工したものである。
FIG. 8 shows another embodiment in which a separator S is press-worked from a single strip plate so that both ends A, A and a middle part M are integrally connected.

第9図は、中間バーMに接続される鋼製の接続部Bに対
し、別体のステンレス製耳部Aをピン10.10接合し
たものである。
In FIG. 9, a separate stainless steel ear part A is joined to a steel connecting part B connected to an intermediate bar M by pins 10 and 10.

この場合も、第10図のように、長さ2Lとピン10,
10相当分長さを有する帯状板7を、点Pでの回転対称
形に切断することで作製する。
In this case as well, as shown in Fig. 10, the length 2L and the pin 10,
It is produced by cutting a strip plate 7 having a length corresponding to 10 mm into a rotationally symmetrical shape at a point P.

【図面の簡単な説明】[Brief explanation of the drawing]

図面中第1図乃至第10図本考案に係るコンクリートセ
パレータ用耳部の構造の実施例を示し、第1図は型枠牽
引状態の概略断面図、第2図は要部平面図、第3図は要
部側面図、第4図は要部の一部切欠正面図、第5図は耳
部作製手段の概略平面図、第6図、第7図は同手段の変
形例を示す平面図、第8図、第9図は夫々別の実施例に
係る要部平面図で、第10図は第9図の作製手段を示す
平面図である。 尚、第11図イ、町よ従来のものを示す縦断面図、平面
図、同ハは型枠組立姿勢の概略側面図である。 1・・・・・・孔、7・・・・・・扁平帯状板、14・
・・・・・周辺突出板部、16・・・・・・ピン、A・
・・・・・扁平板状耳部、C・・・・・・コンクリート
型枠、L・・・・・・板部突出長さ、P・・・・・・交
点。
Figures 1 to 10 in the drawings show an embodiment of the structure of the ear part for a concrete separator according to the present invention. The figure is a side view of the main part, Fig. 4 is a partially cutaway front view of the main part, Fig. 5 is a schematic plan view of the ear part manufacturing means, and Figs. 6 and 7 are plan views showing modifications of the same means. , FIG. 8, and FIG. 9 are plan views of main parts according to different embodiments, respectively, and FIG. 10 is a plan view showing the manufacturing means of FIG. 9. In addition, FIG. 11A is a vertical cross-sectional view and a plan view showing the conventional one, and FIG. 11C is a schematic side view of the formwork assembly posture. 1... Hole, 7... Flat strip plate, 14.
...Peripheral protruding plate part, 16...Pin, A.
...Flat plate-like ear portion, C...Concrete formwork, L...Protrusion length of plate portion, P...Intersection point.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 扁平板状て隣接コンクリート型枠C9Cの周辺突出板部
14,14間に挾み込み位置させた状態でピン13杢介
して係止固定されるコンクリートセパレータ用耳部Aの
構造であって、爺の扁平板状耳部Aの幅方向中心位置に
、ビン16挿通用の孔1が穿設形成され、詠孔1が穿設
された部分から外端側部分□にお□いて前記:コンクリ
ード紗枠(の周辺突出板部14の突出長さLと等しいか
、又はほぼ等しい長さ1を有する拡張部分と、1該部分
に対して長さの短小な部分とで形成七、該拡張部分の形
状を前艷孔11形戊部分+4おける幅方向に沿った中心
線と上艷拡張部分□!g”bける長手方向の中間部との
交点Pを中心とする回転対称形に形成じであるコンクリ
ートセパレータ用耳部の構造。
This is a structure of a concrete separator ear part A which is in the form of a flat plate and is held and fixed through a pin 13 in a state where it is inserted between peripheral protruding plate parts 14, 14 of an adjacent concrete formwork C9C, A hole 1 for inserting a bottle 16 is formed at the center position in the width direction of the flat plate-like ear part A of the above-mentioned concrete concrete. Formed by an extended portion having a length 1 equal to or approximately equal to the protruding length L of the peripheral protruding plate portion 14 of the gauze frame (1), and a portion shorter in length than the portion 7. The extended portion The shape is formed into a rotationally symmetrical shape centered on the intersection point P between the center line along the width direction of the front port hole 11-shaped hollow part + 4 and the longitudinal middle part of the upper port extension part □!g"b. Structure of an ear for a concrete separator.
JP8714578U 1978-06-23 1978-06-23 Structure of ears for concrete separator Expired JPS601169Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8714578U JPS601169Y2 (en) 1978-06-23 1978-06-23 Structure of ears for concrete separator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8714578U JPS601169Y2 (en) 1978-06-23 1978-06-23 Structure of ears for concrete separator

Publications (2)

Publication Number Publication Date
JPS554267U JPS554267U (en) 1980-01-11
JPS601169Y2 true JPS601169Y2 (en) 1985-01-14

Family

ID=29012393

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8714578U Expired JPS601169Y2 (en) 1978-06-23 1978-06-23 Structure of ears for concrete separator

Country Status (1)

Country Link
JP (1) JPS601169Y2 (en)

Also Published As

Publication number Publication date
JPS554267U (en) 1980-01-11

Similar Documents

Publication Publication Date Title
US6926470B2 (en) Metal sheet pile
US4964256A (en) Beam member for concrete forming system
US8359813B2 (en) Steel stud with openings and edge formations and method
KR100947340B1 (en) Shear reinforcement device for junctional region of slab and column, and manufacturing mathod of it
JP2013238035A (en) Formwork comprising multiple cylindrical materials, base concrete, and construction method of pile foundation
JPS601169Y2 (en) Structure of ears for concrete separator
JPH05148930A (en) Precast concrete plate for compound floor
DE10196810T5 (en) Composite construction part, in particular for the production of cladding and wall structures of buildings
DE3744037C2 (en) Shell of a formwork block made of plastic foam, in particular polystyrene foam
US2142637A (en) Lota-beam
KR200179329Y1 (en) Ledger connector for scaffold of assembly type
JPS5918027Y2 (en) Joint member of separator for concrete formwork
CN220768834U (en) Beam column node template and beam column pouring template
JPH0335458B2 (en)
JPS6370748A (en) Truss beam for precast concrete panel and its production
JPS5929083Y2 (en) Intermediate bar for concrete separator
JPH0417727Y2 (en)
KR100533805B1 (en) Steel joist using formed thin plate
JPS6013554Y2 (en) architectural structure
JPS6013954Y2 (en) Corner wall structure
JP2750032B2 (en) Architectural frame
JPS5942450Y2 (en) Intermediate bar of separator for concrete formwork
JP2534576Y2 (en) Multi-segment structure and branch segment
KR200200358Y1 (en) Metal sheet structural member enhanced heat and noise shield effect
JPS6320771Y2 (en)