JPS5961259A - Method for constituting subscriber's leading-in link - Google Patents

Method for constituting subscriber's leading-in link

Info

Publication number
JPS5961259A
JPS5961259A JP17074082A JP17074082A JPS5961259A JP S5961259 A JPS5961259 A JP S5961259A JP 17074082 A JP17074082 A JP 17074082A JP 17074082 A JP17074082 A JP 17074082A JP S5961259 A JPS5961259 A JP S5961259A
Authority
JP
Japan
Prior art keywords
test
subscriber
link
circuit
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17074082A
Other languages
Japanese (ja)
Inventor
Masaharu Ruike
類家 正晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Nippon Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp, Nippon Electric Co Ltd filed Critical NEC Corp
Priority to JP17074082A priority Critical patent/JPS5961259A/en
Publication of JPS5961259A publication Critical patent/JPS5961259A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/26Arrangements for supervision, monitoring or testing with means for applying test signals or for measuring
    • H04M3/28Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor
    • H04M3/30Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for subscriber's lines, for the local loop

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Monitoring And Testing Of Exchanges (AREA)

Abstract

PURPOSE:To attain the leading-in test of one subscriber even if another test link is in using by dividing the test link into a test link from the subscriber's side and the one from the maintenance side and connecting a switching circuit for these test links. CONSTITUTION:In case of a test from the subscriber's side, the subscriber 11 e.g. is lead in a test link 40 through a line circuit 21 and a contact sw of a test link switching circuit 61 and connected to a test device 5a1 through a contact ta1 by the operation of a test relay to execute a prescribed speech path test. At the test from the maintenance operator side, the test relay is actuated in accordance with the operation of the maintenance side and a switching relay of the circuit 61 is actuated. Subsequently, the subscriber's leading-in relay of a circuit 21 is actuated for instance, so that the subscriber 11 is lead in to a test device 5b1 through the contact sp of the circuit 21, the contact sw of the circuit 61, a test link 41, and a contact tb1 to execute the prescribed speech path test by the maintenance operator.

Description

【発明の詳細な説明】 本発明は加入者引込みリンク構成方式に関し、特にディ
ジタル交換システムにおける加入者引込み試験に適用し
うる加入者引込みリンク1βf成方式一般にディジタル
交換システムにおいて加入者を試験装置に引き込んで行
う加入者引込み試験は次の2つに大別される。1)は局
内の保9者が関知しなくてもよい、又は関知できないも
の、例えば受話器はずし防止警報音送出、加入側からの
加守者が関知しているもの、例えば通話路接続試験。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a subscriber attraction link configuration method, and more particularly to a subscriber attraction link 1βf configuration method applicable to subscriber attraction testing in a digital switching system. The subscriber attraction tests conducted in 2017 can be roughly divided into the following two types. 1) is something that the maintenance person in the station does not have to be concerned with or cannot be concerned with, such as sending out an alarm to prevent the handset from being disconnected, and something that the maintenance person from the subscriber side is concerned with, such as a call path connection test.

自動加入者通話路試験、自動加入者ライン試験等(以下
保守者側からの試験と称す)である。
These include automatic subscriber call path tests, automatic subscriber line tests, etc. (hereinafter referred to as tests from the maintenance personnel side).

この種の加入者引込み試験について従来の加入者引込み
リンク構成方式の一例を示す第1図を参照して説明する
。第1図において、複数n(例えばn=64)の加入者
11%Inはそれぞれライン回路(以下L C)LC+
 2I〜LCn 2 n k介してディジタル通話路ス
イッチ(以下TDSW)3 に収容され−般的ディジタ
ル交換システムの通話路を形成する。
This type of subscriber attraction test will be explained with reference to FIG. 1, which shows an example of a conventional subscriber attraction link configuration method. In FIG. 1, a plurality of n (for example, n=64) subscribers 11%In each have a line circuit (hereinafter referred to as LC) LC+
2I to LCn are accommodated in a digital communication path switch (hereinafter referred to as TDSW) 3 via 2n k - forming a communication path of a general digital switching system.

また各LCの加入者引込みリレー(図示していない)の
接点spのメーク側はそれぞれ(従っ′ζ、″64組)
複式接続されてテストリンク4に引き込マれ、さらにe
亥テストリンク4はテストリレー’I’A、 、TA。
In addition, the make side of the contact point SP of each LC's subscriber pull-in relay (not shown) is 64 sets (therefore, ′ζ, ″).
It is double-connected and pulled into the test link 4, and then e
Pig test link 4 is test relay 'I'A, TA.

およびTB、 、 TB、(いずれも図示していない)
のそれぞれの接点ta、、ta2およびtb、、tt)
、を介してそれぞれ試験装置(以下’l’5T)TST
A、5a、、TSTA。
and TB, , TB, (none shown)
each contact point ta,, ta2 and tb,, tt)
, respectively through the test equipment (hereinafter 'l'5T) TST
A,5a,,TSTA.

5a、オjヒTsTB、 5b、 、’l’s’l’B
、 51)t  ニi続すして加入者引込みリンクを構
成する。ここで’I’ 81’A。
5a, OhjhiTsTB, 5b, ,'l's'l'B
, 51) t and then configure the subscriber attraction link. Here 'I'81'A.

5a1 、 ’I’STA、 5a2はそれぞれ加入者
通i’tt!i路試験器。
5a1, 'I'STA, and 5a2 are respectively subscriber communication i'tt! i-road tester.

通話路導通試験器等の前記加入者側からの試験用、TS
TB、 5b、 、 T8Tb、 5b、はそれぞれ通
話路接続試験器、自動加入者通話路試験器等の前記保守
者側からの試験用である。
For testing from the subscriber side such as communication line continuity tester, TS
TB, 5b, T8Tb, 5b are used for testing by the maintenance personnel, such as a communication path connection tester and an automatic subscriber communication path tester, respectively.

加入者側からの試験全行うときは、例えば加入者11が
発呼したのちローカルコン)o−ラ(図示していない)
の指示によりhc、2. の前記加入者引込みリレーが
動作すると、該加入者1.は前記接点spによシテスト
リンク4に引き込まれるとともに前記加入者IIがらT
DSW3への通話路はスプリットされる。続いて中央制
御装置(図示していない)の指示にょシテストリレー例
えば前記テストリレーTA、を動作させると、前記テス
トリンク4は接点ta、を介して加入者通話路試験器T
81’A。
When performing all tests from the subscriber side, for example, after the subscriber 11 makes a call, the local controller (not shown)
hc according to the instructions of 2. When said subscriber attraction relay of said subscriber 1. is operated, said subscriber 1. is drawn into the site test link 4 by the contact sp, and T
The communication path to DSW3 is split. Subsequently, when the test relay, for example the test relay TA, is operated according to instructions from a central control unit (not shown), the test link 4 is connected to the subscriber channel tester T via the contact ta.
81'A.

5a、と接続され、前記加入者1.への通話路試験が行
われる。他の加入者側からの試験(受話器はずし防止警
報音送出2通話路導通試験等)についても同様である。
5a, and the subscriber 1. A call route test will be conducted. The same applies to tests from other subscribers (phone-removal prevention alarm sound transmission 2 communication path continuity test, etc.).

また保守者側からの試験を行うときは、保守者による操
作に応じて前記中央制御装置がテストリレー例えば前記
テストリレー1’13.y。
Further, when a maintenance person performs a test, the central control unit controls the test relay 1'13, for example, the test relay 1'13. y.

動作させ、続いて前記ローカルコントローラの指示によ
り例えばLCI 2+ の前記加入者引込みリレーを動
作させると、上記加入者側からの試験のときと同様に、
前記加入者11は接点sp、テス) +7ンク4.接点
tb、を介して通話路接続試験器’l’8TI3゜5b
1に引き込まれ保守者による所定の試験が行われる。他
の保守者側からの試験(自動加入者通話路試験、自動加
入者ライン試験等)についても同様である。
When the subscriber pull-in relay of, for example, LCI 2+ is operated according to instructions from the local controller, as in the case of the test from the subscriber side,
The subscriber 11 is contact point SP, TESS) +7 link 4. Communication path connection tester 'l'8TI3゜5b through contact tb.
1 and a predetermined test is conducted by a maintenance person. The same applies to other tests from the maintenance personnel (automatic subscriber call path test, automatic subscriber line test, etc.).

しかるに本例では、加入者引込みソ/りが加入者側から
の試験および保守者側からの試験で同一のテストリンク
全使用する構成を採っており、該加入者引込みリンクは
64加入者単位に複式接続されているため、ある1加入
者が例えば受話器はずし等の状態となっている場合は警
報音送出のリンクが閉成され、その加入者がロックアウ
ト状態又はリンク復旧(開放)するまで残りの63加入
者の引き込み酷、鋏はできない。従ってこのとき保守者
が自動加入者ライン試験等を行なおうとしてもその加入
者群(64加入者)は全てリンクブロックとなシ、該自
動加入者ライン試験がスキップされてしまい、このスキ
ップの度に試験設定を行わねはならないという欠点があ
った。
However, in this example, the subscriber attraction system uses all the same test links in the test from the subscriber side and the test from the maintenance side, and the subscriber attraction link is divided into 64 subscriber units. Due to the dual connection, if one subscriber goes off the hook, for example, the link for sending the alarm sound will be closed, and the link will remain until the subscriber is locked out or the link is restored (released). It is difficult to attract 63 subscribers, and the scissors cannot be used. Therefore, even if the maintainer attempts to perform an automatic subscriber line test at this time, all of the subscriber groups (64 subscribers) will not be linked, and the automatic subscriber line test will be skipped. The drawback was that test settings had to be made each time.

本発明の目的は、テストリンクを加入者側からの試験用
と保守者側からの試験用の2群に分けこれらテストリン
クの切替回路を備えることにより上記の欠点を解決し、
ある加入者によシ一方のテストリンクを開成使用中であ
っても該加入者と複式接続されている他の加入者の引込
み試験をできるようにする加入者引込みリンク構成方式
f提供することにある〇 本発明による加入者引込みリンク構成力式によれば、デ
ィジタル交換システムにおいて、それぞれ加入者を試験
装置に引き込む複ムの引込み回路と1加入者側からの試
験用の試験装置に接続された第1のテストリンクおよび
保守者flllJからの試験用の試験装置に接続された
第2のテストリンクの2群のテストリンク七、前記各引
込み回路と前HL’r2群のテストリンクとの間に設け
たテストリンク切替回路金儲えて成シ、該テストリンク
切替回路は前記保守者からの指示によシ前記引込み回路
の引込みリンクを前記第1のυ/りから第2のリンクへ
切替接続すること全特徴とする。
An object of the present invention is to solve the above-mentioned drawbacks by dividing the test links into two groups, one for testing from the subscriber side and one for testing from the maintenance side, and providing a switching circuit for these test links.
To provide a subscriber pull-in link configuration method f that allows a certain subscriber to conduct a pull-in test for other subscribers that are multiple-connected to the subscriber even when one test link is opened and in use. According to the subscriber pull-in link configuration formula according to the present invention, in a digital switching system, there is a multiple pull-in circuit for pulling each subscriber to a test device, and a test device connected to a test device for testing from one subscriber side. 2 groups of test links 7 of the 1st test link and the 2nd test link connected to the test equipment for testing from the maintainer flllJ, between each said lead-in circuit and the test link of the previous HL'r 2 group; The provided test link switching circuit makes money, and the test link switching circuit switches and connects the retracting link of the retracting circuit from the first υ/ to the second link according to instructions from the maintenance person. This is a full feature.

次に本発明の加入者引込みリンク偵成方式について第2
図を参照して説明する。
Next, we will discuss the subscriber attraction link scouting method of the present invention in the second section.
This will be explained with reference to the figures.

第2図は本発明の加入者引込みリンク構成方式の一実施
例を示す構成図である。同図において。
FIG. 2 is a block diagram showing an embodiment of the subscriber attraction link configuration method of the present invention. In the same figure.

従来の加入者引込みリンク構成方式と同じ構成、9件に
はそれぞれ第1図と同じ符号’t(ゴしである。
It has the same configuration as the conventional subscriber attraction link configuration method, and each of the nine items has the same symbol 't' as in FIG.

LC,2,、〜J、Cn2n(ここでn−64とする)
はそれぞれテストリンク切替回路(以下8 W ) S
W、 6. 。
LC,2,,~J,Cn2n (here n-64)
are respectively test link switching circuits (hereinafter referred to as 8W) S
W, 6. .

〜5Wn5nと接続され、該SW、6I、〜5Wn6n
はそれぞれ切替リレー(図示していない)とその接点s
wを有し、保守者側からの試験を行うとき一般に知られ
ている方法で該切替リレーを動作させる。またこれら接
点swの対応するもののブレーク側同志、メータ側同志
はそれぞれ(すなわち6・1組)複式に2群のテストリ
ンク40.41と接続いれ、さらに該デスドリンク40
および41はそれぞれ接点La1.ta2およびtb、
 、 tb、 1介して1’ S ’I’A。
~5Wn5n and the SW, 6I, ~5Wn6n
are a switching relay (not shown) and its contact point s, respectively.
w, and the switching relay is operated by a generally known method when performing a test from the maintenance personnel side. Also, the break side comrades and meter side comrades of the corresponding contacts SW are connected to two groups of test links 40 and 41 in a duplex manner (that is, 6 sets, 1 set), and furthermore, the death links 40
and 41 are contact points La1. ta2 and tb,
, tb, 1 via 1'S'I'A.

5 al 、 TSTA25 a2およびT8T、B、
 5b、、T8’l’J3.5b。
5 al, TSTA25 a2 and T8T, B,
5b,,T8'l'J3.5b.

と接続される。connected to.

加入者側からの試験を行うときの動作は第1図における
ものと同様である。すなわち例えば加入者lIはLC+
21 、5WI6+の接点sw (プレ、り側)を介し
てテストリンク40に引き込まれ、テストリレーTA、
の動作によシ接点ta+t:介して1、’8TA、 5
a、  と接続され所定の通話路試験が行われる。また
保守者側からの試験を行うときは、保守者側による操作
に応じて中央制御装g(図示していない)がテストリレ
ー例えLrJ′T 13 + f %、を作させるとと
もにsw、 6.  の切替リレーf I11作させ、
紗いてローカルコントローラ(図示していない)の指示
により例えばLC2,の加入者引込みリレーをpfl+
作させるので、前記加入者11はNrlC2,の接点S
p、5W16□の接点SW (/’−り(ill) 、
  fスト’)ンク41.接点tb、を介してTSTB
、5b、に引き込1れ保守者による所定の通話路接続試
I・力が行われる。
The operation when testing from the subscriber side is similar to that in FIG. That is, for example, subscriber II is LC+
21, is drawn into the test link 40 via the contact SW (pre, rear side) of 5WI6+, and the test relay TA,
Contacts ta+t: 1, '8TA, 5 through the operation of
a, and a predetermined communication path test is performed. When a test is performed by a maintenance person, the central control unit g (not shown) activates a test relay (for example, LrJ′T 13 + f %) in response to an operation by the maintenance person, and sw; Make the switching relay f I11,
According to instructions from a local controller (not shown), for example, the subscriber pull-in relay of LC2 is connected to pfl+.
Therefore, the subscriber 11 connects the contact S of NrlC2,
p, 5W16□ contact SW (/'-ri(ill),
f st')nk 41. TSTB via contact tb,
, 5b, and a predetermined call path connection test is performed by the maintenance person.

なお本実施例では加入者引込みリレー、テストリレーお
よびテストリンクの切替リレーの動作4旧制御はいずれ
も一般にソフトウェア処理される。
In this embodiment, the operation 4 old control of the subscriber draw-in relay, the test relay, and the test link switching relay are all generally processed by software.

すなわちプログラムに基づいてローカルコントローラ、
中央制御装置等の制御装置が制御を行う。
i.e. local controller based on the program,
A control device such as a central control device performs control.

またテストリンク切替回路をそれぞれ対応するライン回
路に含めて構成してもよい。
Alternatively, the test link switching circuits may be included in corresponding line circuits.

以上の説明により明らかなように本発明の加入者引込み
リンク構成方式によれば、デス) l)ンクを加入者側
からの試験用と保守者側からの試験用の2群に分け、こ
れらテストリンクの切替回路を備えることによシ、ある
加入者により一方のテストリンクラN」成使用中であっ
ても該加入者と複式接続されている加入者群の他の加入
者の引込み試験が可能になシ、従来その加入者群の全リ
ンクブロック等によりスキップしていた加入者試験の再
設定が不要となるので、保守運用面において障害回線の
予防保全又は障害の早期発見上、極めて有効であるとい
う効果が生じる。
As is clear from the above explanation, according to the subscriber pull-in link configuration method of the present invention, the links are divided into two groups, one for testing from the subscriber side and one for testing from the maintenance side, and these By providing a link switching circuit, even if a certain subscriber is using one test link, the pull-in test for other subscribers in the subscriber group that is dually connected to that subscriber can be performed. This eliminates the need to reconfigure subscriber tests, which were previously skipped due to all link blocks for that subscriber group, which is extremely effective in preventive maintenance of faulty lines or early detection of faults in terms of maintenance operations. The effect is that.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の加入者引込みリンク41吋成方式の一例
を示す4A成図および第2図は本発明の加入者引込みり
“ンク構成方式の一実施例を示す構成図である。 図において、11.〜1n・・・・・・加入者、2I、
〜2n・・・・・・ライン回路、3・・・・・・ディジ
タル通話路スイッチ、4.40.41・−・・−テスト
リンク、5 aI + 5 at + 5 bl + 
5 bl・・・・・・試験装置、61+〜6n・・・・
・・テストリンク切替回路。 茅 l 図 芽 2 図
FIG. 1 is a 4A configuration diagram showing an example of a conventional subscriber attraction link 41 configuration system, and FIG. 2 is a configuration diagram showing an embodiment of the subscriber attraction link configuration system of the present invention. , 11.~1n...subscriber, 2I,
~2n...Line circuit, 3...Digital channel switch, 4.40.41...-Test link, 5 aI + 5 at + 5 bl +
5 bl... Test equipment, 61+~6n...
...Test link switching circuit. Kaya l Utsume 2 fig.

Claims (1)

【特許請求の範囲】[Claims] ディジタル交換システムにおいて、それぞれ加入者を試
験装置に引き込む複数の引込み回路と、加入者側からの
試験用の試験装置に接続された第1のテストリンクおよ
び保守者側からの試験用の試験装置に接続された第2の
テストリンクの2群のテストリンクと、前記各引込み回
路と前記2群のテストリンク七の間に設けたテストリン
ク切替回路を備えて成り、該テストリンク切替回路は前
記保守者からの指示により前記引込み回路の引込みリン
クを前記第1のリンクから第2のリンクへ切替接続する
ことを特徴とする加入者引込みリンク構成方式。
In a digital switching system, a plurality of lead-in circuits each lead a subscriber to a test equipment, a first test link connected to a test equipment for testing from the subscriber side, and a first test link connected to the test equipment for testing from the maintenance side. The test link switching circuit comprises two groups of connected second test links, and a test link switching circuit provided between each of the lead-in circuits and the two groups of test links, and the test link switching circuit is connected to the maintenance circuit. A subscriber lead-in link configuration method characterized in that the lead-in link of the lead-in circuit is switched from the first link to the second link in response to an instruction from a subscriber.
JP17074082A 1982-09-29 1982-09-29 Method for constituting subscriber's leading-in link Pending JPS5961259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17074082A JPS5961259A (en) 1982-09-29 1982-09-29 Method for constituting subscriber's leading-in link

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17074082A JPS5961259A (en) 1982-09-29 1982-09-29 Method for constituting subscriber's leading-in link

Publications (1)

Publication Number Publication Date
JPS5961259A true JPS5961259A (en) 1984-04-07

Family

ID=15910500

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17074082A Pending JPS5961259A (en) 1982-09-29 1982-09-29 Method for constituting subscriber's leading-in link

Country Status (1)

Country Link
JP (1) JPS5961259A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62274859A (en) * 1986-05-22 1987-11-28 Nec Corp Digital line test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62274859A (en) * 1986-05-22 1987-11-28 Nec Corp Digital line test system

Similar Documents

Publication Publication Date Title
JPS5961259A (en) Method for constituting subscriber's leading-in link
US1899112A (en) Multioffice telephone system
US2744161A (en) Circuit arrangement for all-relay selecting equipment
US5459772A (en) External apparatus for monitoring a communication system
KR970002694B1 (en) Full electronic exchanger
JPH04122162A (en) Self-diagnosis system for terminal system equipment
US2261485A (en) Telephone system
US3136851A (en) Automatic telegraph test line
JPH02223263A (en) Automatic test system for exchange
US1372050A (en) Busy-signal-testing apparatus
US1256661A (en) Telephone-exchange system.
JPS612467A (en) Testing method of subscriber's circuit
US1149229A (en) Telephone system.
US1786480A (en) Toll-service trunking system
US1541401A (en) Automatic telephone system
US2787674A (en) Circuit arrangement for the automatic testing of lines
US1109165A (en) Telephone-exchange system.
JPS60132450A (en) Leading-in system for circuit to be tested
JPS6337729A (en) Loop back test control system for transmission line
JPH09233073A (en) Test diagnosis connection control system for on-demand connection data communication
JPS62258546A (en) Isdn exchange test system
JPS5834642A (en) Automatic circuit lead-in system
JPH0290767A (en) Subscriber line equipment for electronic exchange
JPS58160869A (en) Method for false cross and ground test
JPH08223216A (en) Method and device for testing packet terminal