JPS5939683A - Hanger - Google Patents

Hanger

Info

Publication number
JPS5939683A
JPS5939683A JP14762282A JP14762282A JPS5939683A JP S5939683 A JPS5939683 A JP S5939683A JP 14762282 A JP14762282 A JP 14762282A JP 14762282 A JP14762282 A JP 14762282A JP S5939683 A JPS5939683 A JP S5939683A
Authority
JP
Japan
Prior art keywords
hanging
hanging arm
arm
nut
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14762282A
Other languages
Japanese (ja)
Inventor
知弘 川野
「たか」松 甚造
先崎 和明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP14762282A priority Critical patent/JPS5939683A/en
Publication of JPS5939683A publication Critical patent/JPS5939683A/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は運搬および段取作業などに用いられる吊り具に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a hanging device used for transportation, setup work, and the like.

従来のこの種吊シ具は品物によりそれぞれ異なシ、第1
図に示すような棒状または筒状の品物2を吊シ下げる場
合には、2点で吊シ下げる吊)具lが使用される。一方
、第2図に示すような平板状の品物4を吊プ下げる場合
には、3点で吊シ下げる吊り具3が使用されている。
Conventional hanging tools of this type have different methods depending on the item.
When suspending a rod-shaped or cylindrical article 2 as shown in the figure, a hanging tool 1 is used to suspend it from two points. On the other hand, when suspending a flat article 4 as shown in FIG. 2, a hanger 3 is used to hang it from three points.

このように品物に応じて吊り具を交換しているため、こ
の交換に多大の時間を要するはもちろん、2種類の吊り
具を準備しなければならないから不経済である。
In this way, since the hanging tools are replaced depending on the item, it not only takes a lot of time to replace the hanging tools, but it is also uneconomical because two types of hanging tools have to be prepared.

本発明は上記にかんがみ2点吊り下げおよび3点吊カ下
げf、1台で行うことが可能な吊り具を提供することを
目的とするもので、平板状の品物を3点でm9下げる7
字状に形成された3本の第1吊シ腕ないし第3吊ル腕の
うち、第1吊り腕をハンドル操作により移動させること
により、他の第2吊り腕と第3吊り腕を回動させて一直
線となし、この両吊り腕を介して棒状の品物を2点で吊
シ下げすることができるようにしたものである。
In view of the above, it is an object of the present invention to provide a hanging tool that can perform two-point hanging and three-point hanging with one device, in which a flat article can be lowered by 3 m9 at 3 points.
Of the three first to third hanging arms formed in a letter shape, by moving the first hanging arm by operating the handle, the other second hanging arm and third hanging arm can be rotated. They are hung in a straight line, and rod-shaped items can be suspended from two points via these hanging arms.

以下本発明の一実施例を図面について説明する。An embodiment of the present invention will be described below with reference to the drawings.

第3図および第4図において、5は中心部に長孔9を半
径方向にそれぞれ設けた一対の円板5a。
In FIGS. 3 and 4, reference numeral 5 designates a pair of discs 5a each having a long hole 9 in the center in the radial direction.

5b2、その各長孔9を互に対向させ、かつ複数本のセ
ット用リーマボルト19と3本の腕側リーマポル)88
〜8Cにより一定間隔を保って一体に結合された本体で
ある。6A〜6Cは各基端部6Aa〜6Caがそれぞれ
側円板5a、5bと微小間隙を保って摺動するように設
けられた第1吊り腕ないし第3吊り腕で、これらの各基
端6 A a 1〜6Ca、は第4図に示すように重合
されておシ、かつ基端6Bal* 6Ca1に設けられ
た長孔10.11には第1吊シ腕6A(7)基端6Aa
lに固定されたビン7が挿入されている。また第1吊り
腕6Aの基端部6Aaには腕用リーマボルト8aの挿入
する長孔6Abが設けられ、第2.第3吊シ腕6B、6
Cは腕側リーマポル)8b。
5b2, with their long holes 9 facing each other, and a plurality of setting reamer bolts 19 and three arm side reamer poles) 88
This is a main body that is integrally connected at a constant interval by ~8C. Reference numerals 6A to 6C indicate first to third hanging arms whose respective base end portions 6Aa to 6Ca slide with the respective side discs 5a and 5b while keeping minute gaps; A a 1 to 6Ca are polymerized as shown in FIG.
A bottle 7 fixed to l is inserted. Further, the base end 6Aa of the first hanging arm 6A is provided with a long hole 6Ab into which the arm reamer bolt 8a is inserted. Third hanging arm 6B, 6
C is arm side reamer pole) 8b.

8Cにそれぞれ枢着されている。They are each pivoted to 8C.

12Ifi第1吊り腕6Aを移動させる操作機構で、こ
の操作機構12は第1吊シ腕6Aの基端部6Aaにねじ
込み固定されたスタッド13と、このスタッド13にら
合するナツト14と、このナツト14に取付けられたハ
ンドル15と、ナツト14と側円板5a、5b′ft:
それぞれ連結する一対のホルダー16とによシ構成され
ている。この両ホルダー16はその一端がリーマボルト
17を介して円板5a、5bにそれぞれ枢着され、他端
に設けた突起部16aがナツト14のつば14aに係止
されている。
12Ifi is an operation mechanism for moving the first suspension arm 6A, and this operation mechanism 12 includes a stud 13 screwed and fixed to the base end 6Aa of the first suspension arm 6A, a nut 14 that engages with this stud 13, and a nut 14 that is engaged with this stud 13. The handle 15 attached to the nut 14, the nut 14 and the side discs 5a, 5b'ft:
It is composed of a pair of holders 16 that are connected to each other. One end of both holders 16 is pivotally connected to the disks 5a and 5b via a reamer bolt 17, and a protrusion 16a provided at the other end is locked to the collar 14a of the nut 14.

次に上記のような構成からなる本実施例の作用について
説明する。
Next, the operation of this embodiment configured as described above will be explained.

操作機構12のハンドル15を回わしてナツト14を回
転させると、このナツト14にら合するスタッド13を
介して第1吊勺腕6Aは左方向(矢印X方向)に移動さ
れる。この第1吊υ腕6Aの左行は第3図に示すように
、その長孔6Abの左端がリーマボルト88に接すると
停止される。
When the handle 15 of the operating mechanism 12 is turned to rotate the nut 14, the first hanging arm 6A is moved to the left (in the direction of arrow X) via the stud 13 that engages with the nut 14. The leftward movement of the first hanging arm 6A is stopped when the left end of the elongated hole 6Ab touches the reamer bolt 88, as shown in FIG.

この場合、第1吊シ腕6Aが左行すると、その腕6Aに
固定したビン7も左行するので、このビン7を介して第
2吊り腕6Bは時計(矢印Y)方向に、第3吊シ腕6c
は反時計(矢印2)方向にそれぞれ回動され、第3の一
点鎖線で示すように一直線をなす状態となって停止され
る。
In this case, when the first hanging arm 6A moves to the left, the bottle 7 fixed to the arm 6A also moves to the left, so the second hanging arm 6B moves clockwise (arrow Y) via the bottle 7 to the third hanging arm 6A. Hanging arm 6c
are respectively rotated counterclockwise (arrow 2), and stopped in a straight line as shown by the third dashed line.

一方、前記ハンドル15を上記の場合と逆方向に回せば
、現状に腹痛させることができる。
On the other hand, if the handle 15 is turned in the opposite direction to the above case, it is possible to cause abdominal pain.

上述したようにハンドル15を操作することにより、吊
り具tY字状の3点吊り下げ状態からT字状の2点用シ
下げ状態に、逆に2点吊り下げ状態から3点吊り下げ状
態にそれぞれ容易に切替えることができる。
By operating the handle 15 as described above, the hanging tool t changes from a Y-shaped three-point hanging state to a T-shaped two-point hanging state, and conversely from a two-point hanging state to a three-point hanging state. Each can be easily switched.

第5図は3点吊り下げ吊シ具の各吊シ腕6A〜6CK電
動チェンブCI7り2oA〜2oc′ft:それぞれ取
付け、これらの電動チェンブロック20A〜20Cによ
り平板状の品物21を3点吊り下げした状態を示したも
のである。また第6図は第2吊り腕6Bと第3吊υ腕6
cとを前記のように回動させて一直線となし、その各市
り腕6B、60に取付けた電動チェンブロック20B、
20Cにより棒状の品物22を2点吊り下げした状態を
示したものである。
Figure 5 shows each hanging arm 6A to 6CK of a 3-point hanging hoist, electric chain CI7 2oA to 2oc'ft: attached respectively, and a flat article 21 suspended at three points by these electric chain blocks 20A to 20C. This shows the lowered state. Also, Fig. 6 shows the second hanging arm 6B and the third hanging arm 6.
c and rotated as described above to form a straight line, and an electric chain block 20B attached to each rising arm 6B, 60,
20C shows a state in which a rod-shaped item 22 is suspended at two points.

上記各市CM6A〜6Cをそれぞれ支持する吊シ手23
A〜23Cの長さの差は、前記吊シ腕6A〜6Cを連動
式せて動かすことおよびビン7とリーマポル)8b、8
cとの配置を適宜に選定することによシ、ビン7とリー
マボルト8bまたは8Cの中心を結ぶ直線の長さと、リ
ーマポルト7b、7cの両中心を結ぶ直線の長さの1/
2との差の函数となシ、実用上問題とならない程度の差
に納めることができる、。したがって吊フ具を3点吊シ
下げ状態から2点用シ下げ状態に切替えた時に、第2吊
p腕6Bと第3吊り腕6cとをほぼ水平に維持すること
ができるので、吊シ手23A〜23Cと吊シ腕6A〜6
cとを接続するピン類(図示せず)に無理なカが作用す
るのを防止することができる。
Hanging hands 23 that support each of the above cities CM6A to 6C
The difference in length between A to 23C is determined by interlocking the suspension arms 6A to 6C and by moving the hanging arms 6A to 6C in an interlocking manner, and by moving the hanging arms 6A to 6C in an interlocking manner, and by moving the hanging arms 6A to 6C in an interlocking manner, and by moving the hanging arms 6A to 6C in an interlocking manner.
By appropriately selecting the arrangement of the reamer bolts 7b and 8c, the length of the straight line connecting the center of the bottle 7 and the reamer bolt 8b or 8C, and the length of the straight line connecting the centers of both the reamer bolts 7b and 7c can be adjusted to 1/1/2.
The difference between 2 and 2 can be reduced to a level that does not pose a practical problem. Therefore, when the lifting tool is switched from a 3-point hanging state to a 2-point hanging state, the second hanging arm 6B and the third hanging arm 6c can be maintained almost horizontally, so that the lifting arm can be kept almost horizontally. 23A-23C and hanging arms 6A-6
It is possible to prevent excessive force from acting on the pins (not shown) connecting the terminal c and the terminal.

以上説明したように本発明によれば、ハンドル操作によ
り3点吊シ下げ状態または2点吊り下げ状態に随時に、
かつ簡単に切替えることができるので、吊シ具を品物に
応じて交換する必要がないから作業効率を向上させるこ
とができる。また本発明によれば、1台で2台分の機能
を発揮させることができるから非常に経済的である利点
がある。
As explained above, according to the present invention, the three-point hanging state or the two-point hanging state can be changed to the three-point hanging state or the two-point hanging state at any time by operating the handle.
In addition, since it can be easily switched, there is no need to replace the lifting tool depending on the item, so work efficiency can be improved. Further, according to the present invention, one device can perform the functions of two devices, so there is an advantage that it is very economical.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図および第2図は、従来の吊り具を示す斜視図、第
3図および第4図は本発明の吊り具の一実施例を示す平
面図および一部切開側面図、第5図および第6図は同実
施例の使用状態を示す斜視図である。 5a# 5b・・・円板、6八〜6C・・・第1吊す腕
〜第3吊り腕、6Aa〜6Ca・・・基端部、7・・・
ピン、12・・・操作機構、13・・・スタッド、14
・・・ナツト、15・・・ハンドル、16・・・ホルダ
ー。 第 1  図 石 2 図 第3図
1 and 2 are perspective views showing a conventional hanging device, FIGS. 3 and 4 are a plan view and a partially cutaway side view showing an embodiment of the hanging device of the present invention, and FIG. FIG. 6 is a perspective view showing the usage state of the same embodiment. 5a# 5b...disc, 68-6C...first hanging arm to third hanging arm, 6Aa-6Ca...base end, 7...
Pin, 12... Operating mechanism, 13... Stud, 14
...Natsuto, 15...Handle, 16...Holder. Figure 1 Stone Figure 2 Figure 3

Claims (1)

【特許請求の範囲】 1、中心部に長孔を有する一対の円板を、その長孔を対
向させると共に、一定間隔を保ってセットしてなる本体
と、前記両長孔を貫通するピンを取付けた基端部を前記
周円板間に、かつ半。 径方向に摺動可能に設けた第1吊り腕と、前記ピンの嵌
入する長孔を有する基端部を前記周円板間に、かつ周方
向に摺動可能に設けた第2吊り腕および第3吊り腕と、
前記第1吊シ腕の基端部に取付けた操作機構とからなり
、この操作機構を介して第1吊シ腕を移動させることに
より、前記ピンを介して第2.第3吊シ腕を回動させて
一直線をなすようにしたことを特徴とする吊り具。 2、前記操作機構は第1吊シ腕の基端面に取付けたスタ
ッドと、このスタッドにら合するナツトと、このナツト
に取付けたハンドルと、前記円板とナツトを連結するホ
ルダーとからなること全特徴とする特許請求の範囲第1
項記載の吊シ具。
[Scope of Claims] 1. A main body consisting of a pair of discs each having a long hole in the center, with the long holes facing each other and set at a constant interval, and a pin passing through both of the long holes. Place the attached proximal end between the circumferential disks and half. a first hanging arm provided so as to be slidable in the radial direction; a second hanging arm provided so as to be slidable in the circumferential direction between the circumferential disks, and a base end portion having a long hole into which the pin is inserted; A third hanging arm,
and an operating mechanism attached to the proximal end of the first hanging arm, and by moving the first hanging arm via this operating mechanism, the second hanging arm is moved via the pin. A hanging device characterized in that the third hanging arm is rotated so as to form a straight line. 2. The operating mechanism comprises a stud attached to the proximal end surface of the first hanging arm, a nut that engages with this stud, a handle attached to this nut, and a holder that connects the disc and the nut. Claim 1, which is all the features
Hanging equipment as described in section.
JP14762282A 1982-08-27 1982-08-27 Hanger Pending JPS5939683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14762282A JPS5939683A (en) 1982-08-27 1982-08-27 Hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14762282A JPS5939683A (en) 1982-08-27 1982-08-27 Hanger

Publications (1)

Publication Number Publication Date
JPS5939683A true JPS5939683A (en) 1984-03-05

Family

ID=15434484

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14762282A Pending JPS5939683A (en) 1982-08-27 1982-08-27 Hanger

Country Status (1)

Country Link
JP (1) JPS5939683A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01112416U (en) * 1988-01-21 1989-07-28

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01112416U (en) * 1988-01-21 1989-07-28

Similar Documents

Publication Publication Date Title
JP2010500152A (en) Portable lifting device for handbags
SE451367B (en) IN A CLOTHING CLOTH, SUCH AS A VEST, JACKET, TROUSER AND AN APPROPRIATE DEVICE FOR THE FIXING OF FORMAL
US4957259A (en) Double hooked utility hanger, with hanger suspension hole
JPS5939683A (en) Hanger
CA2004228C (en) Multiple-garment hanger
FR2576239B1 (en) TOOL HOLDER IN TWO ELASTICALLY CONNECTED PARTS, PARTICULARLY FOR ROBOT
JPS62212058A (en) Soldering bit pedestal
CN214587875U (en) Time management tool
JPS6014820A (en) Hanger for skirt
US10434640B1 (en) Tool storage system
JPH0986863A (en) Hoist tool for concrete product and the like
WO2001030209A3 (en) Plate carrier and method of use
JPS6011018Y2 (en) Arm folding jig for lifting heavy objects
JPH0325904Y2 (en)
JPS59148165U (en) Ladle lid hanging device
JPS6320705Y2 (en)
WO1999062067A3 (en) Hanger for holding a data carrier case
JPS60120740U (en) Workpiece processing positioning device
KR960013291A (en) Hanger with adjustable shoulderrest area
JP3020757U (en) Hat with hanging equipment
JPS63177497U (en)
JP3013539U (en) Hanger suspension equipment for upper sill
JPS581066U (en) tubing carrier
JPH073517U (en) Survival
JPS5834872U (en) pipe loading and unloading equipment