JPS5935626Y2 JP12596080U JP12596080U JPS5935626Y2 JP S5935626 Y2 JPS5935626 Y2 JP S5935626Y2 JP 12596080 U JP12596080 U JP 12596080U JP 12596080 U JP12596080 U JP 12596080U JP S5935626 Y2 JPS5935626 Y2 JP S5935626Y2
Authority
JP
Japan
Prior art keywords
hook
gate
water intake
cylinder
cylinder gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP12596080U
Other languages
Japanese (ja)
Other versions
JPS5746627U (en
Inventor
貞二 塩原
Original Assignee
株式会社 栗本鉄工所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 栗本鉄工所 filed Critical 株式会社 栗本鉄工所
Priority to JP12596080U priority Critical patent/JPS5935626Y2/en
Publication of JPS5746627U publication Critical patent/JPS5746627U/ja
Application granted granted Critical
Publication of JPS5935626Y2 publication Critical patent/JPS5935626Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Barrages (AREA)
  • Telescopes (AREA)

Description

【考案の詳細な説明】 この考案はシリンダゲートにおけるシリンダゲート本体
(以下ゲート本体と称する)の吊上げ時におけるフック
の着脱を確認する装置に関するものである。
[Detailed Description of the Invention] This invention relates to a device for checking the attachment and detachment of a hook when lifting a cylinder gate main body (hereinafter referred to as the gate main body) in a cylinder gate.

取水塔内に設けたゲート本体は径の異なる複数の摺動管
を摺動自在にはめ合せ、この各摺動管の摺動により高さ
を調整し、上端の取水口から水面近くの表層水を取水し
て下端に通じる下流管路へ流すものである。
The main body of the gate installed inside the water intake tower has multiple sliding pipes of different diameters slidably fitted together, and the height is adjusted by the sliding of each sliding pipe, allowing surface water near the water surface to flow from the water intake at the top end. It takes water and flows it to the downstream pipe leading to the lower end.

このようなシリンダゲートにおいて底部取水や再塗装そ
の他の保守点検のさい、ゲート本体を全縮状態にして巻
上げ、作業が終ると元に戻す必要がある。
When carrying out maintenance and inspections such as bottom water intake, repainting, and other such maintenance on such cylinder gates, it is necessary to fully retract the gate body, roll it up, and return it to its original position when the work is completed.

上記の作業において、取水状態にあるシリンダゲート本
体を全縮状態にするにはゲート本体の最上端の摺動筒を
吊上げている巻上げ装置を弛めて最上端の摺動筒を自重
により下降させるとそのつぎの摺動筒も下降して全ての
摺動筒が重なって全縮状態となる。
In the above work, to fully retract the cylinder gate body that is in the water intake state, loosen the hoisting device that lifts the sliding tube at the top end of the gate body, and lower the sliding tube at the top end by its own weight. The next sliding tube also descends, and all the sliding tubes overlap to become fully contracted.

こうして全縮状態となったゲート本体を吊上げるには、
最上段となる摺動筒に設けたフックを最下段の摺動筒の
外側の係合ピンに係合させたのち最上段の摺動筒に連結
したリフティングビームを吊上げなければならない。
In order to lift the gate body which is now fully contracted,
After the hook provided on the uppermost sliding cylinder is engaged with the outer engagement pin of the lowermost sliding cylinder, the lifting beam connected to the uppermost sliding cylinder must be lifted.

また補修が終ると下降させたゲート本体がらフックを外
さなければならないが、これらのフックの着脱は水中で
行われるので直接視認することはできない。
Furthermore, once repairs are completed, the hooks must be removed from the lowered gate body, but these hooks cannot be seen directly as they are attached and detached underwater.

従って従来では取水塔上の操作室において巻上機を操作
してリフティングビームにより最上段の摺動筒を上下に
動かして自動的にフックを係脱させるようになっている
が、水中での作動であり、取水塔上部の操作室からの作
動確認は不可能であるため片吊りのまま引上げるなどの
トラブルが生じていた。
Therefore, in the past, the hook was automatically engaged and disengaged by operating a hoist in the control room on the water intake tower and moving the top sliding tube up and down using a lifting beam, but this method does not work underwater. It was impossible to check the operation from the control room at the top of the water intake tower, which caused problems such as having to pull it up while hanging on one side.

この考案は上記の問題を解決するため、光学的な検査器
を用いて操作室から水中におけるフックの係脱状態を確
認できるようにした着脱確認装置を提供するものである
In order to solve the above-mentioned problems, this invention provides an attachment/detachment confirmation device that uses an optical inspection device to confirm the engagement/disengagement status of a hook underwater from an operating room.

以下にこの考案の装置の実施例を添附図面に基づいて詳
細に説明する。
Embodiments of the device of this invention will be described in detail below with reference to the accompanying drawings.

図において1は貯水池を構成するダムで、このダム1の
内側にスクリーンからなる取水塔2を設け、この取水塔
2内にシリンダゲート本体Aを設ける。
In the figure, reference numeral 1 denotes a dam constituting a reservoir. A water intake tower 2 made of a screen is provided inside this dam 1, and a cylinder gate main body A is provided within this water intake tower 2.

このゲート本体Aは径の異なる複数の摺動筒3を摺動自
在にはめ合せたもので、上段の摺動筒3を引上げると上
段の摺動筒3の下端外周の突部が下段の摺動筒3の上端
内周の突部に係合してこれを引上げるようにしである。
This gate body A is made by slidably fitting together a plurality of sliding tubes 3 with different diameters, and when the upper sliding tube 3 is pulled up, the protrusion on the outer periphery of the lower end of the upper sliding tube 3 changes to the lower sliding tube 3. It is designed to engage with a protrusion on the inner periphery of the upper end of the sliding tube 3 and pull it up.

4は最上段の摺動筒3の上端に形成した取水口でこの取
水口4の外枠12に摺動自在に取付けた複数のテンショ
ンロッド5の上端にリフティングビーム6を固定する。
A lifting beam 6 is fixed to the upper ends of a plurality of tension rods 5 which are slidably attached to the outer frame 12 of the water intake port 4 at the water intake port 4 formed at the upper end of the uppermost sliding tube 3.

このビーム6は取水塔2上の操作室7内に設けた巻上機
により巻上げられるワイヤロープ8によって吊下げられ
ており、このビーム6と取水口4間にはロッド5に沿っ
て上下するフロート9を設けである。
This beam 6 is suspended by a wire rope 8 that is hoisted up by a hoist installed in an operation room 7 on the water intake tower 2, and between this beam 6 and the water intake 4 there is a float that moves up and down along a rod 5. 9 is provided.

10は取水塔2内に起伏自在に取付けた休止台で、この
台10に補修用蓋11がボルト止めなどの手段で着脱自
在に取付けであるがこの補修用蓋11は下流管路23の
人口を遮断する場合に用いるものである。
Reference numeral 10 denotes a suspension stand installed in the water intake tower 2 so that it can rise and fall freely, and a repair cover 11 is detachably attached to this stand 10 by means such as bolting. This is used when blocking.

前記外枠12の下部にはフック13の上端を揺動自在に
取付け、最下段の摺動筒3の上部外側にはフック13に
係合する係合ピン14を設けておく。
The upper end of a hook 13 is swingably attached to the lower part of the outer frame 12, and an engagement pin 14 that engages with the hook 13 is provided outside the upper part of the lowermost sliding tube 3.

また前記のフック13にはバランスウェイトあるいは遠
隔操作ワイヤなどを設けて最上段の摺動筒3を下降させ
て上下運動を行なわせることによりフック13を自動的
に係合ピン14に係脱する構造あるいは遠隔操作ワイヤ
によりフック13を操作して係合ピン14に係脱させる
構造があるが何れも公知のものである。
The hook 13 has a structure in which a balance weight or a remote control wire is provided to automatically engage and disengage the hook 13 from the engagement pin 14 by lowering the uppermost sliding tube 3 to perform vertical movement. Alternatively, there is a structure in which the hook 13 is operated by a remote control wire to engage and disengage the engagement pin 14, but both are known.

Bは取水塔2内に設けた一対の検査器で光学的なもので
ある。
B is a pair of optical inspection devices installed in the water intake tower 2.

すなわち、長い筒15の上端に接眼部16を設は下端に
は対物部17を設ける。
That is, the eyepiece section 16 is provided at the upper end of the long tube 15, and the objective section 17 is provided at the lower end.

接眼部16(つは接眼レンズおよび視度調整環を設け、
筒15内にはリレーレンズを設け、対物部17には対物
レンズとプリズム18、照明ランプ19を設け、この対
物部17の窓20を最下段の摺動筒3上の各係合ピン1
4の附近に向けておく。
An eyepiece section 16 (includes an eyepiece lens and a diopter adjustment ring,
A relay lens is provided in the cylinder 15, and an objective lens, a prism 18, and an illumination lamp 19 are provided in the objective part 17.
Aim near 4.

また図示例の場合は前記筒15の上端を操作室7の床板
21を貫通して操作室7内に接眼部16を位置させ、照
明ランプ19の電源コード22は操作室7内の配電盤に
接続する。
In the illustrated example, the upper end of the tube 15 is passed through the floor plate 21 of the operation room 7 to position the eyepiece 16 inside the operation room 7, and the power cord 22 of the illumination lamp 19 is connected to the power distribution board inside the operation room 7. Connecting.

ただし、これは−例であって、例えばリフティングビー
ム6の外周に点検用の架台を設けて、作°業員がこの架
台上に載ることができる構造の場合はこの架台に接眼部
16などを設けてもよくその他に取水塔2内の適当な個
所に作業員が載れる架台や作業台があるときはそこに接
眼部16などを設けてもよい。
However, this is just an example. For example, if a pedestal for inspection is provided around the outer periphery of the lifting beam 6 and the structure is such that a worker can stand on this pedestal, the eyepiece 16 etc. In addition, if there is a stand or a workbench on which a worker can sit at an appropriate location within the water intake tower 2, an eyepiece 16 or the like may be provided there.

上記の実施例において、第1図は取水時を示している。In the above embodiment, FIG. 1 shows the water intake.

このときロープ8によりリフティングビーム6が引上げ
られゲート本体Aが引伸ばされてフロート9が水面上に
浮上し、フロート9と取水口4間から表層水が取水口4
内に流入し、下流管路23に流れている。
At this time, the lifting beam 6 is pulled up by the rope 8, the gate body A is stretched, and the float 9 rises above the water surface, and surface water flows from between the float 9 and the water intake 4 to the water intake 4.
and flows into the downstream pipe line 23.

つぎにゲート本体Aの全縮吊上げの場合は、まずワイヤ
ロープ8を弛めてビーム6を下降させると、最下段以外
の摺動筒3が下降してゲート本体Aが全縮となるととも
に最上部の摺動筒3とともに下降したフック13が最下
段の摺動筒3の外側の係合ピン14に係合する。
Next, in the case of fully retracting the gate body A, first loosen the wire rope 8 and lower the beam 6, then the sliding tubes 3 other than the lowest stage will descend, the gate body A will be fully retracted, and the beam 6 will be lowered. The hook 13 that has descended together with the upper sliding tube 3 engages with the outer engagement pin 14 of the lowermost sliding tube 3.

このとき操作室7内のスイッチを入れ、検査器Bの照明
ランプ19を点灯して係合ピン14の附近を照明し、接
眼レンズ16を覗くと、係合ピン14に対するフック1
3の係合状態が確認できるので、これを確認したのち、
ロープ8を巻上げると全縮状態のゲート本体Aが上限ま
で吊上げられる。
At this time, the switch in the operation chamber 7 is turned on, the illumination lamp 19 of the inspection device B is turned on to illuminate the vicinity of the engagement pin 14, and when looking through the eyepiece lens 16, the hook 1 relative to the engagement pin 14 is
You can check the engagement status of step 3, so after checking this,
When the rope 8 is wound up, the fully contracted gate body A is lifted up to its upper limit.

こうしてゲート本体Aを全縮状態で巻上げ、保守点検な
どが終るとロープ8を弛めてゲート本体Aを全縮のまま
、下降させ、自動的にフック13を係合ピン14から離
脱させるが、このときも検査器Bによりフック13がピ
ン14から外れたことを確認したのち最上段の摺動筒3
を吊上げるとゲート本体Aは伸張状態となる。
In this way, the gate main body A is hoisted up in a fully contracted state, and when maintenance and inspection etc. are completed, the rope 8 is loosened and the gate main body A is lowered in a fully contracted state, and the hook 13 is automatically disengaged from the engagement pin 14. At this time as well, after confirming that the hook 13 has come off the pin 14 using the inspection device B, the top sliding tube 3
When the gate body A is lifted, the gate body A becomes in an extended state.

この考案は上記のように取水塔2内に光学系からなる検
査器Bを設けて水中に下降した摺動筒3のフック13と
係合ピン14の係脱状態を確認できるので、その状態を
見ながら係脱操作を行うことにより確実な係脱が行える
As described above, this device is equipped with an inspection device B consisting of an optical system inside the water intake tower 2, so that the state of engagement and disengagement between the hook 13 and the engagement pin 14 of the sliding tube 3 that has descended into the water can be checked. Reliable engagement and disengagement can be achieved by performing the engagement and disengagement operations while watching.

従って片吊りなどのトラブルを防止することができるも
のである。
Therefore, troubles such as hanging on one side can be prevented.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの考案を実施したシリンダゲートの側面図、
第2図は同上の一部切欠拡大側面図である。 1・・・・・・ダム、2・・・・・・取水塔、3・・・
・・・摺動筒、10・・・・・・休止台、11・・・・
・・補修用蓋、13・・・・・・フック、14・・・・
・・係合ピン、15・・・・・・筒、16・・・・・・
接眼部、17・・・・・・対物部、18・・・・・・プ
リズム、19・・・・・・照明ランプ、A・・・・・・
シリンダゲート本体、B・・・・・・検査器。
Figure 1 is a side view of the cylinder gate that implemented this idea.
FIG. 2 is a partially cutaway enlarged side view of the same as above. 1... Dam, 2... Water intake tower, 3...
... Sliding tube, 10 ... Pausing stand, 11 ...
...Repair lid, 13...Hook, 14...
...Engagement pin, 15...Cylinder, 16...
Eyepiece section, 17... Objective section, 18... Prism, 19... Illumination lamp, A...
Cylinder gate body, B...Inspection device.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 大小径の異なる複数の摺動筒をはめ合せたシリンダゲー
ト本体と、この本体を全縮状態においてフックにより吊
り上げる巻上げ装置を有するシリンダゲートにおいて、
このゲートを取付けた取水塔に沿って光学系からなる検
査器を配置し、この検査器の接眼部を支持塔上の適宜個
所に設け、同上検査器の対物部は水中のフック係脱部を
視認し得る位置としたシリンダゲートにおけるフック着
脱確認装置。
A cylinder gate has a cylinder gate body in which a plurality of sliding tubes of different sizes are fitted together, and a hoisting device for hoisting this body with a hook in a fully retracted state.
An inspection device consisting of an optical system is placed along the water intake tower to which this gate is attached, and the eyepiece of this inspection device is installed at an appropriate location on the support tower. A hook attachment/detachment confirmation device for the cylinder gate, which is located in a position where it can be visually confirmed.
JP12596080U 1980-09-01 1980-09-01 Hook attachment/detachment confirmation device for cylinder gate Expired JPS5935626Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12596080U JPS5935626Y2 (en) 1980-09-01 1980-09-01 Hook attachment/detachment confirmation device for cylinder gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12596080U JPS5935626Y2 (en) 1980-09-01 1980-09-01 Hook attachment/detachment confirmation device for cylinder gate

Publications (2)

Publication Number Publication Date
JPS5746627U JPS5746627U (en) 1982-03-15
JPS5935626Y2 true JPS5935626Y2 (en) 1984-10-02

Family

ID=29486402

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12596080U Expired JPS5935626Y2 (en) 1980-09-01 1980-09-01 Hook attachment/detachment confirmation device for cylinder gate

Country Status (1)

Country Link
JP (1) JPS5935626Y2 (en)

Also Published As

Publication number Publication date
JPS5746627U (en) 1982-03-15

Similar Documents

Publication Publication Date Title
JP2006284105A (en) In-furnace inspection device for vertical furnace
JPS5935626Y2 (en) Hook attachment/detachment confirmation device for cylinder gate
CN204882022U (en) Heavy construction curtain physical properties detecting system
CN218114771U (en) Automatic unhooking hanger for empty concrete box
CN210767174U (en) YZ thing allies oneself with prefabricated pump station of type integration
CN213141328U (en) Hanging basket for mounting safety type outdoor high-rise building electrical appliances
CN112709365B (en) System and method for installing unit type glass curtain wall of variable-angle inclined building
CN111686384B (en) Temporary fixing device for safety rope of first-step personnel of power line
CN113894716A (en) Telescopic clamp for pipeline installation and use method thereof
JP5681318B1 (en) Method for dismantling a damaged reactor core
CN211260546U (en) Landscape lamp supporting structure
CN216553915U (en) Tunnel pressure steel pipe shaft inner wall inspection device
CN219692871U (en) Detector overhauling device for gas pipe well
JP2016016940A (en) Lifting apparatus
JPS5847060Y2 (en) Repair lid attachment/detachment device
JPS6333316Y2 (en)
CN220300368U (en) Dedicated elevating gear of electromechanical installation
CN214541832U (en) Transformer stores up oil tank cabinet foot structure
JP3958204B2 (en) Suspension device for in-reactor equipment
CN215855005U (en) Movable elevator for high-altitude operation
CN219239032U (en) Rescue tripod
JP2017089265A (en) Gate device and gate resting method thereof
JPS5922843Y2 (en) Chimney hopper that doubles as a work gondola
JP3040602U (en) Balancing device for exhaust hood section
CN106935374A (en) A kind of oil-filled transformer with inspection platform