JPS5931384A - Method of exchange construction of window - Google Patents
Method of exchange construction of windowInfo
- Publication number
- JPS5931384A JPS5931384A JP14058582A JP14058582A JPS5931384A JP S5931384 A JPS5931384 A JP S5931384A JP 14058582 A JP14058582 A JP 14058582A JP 14058582 A JP14058582 A JP 14058582A JP S5931384 A JPS5931384 A JP S5931384A
- Authority
- JP
- Japan
- Prior art keywords
- frame
- window frame
- window
- opening
- mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
この発明は建造物の011口部に装着された1目2枠を
新窓枠に取替える窓の取替工法に閃するもので、主に木
造の建造物の場合に適用して有効なものである。DETAILED DESCRIPTION OF THE INVENTION This invention is inspired by a window replacement method in which the first and second frames installed at the opening of a building are replaced with new window frames, and is mainly used in the case of wooden buildings. It is applicable and effective.
従来のこの種の窓の取替工法にあっては、旧窓枠の室外
側の外壁と室内側の内壁とを取除いて旧窓枠を開口部か
ら取外し、次に新窓枠を開口部内に室外側から11叉め
込んだ宿この新窓枠と開口部内面との間に室内1i11
からスペーサーを挿入して新窓枠を位に決めし、然る後
断窓枠の室外側に外壁を、室内側に内壁を夫々取付りる
ようにしているので、取替工事後の新しい外壁と古い外
[;)との間に色違いによる堺界腺ができて見栄えが悪
くなり、しかもこの堺界P′Aに時間が経つにつれてク
ラック(1;すれ)が入ってこのfili分からin水
が浸入する問題があり、その為にrij水浸水浸出防止
板設する等の防水対負゛iを必要とする欠点があり、イ
ーの上内壁を大11り4に拐j修しなりればならず、施
工期間が長くなったり、’J’l用力幅’lなる欠点が
あった。In the conventional window replacement method of this type, the exterior wall on the outdoor side and the interior wall on the indoor side of the old window frame are removed, the old window frame is removed from the opening, and then the new window frame is inserted inside the opening. Indoor 1i11 between this new window frame and the inner surface of the opening, which was inserted from the outside of the room.
Insert a spacer from the beginning to determine the position of the new window frame, and then attach the outer wall to the outdoor side of the window frame and the inner wall to the indoor side, so the new outer wall after replacement work is installed. A Sakai gland due to the difference in color is formed between the P'A and the old outside [;), which makes it look bad, and as time passes, cracks (1; scratches) appear in this Sakai P'A, causing in-water from this fili. There is a problem of water infiltration, and for this reason, there is a drawback that waterproofing measures such as installing water ingress prevention plates are required, and the upper inner wall of the building has to be repaired to a size of 11 to 4. However, there were drawbacks such as a long construction period and a short usage range.
そこで本発明は上記欠点を除去することを目的とし、取
替工事後の外観を良くし得ると共に、内壁の補修を少な
くできて施工期間の短tiと費用の低ηシを図り得るよ
うにした窓の取(・V工法を提供しようとするものであ
る。Therefore, the present invention aims to eliminate the above-mentioned drawbacks, and makes it possible to improve the appearance after replacement work, reduce the number of repairs to the inner wall, shorten the construction period, and reduce costs. This is an attempt to provide the V construction method for window removal.
次に本願の実jTfi例を図面にハいてi’l’ L
< ’I’j^明する。第1図、9TS2図は取替前の
状態を示し1第、3図〜第5図は取替俵の状態を示して
いる。この第1図1第2図においr11は開口部2を形
成する開口枠で、周知の如く才ぐさ3、窓台4及び朴5
.5によって矩形に11・γ成されている。6は上記開
口部2内に室外側から嵌め込まれた重窓tjシで、アル
ミニウム襲の一般サッシを示している。この111S’
Fs”+枠6は上枠7、下枠8及び部枠9.9を短形に
枠組みして(、−7成され、この下枠8が窓台4上に賎
[?されている。これらの上枠7、下枠8及び竪()・
9.9には室外側端近くに夫々外周側へ突出する取付片
10が一体に形成され、これらの取(=J片10が上記
開口4++1の室外側に当て付I′lられてくぎ11に
よって固定されている。また−り記各tl、、 7〜9
には取付片100基部から室外側へ突出する張出片12
が夫々一体に形成され、下!?+8にはその室内側枠片
13の上端に室内側へ突出する取付突片14が一体に形
成され、この取付突片14がIIV板15に取付ねじ1
6にて取f=Jりられている。上記上枠7と開口fil
s 2内面間及び竪枠9.9とI;il I:J■1−
2内面間に11夫々スペーサー17が案内側から挿入さ
れ、取イ」ねじ18によって開11枠1に固定されてい
る。19はU)J口枠1に取4zJ番jられた内(1!
ilだHAで、旧窓枠6の室内側面に当接されている。Next, write the actual example of the present application on the drawing and write i'l' L
< 'I'j^I will clarify. 1 and 9TS2 show the state before replacement, and FIGS. 1 and 3 to 5 show the state of the replacement bales. In FIG. 1 and FIG. 2, r11 is an opening frame forming the opening 2, and as is well known, the window frame 3, the window sill 4, and the window 5 are
.. 5 to form a rectangular shape of 11·γ. Reference numeral 6 indicates a double window fitted into the opening 2 from the outside side, which is a general sash made of aluminum. This 111S'
Fs'' + frame 6 is constructed by rectangularly forming the upper frame 7, lower frame 8, and sub-frames 9 and 9, and this lower frame 8 is mounted on the window sill 4. These upper frame 7, lower frame 8 and vertical ()・
9.9 are integrally formed with mounting pieces 10 protruding toward the outer circumferential side near the outdoor end, and these mounting pieces (=J pieces 10 are abutted on the outdoor side of the opening 4++1 and the nails 11 It is fixed by. Also, each tl, 7-9
There is a mounting piece 100 and an overhanging piece 12 that protrudes from the base to the outdoor side.
are each formed integrally, and the bottom! ? +8 is integrally formed with a mounting protrusion 14 projecting toward the indoor side at the upper end of the indoor frame piece 13, and this mounting protrusion 14 is attached to the IIV plate 15 with the mounting screw 1.
6, f=J is taken. Above upper frame 7 and opening fil
s 2 between inner surfaces and vertical frame 9.9 and I;il I:J■1-
A spacer 17 is inserted between each of the two inner surfaces from the guide side, and is fixed to the open frame 1 with a take-out screw 18. 19 is U) J frame 1 is taken 4zJ number j (1!
It is il HA and is in contact with the interior side of the old window frame 6.
20は内携で、図面では仮1’=LE 4Wを示してい
る。21はモルタル等から戊る外n:;で、上t(11
7と部枠9.9の取付片10の室外側をHうように設け
られている。22は水切り、2ろはコーテイング材であ
る。The reference numeral 20 is a temporary one, and the drawing shows temporary 1'=LE 4W. 21 is removed from the mortar etc., and the upper t(11
7 and the mounting piece 10 of the frame 9.9 is provided on the outdoor side. 22 is a drainer, and 2 is a coating material.
次に、第3図〜第51閃についてn;2明するが、第1
図、1Ts 2図に示すものと同じものについ゛(は同
−旬一号を付して型持説明全省略する。25は上記旧窓
枠乙の代わりに開口部2内に11°にめ込丈れた改装べ
用新窓枠で、アルミニウム111′美の防音サツシを2
ら、F拌
示している。この光“i窓枠25 tJ上枠27及び部
枠28.28を矩形に枠4゛J1みして借成され゛てい
る。Next, I will explain about Figures 3 to 51, but the first
Fig. 1Ts The same thing as shown in Fig. 2 is marked with the same number and the explanation of the mold holder is omitted. A new window frame for refurbishment, with a beautiful aluminum 111' soundproof sash.
et al., F stirring is shown. This light is borrowed by using the window frame 25, tJ upper frame 27, and subframes 28 and 28 as a rectangular frame 4J1.
これらの上枠26、下枠27及び翌村12B、2Bには
室外付文1′1近くに夫々外周側へ突出する取付片29
が一体に形成され、これらの取付片29の室外側にくさ
゛頭数舶用の凹WG 29 hが第51P:lに示すよ
うに形成されている。上記取付片29&まシールテープ
30を介して開口枠1の室外側に当て(=Jけられ、く
ぎ31によって開口j!−1に固定されている。上記取
付片29には6枠26〜28の17J ili+と開口
部2内面との間に介在させるスペーリーを挿入する為の
切欠窓33がfllt分的に夫々J)つ成されてい2)
。これらの切欠YAま種々のI’;z:みのスペーサー
を11人し得るように充分な大きさに設定されている。These upper frame 26, lower frame 27, and next frame 12B, 2B have mounting pieces 29 protruding toward the outer periphery near the outdoor attachment 1'1, respectively.
are integrally formed, and a concave WG 29 h for multiple ships is formed on the outdoor side of these mounting pieces 29 as shown in No. 51P:l. It is applied to the outdoor side of the opening frame 1 via the mounting piece 29 & sealing tape 30 (=J is cut and fixed to the opening j!-1 with nails 31. The mounting piece 29 has 6 frames 26 to 28 A notch window 33 for inserting a spacer to be interposed between the 17J ili+ and the inner surface of the opening 2 is formed in each part J)2).
. These notches are set to be large enough to accommodate 11 spacers of various I'; z: sizes.
また上記6枠26〜28には取付片29の八τ;19か
ら室外側へ突出する張出片34が夫ノ(互いにXli!
x、s!するように形成され、またiハ内側枠片35の
内周☆;IJには室内側へ突出する取付突−片36が夫
々互いに連tλするように形成されている。上記豹〔窓
枠25の下枠27と窓台4の内rfii (J二101
)との間には適当な厚さのスペーサー(くさびと称され
ているものも含む)37が複数筒所に介在され、これに
より下枠27の取付突片36がtN 4に、 15の切
除部1.51Lに正しく位置されて取イ1ねじ58によ
って指板15に取付けられている。また部枠28128
と柱5.5との間にはスペー1ノ゛−39,39が、上
枠26と丈ぐさ6との間にはスペーサー40が夫々介在
されている。これらのスペーサー39.39.40は取
付ねじ41によって6枠28.28.26と共に開口枠
1に固定されている。上記上枠26と全り枠28.28
との各取付突片36と各内側α(縁19との間にはその
間隔に適合した厚さのtfil助材42が介在され、か
つ取イ1ねじ43によって取付突片36と共に内(1f
!I Vi k& 1.9に夫々固定されている。また
取付片29の室外側と張出片34の外周側には夫々IF
II 整flj &:44が互いに連続するように当て
付けられ、かつ取付ねじ45によって張出片34に夫々
固定されている。このtN整む1緑44はその外周面と
外壁21の切1?r面21&との間IQJがこの間にコ
ーキング4i4’ 46を充填して防水するに適した寸
法(例えば約10絹程バL)となるようにその大きさが
2 Qされている。Further, in the six frames 26 to 28, there are projecting pieces 34 that protrude from the mounting pieces 29 toward the outdoor side (Xli!
x, s! Also, on the inner periphery of the inner frame piece 35, mounting protrusions 36 protruding toward the indoor side are formed so as to be connected to each other. The above leopard [rfii inside the lower frame 27 of the window frame 25 and the window sill 4 (J2101
) Spacers 37 of appropriate thickness (including those called wedges) are interposed at multiple cylindrical positions, and this allows the mounting protrusion 36 of the lower frame 27 to reach tN 4, and the cutout of 15. 1.51L and is attached to the fingerboard 15 by means of a single screw 58. Also part frame 28128
Spacers 1-39, 39 are interposed between the upper frame 26 and the column 5.5, and a spacer 40 is interposed between the upper frame 26 and the length 6, respectively. These spacers 39, 39, 40 are fixed to the opening frame 1 together with the six frames 28, 28, 26 by mounting screws 41. Above upper frame 26 and full frame 28.28
A Tfil auxiliary material 42 having a thickness suitable for the spacing is interposed between each mounting protrusion 36 and each inner side α (edge 19), and a Tfil auxiliary material 42 with a thickness suitable for the spacing is interposed between each mounting protrusion 36 and each inner side α (edge 19), and the inner side (1f
! I Vik & 1.9, respectively. In addition, there are IFs on the outdoor side of the mounting piece 29 and on the outer peripheral side of the overhanging piece 34, respectively.
II &: 44 are abutted so as to be continuous with each other, and are each fixed to the overhanging piece 34 by a mounting screw 45. This tN aligned 1 green 44 is the cut 1 between the outer peripheral surface and the outer wall 21? The size of IQJ between the r surface 21 & is set to 2Q so that it has a size suitable for waterproofing by filling caulking 4i4' 46 between them (for example, about 10 mm).
これらの刺垂振額縁44と外壁21の切断面211Lと
の間にはバックアツプ材47とコーキング材46が充填
されている。A back-up material 47 and a caulking material 46 are filled between the hanging frame 44 and the cut surface 211L of the outer wall 21.
υ(に;i!j 1図、第2Iズに示す旧窓枠6を取外
して第6図〜第5図に示す所感1tf25を取イ]ける
窓の取替工法についてnla明する。先ず第1図、第2
1ン1に示す建造物の外壁21を二点i、ff 絆にて
示すように旧窓枠6の各取付片10よりも適当r、を外
周側の位「Iでカッター等を用いて矩31チに!7J
Itli L 、この切断面21&にて囲まれている外
壁21 =p全取除く。上記外壁21の切断面721a
の位置は旧4i!、q枠6と交替したときの新窓枠25
の取イ1片29よりも外周側になるように設定される。υ(ni;i!j 1, 2I) Remove the old window frame 6 shown in Fig. 1 and 2I and take the impressions 1tf25 shown in Figs. 6 to 5]. Figure 1, 2nd
Cut the outer wall 21 of the building shown in 1-1 into a rectangle using a cutter or the like at two points (i, ff) on the outer circumferential side of each mounting piece 10 of the old window frame 6 as shown by the bond. To 31ch!7J
Itli L, the outer wall 21 = p surrounded by this cut surface 21 & is completely removed. Cut surface 721a of the outer wall 21
The location is the old 4i! , New window frame 25 when replaced with q frame 6
It is set so that it is on the outer peripheral side than the first piece 29 of the groove.
次に、旧窓枠6の取付片10を固定しているくぎ11や
T伜8の取付突片14を固定している取刊づコじ16や
上枠7と開枠9.9を固定している取(Ni t+じ1
8を取外した後、旧窓枠6全体を開口f’ds 2から
室外側へ取外す。然る0、新窓枠25を第6図〜第5し
Δ:1に示すように室外側から開口■52内に1)°り
め込み、またこの新窓枠25の下枠27と豚舎4との間
にr!数の適切な厚さのスペ“−サー37を取付片10
の切欠窓53°を通して室外側から挿入し、こilらの
窓台4上のスペーサー37上に新窓枠25の下枠27を
a置する。このn、−合、上a己スペーサー37の厚み
寸法は下4’:’ 27の取付突片36の上面が斜板1
5の上面と同−甚さになるように個々の室毎に調整する
。また新窓枠25の上枠26とまぐさ3間及び開枠28
.2Bと柱5.5間にもスペー′4I−37を取fj片
10の切欠窓33を101シて室外側から挿入し、新1
′i′λ枠25の上下、左右の位置を位11?決めする
。上記スペーサー37による新窓枠25の位IFj g
、i 整はスペーサー67を例えば多数の薄板を接着剤
によって貼り合せて4RJあするようにしたり、スペー
サー37をくさび形にノl(成することによって「11
単にかつ正確に行うことができる。Next, fix the nails 11 that are fixing the mounting piece 10 of the old window frame 6, the mounting bracket 16 that is fixing the mounting protrusion 14 of T8, and the upper frame 7 and opening frame 9.9. Ni t+ji1
8, the entire old window frame 6 is removed from the opening f'ds 2 toward the outdoor side. Then, insert the new window frame 25 into the opening 52 from the outdoor side as shown in Figs. Between 4 and 4 r! Attach a number of spacers 37 of appropriate thickness to the mounting piece 10.
The lower frame 27 of the new window frame 25 is placed a on the spacer 37 on the window sill 4. The thickness of the upper spacer 37 is 4':' The upper surface of the mounting protrusion 36 of 27 is the swash plate 1.
Adjust each chamber so that it is the same height as the top surface of 5. Also, between the upper frame 26 of the new window frame 25 and the lintel 3 and the open frame 28
.. Also take a space '4I-37 between 2B and pillar 5.5 and insert the cutout window 33 of fj piece 10 from the outdoor side.
'i'λ The top, bottom, left and right positions of frame 25 are 11? Decide. New window frame 25 position by spacer 37 IFj g
, i For example, the spacer 67 can be made by pasting together many thin plates with adhesive, or by forming the spacer 37 into a wedge shape.
It can be done simply and accurately.
また上記新5べ枠25の取イ\J片29を開口枠1の室
外側にシールテープ30を介して当て4=Jけ、新窓枠
25の回内外方向の位I;l決めを行う。この場合、新
豚枠25における取イ・」片29と室内側枠片35との
間の寸法が1!110(・;(・1の室外側1711と
内側類R19の室外側面との間の寸法により小さい場合
には、室内側枠片55と内側類ε19の室外側面との間
にIlc?間をつくることによって内側a #t 19
やル・T板15をほとんどそのままf、!4川すること
ができる0また下枠27の取付突片36がuni 、’
d+i、 1sの切除部1Saに合致しない場合にはそ
の切除G1ζ15aを合致するように形成する。凍に、
上記−ヒ47jI、 26、開枠28.28をスペーサ
ー40.39,39と共に開口枠1に取付ねじ41によ
って固定し、また各取付片29をくぎ31によって開口
枠1に固定する。また、下枠27の]j7付94片36
を11.r板15に取付ねじ38によってli!11定
する。更にまた1上枠26と開枠28.2Bの各取付突
片36と内側額縁19との間に補助旧42を介在させて
取付ねじ45によって固定する。次に、名取(=J片2
9の室外側にWi ti fil縁44を肖て付けて取
付ねじ45によって固定し、これによって切欠窓53や
くぎ31の頭を覆い隠す。その徒、上記ii”J M1
% fJ:1緑44と外壁21の切断面211Lとの間
にバックアツプ材47とツーキング材46を充)^して
両者間からの雨水の浸入を防止する。Also, remove the new window frame 25 and place the J piece 29 on the outdoor side of the opening frame 1 via the seal tape 30 to determine the pronation/inside pronation direction position of the new window frame 25. . In this case, the dimension between the frame piece 29 of the new pig frame 25 and the indoor frame piece 35 is 1!110 (... If the dimensions are too small, a gap is created between the indoor side frame piece 55 and the outdoor side surface of the inner side class ε19.
Yaru T board 15 is almost the same f,! Also, the mounting protrusion 36 of the lower frame 27 is unique.
If it does not match the cutout 1Sa of d+i, 1s, the cutout G1ζ15a is formed so as to match. Freeze,
The opening frames 28 and 28 are fixed together with the spacers 40, 39 and 39 to the opening frame 1 with mounting screws 41, and each mounting piece 29 is fixed to the opening frame 1 with nails 31. In addition, the bottom frame 27 has 94 pieces 36 with j7
11. li! by the mounting screw 38 on the r plate 15! 11. Furthermore, an auxiliary member 42 is interposed between each of the mounting protrusions 36 of the upper frame 26 and the open frame 28.2B and the inner frame 19, and is fixed with mounting screws 45. Next, Natori (=J piece 2
A Wi ti fil edge 44 is attached to the outdoor side of the window 9 and fixed with a mounting screw 45, thereby covering the cutout window 53 and the head of the nail 31. That person, the above ii”J M1
%fJ:1 Backup material 47 and tooling material 46 are filled between the greenery 44 and the cut surface 211L of the outer wall 21 to prevent rainwater from entering between the two.
次に、第6図、第7図は奉り(の界なる実1111例を
示すもので1新窓枠25eにおりる取付片290と室内
側砕片35eとの間のXj法がll’FJ口替110の
室外側面と内側類R19eの室外側面どの間の寸法より
大きい場合のh乍工例を示している。この実施例におい
ては、新窓枠25θの各取付片290と開口枠10の室
外側面との間に調N、ちg750を介在させて室内側(
)(片55eが内側1’+lI F、’< 190と干
渉するのを防止し、新窓枠25eをa々の開口部2eに
内側額縁19eをはLんど補修することなく嵌着し得る
ようになっている。また、上枠260と竪t’/r 2
8 eとの取付突片368は内側額縁19eに形成した
切除部19aeに嵌め込まれている。なお、上記実施例
と同−若しくは均等と考え得るものには対応するr11
S分と同一の符号にアルファベットのθをイリして重複
説明を省略する。Next, FIGS. 6 and 7 show an example of the 1111 example of the 1111th example of the world of worship, in which the This figure shows an example of construction in a case where the dimension between the outdoor side of the replacement 110 and the outdoor side of the inner class R19e is larger than the dimension between the two.In this example, each mounting piece 290 of the new window frame 25θ and the outdoor side of the opening frame The indoor side (
) (This prevents the piece 55e from interfering with the inner side 1'+lI F,'< 190, and allows the new window frame 25e to be fitted into the opening 2e of each of the inner frames 19e without any repairs. In addition, the upper frame 260 and the vertical t'/r 2
The attachment protrusion 368 with 8e is fitted into the cutout 19ae formed on the inner frame 19e. In addition, for those that can be considered to be the same as or equivalent to the above embodiments, the corresponding r11
The alphabet θ is replaced by the same reference numeral as that for S, and the redundant explanation is omitted.
なお、本願にあっては上記実1111例に限定されるも
のではなく、例えば第6図、第7い1に示すrp71
[%板を使用せずに、内側C1111mと「1仮との一
部を第6図、第7図に仮想線にて示したようにVJ断じ
て新窓枠と内側411緑及びIt;’t Wとの干渉を
防止するようにしでも良い。Note that the present application is not limited to the above-mentioned example 1111, and for example, the rp71 shown in FIGS. 6 and 7-1
[Without using the % board, part of the inside C1111m and ``1 provisional'' is shown with virtual lines in Figures 6 and 7, and the VJ definitely has a new window frame and the inside 411 green and It;'t Interference with W may be prevented.
以上のように不発Wjにあっては、n! 4i物の外壁
を矩形に!71断して旧S1;シ1:qNt寸IF’:
、 %IL付け〜このズノ「窓枠の取付片の室外[1[
’l k:&:i Mf% +Xlf縁をIiV iて
1りてこの■η’、F rJj 縁ど外壁のvJ+≧1
面間にコーキング材を充填するようにしたので、取替工
事完了後の悼′(の外9!11には矩形の置県額縁とこ
れを囲む外拮・1の切断線がくっきり表われて見栄えが
良くなり、また上記のように611整額靭と外片シのり
J断面間にコーキング材を充jAシてシールするように
したので、この間からの雨水の浸入を長期に亘って綿実
にlil、r止できる。また所感ffl、をU10部に
室外llNから嵌め込んだ後この新窓枠の取f1片の切
欠8からスペーサーを挿入して新窓枠を位rt1決めす
るようにし・だので、内111gの補修をほとんど或い
は全く行うことなく窓の取替を行うことができて1点工
Jυ」間の短4.11と′I+1.“用の低減を図るこ
とができる。As mentioned above, in case of unfired Wj, n! Make the outer wall of the 4i building rectangular! 71 cut off old S1; 1: qNt dimension IF':
, %IL attached ~ Kono Zuno "Window frame mounting piece outdoor [1 [
'l k:&:i Mf% +
Since we filled the spaces between the surfaces with caulking material, the rectangular Oiken picture frame and the cutting line of the outer panel 1 that surrounds it are clearly visible on the outside of 9!11 after the replacement work is completed. The appearance is better, and as mentioned above, caulking is filled between the 611 straight edge and outer edge J section to seal it, preventing rainwater from entering from this gap for a long time. lil, r can be stopped.Also, after fitting the impression ffl into the U10 part from the outdoor llN, insert a spacer from the notch 8 of the f1 piece of this new window frame to position the new window frame. Therefore, the window can be replaced with little or no repair of 111g, and it is possible to reduce the one-point work Jυ'' between 4.11 and 'I+1.''.
図面は本願の実施例を示すもので、ε151図は1[1
窓枠の取(=J状態を示す縦]1シ1面図−、第2図は
1111図の1黄断面図、第3図は新窓枠の取付状部を
示す縦断面図、第41;1は第3図の1.、l、li断
面図、第5図は第3図の要部拡大図、第6図は漁なる実
施例を示す縦断面図、1+S 7図は第6図の描11ノ
r面図である01・・・l7fJ D枠、 6・・・1
1−1窓枠、 10・・・取Lj片、 21・・・外壁
、21a・・・切断面、 25・・・新窓枠、 29・
・・取tj片、 。
35・・・切欠窓、 59.40・・・スペーサー、
44・・・¥411額縁、46・・・コーキング材
特許出願人 豊和工業株式会社
第5図
47
第6図The drawing shows an example of the present application, and the ε151 diagram is 1[1
Window frame installation (vertical showing J state) 1 side view - Figure 2 is a 1 yellow sectional view of Figure 1111, Figure 3 is a vertical sectional view showing the mounting part of the new window frame, Figure 41 1 is a sectional view of 1., l, li in Fig. 3, Fig. 5 is an enlarged view of the main part of Fig. 3, Fig. 6 is a vertical sectional view showing an example of fishing, 1+S Fig. 7 is Fig. 6 01...17fJ D frame, 6...1
1-1 window frame, 10... Lj piece, 21... outer wall, 21a... cut surface, 25... new window frame, 29.
...Take TJ piece, . 35... Notch window, 59.40... Spacer,
44...¥411 Picture frame, 46...Caulking material Patent applicant Howa Kogyo Co., Ltd. Figure 5 47 Figure 6
Claims (1)
取替える窓の取替工法において、先ず建造物の外壁を上
記旧窓枠の各取付片よりも適当J、1外周側の位置で矩
形に切断した彼111窓枠を開口部から室外側へ取外し
、次に新窓枠を上記1ji、1口部に室外側から嵌め込
んだ後この祈念I:11の各取付片に;し成されている
切欠窓から開口1’Wl+の各内面と新窓枠間にスペー
市−を夫々挿入して91窓枠を位置決めし、次にこの新
窓枠の各取付片の室外側に?;!J !IiJ額にすを
夫々取イ1けた後これらのti’41Jk l’J+縁
と上記外壁の切11+面間にコーキング劇を充填するこ
とを特rtとする窓の取替工法。rJ,li In the window replacement method of replacing the old window frame fitted to the opening with a new window frame, first, the outer wall of the building is installed on the outer circumferential side of the building, which is more suitable than each mounting piece of the old window frame. Remove the 111 window frame cut into a rectangle at the location from the opening to the outdoor side, then fit the new window frame into the above opening from the outdoor side. ; Position the window frame 91 by inserting a spacer between each inner surface of the opening 1'Wl+ and the new window frame from the cut-out window that has been made, and then attach the outdoor side of each mounting piece of this new window frame. To? ;! J! A method for replacing windows, which is characterized in that after each frame is removed, caulking is filled between these ti'41Jk l'J+ edges and the cut 11+ surface of the outer wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14058582A JPS5931384A (en) | 1982-08-12 | 1982-08-12 | Method of exchange construction of window |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14058582A JPS5931384A (en) | 1982-08-12 | 1982-08-12 | Method of exchange construction of window |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5931384A true JPS5931384A (en) | 1984-02-20 |
JPS6313511B2 JPS6313511B2 (en) | 1988-03-25 |
Family
ID=15272108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14058582A Granted JPS5931384A (en) | 1982-08-12 | 1982-08-12 | Method of exchange construction of window |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5931384A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0189585U (en) * | 1987-12-03 | 1989-06-13 |
-
1982
- 1982-08-12 JP JP14058582A patent/JPS5931384A/en active Granted
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0189585U (en) * | 1987-12-03 | 1989-06-13 |
Also Published As
Publication number | Publication date |
---|---|
JPS6313511B2 (en) | 1988-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8615944B2 (en) | Stop bead for separating stucco material from a frame of a window or door | |
US7587868B2 (en) | Method of installing windows into a concrete structure | |
US5157881A (en) | Replacement window construction and method | |
US4372094A (en) | Process for simple, rapid and economical transformation of a window with a wooden or metal frame or a single pane frame into a window with a plurality of insulating panes | |
US4813203A (en) | Retrofit glazing system | |
US4803817A (en) | Glazing assembly and method for glazing a building | |
JPS5931384A (en) | Method of exchange construction of window | |
US4967519A (en) | Exterior interface sealing system | |
US6581354B1 (en) | Glass curtain wall system | |
JP3571213B2 (en) | window | |
JPS6347875B2 (en) | ||
JP4312441B2 (en) | Refurbished sash | |
JP2718906B2 (en) | Mounting structure of vertical frame for door in curtain wall | |
US20050086884A1 (en) | Access door | |
US4403451A (en) | Weatherstripping method and arrangement | |
JP2602019Y2 (en) | Double glass structure | |
CA1284713C (en) | Glazing assembly and method for glazing a building | |
JPS6214254Y2 (en) | ||
JPS6218709B2 (en) | ||
JPH0518405Y2 (en) | ||
JPS59165783A (en) | Floor and baseboard rail apparatus in lead chamber | |
JPS606140Y2 (en) | External door frame for replacement door | |
JPH04315686A (en) | Opening section structure for building | |
JPS6324220Y2 (en) | ||
JPS5829261Y2 (en) | Window frame renovation equipment |