JPS5920941Y2 - Spanner for installing hooks such as slate, galvanized iron, etc. - Google Patents
Spanner for installing hooks such as slate, galvanized iron, etc.Info
- Publication number
- JPS5920941Y2 JPS5920941Y2 JP1979057859U JP5785979U JPS5920941Y2 JP S5920941 Y2 JPS5920941 Y2 JP S5920941Y2 JP 1979057859 U JP1979057859 U JP 1979057859U JP 5785979 U JP5785979 U JP 5785979U JP S5920941 Y2 JPS5920941 Y2 JP S5920941Y2
- Authority
- JP
- Japan
- Prior art keywords
- hook
- spanner
- shaft
- main body
- slate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Details Of Spanners, Wrenches, And Screw Drivers And Accessories (AREA)
Description
【考案の詳細な説明】
本考案はスレーl〜、1〜タン等を建物等に取付けるフ
ックの施工に用いるスパナに関するものである。[Detailed Description of the Invention] The present invention relates to a spanner used for constructing hooks for attaching sleds 1~, 1~tan, etc. to buildings, etc.
周知のようにこの種フックは、フックボルトとナツト及
びパツキン、座金よりなり、フックボルトをスレート、
トタン等に設けた孔に挿通してフックボルトのフック部
を建物のC型鋼等の骨組に係合し、ナツトをフックボル
トに締付けて施工状態とするのであるが、従来、この施
工に際してはナツトから僅かに突出したフックポル1〜
の先を持って、フックポルI・のスレート、トタン等で
視界を遮られたフック部をC型鋼等の骨組に係合するた
め、この係合作業が困難であり、また折角この保合を行
ってもフックボルトを手前に引張った状態でナツトを締
付けないと前記係合が外れ易く、この引張り状態でナツ
トを締付けるには両手を要するため高所作業の場合危険
を伴い、そのような危険をなくすにはスレー1〜、トタ
ン等の表側と裏側とで2名の作業者を要するものであっ
た。As is well known, this type of hook consists of a hook bolt, a nut, a gasket, and a washer.
The hook part of the hook bolt is inserted into a hole made in galvanized iron or the like, and the hook part of the hook bolt is engaged with the framework of the building, such as C-shaped steel, and the nut is tightened to the hook bolt to complete the construction. Hook pole 1 slightly protruding from
The hook part of the Hook Pol I, whose visibility is blocked by slate, galvanized iron, etc., must be engaged with the frame made of C-shaped steel, etc., by holding the tip of the hook.This engagement work is difficult, and we have taken great pains to secure it. However, if you do not tighten the nut with the hook bolt pulled toward you, the engagement will easily come off, and tightening the nut with this tension requires both hands, which can be dangerous when working at heights. To eliminate it, it would take one or two workers to work on the front and back sides of the slate or galvanized iron, etc.
そこで本考案は、フックボルトを建物のC型鋼等の骨組
に係合し易く且つこの保合状態下に片手でフックの締付
は作業が容易にでき、高所作業の場合の危険性を低減で
き、しかも短いフックボルトを用いて施工できるスレー
1へ、)・タン等取付はフック施工用スパナを提供する
ことを目的とするものである。Therefore, the present invention makes it easy to engage the hook bolt with the frame of the building, such as C-shaped steel, and in this engaged state, the hook can be easily tightened with one hand, reducing the risk of working at heights. The purpose of the attachment is to provide a wrench for hook construction, which can be installed using short hook bolts.
次に本考案の図示の一実施例について説明すると、本例
スパナは円筒状スパナ主体1と軸2とを備え、スパナ主
体1の前端にフック11のナツト12に合致する六角礼
状スパナ口3を形成し、スパナ主体1に軸2を回転可能
且つ長手方向に移動可能に挿嵌し、軸2の前端にはフッ
ク11のフックボルト13に螺合する所要深さのわじ孔
4を設け、軸2の後部には軸2よりも大径な把手部5を
形成し、スパナ主体1の前方脱出防止用鍔状段部7を軸
2の前部に形成すると共に鍔状段部7に係合する内鍔状
段部6をスパナ主体1の後部に形成し、スパナ主体1の
外周及び把手部5外周に夫々微細な凹凸の滑止面8,9
を形成し、把手部5前端をスパナ主体1の後方脱出防止
用段部10としている。Next, an illustrated embodiment of the present invention will be described. The spanner of this embodiment includes a cylindrical spanner main body 1 and a shaft 2, and has a hexagonal bow-shaped spanner opening 3 at the front end of the spanner main body 1 that fits into the nut 12 of the hook 11. A shaft 2 is rotatably and longitudinally movably inserted into the spanner main body 1, and a hole 4 of a required depth is provided at the front end of the shaft 2 to be screwed into the hook bolt 13 of the hook 11. A handle portion 5 having a larger diameter than the shaft 2 is formed at the rear of the shaft 2, and a flange-like stepped portion 7 for preventing the wrench main body 1 from slipping forward is formed at the front portion of the shaft 2, and a handle portion 5 that engages with the flange-like stepped portion 7 is formed at the front portion of the shaft 2. A mating inner flange-like stepped portion 6 is formed at the rear of the spanner main body 1, and finely uneven non-slip surfaces 8, 9 are provided on the outer periphery of the spanner main body 1 and the outer periphery of the handle portion 5, respectively.
The front end of the handle portion 5 serves as a stepped portion 10 for preventing the spanner main body 1 from slipping out from behind.
なお、前記フック11はフック部14を頭部に有するフ
ックボルト13の先にフェルトパツキン15、座金16
を順に介してナラ1〜12を螺挿している。The hook 11 has a felt packing 15 and a washer 16 at the tip of a hook bolt 13 having a hook portion 14 on the head.
Screws 1 to 12 are inserted in order through the holes.
また図に於いて、17は建物の骨組を形成したC型鋼、
18はC型鋼17に取付けるスレートである。Also, in the figure, 17 is the C-shaped steel that formed the frame of the building.
18 is a slate attached to the C-shaped steel 17.
このようにした本例スパナによるフック11の施工に際
しては、スパナ主体1を少し後退して軸2前端をスパナ
主体1前端より若干前方に露出した見易い状態となし、
軸前端のねじ孔4をフックボルト13に捻し込んで連結
状態となし、次いでフック部14先からフックボルト1
3をスレーI・18の透孔19に挿通し、把手部5を把
んだ状態で回転してフックボルトのフッ部14をC型鋼
17に係合し、この保合が外れないように把手部5を後
方に引張った状態下に、第1図に示すように、その引張
った片手20の親指と人差指でスパナ主体1を前方に移
動させてスパナ口3をフックのナラI・12に嵌合し、
引続きスパナ主体1を回転させてナツト12を締付け、
この締付けの終りにスパナ主体1を把み直して更に強力
にナツト12を締付け、次いでスパナ主体1を後退して
ナツト12がら外すと共に軸2を把手部5により捻し戻
してフックボルト13から外し、フック11の施工を完
了する。When constructing the hook 11 using the spanner of this embodiment, the spanner main body 1 is moved back a little so that the front end of the shaft 2 is exposed slightly forward of the front end of the spanner main body 1 for easy viewing.
The screw hole 4 at the front end of the shaft is screwed into the hook bolt 13 to establish a connection state, and then the hook bolt 1 is inserted from the tip of the hook portion 14.
3 into the through hole 19 of the sleigh I.18, rotate it while grasping the handle part 5 to engage the foot part 14 of the hook bolt with the C-shaped steel 17, and then tighten the handle to prevent this attachment from coming off. While the part 5 is pulled backward, as shown in Fig. 1, move the spanner main body 1 forward with the thumb and index finger of the pulled hand 20, and fit the spanner mouth 3 into the nut I/12 of the hook. together,
Continue to rotate the spanner body 1 to tighten the nut 12,
At the end of this tightening, grasp the spanner main body 1 again, tighten the nut 12 even more strongly, then move the spanner main body 1 back to remove the nut 12, and at the same time, twist the shaft 2 back with the handle part 5 to remove it from the hook bolt 13. , the construction of the hook 11 is completed.
またこの施工に際して把手部5を持って持歩き等しても
スパナ主体1の前方脱出が段部6,7の保合により防止
される。Furthermore, even if the wrench main body 1 is carried around by the handle 5 during this construction, the front escape of the spanner main body 1 is prevented by the engagement of the stepped portions 6 and 7.
上記のように本考案のスパナは、前端にフックのナツト
に嵌合するスパナ口を形成した筒状スパナ主体に軸を回
転可能且つ長手方向に移動可能に挿嵌し、軸の前端には
フックのフックボルト螺合用ねし孔を設け、軸の後部に
は把手部を形威し、スパナ主体の後部と軸の前部にスパ
ナ主体の前方脱出防止用段部を形成したことを特徴とし
ており、フックの施工に際し、フックのフックポル1へ
を軸に連結した状態としうるのでフックボルトをC型鋼
等の建物骨組に係合し易く、且つこの保合を軸の引張に
より維持した状態下にスパナ主体でフックのナツトの締
付は作業が片手で容易にでき、高所作業時の危険性を防
止でき且つフック施工の作業能率を向上でき、殊に短い
フックボルトによるフック施工時に上記効果が著しい。As mentioned above, the spanner of the present invention has a shaft rotatably and longitudinally movably inserted into a cylindrical spanner main body which has a spanner opening at the front end that fits into a nut of a hook, and a hook at the front end of the shaft. It features a threaded hole for threading the hook bolt, a handle at the rear of the shaft, and stepped sections at the rear of the wrench and at the front of the shaft to prevent the front of the wrench from slipping out. When installing the hook, the hook pole 1 of the hook can be connected to the shaft, so the hook bolt can be easily engaged with the building frame such as C-shaped steel, and this connection can be maintained by tensioning the shaft using a wrench. The nut of the hook can be easily tightened with one hand, which prevents the danger of working at heights and improves the work efficiency of hook installation.The above effect is especially noticeable when installing hooks with short hook bolts. .
図面は本考案の一実施例を示し、第1図は使用状態に於
ける一部欠截側面図、第2図は拡大した一部欠截側面図
、第3図は拡大正面図である。
1・・・・・・スパナ主体、2・・・・・・軸、3・・
・・・・スパナ口、4・・・・・・ねヒ孔、5・・・・
・・把手部、6,7・・・・・・段部、8.9・・・・
・・滑止面、10・・・・・・段部、11・・・・・・
フック、12・・・・・・ナツト、13・・・・・・フ
ックポル1〜.14・・・・・・フック部、15・・・
・・・フェルトパツキン、16・・・・・・座金、17
・・・・・・C型鋼、18・・・・・・スレート、19
・・・・・・透孔、20・・・・・・片手。The drawings show an embodiment of the present invention, with FIG. 1 being a partially cutaway side view in use, FIG. 2 being an enlarged partially cutaway side view, and FIG. 3 being an enlarged front view. 1...Wrench main body, 2...Shaft, 3...
...Spanner opening, 4...Neutral hole, 5...
...Handle part, 6,7...Stepped part, 8.9...
...Non-slip surface, 10...Stepped portion, 11...
Hook, 12...Natsuto, 13...Hook Pol 1~. 14...Hook part, 15...
...Felt packing, 16...Washer, 17
...C-shaped steel, 18...Slate, 19
......Through hole, 20...One hand.
Claims (1)
状スパナ主体に軸を回転可能且つ長手方向に移動可能に
挿嵌し、軸の前端にはフックのフックボルト螺合用ねし
孔を設け、軸の後部には把手部を形成し、スパナ主体の
後部と軸の前部にスパナ主体の前方脱出防止用段部を形
成したことを特徴とするスレート、l−タン等取付はフ
ック施工用スパナ。The shaft is inserted into the main body of a cylindrical wrench, which has a wrench opening at the front end that fits into the nut of the hook, so as to be rotatable and movable in the longitudinal direction, and the front end of the shaft is provided with a threaded hole for screwing in the hook bolt of the hook. , a handle part is formed at the rear of the shaft, and a step part is formed at the rear of the wrench body and at the front part of the shaft to prevent the wrench body from escaping in the front.Slate, L-tongue, etc. mounting is for hook construction. spanner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1979057859U JPS5920941Y2 (en) | 1979-04-30 | 1979-04-30 | Spanner for installing hooks such as slate, galvanized iron, etc. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1979057859U JPS5920941Y2 (en) | 1979-04-30 | 1979-04-30 | Spanner for installing hooks such as slate, galvanized iron, etc. |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS55160774U JPS55160774U (en) | 1980-11-18 |
JPS5920941Y2 true JPS5920941Y2 (en) | 1984-06-18 |
Family
ID=29291931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1979057859U Expired JPS5920941Y2 (en) | 1979-04-30 | 1979-04-30 | Spanner for installing hooks such as slate, galvanized iron, etc. |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5920941Y2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103395025A (en) * | 2013-08-12 | 2013-11-20 | 苏州启智机电技术有限公司 | Locking tool of bolt pair |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009196051A (en) * | 2008-02-22 | 2009-09-03 | Mitsubishi Heavy Ind Ltd | Socket for socket wrench and fixing method of fastened member |
CN102152266A (en) * | 2011-03-15 | 2011-08-17 | 安徽省思维新型建材有限公司 | Combined wrench capable of quickly tightening nut on bolt |
CN105382748B (en) * | 2015-12-18 | 2018-03-02 | 国家电网公司 | A kind of box spanner |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4029749Y1 (en) * | 1964-02-20 | 1965-10-18 |
-
1979
- 1979-04-30 JP JP1979057859U patent/JPS5920941Y2/en not_active Expired
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4029749Y1 (en) * | 1964-02-20 | 1965-10-18 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103395025A (en) * | 2013-08-12 | 2013-11-20 | 苏州启智机电技术有限公司 | Locking tool of bolt pair |
Also Published As
Publication number | Publication date |
---|---|
JPS55160774U (en) | 1980-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5920941Y2 (en) | Spanner for installing hooks such as slate, galvanized iron, etc. | |
US5320021A (en) | Universal chain wrench and tools | |
RU2198087C2 (en) | Manual tool with bearing lever and holding mechanism and method for releasing fastening means | |
CN211414952U (en) | Novel universal chain wrench | |
JP2001056009A (en) | Hexagon head bolt with hexagon socket | |
CN217966772U (en) | Wrench device | |
CN208262703U (en) | A kind of spanner | |
CN210732305U (en) | Nut torque tool | |
CN216180067U (en) | Insulating type torque wrench | |
CN109013974A (en) | A kind of building implement | |
CN220279491U (en) | Multifunctional adjustable wrench | |
CN211761098U (en) | Multifunctional quick wrench | |
CN211693175U (en) | Hexagonal flange face locknut | |
CN213858985U (en) | Telescopic oscillating ratchet adjustable wrench | |
CN211661915U (en) | Special wrench for disassembling and assembling pinion clutch of ball mill | |
KR20080001110U (en) | Supply of electric power telegraph pole step bolt | |
JPH0214604Y2 (en) | ||
JP3102179U (en) | Auxiliary grip for screw driver | |
KR101458982B1 (en) | Spanner for scaffolding work | |
JP3071753U (en) | Auxiliary tool for electric drill | |
JPS6360608B2 (en) | ||
KR0122223Y1 (en) | Bolt for an axle stabilizer | |
JP3040321U (en) | Spacer to prevent loosening of fixing plate | |
JP3020340U (en) | Chain tensioner | |
JPS6231483Y2 (en) |