JPS5911121Y2 - Manufacturing equipment for precast concrete parts - Google Patents

Manufacturing equipment for precast concrete parts

Info

Publication number
JPS5911121Y2
JPS5911121Y2 JP5524979U JP5524979U JPS5911121Y2 JP S5911121 Y2 JPS5911121 Y2 JP S5911121Y2 JP 5524979 U JP5524979 U JP 5524979U JP 5524979 U JP5524979 U JP 5524979U JP S5911121 Y2 JPS5911121 Y2 JP S5911121Y2
Authority
JP
Japan
Prior art keywords
cap
bolt
nut
steel plate
bolt hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP5524979U
Other languages
Japanese (ja)
Other versions
JPS55156907U (en
Inventor
実 上床
明弘 宮路
徳隆 石崎
Original Assignee
大成建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大成建設株式会社 filed Critical 大成建設株式会社
Priority to JP5524979U priority Critical patent/JPS5911121Y2/en
Publication of JPS55156907U publication Critical patent/JPS55156907U/ja
Application granted granted Critical
Publication of JPS5911121Y2 publication Critical patent/JPS5911121Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【考案の詳細な説明】 本出願人は異に実願昭53−126931号において、
コンクリート部の表面に鋼板1の碇着されたプレキャス
トコンクリート部材の製造装置にあって、鋼板1の裏面
にそのボルト孔2を掩覆して同ボルト孔2と同心状に配
置され、且つその内腔部にナット3及び座金4をボルト
孔2の径方向に可摺動的に遊嵌してなる透明の合威樹脂
製キャップ5を配設し、前記ボルト孔2に嵌脱自在に挿
貫された仮ボルト6の先端面に螺挿され、且つ側方から
螺挿された螺子7によって圧着された螺桿8を前記キャ
ップ5の頭部透孔9に貫拝するとともに、同螺桿8のキ
ャップ頭部より突出した部分にナット10を螺着緊締し
て、前記キャップ5の外周縁を前記鋼板1に圧着したプ
レキャストコンクリート部材の製造装置を提案した。
[Detailed description of the invention] The present applicant differs in U.S. Pat. No. 53-126931,
In an apparatus for manufacturing a precast concrete member in which a steel plate 1 is anchored on the surface of a concrete part, the bolt hole 2 is covered with the back surface of the steel plate 1 and is arranged concentrically with the bolt hole 2. A transparent resin cap 5, which is formed by fitting a nut 3 and a washer 4 slidably and loosely in the radial direction of the bolt hole 2, is disposed in the bolt hole 2, and is inserted into and detachably from the bolt hole 2. The screw rod 8, which is screwed into the tip end surface of the temporary bolt 6 and crimped by the screw 7 inserted from the side, is inserted into the head through hole 9 of the cap 5, and the cap head of the screw rod 8 is inserted. We have proposed an apparatus for manufacturing a precast concrete member in which the outer circumferential edge of the cap 5 is crimped to the steel plate 1 by screwing and tightening a nut 10 onto the protruding part.

(第1図参照)同装置によってプレキャストコンクリー
ト部材を製造する際には、鋼板1の背面にコンクリート
11を打設し、同打設コンクリート11の硬化後、前記
仮ボルト6を螺回してその先端部の螺桿8をナット5よ
り離脱させて鋼板1の外部に除去し、前記キャップ5、
座金3ナット4,10をコンクリート部内に残置するも
のであり、このようにして製作されたプレキャストコン
クリート部材の鋼板1を他部材の鋼板12に摩擦接合す
る際、同鋼板12を鋼板1に衝接し、鋼板12とボルト
頭部との間に座金13が介在するように本設用ハイテン
ションボルト14を前記鋼板1,12のボルト孔に貫挿
し、更に前記座金3に貫挿してナット4に螺着緊締する
もので、この際ナット4はボルト孔2の径方向に移動し
、本設用ハイテンションボルト14とナット4との対向
面に設けられた傾斜面14a,4aとが衝合して、ナッ
ト4が強制的に本設用ハイテンションボルト14の中心
軸と同一軸上に移動されて螺着されるようになっている
(See Figure 1) When manufacturing a precast concrete member using the same device, concrete 11 is poured on the back of the steel plate 1, and after the poured concrete 11 has hardened, the temporary bolt 6 is screwed onto the tip of the concrete 11. The screw rod 8 of the part is detached from the nut 5 and removed to the outside of the steel plate 1, and the cap 5,
The washers 3 and nuts 4 and 10 are left in the concrete part, and when the steel plate 1 of the precast concrete member produced in this way is friction-welded to the steel plate 12 of another member, the steel plate 12 collides with the steel plate 1. , a high-tension bolt 14 for permanent installation is inserted into the bolt hole of the steel plates 1 and 12 so that the washer 13 is interposed between the steel plate 12 and the bolt head, and then inserted through the washer 3 and screwed into the nut 4. At this time, the nut 4 moves in the radial direction of the bolt hole 2, and the high tension bolt 14 for permanent installation and the inclined surfaces 14a, 4a provided on the opposing surface of the nut 4 collide with each other. The nut 4 is forcibly moved coaxially with the central axis of the high tension bolt 14 for permanent installation and is screwed into place.

前記装置において、透明合或樹脂製キャップ5を使用し
たことによって、フ゜レキャストコンクリート部材の製
作時、キャップ5内のナットの有無が外部より確認でき
、ナットの入れ忘れを防止でき、また前記キャップ5は
合成樹脂製で柔軟性を有するので、その外周縁を鋼板1
に圧着するだけでキャップ5と鋼板1との間を十分に水
密に保持でき、またキャップ5頭部の透孔9はナット1
0を圧着することによって同部の水密性を十分に保持で
き、この結果パッキングの使用を省略して工程の簡素化
とコストの低減とを図ることができるものである。
In the above device, by using the cap 5 made of transparent resin, the presence or absence of a nut in the cap 5 can be confirmed from the outside during the production of a precast concrete member, and it is possible to prevent forgetting to insert a nut. Since it is made of resin and has flexibility, its outer periphery is covered with a steel plate 1.
The gap between the cap 5 and the steel plate 1 can be maintained sufficiently watertight simply by crimping the cap 5 to the nut 1.
By crimping the 0, the watertightness of the part can be maintained sufficiently, and as a result, the use of packing can be omitted, simplifying the process and reducing costs.

また前記装置によれば、鋼板1のボルト孔2に嵌脱自在
に貫挿された仮ボルト6の先端面に植立された螺桿8を
キャップ5の頭部透孔9に貫通して同透孔9からの突出
部にナット10を螺着緊締し、キャップ5をその外周縁
が鋼板1の裏面に圧着されるように仮止めし、コンクリ
ート打設後、仮ボルト6を螺桿8とともに鋼板1より除
去してキャップ5及びその頭部に圧着されたナット10
を打設コンクリート内に残留碇着するようにしたことに
より、キャップ5の頂面から他部材が突出することがな
く、キャップ5内の有効働き長さZが大きくとれること
となり、前記装置によって製造されたプレキャストコン
クリート部材の取付けられる建造物の本体鉄骨の階数に
よるフランジ厚さの変化に応じて、本設用ハイテンショ
ンボルト14の首下長さを変える必要がなく、作業性の
単純化が図られるものである。
Further, according to the above device, the threaded rod 8 erected on the tip end face of the temporary bolt 6 which is removably inserted into the bolt hole 2 of the steel plate 1 is passed through the head through hole 9 of the cap 5 and the screw rod 8 is inserted into the bolt hole 2 of the steel plate 1 so as to be inserted into the bolt hole 2 of the steel plate 1. A nut 10 is screwed onto the protrusion from the hole 9 and tightened, and the cap 5 is temporarily fixed so that its outer periphery is crimped to the back surface of the steel plate 1. After concrete is poured, the temporary bolt 6 is attached to the steel plate 1 together with the threaded rod 8. The nut 10 is removed and crimped onto the cap 5 and its head.
By allowing the remaining parts to anchor in the poured concrete, other parts do not protrude from the top surface of the cap 5, and the effective working length Z inside the cap 5 can be increased. There is no need to change the length under the neck of the high tension bolt 14 for main installation in accordance with the change in flange thickness depending on the number of floors of the main steel frame of the building to which the precast concrete member is attached, simplifying workability. It is something that can be done.

更にまた前記装置によれば、キャップ5内においてナッ
ト4の下に座金3が配設されているので、本設用ハイテ
ンションボルト14をナット4に螺着緊締して、前記プ
レキャストコンクリート部材を他部材に接合した際、前
記座金3の存在によって鋼板1に与える変形が少なぐな
るものである。
Furthermore, according to the device, since the washer 3 is disposed below the nut 4 in the cap 5, the high tension bolt 14 for permanent installation is screwed into the nut 4 and tightened, and the precast concrete member is removed from the other parts. When the steel plate 1 is joined to a member, the presence of the washer 3 reduces deformation of the steel plate 1.

このように前記の装置においては多くの利点を有するも
のであるが、仮ボルト6は普通ボルトを加工して製作さ
れるため加工精度を要求され、また仮ボルト6に植設す
るための螺桿8用の孔明け加工を必要とし、加工精度が
悪いと螺桿8の中心軸と本設用ハイテンションボルト1
4の中心軸トがくい違ってしまい、この結果、キャップ
5がずれ、ひいてはナット4、座金3がずれてしまって
、所期の機能が果せなくなってしまう。
Although the above-mentioned device has many advantages, the temporary bolt 6 is manufactured by machining a normal bolt, so processing accuracy is required, and the screw rod 8 to be attached to the temporary bolt 6 is required. If the machining accuracy is poor, the central axis of the screw rod 8 and the high tension bolt 1 for the main installation will need to be drilled.
4 becomes misaligned, and as a result, the cap 5 becomes misaligned, which in turn causes the nut 4 and washer 3 to become misaligned, making it impossible to perform the intended function.

更に前記の装置においては、螺桿8が仮ボルト6の側方
より螺子7で締付けられているので、この螺子7の締付
けが悪いと、コンクリート打設後、仮ボルト6を取外す
際に螺桿8が残留してしまい、本設用ハイテンションボ
ルト14の締付けができなくなることがある。
Furthermore, in the above-mentioned device, the screw rod 8 is tightened with the screw 7 from the side of the temporary bolt 6, so if the screw 7 is not tightened properly, the screw rod 8 will be damaged when removing the temporary bolt 6 after concrete pouring. It may remain and make it impossible to tighten the high tension bolt 14 for permanent installation.

本案はこのような欠陥を除去するために提案されたもの
で、コンクリート部表面に鋼板の碇着されたプレキャス
トコンクリート部材の製造装置において、前記鋼板の裏
面に同鋼板に穿設されたボルト孔を掩覆して同ボルト孔
と同心状に配置され、且つその内腔部にナット及び座金
を前記ボルト孔の径方向に可摺動的に遊嵌してなる透明
の合戊樹脂製キャップを配設し、前記ボルト孔に嵌脱自
在に挿貫され且つキャップ締付時にその頭部裏面に衝接
すべき締過ぎ防止ナットの装着された仮ボルトを前記座
金及びナット並に前記キャップの頭部透孔に貫拝すると
ともに、同キャップの頭部より突出した前記仮ボルトの
先端部にナットを螺着緊締して前記キャップの外周縁を
前記鋼板に圧着してなることを特徴とするプレキャスト
コンクノート部材の製造装置に係るものである。
This project was proposed to eliminate such defects, and in a manufacturing device for precast concrete members in which a steel plate is anchored on the surface of the concrete part, bolt holes drilled in the steel plate are installed on the back side of the steel plate. A transparent synthetic resin cap is disposed concentrically with the bolt hole and has a nut and washer slidably fitted in the radial direction of the bolt hole in its inner cavity. A temporary bolt, which is removably inserted into the bolt hole and is fitted with an over-tightening prevention nut that hits the back side of the head when the cap is tightened, is inserted through the washer and nut as well as through the head of the cap. A precast conch notebook characterized in that the outer circumferential edge of the cap is crimped to the steel plate by screwing and tightening a nut to the tip of the temporary bolt that penetrates the hole and protrudes from the head of the cap. This relates to a manufacturing device for parts.

本案においては前記したように、鋼板のボルト孔に嵌脱
自在に挿貫される仮ボルトの先端に前記の装置における
ように螺桿を植立することなく、前記ボルト孔を掩覆す
るよう鋼板の裏面に配設された透明の合戒樹脂製キャッ
プに内装された座金及びナットに貫挿したのち、仮ボル
ト先端を直接前記キャップの頭部透孔に貫挿して同キャ
ップより突出した部分にナットを螺着緊締するようにし
たので、本案によれば仮ボルトとして市販のボルトを使
用でき、装置全体の構戒が簡略化されるものであり、本
設用ハイテンションボルト用の座金及びナットが高精度
で前記キャップ内に可摺動的に配設され、コストも節減
されるものである。
In this case, as described above, instead of installing a threaded rod at the tip of a temporary bolt that is removably inserted into the bolt hole of the steel plate as in the above-mentioned device, the steel plate is inserted so as to cover the bolt hole. After inserting the washer and nut inside the transparent resin cap arranged on the back side, insert the temporary bolt tip directly into the head hole of the cap and insert the nut into the part protruding from the cap. Since the bolts are screwed and tightened, according to this proposal, commercially available bolts can be used as temporary bolts, simplifying the construction of the entire device, and eliminating the need for washers and nuts for high-tension bolts for permanent installation. It can be slidably disposed within the cap with high precision and also saves costs.

また本案においては前記仮ボルトには締過ぎ防止ナット
が装着され、前記キャップの頭部透孔より突出した仮ボ
ルトの先端部に締付ナットを螺着緊締する場合、前記締
過ぎ防止ナットがキャップ頭部裏面に衝接して締付ナッ
トの締付力を支持することにより、同締付ナットの締過
ぎによる合戒樹脂製キャップの変形を防止しつるもので
ある。
Further, in the present invention, an over-tightening prevention nut is attached to the temporary bolt, and when the tightening nut is screwed onto the tip of the temporary bolt protruding from the head through hole of the cap and tightened, the over-tightening prevention nut is attached to the cap. By colliding with the back surface of the head and supporting the tightening force of the tightening nut, the cap is prevented from being deformed due to over-tightening of the tightening nut.

以下本案を図示の実施例について説明する。The present invention will be described below with reference to the illustrated embodiments.

21はプレキャストコンクリート部材の接合面に碇着さ
れるべき鋼板で、そのボルト孔22に、ガイドプレート
23及び同プレート23に貫挿された仮ボルト24を挿
入する。
A steel plate 21 is to be anchored to the joint surface of the precast concrete member, and a guide plate 23 and a temporary bolt 24 inserted through the plate 23 are inserted into the bolt hole 22 of the steel plate.

なお前記ガイドプレート23のボルト孔22に対する挿
入部の径D1はボルト径D2よりやや小径に形威されて
おり、ボルト孔22に嵌装時、ガイドプレート23に貫
挿された仮ボルト24の軸心がボルト孔22に貫挿され
るべき本設用ハイテンションボルト25の軸心と一致す
るようになっている。
The diameter D1 of the insertion portion of the guide plate 23 into the bolt hole 22 is made slightly smaller than the bolt diameter D2, so that the shaft of the temporary bolt 24 inserted through the guide plate 23 when fitted into the bolt hole 22. The center is made to coincide with the axis of the permanent high tension bolt 25 to be inserted into the bolt hole 22.

前記仮ボルト24には本設用ハイテンションボルト用の
座金26及びナット27が遊嵌され、透明の合戊樹脂製
キャップ28が、前記座金26及びナット27がボルト
孔22の径方向に移動可能なように両者を掩覆する如く
鋼板21の背面に配設され、その頭部透孔29に前記仮
ボルト24の先端が貫通され、同仮ボルト24の突出端
部にナツ} 30が螺着緊締され、キャップ28の周縁
が鋼板21の背面に圧着されている。
A washer 26 and a nut 27 for the permanent high-tension bolt are loosely fitted into the temporary bolt 24, and a transparent synthetic resin cap 28 allows the washer 26 and nut 27 to move in the radial direction of the bolt hole 22. It is arranged on the back side of the steel plate 21 so as to cover both of them, and the tip of the temporary bolt 24 is passed through the head through hole 29, and the nut 30 is screwed into the protruding end of the temporary bolt 24. The peripheral edge of the cap 28 is crimped to the back surface of the steel plate 21.

なお前記ナット30をあまり強く締付け過ぎると、合或
樹脂製キャップ28が変形する惧れがあるので、仮ボル
ト24には予め締過ぎ防止ナット31が装着され、ナッ
ト30を緊締してキャップ28が鋼板21に水密に圧着
されたとき、ナット30と締過ぎ防止ナット31との間
にキャップ28が狭着され、キャップ28はそれ以上締
付けられないようになっている。
Note that if the nut 30 is tightened too strongly, there is a risk that the plastic cap 28 may be deformed. Therefore, an over-tightening prevention nut 31 is attached to the temporary bolt 24 in advance, and the nut 30 is tightened to remove the cap 28. When the steel plate 21 is watertightly crimped, the cap 28 is tightly fitted between the nut 30 and the over-tightening prevention nut 31, so that the cap 28 cannot be tightened any further.

次いで鋼板21の背面にコンクリート32を打設し、同
打設コンクリート32の硬化後、仮ボルト24を回転さ
せながら抜き取る。
Next, concrete 32 is placed on the back surface of the steel plate 21, and after the poured concrete 32 has hardened, the temporary bolt 24 is removed while being rotated.

この際キャップ28はコンクリート32によって拘束さ
れて動かない。
At this time, the cap 28 is restrained by the concrete 32 and does not move.

このようにして製作されたプレキャストコンクリート部
材の鋼板を他部材の鋼板33に摩擦接合する際、本設用
ハイテンションボルト25を鋼板33に同ボルトの頭部
との間に座金34が介在するように貫挿し、更にその先
端を鋼板21のボルト孔22、座金26に貫挿してナッ
ト27に螺着緊締するものである。
When friction welding the steel plate of the precast concrete member manufactured in this way to the steel plate 33 of another member, the high tension bolt 25 for permanent installation is attached to the steel plate 33 so that the washer 34 is interposed between the head of the bolt. Further, the tip thereof is inserted into the bolt hole 22 of the steel plate 21 and the washer 26, and then screwed onto the nut 27 and tightened.

この際、ナット27はボルト孔22の径方向に移動可能
であるので、鋼板21と他部材の鋼板33とが施工上の
誤差でずれていてもこの誤差が吸収され、両者は本設用
ハイテンションボルト25の中心軸と同一軸上で締付け
られるものである。
At this time, since the nut 27 is movable in the radial direction of the bolt hole 22, even if the steel plate 21 and the steel plate 33 of another member are misaligned due to construction errors, this error is absorbed, and both of them are It is tightened on the same axis as the central axis of the tension bolt 25.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来のプレキャストコンクリート部材の製造装
置の縦断面図、第2図は本案に係るプレキャストコンク
リート部材の製造装置の一実施例の縦断面図である。 21・・・鋼板、22・・・ボルト孔、24・・・仮ボ
ルト、26・・・座金、27・・・ナット、28・・・
キャップ、29・・・透孔、30・・・ナット、31・
・・締過ぎ防止ナット。
FIG. 1 is a longitudinal sectional view of a conventional precast concrete member manufacturing apparatus, and FIG. 2 is a longitudinal sectional view of an embodiment of the precast concrete member manufacturing apparatus according to the present invention. 21... Steel plate, 22... Bolt hole, 24... Temporary bolt, 26... Washer, 27... Nut, 28...
Cap, 29...Through hole, 30...Nut, 31.
・Over-tightening prevention nut.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] コンクリート部表面に鋼板の碇着されたプレキャストコ
ンクリート部材の製造装置において、前記鋼板の裏面に
同鋼板に穿設されたボルト孔を掩覆して同ボルト孔と同
心状に配置され、且つその内腔部にナット及び座金を前
記ボルト孔の径方向に可摺動的に遊嵌してなる透明の合
或樹脂製キャップを配設し、前記ボルト孔に嵌脱自在に
挿貫され且つキャップ締付時にその頭部裏面に衝接すべ
き締過ぎ防止ナットの装着された仮ボルトを前記座金及
びナット並に前記キャップの頭部透孔に貫挿するととも
に、同キャップの頭部より突出した前記仮ボルトの先端
部にナットを螺着緊締して前記キャップの外周縁を前記
鋼板に圧着してなることを特徴とするプレキャストコン
クリート部材の製造装置。
In an apparatus for manufacturing a precast concrete member in which a steel plate is anchored on the surface of a concrete part, a bolt hole drilled in the steel plate is placed on the back side of the steel plate, and the bolt hole is arranged concentrically with the bolt hole, and the inner cavity thereof is A transparent resin cap is disposed in the bolt hole, and a nut and a washer are slidably and loosely fitted in the radial direction of the bolt hole, and the cap is inserted into and removably into the bolt hole, and the cap is tightened. At the same time, insert a temporary bolt fitted with an over-tightening prevention nut that should come into contact with the back side of the head into the washer and nut as well as the head hole of the cap, and insert the temporary bolt that protrudes from the head of the cap. An apparatus for manufacturing a precast concrete member, characterized in that a nut is screwed onto the tip of a bolt and tightened, and the outer peripheral edge of the cap is crimped to the steel plate.
JP5524979U 1979-04-26 1979-04-26 Manufacturing equipment for precast concrete parts Expired JPS5911121Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5524979U JPS5911121Y2 (en) 1979-04-26 1979-04-26 Manufacturing equipment for precast concrete parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5524979U JPS5911121Y2 (en) 1979-04-26 1979-04-26 Manufacturing equipment for precast concrete parts

Publications (2)

Publication Number Publication Date
JPS55156907U JPS55156907U (en) 1980-11-11
JPS5911121Y2 true JPS5911121Y2 (en) 1984-04-06

Family

ID=29289514

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5524979U Expired JPS5911121Y2 (en) 1979-04-26 1979-04-26 Manufacturing equipment for precast concrete parts

Country Status (1)

Country Link
JP (1) JPS5911121Y2 (en)

Also Published As

Publication number Publication date
JPS55156907U (en) 1980-11-11

Similar Documents

Publication Publication Date Title
JP2750846B2 (en) Concrete formwork facing distance fixing fixture
JP2000027832A (en) Torque angle control wheel nut
JPS5911121Y2 (en) Manufacturing equipment for precast concrete parts
JPH06235414A (en) Spacer washer a bolt joint
JPS5929046Y2 (en) Manufacturing equipment for precast concrete parts
JPH0313891A (en) Stud hole plug of nuclear reactor vessel
JP2550046Y2 (en) Concrete form holding device
JPS6224655Y2 (en)
JPS629054Y2 (en)
JPH0431939Y2 (en)
JPS6338265Y2 (en)
JPS6129888Y2 (en)
JPH0431937Y2 (en)
JPH0637774B2 (en) Column base joining method
JP2003313816A (en) Construction method of bridge falling prevention device and temporary fixing sheath assembly
JPS6330473B2 (en)
JPS5921230Y2 (en) formwork supports
JP2584385B2 (en) Removal of joint fittings and fastening cavities for RC lining materials
JPH0427614Y2 (en)
JPH0244976Y2 (en)
JPS6246010Y2 (en)
JP2587684Y2 (en) Concrete block
JPS6240495B2 (en)
JPH0330481Y2 (en)
JPS5915320Y2 (en) formwork equipment