JPS5845334Y2 - Operation part structure of excavation work vehicle - Google Patents

Operation part structure of excavation work vehicle

Info

Publication number
JPS5845334Y2
JPS5845334Y2 JP2264979U JP2264979U JPS5845334Y2 JP S5845334 Y2 JPS5845334 Y2 JP S5845334Y2 JP 2264979 U JP2264979 U JP 2264979U JP 2264979 U JP2264979 U JP 2264979U JP S5845334 Y2 JPS5845334 Y2 JP S5845334Y2
Authority
JP
Japan
Prior art keywords
interlocking
rod
rotation
parallel
excavation work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2264979U
Other languages
Japanese (ja)
Other versions
JPS55123071U (en
Inventor
静夫 下家
Original Assignee
株式会社クボタ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社クボタ filed Critical 株式会社クボタ
Priority to JP2264979U priority Critical patent/JPS5845334Y2/en
Publication of JPS55123071U publication Critical patent/JPS55123071U/ja
Application granted granted Critical
Publication of JPS5845334Y2 publication Critical patent/JPS5845334Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は、ブーム旋回用、ブーム上下揺動用、アーム揺
動用及びパケット回動用の操作バルブを、それらの揺動
スプールが互にほぼ平行になる状態で並設すると共に、
十字揺動操作自在な2本のレバーに対して2系統づつか
つ各別操作可能に連動連結された4本の押し引きロッド
連動系を、前記4個の摺動スプールに各別に連動連結し
た状態でかつ前記摺動スプールの並設方向に並べた状態
で設けた掘削作業車の操作部構造に関する。
[Detailed description of the invention] The invention consists of operating valves for boom rotation, boom vertical swing, arm swing, and packet rotation, which are arranged side by side with their swing spools being approximately parallel to each other. ,
A state in which four push/pull rod interlocking systems, two systems each of which are interlocked and connected to two levers that can be freely operated in a cross-swing motion, are interlocked and connected to the four sliding spools, respectively. The present invention relates to a structure of an operating part of an excavating vehicle in which the sliding spools are arranged side by side in a parallel direction.

上記の操作部構造において、4個の操作バルブにするレ
バーの操作形態が各メーカーによって異なる現状にあり
、操作形態の異なる機種を同一作業者が操作するに、操
作感覚が狂って作業性が悪くなるのみならず、誤操作を
招く危険性が大であった。
In the above operation structure, the operation style of the levers that make up the four operation valves differs depending on the manufacturer, and if the same operator operates models with different operation styles, the operation feeling will be distorted and work efficiency will be poor. Not only that, but there was also a great risk of erroneous operation.

本考案は、上述の実情に鑑みて、簡単な連係構造を備え
させる事によって、操作形態の異なる機種であっても同
一操作感覚でもって旨く使いこなす事ができるようにす
る事を目的とする。
In view of the above-mentioned circumstances, it is an object of the present invention to provide a simple linkage structure so that even models with different operating modes can be effectively used with the same operating feeling.

次に、本考案の実施の態様を例示図に基づいて詳述する
Next, embodiments of the present invention will be described in detail based on illustrative drawings.

クローラ走行装置を備えた車体1に旋回台2を縦軸芯ま
わりで旋回自在に取付け、この旋回台2に操縦部3と原
動部4を搭載すると共に、旋回台2に対して縦軸芯まわ
りで揺動自在に掘削作業装置5を取付け、そして前記走
行車体1に排土装置6を設けて掘削作業者を構威しであ
る。
A swivel base 2 is attached to a vehicle body 1 equipped with a crawler traveling device so as to be able to rotate around the vertical axis, and a control section 3 and a driving section 4 are mounted on the swivel base 2. An excavation work device 5 is swingably attached to the excavation work device 5, and an earth removal device 6 is provided on the traveling vehicle body 1 to accommodate an excavation worker.

前記掘削作業装置5を構成するに、シリンダ7によって
縦軸芯まわりで揺動自在にブラケット8を設けると共に
、先端にアーム9を連結したブーム10を前記ブラケッ
ト8に連結し、そして前記アーム9の先端にパケット1
1を取付けると共に、前記ブーム10を上下揺動させる
為のシリンダ12と、ブーム10に対してアーム9を揺
動させる為のシリンダ13、及び前記パケット11を回
動させる為のシリンダ14を設けである。
The excavation work device 5 is constructed by providing a bracket 8 swingable around a vertical axis by a cylinder 7, and connecting a boom 10 with an arm 9 connected to the tip thereof to the bracket 8. Packet 1 at the tip
1, and a cylinder 12 for vertically swinging the boom 10, a cylinder 13 for swinging the arm 9 relative to the boom 10, and a cylinder 14 for rotating the packet 11. be.

ブーム旋回用モーターMの操作バルブ■1、ブームシリ
ンダ用とアームシリンダ用及びパケットシリンダ用の操
作バルブV2.V3.V4に対する操作部構造を構成す
るに、第2図に示すように、軸芯X、Yまわっで十字揺
動操作される2本のレバー25.26に対して、その操
作部S1.S2.S3.S4にロッドP1.P2.P3
.P4を互にほぼ平行に並設させて連結し、ロッドP1
にバルブV3を、ロッドP2に旋回バルブ■1を、ロッ
ドP3にブームバルブ■2を、ロッドP4にパケットバ
ルブ■4を、夫々のスプールが互に平行になる状態で連
係し、運転席15に対する第ルバー25の前後揺動操作
で旋回台2を、第ルバー25の左右揺動操作でアーム9
を、第2レバー26の前後揺動操作でブーム10を、及
び第2のレバー26の左右揺動操作でパケット11を、
夫々駆動するようにしである。
Operation valve for boom rotation motor M ■1, operation valve for boom cylinder, arm cylinder, and packet cylinder V2. V3. As shown in FIG. 2, the structure of the operating section for V4 is configured such that the operating section S1. S2. S3. Rod P1 to S4. P2. P3
.. P4 are arranged in parallel and connected to each other, and the rods P1
The valve V3 is connected to the valve V3, the swing valve ■1 is connected to the rod P2, the boom valve ■2 is connected to the rod P3, and the packet valve ■4 is connected to the rod P4 so that the respective spools are parallel to each other. The swivel base 2 is moved by swinging the lever 25 back and forth, and the arm 9 is moved by swinging the lever 25 left and right.
The boom 10 is moved by swinging the second lever 26 back and forth, and the packet 11 is moved by swinging the second lever 26 left and right.
They are designed to be driven individually.

前記ロッド連動系の途中に、レバー25.26とバルブ
用摺動スプールの連動関係を変更するための回転連動軸
16を介装できるようにしである。
A rotary interlocking shaft 16 for changing the interlocking relationship between the lever 25, 26 and the valve sliding spool can be interposed in the middle of the rod interlocking system.

前記回転連動軸16を構成するに、第3図に示すように
、ロッド連動系並設方向に軸芯を向わせた2本の軸17
.18をブラケツ) 19.19に回転自在に架設し、
第1軸17の中間部に第1筒体21を、かつ第2軸18
に第2及び第3の筒体22.23を、夫々相対回転自在
に外嵌し、そして2個のアームにわたってリンクを枢支
連結した第1連動具20の2組を、第1筒体21と第2
筒体22、及び第1軸17と第3筒体23にわたって夫
々固着すると共に、アームにロッドを枢支連結した第2
連動具24を、第1軸17と、第1と第2及び第3筒体
21,22.23の夫々に固着しである。
As shown in FIG. 3, the rotation interlocking shaft 16 is composed of two shafts 17 whose axes are oriented in the direction in which the rod interlocking system is arranged side by side.
.. 18 (bracket)) 19. Equipped rotatably on 19,
The first cylindrical body 21 is placed in the middle part of the first shaft 17, and the second shaft 18
The second and third cylindrical bodies 22 and 23 are respectively fitted onto the outside of the first cylindrical body 21 so as to be relatively rotatable. and second
The cylinder body 22, and a second shaft which is fixedly fixed across the first shaft 17 and the third cylinder body 23, respectively, and has a rod pivotally connected to the arm.
The interlocking tool 24 is fixed to the first shaft 17 and each of the first, second, and third cylindrical bodies 21, 22, and 23.

上記構成の回転連動軸16によって連動系を変更するに
、第4図イに示すロッド連動系において、ロッドP、、
P3を取外し、第4図口に示すように、第1軸17の連
動具24を操作部S1に、第1筒体21の連動具24を
操作部S3に、第2筒体22の連動具24を操作バルブ
■3に、第3筒体23の連動具24を操作バルブV2に
、夫々枢支連結する事により、操作レバー25.26に
よるアーム9とブーム10の操作対象を変更するロッド
連動系が得られ、また第4図イに示す連動系において、
ロッドP3.P4を取外すと共に連動軸16を逆にして
、その第1筒体21の連動具24を操作部S2に、第1
軸17の連動具24を操作部S4に、第3筒体23の連
動具24を操作バルブ■1に、第2筒体22の連動具2
4を操作バルブ■4に、夫々枢支連結する事によって、
操作レバー25.26による旋回台2とパケット11の
操作対象を変更するロッド連動系が得られる。
To change the interlocking system using the rotation interlocking shaft 16 configured as described above, in the rod interlocking system shown in FIG. 4A, the rods P, .
P3 is removed, and as shown in FIG. 24 to the operating valve V2, and the interlocking tool 24 of the third cylinder 23 to the operating valve V2, rod interlocking changes the operation target of the arm 9 and boom 10 by the operating lever 25.26. A system is obtained, and in the interlocking system shown in Figure 4 A,
Rod P3. At the same time as removing P4, the interlocking shaft 16 is reversed, and the interlocking tool 24 of the first cylindrical body 21 is connected to the operation part S2, and the first
The interlocking tool 24 of the shaft 17 is connected to the operating part S4, the interlocking tool 24 of the third cylinder 23 is connected to the operation valve ■1, and the interlocking tool 2 of the second cylinder 22 is connected to the operating part S4.
By pivotally connecting 4 to the operating valve 4,
A rod interlocking system is obtained in which the operation targets of the swivel table 2 and the packet 11 are changed by the operation levers 25 and 26.

尚、旋回台2の旋回操作によってブーム10の旋回を行
なわせるようにしたが、ブーム揺動用のシノンダ7に対
する操作バルブを旋回バルブ■1に代えて設ける。
Although the boom 10 is caused to rotate by the rotation operation of the rotation base 2, an operation valve for the boom swinging cylinder 7 is provided in place of the rotation valve (1).

あるいはシリンダ7とモーターMに対する流路切換弁を
設けて、バルブV1を兼用してブーム10をシリンダ7
によって揺動させるようにするも良い。
Alternatively, a flow path switching valve for the cylinder 7 and the motor M is provided, and the valve V1 is also used to connect the boom 10 to the cylinder 7.
It is also a good idea to oscillate it.

また、回転連動軸16によるロッド連動系の変更構造を
各種変形する事が可能である。
Furthermore, the structure of the rod interlock system using the rotation interlock shaft 16 can be modified in various ways.

以上要するに本考案は、冒記した掘削作業車の操作部構
造において、前記ロッド連動系の途中に、前記レバーと
摺動スプールの連動関係を変更するために、ロッド連動
系並設方向に向けた回転連動軸を、ロッドとの連結関係
変更可能な状態で設けである事を特徴とする。
In summary, the present invention, in the above-mentioned operation part structure of the excavation work vehicle, has a structure in which the rod interlocking system is arranged in parallel in the middle of the rod interlocking system in order to change the interlocking relationship between the lever and the sliding spool. It is characterized in that the rotation interlocking shaft is provided in a state where the connection relationship with the rod can be changed.

即ち、押し引きロッドの連線運動をその連動系途中で一
且回転運動に変換して、その回転運動をロッド並設方向
の異なる位置から取出すと共に、その回転運動を元の直
線運動に変換してバルブスプールに伝達させる等、ロッ
ドとの連結関係を変更できる回転連動軸を連動系に介装
させるようにしておくことによって、その操作形態が従
前に操作していたものとは異なる場合に、それを従前の
操作形態に合せる事ができるようになり、必要に応じて
操作形態を変更する事のできる準備構成を備えさせてお
く事により、常に同一の操作感覚でもって作業性良く安
全に異なる機種を旨く使いこなせるようになった。
That is, the connected motion of the push-pull rods is converted into rotational motion once in the middle of the interlocking system, the rotational motion is taken out from a different position in the direction in which the rods are arranged side by side, and the rotational motion is converted into the original linear motion. By installing a rotation interlocking shaft in the interlocking system that can change the connection relationship with the rod, such as transmitting the information to the valve spool, when the operation mode is different from the previous operation, By making it possible to adapt it to the previous operating style, and by providing a preparation configuration that allows the operating style to be changed as necessary, the same operating feel can be achieved while ensuring good workability and safety. I am now able to use the model effectively.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本考案に係る掘削作業車の操作部構造の実施の態
様を例示し、第1図は掘削作業車の側面図、第2図は操
作部構造の概略斜視図、第3図は回転連動具の概略斜視
図、第4図イ9口、ハは連動系の変更状態を示す説明図
である。 16・・・・・・回転連動具、25.26・・・・・・
レバー、P1〜P4・・・・・・ロッド、■1〜■4・
・・・・・操作バルブ。
The drawings illustrate an embodiment of the operation part structure of the excavation work vehicle according to the present invention, FIG. 1 is a side view of the excavation work vehicle, FIG. 2 is a schematic perspective view of the operation part structure, and FIG. 3 is a rotationally linked structure. A schematic perspective view of the tool, FIG. 4 A9 and C are explanatory views showing changed states of the interlocking system. 16...Rotation interlocking tool, 25.26...
Lever, P1 to P4...Rod, ■1 to ■4・
・・・・Operation valve.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] ブーム旋回用、ブーム上下揺動用、アーム揺動用及びパ
ケット回動用の操作バルブ■1.■2.V3.■4を、
それらの摺動スプールが互いにほぼ平行になる状態で並
設すると共に、十字揺動操作自在な2本のレバー25.
26に対して2系統づつかつ各別操作可能に連動連結さ
れた4本の押し引きロッド連動系を、前記4個の摺動ス
プールに各別に連動連結した状態でかつ前記摺動スプー
ルの並設方向に並べた状態で設けた掘削作業車の操作部
構造であって、前記ロッド連動系の途中に、前記レバー
25゜26と摺動スプールの連動関係を変更するために
、ロッド連動系並設方向に向けた回転連動軸16を、ロ
ッドP 1. P 2. P 3. P 4との連結関
係変更可能な状態で設けであることを特徴とする掘削作
業車の操作部構造。
Operation valves for boom rotation, boom vertical swing, arm swing, and packet rotation ■1. ■2. V3. ■4,
These sliding spools are arranged side by side in a state that they are almost parallel to each other, and two levers 25.
Four push/pull rod interlocking systems, two systems each of which are interlocked and connected to each of the four sliding spools in a manner that can be operated separately, are separately connected to the four sliding spools, and the sliding spools are arranged in parallel. This is the structure of the operation part of an excavation work vehicle arranged in parallel in the direction, and the rod interlocking system is arranged in parallel in the middle of the rod interlocking system in order to change the interlocking relationship between the lever 25° 26 and the sliding spool. The rotation interlocking shaft 16 is oriented in the direction of the rod P1. P2. P3. An operation part structure for an excavation work vehicle, characterized in that it is provided in a state in which the connection relationship with P4 can be changed.
JP2264979U 1979-02-22 1979-02-22 Operation part structure of excavation work vehicle Expired JPS5845334Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2264979U JPS5845334Y2 (en) 1979-02-22 1979-02-22 Operation part structure of excavation work vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2264979U JPS5845334Y2 (en) 1979-02-22 1979-02-22 Operation part structure of excavation work vehicle

Publications (2)

Publication Number Publication Date
JPS55123071U JPS55123071U (en) 1980-09-01
JPS5845334Y2 true JPS5845334Y2 (en) 1983-10-14

Family

ID=28857796

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2264979U Expired JPS5845334Y2 (en) 1979-02-22 1979-02-22 Operation part structure of excavation work vehicle

Country Status (1)

Country Link
JP (1) JPS5845334Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5943558U (en) * 1982-09-09 1984-03-22 新キャタピラ−三菱株式会社 Hydraulic excavator steering system
JPS5976669U (en) * 1982-11-16 1984-05-24 株式会社小松製作所 Work equipment operating device for hydraulically driven vehicles

Also Published As

Publication number Publication date
JPS55123071U (en) 1980-09-01

Similar Documents

Publication Publication Date Title
CA2041899C (en) Reversible control lever linkage
JPH0474491B2 (en)
JPS5845334Y2 (en) Operation part structure of excavation work vehicle
JPH0351259Y2 (en)
JPH0288824A (en) Operational structure of back-hoe device
JPH0322366Y2 (en)
JPS5810779Y2 (en) excavator work vehicle
JPS607264Y2 (en) work vehicle
JPS5840129Y2 (en) work vehicle
US4256144A (en) Lever control for hydraulic control circuits
JPS607421Y2 (en) work equipment
JPS5813367Y2 (en) Operation structure
JPS5820689Y2 (en) Remote control device for work equipment
JPS5820683Y2 (en) Remote control device for work equipment
JPH0321727A (en) Hydraulic shovel
JPH0324682Y2 (en)
JPS595089Y2 (en) Control lever device for construction machinery, etc.
JPS5825006Y2 (en) Hydraulic excavator operating device
JPS639641Y2 (en)
JPS5828045Y2 (en) Hydraulic excavator operating device
JPS5820688Y2 (en) Remote control device for work equipment
JP2868321B2 (en) Operation mechanism of hydraulic working machine
JPS5820686Y2 (en) work equipment
JPS5924583Y2 (en) Steering clutch linkage state switching device for walking-type mobile agricultural machinery
JPS59185233A (en) Power shovel equipped with profiling operating device