JPS5836725Y2 - brace - Google Patents

brace

Info

Publication number
JPS5836725Y2
JPS5836725Y2 JP11056079U JP11056079U JPS5836725Y2 JP S5836725 Y2 JPS5836725 Y2 JP S5836725Y2 JP 11056079 U JP11056079 U JP 11056079U JP 11056079 U JP11056079 U JP 11056079U JP S5836725 Y2 JPS5836725 Y2 JP S5836725Y2
Authority
JP
Japan
Prior art keywords
place
steel bar
leaf spring
plate
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11056079U
Other languages
Japanese (ja)
Other versions
JPS5629106U (en
Inventor
哲夫 高山
Original Assignee
積水ハウス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 積水ハウス株式会社 filed Critical 積水ハウス株式会社
Priority to JP11056079U priority Critical patent/JPS5836725Y2/en
Publication of JPS5629106U publication Critical patent/JPS5629106U/ja
Application granted granted Critical
Publication of JPS5836725Y2 publication Critical patent/JPS5836725Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】 本考案は軽量鉄骨建築物の補強に用いる新規なプレース
に関する。
[Detailed Description of the Invention] The present invention relates to a novel place used for reinforcing lightweight steel buildings.

本出願人は先に軽量鉄骨建築物の一補強工法としてター
ンバックルを有しない長さの固定されたプレースを使用
する新規な方法を提案した。
The present applicant has previously proposed a new method of reinforcing lightweight steel buildings using a fixed length of place without turnbuckles.

この方法は、柱、梁等の建物側に対向して設けられた一
対のプレース固定片の一方にまずプレース一端を固定し
て後、他端と他方のプレース固定片とを別途引寄せ工具
にて引寄せ、固定するという方法である。
In this method, one end of the place is first fixed to one of a pair of place fixing pieces installed opposite to each other on the building side such as columns and beams, and then the other end and the other place fixing piece are pulled together using a separate pulling tool. The method is to pull it together and fix it.

本考案は、この方法により鉄骨建築物を補強する際使用
する新規なプレースを提供することを目的とする。
The object of the present invention is to provide a new place for use in reinforcing steel buildings by this method.

次に本考案に係るプレースの一実施例を図面に基づいて
説明する。
Next, an embodiment of the place according to the present invention will be described based on the drawings.

第1図において、1,2はそれぞれ適当長さを有した第
1棒鋼及び第2棒鋼で、一端に雄ネジ部3,4が形成さ
れ、他端にプレート5゜6が固着しである。
In FIG. 1, reference numerals 1 and 2 represent a first steel bar and a second steel bar having appropriate lengths, each having a male threaded portion 3, 4 formed at one end, and a plate 5.about.6 fixed to the other end.

7,8は、第2図に示すように例えば長さの異なる第1
板バネ9及び第2板バネ10からなる弾機で、画板バネ
9,10をU字状に形成してその両端を一枚の連結片1
1に取付けることによって両弾機7,8同士を直列に連
結した構成としている。
7 and 8 are, for example, first wires of different lengths as shown in FIG.
An elastic machine consisting of a leaf spring 9 and a second leaf spring 10, the drawing leaf springs 9 and 10 are formed into a U-shape, and both ends thereof are connected to one connecting piece 1.
1, the two bombs 7 and 8 are connected in series.

そして一方の弾機7である第1板バネ9の長手方向中央
部に孔9aを形成し、該孔9aに前記第1棒鋼1の雄ネ
ジ部3を挿通し、ナツト12を螺入することによって該
第1棒鋼1と弾機7とを連結している。
Then, a hole 9a is formed in the longitudinal center of the first leaf spring 9, which is one of the bullets 7, and the male threaded portion 3 of the first steel bar 1 is inserted into the hole 9a, and the nut 12 is screwed into the hole 9a. The first steel bar 1 and the ammunition 7 are connected by.

また他方の弾機8である第2板バネ10及び連結片11
の長手方向中央部に7110 a 、11 aを形成し
、該孔10a、llaに第2棒鋼2の雄ネジ部4を挿通
し、ナツト13を螺入することによって該第2棒鋼2と
弾機8とを連結している。
Also, the second leaf spring 10 and the connecting piece 11 which are the other ammunition 8
7110a and 11a are formed in the center in the longitudinal direction, and the male screw part 4 of the second steel bar 2 is inserted into the holes 10a and lla, and the nut 13 is screwed in, thereby connecting the second steel bar 2 and the bullet. 8 are connected.

この場合両弾機7,8とも同一の弾性係数をもったバネ
鋼を用いても良く、或いは弾性係数に差のあるバネ鋼を
用いてもよい。
In this case, spring steel having the same elastic modulus may be used for both bullets 7 and 8, or spring steel having different elastic modulus may be used.

尚、前記プレート5,6及び該プレートとボルト、ナツ
トにて固定されるプレース固定片15.23とにはボル
ト挿通孔5a、6a、15a、23aの他に引寄せ工具
の腕杆(後述する)を挿通する挿通孔5b、6b 、1
5 b 、23 bが形成しである(第3図参照)。
In addition to the bolt insertion holes 5a, 6a, 15a, and 23a, the plates 5 and 6 and the place fixing pieces 15 and 23 fixed to the plates with bolts and nuts have an arm rod of a pulling tool (described later). ) through the insertion holes 5b, 6b, 1
5 b and 23 b are formed (see Figure 3).

但し、腕杆を挿通する挿通孔は少なくとも引寄せ工具を
適用する側のプレート6及びプレース固定片23のみに
形成しておけば足りる。
However, it is sufficient that the insertion hole through which the arm rod is inserted is formed at least only in the plate 6 and the place fixing piece 23 on the side to which the pulling tool is applied.

また、2aは第2棒鋼2の平板部分で、プレースを交差
状に張設する際の交差部分に位置し、両プレースが交差
部分で互いに当って歪まないようにしている。
Further, 2a is a flat plate portion of the second steel bar 2, which is located at the intersection when the places are stretched in a crosswise manner, and prevents both places from coming into contact with each other at the intersection and being distorted.

上記構成のプレースを建物側のプレース固定片間に張設
する手順を説明すると、まず第3図に示すように、プレ
ース一端のプレート5を柱14下端に設けられたプレー
ス固定片15にボルト、ナツトにて固定しておき、次に
六角ナツト16の各端部に、右ネジ17が形成された腕
杆18と左ネジ19が形成された腕杆20とを螺入した
構成の引寄せ工具21を準備し、該工具21の一方の腕
杆18先端をプレート6の挿通孔6bに挿通し、他方の
腕杆20の先端を柱22上端に設けられたプレース固定
片23の一方の孔23 bに挿通して六角ナツト16を
レンチ等操作具にて回動操作する。
To explain the procedure for installing the place with the above structure between the place fixing pieces on the building side, first, as shown in FIG. It is fixed with a nut, and then an arm rod 18 with a right-hand thread 17 and an arm rod 20 with a left-hand thread 19 are screwed into each end of the hexagonal nut 16. 21, insert the tip of one arm rod 18 of the tool 21 into the insertion hole 6b of the plate 6, and insert the tip of the other arm rod 20 into one hole 23 of the place fixing piece 23 provided at the upper end of the column 22. b and rotate the hexagonal nut 16 using an operating tool such as a wrench.

すると各腕杆18.20には右ネジ、左ネジという互い
に逆方向ネジが形成しであるので、六角ナツト16の回
動によって両腕杆18.20は互いに接近する方向に移
動する。
Then, since each arm rod 18.20 has a right-hand thread and a left-hand thread, which are opposite to each other, the rotation of the hexagonal nut 16 causes the arm rods 18.20 to move toward each other.

従って各腕杆18,20が挿通されたプレート6とプレ
ース固定片23とは両腕杆18.20の前記移動に伴な
って引寄せられる。
Therefore, the plate 6 through which the arm rods 18, 20 are inserted and the place fixing piece 23 are drawn together as the arm rods 18, 20 move.

そして、プレート6のボルト挿通孔6aとプレース固定
片23のボルト挿通孔23 aとが合致した状態で六角
ナツト16の回動を止め、両挿通孔6a、23aにボル
トを挿通し、ナツトで締付けることによって固定する。
Then, with the bolt insertion hole 6a of the plate 6 and the bolt insertion hole 23a of the place fixing piece 23 aligned, the rotation of the hexagonal nut 16 is stopped, and the bolt is inserted into both insertion holes 6a and 23a, and tightened with the nut. Fix it by doing this.

固定が完了すれば引寄せ工具21を取り去り、次に新た
なプレースを上記と同様の手順にて、柱22下端のプレ
ース固定片15と柱14上端のプレース固定片23との
間に張設する。
When the fixing is completed, remove the pulling tool 21, and then install a new place between the place fixing piece 15 at the lower end of the column 22 and the place fixing piece 23 at the upper end of the column 14 using the same procedure as above. .

この場合、各プレース長及びプレース固定片間隔は製作
、加工並びに施工精度上の誤差によって多少の差異を生
じているが、各プレースは直列に連結された2つの弾機
7,8が介在しであるので、プレース張設時にその引張
力に応じて両弾機7,8が弾性変形し、前記精度誤差が
あっても張設することができる。
In this case, the length of each place and the interval between the place fixing pieces are slightly different due to errors in manufacturing, processing, and construction accuracy, but each place has two bullets 7 and 8 connected in series. Therefore, both the bullets 7 and 8 are elastically deformed in accordance with the tensile force during place tensioning, and tensioning can be carried out even if there is the above-mentioned accuracy error.

また、ここで2つの弾機7,8を直列に接続しているの
で、変位量を大きくとることができ、それだけ大きな精
度誤差があっても張設することができるものである。
In addition, since the two bombs 7 and 8 are connected in series, the amount of displacement can be large, and even if there is a large accuracy error, the tension can be maintained.

本考案に係るプレースは上記の如く構成したので、プレ
ース張設時に前記弾機にて、製作、加工並びに施工精度
上の誤差分を効果的に吸収し、確実、容易に張設するこ
とができる。
Since the place according to the present invention is constructed as described above, errors in manufacturing, processing, and construction accuracy can be effectively absorbed by the bullet machine during place tensioning, and tensioning can be performed reliably and easily. .

従って、弾機によって吸収される分だけプレースの製作
、加工精度も緩和することができ、その分製作、加工費
の低減も図り得るという利点ももつ。
Therefore, the production and machining accuracy of the place can be relaxed by the amount absorbed by the bullet, and there is also the advantage that the production and machining costs can be reduced accordingly.

【図面の簡単な説明】[Brief explanation of drawings]

図は本考案に係るプレースの一実施例を示し、第1図は
全体正面図、第2図は要部詳細斜視図、第3図は第1図
のプレースを張設する場合の手順を説明する図である。 1・・・・・・第1棒鋼、2・・・・・・第2棒鋼、5
,6・・・・・・プレート、7,8・・・・・・弾機。
The figures show one embodiment of the place according to the present invention, with Fig. 1 being an overall front view, Fig. 2 being a detailed perspective view of the main parts, and Fig. 3 explaining the procedure for installing the place shown in Fig. 1. This is a diagram. 1...First steel bar, 2...Second steel bar, 5
, 6... plate, 7, 8... ammunition.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 第1板バネ及び第2板バネをそれぞれU字状に形成する
とともに、第1板バネの中央部に第1棒鋼の一端を連結
し、第2板バネの中央部に第2棒鋼の一端を連結し、第
1板バネ及び第2板バネの両端を−の連結片に取付けて
なることを特徴とするプレース。
The first plate spring and the second plate spring are each formed into a U-shape, one end of the first steel bar is connected to the center of the first plate spring, and one end of the second steel bar is connected to the center of the second plate spring. A place characterized in that the first leaf spring and the second leaf spring are connected to each other and both ends of the first leaf spring and the second leaf spring are attached to a negative connecting piece.
JP11056079U 1979-08-11 1979-08-11 brace Expired JPS5836725Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11056079U JPS5836725Y2 (en) 1979-08-11 1979-08-11 brace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11056079U JPS5836725Y2 (en) 1979-08-11 1979-08-11 brace

Publications (2)

Publication Number Publication Date
JPS5629106U JPS5629106U (en) 1981-03-19
JPS5836725Y2 true JPS5836725Y2 (en) 1983-08-18

Family

ID=29343088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11056079U Expired JPS5836725Y2 (en) 1979-08-11 1979-08-11 brace

Country Status (1)

Country Link
JP (1) JPS5836725Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6146167U (en) * 1984-08-29 1986-03-27 太平洋工業株式会社 high frequency driver
JP4489548B2 (en) * 2003-09-04 2010-06-23 正雄 林 Vibration absorber and earthquake-resistant mechanism

Also Published As

Publication number Publication date
JPS5629106U (en) 1981-03-19

Similar Documents

Publication Publication Date Title
JPH0366936A (en) Elastic plastic damper
EP0776399B1 (en) Metal loadbearing structure having structural connections with no welding or drilling
JP2558425B2 (en) Claw assembly
JPS5836725Y2 (en) brace
JPH03183873A (en) Steel damper
JPS5836726Y2 (en) brace
JPS5919050Y2 (en) brace
KR20090131476A (en) Coupler for connecting strain members and method of connecting same
CN115341709A (en) Assembled syntropy symmetry props string roof beam structure
JP2002250083A (en) Elastic joint for wooden structure
JP2002227421A (en) Turnbuckle-type wire tension unit
JPS5836728Y2 (en) lightweight steel buildings
JP2801854B2 (en) Architectural screw fastening device
KR200351538Y1 (en) Cable turnbuckle unit
JP7498451B1 (en) Joint structure
JPH08199848A (en) Device for reinforcing column
JP2002372021A (en) Bolt fastening structure
JPH0119681Y2 (en)
JP2003119896A (en) Reinforcing device
KR20190091791A (en) Jointing Apparatus for preventing earthquake
JPH0325163A (en) Concrete mold posture regulator and concrete mold posture regulating method by using this regulator
CN217420570U (en) Be used for steel construction building assembly automatic alignment device
JPH09317175A (en) Reinforcing device of form corner section and clamping construction of form corner section
JPS6145045A (en) Brace connection metal fittings
JPH0222820B2 (en)