JPS58173204A - Apparatus for constructing bridge beam - Google Patents

Apparatus for constructing bridge beam

Info

Publication number
JPS58173204A
JPS58173204A JP5534282A JP5534282A JPS58173204A JP S58173204 A JPS58173204 A JP S58173204A JP 5534282 A JP5534282 A JP 5534282A JP 5534282 A JP5534282 A JP 5534282A JP S58173204 A JPS58173204 A JP S58173204A
Authority
JP
Japan
Prior art keywords
bridge
pier
abutment
girder
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5534282A
Other languages
Japanese (ja)
Inventor
川田 忠雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawada Industries Inc
Original Assignee
Kawada Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawada Industries Inc filed Critical Kawada Industries Inc
Priority to JP5534282A priority Critical patent/JPS58173204A/en
Publication of JPS58173204A publication Critical patent/JPS58173204A/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明はエレクションガーダ−を用いて橋桁を橋台、
橋脚上に吊下げ架設するための橋桁架設装置に関するも
のである。
[Detailed Description of the Invention] This invention uses erection girders to connect bridge girders to abutments,
This invention relates to a bridge girder construction device for suspending construction on bridge piers.

従来より矧られるこの棟の装置を用いた橋桁架設工法は
、まず第7図乃至111tj図に示す如く、橋台(/l
及び1a脚E上に夫々複数段の積み重ねられた一対のベ
ント型支柱(り)と内支柱(411(+’1間に架設さ
れた梁材(jlとからなる簡易門構架台(3)を設置し
、これらの簡易門構架台(3)上に前方に手a m (
7)を連結したエレクションガーダ−(1)を載置する
。次にこのエレクションガーダ−1t)にはトロリー(
9)を備えた吊り枠<trによって例えばPC桁の如き
橋桁(/(7)を吊下げ、この橋桁(lのをガーダ−(
6)上の縦行レール(//)に沿って所定架設位wまで
移動させたのち、吊り枠(r)に設けた昇降装置(tr
)により橋台(71及び構脚(a)の支承面(/−(、
?)部上に下降させて仮置きり、Lかるのちこの橋桁(
10)を第2図に鎖線で示す如く橋台(1)及び橋脚(
Aの幅方向に沿ってジヤツキ等の手段により横移動させ
、所定の支承向上に設置する。
The bridge girder construction method using this equipment, which has been limited in the past, first involves building bridge abutments (/l) as shown in Figures 7 to 111tj.
A simple gate structure frame (3) consisting of a pair of stacked bent-type struts (ri) and inner struts (411 Place your hand forward on these simple gate structure frames (3).
Place the erection girder (1) connected to 7). Next, this election girder (1t) is equipped with a trolley (
For example, a bridge girder (/(7) such as a PC girder) is suspended by a suspension frame <tr equipped with a
6) After moving the structure along the upper vertical rail (//) to the predetermined installation position w, move the lifting device (tr) installed on the hanging frame (r).
) to the bearing surface (/-(,
? ) and temporarily placed it on top of the bridge girder (
10) as shown by the chain lines in Figure 2, the abutment (1) and the piers (
It is moved laterally along the width direction of A by means such as jacking, and installed at a predetermined level of support.

このように従来の橋桁架設工程においては、エレクショ
ンガーダ−(6)を載置するための門構架台(3)がベ
ンFを積重ねて造った極めて簡単なものであるために以
下に述べる如き種々の問題点を有していた。即ち第1に
簡易門構架台(3)は単にエレクションガーダ−(4)
を載置支持するという機能をはだすだけにと(まるため
、橋桁(lのをガーダ−(])に沿って縦行移動して橋
台(1)及び橋脚(コ)上に吊降したのちにおいて該橋
台、橋脚上で複雑な横取り作業を別途行わなければなら
ない。第2に簡易門構架台(3)はベントを積重ねた支
柱(4りからなるために、これらはいずれも第1図及び
第2図に示す如く橋台(1)及び橋脚(2)の上面にお
ける橋桁(/のの桁端(tO)aが支承される部分から
外れた位置に設置しなければならない。このため一部の
スパンにおける橋桁(lのの架設を終えて次のスパンの
架設に移る際には、橋ml!l(コ)上に設置された簡
易門構架台(3)をいったん撤去して架設された橋桁の
桁端上に移し書見なければならないという難点を有して
いる。またその外にも簡易門構架台(3)は高さが高い
割にはそれ自体のスパンが小きいので安定性に欠け、従
って前後左右に厳重な捜索(13)を張って安W性を確
保しなければならず、両組の如き移し替えの都度捜索(
13)の張替えを行わなければならないという問題点が
ある。
In this way, in the conventional bridge girder construction process, the gate structure frame (3) on which the erection girder (6) is placed is extremely simple and made by stacking Ben-F, so various types of construction are required as described below. It had the following problems. That is, firstly, the simple gate structure frame (3) is simply an erection girder (4).
In order to perform the function of placing and supporting the bridge girder (L), the bridge girder (L) was moved vertically along the girder (]) and suspended onto the abutment (1) and the bridge pier (C). In this case, complicated horizontal work must be carried out separately on the bridge abutments and piers.Secondly, since the simple gate structure frame (3) consists of four struts with stacked vents, both of these are shown in Figure 1 and As shown in Figure 2, the bridge girder (/'s girder end (tO)a) on the upper surface of the bridge abutment (1) and the bridge pier (2) must be installed at a position away from the supported part. When finishing the erection of the bridge girder (l) in a span and moving on to the erection of the next span, the simple gate structure frame (3) installed on the bridge ml!l (co) must be removed and the bridge girder erected. It has the disadvantage of having to be moved onto the end of the girder for viewing.In addition, the simple gate structure frame (3) has a small span despite its high height, so it is not stable. Therefore, strict searches (13) must be carried out in the front, back, left and right to ensure safety, and each time a transfer like the one in both groups is carried out, a search (13) must be carried out.
13) has to be replaced.

本発明は従来の橋桁架設機構におけるこれらの問題点を
解消するものであり、橋台、橋脚上に設けられる門構架
台を橋台、橋脚の幅と同じ幅の大きさとして両側の支柱
が橋台、橋脚両側部分によって支持されるように設置す
ることを特徴とし、その結果橋桁を吊下けた状態のエレ
クションガーダ−自体が門構架台上を横移動して橋桁の
所定支承位置への架設が行え、しかも架設作業の移動の
際にも移し替えを必要とせず、架設作業が安全にして能
率的に行える架設装置の提供を目的としたものである。
The present invention solves these problems in the conventional bridge girder construction mechanism.The present invention is designed to solve these problems in the conventional bridge girder construction mechanism. It is characterized by being installed so that it is supported by both side parts, and as a result, the erection girder itself with the bridge girder suspended can move laterally on the gate structure frame and erect the bridge girder at a predetermined supporting position. The object of the present invention is to provide an erection device that does not require relocation during movement of the erection work and can perform the erection work safely and efficiently.

次に本発明を第4図以下に示す実施例に基いて詳記すれ
ば、第参図は本発明に係る架設装置の正面図、第3図は
@面図であり、(1)は橋台、(コ)は橋脚、(X)は
門構架台、儲)はエレクションガーダ−1(to) i
i PC桁を示している。エレクションガーダ−(6)
を支えるための門構架台(Jo)は第3図に示す如く鋼
材を下端が拡開された合掌屋根形になるように組合わせ
た両側の支柱(n)と、これらの支柱上に架設された梁
材(tS)とからなり、全体の幅が第参図に示される如
く橋脚(コ)もしくは橋台(/lの輪と略同じ程度の大
きさからなっている。支柱(lりは第3図及び第4図に
示す如く下端部に内側の7ランジを切欠して設けた水平
支持部(Za)を有し、この水平支持部(/l)が橋台
(1)もしくは橋脚(コ)の両側端部上向に支持される
ようにして、該水平支持g (/4)の下方のウェブか
らなる垂直固定部(17)が橋台(1)゛もしくは橋脚
(コ)の両側端向にアイざル) (n)を介して固定さ
れる。橋台(1)及び橋脚(コ)の両側端向にはその築
造時に予め前記アイポル) (/I)を螺着できるイン
サート(19)を埋設しておき、前記支柱(n )がア
イポル) (lr)を介して迅速に装着もしくは撤去で
きるようにしておく。
Next, the present invention will be described in detail based on the embodiment shown in FIG. , (C) is the pier, (X) is the gate frame, and (k) is the erection girder 1 (to) i
i Shows PC digit. Election girder (6)
As shown in Fig. 3, the gate structure frame (Jo) to support the gate is constructed with steel columns (n) on both sides that are combined to form a gassho roof shape with the lower end widened, and is built on these columns. It consists of a beam material (tS) with a total width of about the same size as a ring of a pier (J) or an abutment (/L) as shown in the figure below. As shown in Figures 3 and 4, the lower end has a horizontal support part (Za) with seven inner flange cutouts, and this horizontal support part (/l) is attached to the abutment (1) or pier (Ko). The vertical fixing part (17) consisting of the lower web of the horizontal support g (/4) is supported upward at both ends of the abutment (1) or the pier (k). It is fixed via Aizal) (n).Inserts (19) to which the Aizal) (/I) can be screwed are buried in advance at both ends of the abutment (1) and piers (C) during construction. The column (n) can be quickly installed or removed via the eyepole (lr).

また内支柱(lり関に架設される梁材(n)は橋台(/
1.4i1111i1(コ)の躯体幅と略同じ有効長さ
を有しており、両端が夫々内支柱(l#)と固定されて
門構を形成するが、該梁材(n)の中間部下方には橋台
(1)、橋脚(濁の上(3)との間に長さを自由に調整
し□得る補助支柱(20)が設けられている。この補助
支柱(2D)は上端の梁材支水面(〃)上に梁材下7ラ
ンジ(23)に引掛けられたローラー(22)を有して
おり、長さを支柱(1つと同じとした状態において梁材
(15)の中間部における任意の位置を支持し、長さを
縮めた状態においてはローラー(L2)を介して自由に
移動できるようになっている。また梁材(n)の上山に
は横行レール(3)が設けられていると共に、この梁材
(/3)上に架設されるエレクションガーダ−(6)に
は下向に該横行レール(2q)上を走行する横行台車(
25)が設けられており、エレクションガーダ−(6)
は第ダ図の如く20桁(/のを吊下げた状態でレール(
24I)上を台車(25)によって構台(/1、橋脚(
コ)の幅方向に自由に横移動できるようになっている。
Also, the beam material (n) installed at the inner support (l) is the abutment (/
It has an effective length that is approximately the same as the frame width of 1.4i1111i1 (J), and both ends are fixed to the inner support (l#) to form a gate structure, but the middle lower part of the beam (n) An auxiliary support (20) whose length can be freely adjusted is provided between the abutment (1) and the pier (Nami-no-ue (3)).This auxiliary support (2D) is attached to the top beam It has a roller (22) hooked to the bottom 7 lunge (23) of the beam on the branch water surface (〃), and when the length is the same as the support (1), the middle of the beam (15) is installed. It is supported at any position in the section, and can be moved freely via rollers (L2) when the length is shortened.Moreover, a transverse rail (3) is installed at the top of the beam (n). At the same time, the erection girder (6) installed on this beam (/3) has a transverse bogie (
25) is provided, and the erection girder (6)
As shown in Figure DA, the 20 digits (/) are suspended from the rail (
24I) on top of the gantry (/1, pier (
It is possible to move freely laterally in the width direction of (e).

前記台車(])の両側には夫々ロープ())の一端が連
結されていて、夫々のロープの他端は梁材(n)の両端
部に設けた滑車(27)を介して両支柱(lりの側方に
設けられた調節装置<X>に連結され、夫々の調節装w
 <n>によるロープ(ム)の繰出しと引張りとによっ
てエレクションガーダ−(≦)の横移動及び位置固定が
行えるようになっている。
One end of the rope ( ) is connected to both sides of the cart ( ] ), and the other end of each rope is connected to both the supports ( ) via pulleys ( 27 ) provided at both ends of the beam ( n ). It is connected to the adjustment device <X> provided on the side of the
By letting out and pulling the rope (mu) by <n>, the erection girder (≦) can be moved laterally and fixed in position.

冑図中(r)はエレクションガーダ−(乙)から20桁
(/のを吊り下ける吊の枠、(9)は吊り枠(1)をガ
ーダ−(6)上の縦行レール(ll)に沿って移動させ
るトロリー、(12)は吊り枠哨に設けられた20桁(
/のの昇降装置である。
In the figure (r) is the hanging frame for hanging the 20 columns (/) from the erection girder (B), (9) is the hanging frame (1) connected to the vertical rail (ll) on the girder (6). The trolley (12) is moved along the 20 columns (
/ is a lifting device.

本発明に係る橋桁架設装置は、一台、橋脚上に設けられ
るエレクションガーダ−(≦)の架設用門構架台(30
)を、その幅が橋台、橋脚の1体幅と略同じとなるよう
にした−め、梁材(/3)上においてエレクションガー
ダ−(6)を横行台31(25)を介して橋台、橋脚の
輪方向に自由に移動させることができ、従ってエレクシ
ョンガーダ−(4)によって橋桁(10)を所定の架設
部上方に縦行移動させたのち、エレクションガーダ−(
≦)を門構架台梁材(lS)上で横行移動させることに
よって橋桁(/のを橋台、橋脚上の所定位置に簡単に吊
降し設置することができる。
The bridge girder construction device according to the present invention includes one gate structure frame (30
), so that its width is approximately the same as the width of the bridge abutment and the bridge pier. It can be freely moved in the ring direction of the pier, so after the erection girder (4) moves the bridge girder (10) longitudinally above a predetermined construction part, the erection girder (
By moving the ≦) laterally on the gate frame support beam (lS), the bridge girder (/) can be easily suspended and installed at a predetermined position on the abutment or pier.

その結果この装置によれば、従来の架設機構の如く橋桁
をいったん橋台、橋脚上に吊降ろしたのちに、別途ジヤ
ツキ等の手段を介して該橋桁を橋台、橋脚上の所定位置
に向けて横取り移動させる作業を必要とせず、架設作業
を簡単にして能率的に行うことができる。
As a result, according to this device, the bridge girder is once lowered onto the abutment or pier as in the conventional construction mechanism, and then the bridge girder is moved to a predetermined position on the abutment or pier using a separate jack or other means. Erection work can be performed easily and efficiently without the need for moving work.

また門構架台(3)は両側支柱(ll)が橋台、橋脚の
1ib1m111部分に支持されるようにして設けられ
ているので、橋脚(λ)上において互に横軸方間に連結
される二組の橘忙々端を夫々支障なく支承することがで
きる。従って第5図に示す一11QI(jl上の門構架
台(3)に支持されたエレクションガーダ−(6)によ
り橋桁(10)の架設作業が終了して次のスパンに作業
が移行する際には、従来の架設機構のように門構架台を
いったん撤去して再び先に架設された橋桁上に盛り替え
る必要がなく、橋!1 (2)上に固定設置された門構
架台(3)をそのま−用いてエレクションガーダ−(≦
)の移転作業を直ちに開始できるという効果を有する0
また実施例に示したように門構架台(3)の両側支柱(
n)下端部を、橋台、橋脚両側部上面に支持される水平
支持部(16)と橋台、橋脚両側端面に固定される垂直
固定部(17)とで橋台、橋脚に取付けるようにすれば
、垂直固定部(17)の固定用アイポル) (1g)に
作用する剪断荷重を軽減することができる。更に実施例
に示したように骸門構架台(3)の梁材(n)にローラ
ー付補助支柱(2D)を設けておくことにより、橋台、
橋脚の幅まで拡大さ−れた梁材(tS )の中間部の撓
みを適確に防止することができ、しかも該支柱はローラ
ー(20)により梁材(n))の長さ方向に沿って自由
に移動できるので橋桁の縦行送り出し作業を行う際にも
支障を生ずることがないなど、作業現場の状況に応じた
架設作業を能率的に行えるという効果を有するものであ
る。
In addition, the gate structure frame (3) is installed so that the support columns (ll) on both sides are supported by the 1ib1m111 portion of the abutment and the pier, so the two columns are connected to each other in the horizontal axis direction on the pier (λ). It is possible to support the busy side of Tachibana of the group without any trouble. Therefore, when the erection work of the bridge girder (10) is completed by the erection girder (6) supported by the gate structure frame (3) on the 111QI (jl) shown in Fig. 5 and the work is transferred to the next span, Unlike conventional construction mechanisms, there is no need to remove the gate structure frame and replace it on the previously erected bridge girder. Just use the erection girder (≦
) has the effect of immediately starting relocation work.
In addition, as shown in the example, both side supports (
n) If the lower end is attached to the abutment or pier using the horizontal support part (16) supported on the upper surface of both sides of the abutment or pier, and the vertical fixing part (17) fixed to the end face of both sides of the abutment or pier, It is possible to reduce the shearing load acting on the fixing eye pole (1g) of the vertical fixing part (17). Furthermore, as shown in the example, by providing an auxiliary support column with rollers (2D) on the beam material (n) of the skeleton gate structure frame (3), the bridge abutment,
It is possible to accurately prevent the deflection of the middle part of the beam (tS) that has been expanded to the width of the pier, and the support is also rolled along the length of the beam (n) by the roller (20). Since the bridge can be moved freely, there will be no hindrance when carrying out the work of longitudinally sending out the bridge girder, and it has the effect of efficiently carrying out the erection work according to the situation at the work site.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の橋桁架設機構を用いて行われる架設工法
を示す@面図、第2図は同じくその平闇図、11P13
図は−1じ〈第1図の厘一層線における断面図、第ダ図
は本発明に係る架設装置の実施例を示す正面図、第S図
は同じく側面図、第を図は第S図のM−M線における断
面図である。 図において、 (ll  4台、(2) : lm5Il> (jl 
’ flJl 門構架台、(*) :ペント型支柱、(
jl :梁材、(41:エレクションガーダー、(71
:手延機、伊):吊り枠、(91: )ロリー、(/θ
):411桁、(//) :縦行レール、(/2) :
昇降装置、(/、71 :神業、(30):門構架台、
(ll):支柱、(/3):梁材、(zg) :水平支
持部、(/7) :垂直固定部、(tg) :アイボル
ト、(/q) :インサート、(20) :補助支柱、
()/):梁材支承肉、(22) :ローラー、(23
):梁材下7ランジ、(2<Q :横行レール、(25
) :横付台車、(ス)二ロープ、(27) :滑車、
Oj):dJj4節装置。 特許出願人 川田工業株式会社 r、−:、(−
Figure 1 is a side view showing the construction method performed using a conventional bridge girder construction mechanism, Figure 2 is a plain view of the same, 11P13
The figures are -1.〈A sectional view taken along the single layer line in Figure 1, Figure D is a front view showing an embodiment of the erection device according to the present invention, Figure S is also a side view, and Figure 1 is Figure S. FIG. In the figure, (ll 4 units, (2) : lm5Il> (jl
' flJl Gate frame frame, (*): Pent type support, (
jl: beam material, (41: erection girder, (71
: Hand-rolling machine, Italy) : Hanging frame, (91: ) Rolly, (/θ
): 411 digits, (//): Vertical rail, (/2):
Lifting device, (/, 71: Divine work, (30): Gate structure frame,
(ll): Support column, (/3): Beam material, (zg): Horizontal support section, (/7): Vertical fixing section, (tg): Eye bolt, (/q): Insert, (20): Auxiliary support column ,
()/): Beam bearing thickness, (22): Roller, (23
): 7 lunges under the beam, (2<Q: Traverse rail, (25
): Horizontal trolley, (S) two ropes, (27): Pulley,
Oj): dJj 4-section device. Patent applicant: Kawada Kogyo Co., Ltd. r, -:, (-

Claims (1)

【特許請求の範囲】 L ニレクシシンガーダ−を用いて橋桁を機台及び橋脚
上に吊下げ架設する橋桁架設機構において、橋台、橋脚
上に両側支柱が骸僑台、橋脚両側部分に支持された橋台
、橋脚幅と略同幅の門構架台を設け、橋桁を吊下けた状
態のエレクションガーダ−が前記門III!架台ノ両側
支柱間における梁材上を横行台車を介して橋台、橋脚幅
方向に移動可能なるようにした橋桁架設装置。 2 門構架台における両側支柱の下端部に機台、橋台、 橋脚両側部上面に支持される水平支持部hd橋脚両側面
にメルト止めされる垂直固定部とを有している特許請求
の範囲第1項記載の―桁架設装置。 & 門構架台の梁材中間部と橋台、橋脚との闇に上端の
移動ローラーを介して梁材の長さ方向に移動可能であり
、かつ高さ調整の可能な梁材の補助支柱を備えた特許請
求の範囲第1項記−の橋桁架設装置。
[Scope of Claims] L In a bridge girder construction mechanism in which a bridge girder is suspended and constructed on an abutment and a bridge pier using Nirexi Shindar, supporting columns on both sides of the bridge abutment and abutment are supported by a support platform and both sides of the bridge pier. The erection girder with a bridge abutment and a gate frame frame with approximately the same width as the pier width and with the bridge girder suspended is like the gate III! A bridge girder construction device that can be moved in the width direction of the abutment and pier via a traversing truck on the beam between the supports on both sides of the trestle. 2. The gate structure frame has a machine platform, an abutment, a horizontal support part h supported on the upper surface of both sides of the pier, and a vertical fixing part melt-fixed to both sides of the pier, at the lower ends of both side supports of the gate structure frame. The girder erection device described in item 1. & An auxiliary support for the beam that can be moved in the length direction of the beam via a moving roller at the upper end and that can be adjusted in height is installed between the middle part of the beam of the gate structure frame, the abutment, and the pier. A bridge girder construction device according to claim 1.
JP5534282A 1982-04-05 1982-04-05 Apparatus for constructing bridge beam Pending JPS58173204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5534282A JPS58173204A (en) 1982-04-05 1982-04-05 Apparatus for constructing bridge beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5534282A JPS58173204A (en) 1982-04-05 1982-04-05 Apparatus for constructing bridge beam

Publications (1)

Publication Number Publication Date
JPS58173204A true JPS58173204A (en) 1983-10-12

Family

ID=12995829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5534282A Pending JPS58173204A (en) 1982-04-05 1982-04-05 Apparatus for constructing bridge beam

Country Status (1)

Country Link
JP (1) JPS58173204A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002299106A (en) * 2001-04-02 2002-10-11 Murata Mfg Co Ltd Variable resistor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002299106A (en) * 2001-04-02 2002-10-11 Murata Mfg Co Ltd Variable resistor

Similar Documents

Publication Publication Date Title
US3571835A (en) Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3550723A (en) Bridge scaffold
WO1996005375A9 (en) Construction of large structures by robotic crane placement of modular bridge sections
WO1996005375A1 (en) Construction of large structures by robotic crane placement of modular bridge sections
CN102395731B (en) Overhead form traveller and method
GB1446446A (en) Apparatus for the construction of bridge support systems
CN107201719A (en) Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method
JPH08296210A (en) Stud constructing method, stud demolishing method and lift-up and rotating device
US3863771A (en) Gantry cranes
JPS58173204A (en) Apparatus for constructing bridge beam
JP3038154B2 (en) Overhang work equipment
CN210946528U (en) Movable prefabricated hanging flower basket of assembling
CN110331673B (en) Construction method for segmental installation of bridge steel anchor box
CN211498488U (en) Highway and railway dual-purpose bridge movable railway hard protection platform
CN113718654B (en) Installation structure for ropeless beam section of bridge tower area
CN110387832B (en) Lifting device for bridge steel anchor box segment
CN212375713U (en) Bridge overhauls device
CN113846555B (en) Portable bridge outside breast board can stride obstacle removal construction platform device
CN217499962U (en) Multifunctional bridge girder erection machine
CN211772863U (en) Temporary fixing structure for multilayer municipal interchange ramps
US4639166A (en) Construction of jackets
CN113931071B (en) Prefabricated box girder wet joint attached construction platform and construction method thereof
JPH0336362B2 (en)
JP2567560B2 (en) Bridge construction method using precast girders
SU1048089A1 (en) Method of transporting large blocks of structures into mounting area