JPS5812426B2 - How to connect columns and beams using PC steel bars - Google Patents
How to connect columns and beams using PC steel barsInfo
- Publication number
- JPS5812426B2 JPS5812426B2 JP11865675A JP11865675A JPS5812426B2 JP S5812426 B2 JPS5812426 B2 JP S5812426B2 JP 11865675 A JP11865675 A JP 11865675A JP 11865675 A JP11865675 A JP 11865675A JP S5812426 B2 JPS5812426 B2 JP S5812426B2
- Authority
- JP
- Japan
- Prior art keywords
- column member
- steel
- corners
- passing
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Description
【発明の詳細な説明】
この発明は,PC鋼棒を用いた柱と梁との結合方法にか
んする。[Detailed Description of the Invention] This invention relates to a method of connecting columns and beams using PC steel bars.
プレキャスト部材を結合して正確な構造体を構築する場
合、プレキャスト部材の方は要求された精度を有する部
材を製造することは大して難かしくはないが、給合部の
構造及び構築方法が難かしいため、従来は要求された精
度を有する全構造体を構築する゛点には難点があり、そ
の改良が求められていた。When building an accurate structure by joining precast members, it is not very difficult to manufacture precast members with the required precision, but the structure and construction method of the connecting part is difficult. Therefore, conventionally there has been a difficulty in constructing a complete structure having the required accuracy, and improvements have been sought.
本発明の目的は、このような結合体に固有の欠点を除去
するにある。The aim of the invention is to eliminate the disadvantages inherent in such conjugates.
上記の目的を達成するための、本発明の要旨は、頭書に
記載の特許請求の範囲に掲記したとおりである。The gist of the present invention to achieve the above object is as stated in the claims set forth in the header.
以下に、図面に例示した実施例について、この発明を詳
細に説明する。The present invention will be described in detail below with reference to embodiments illustrated in the drawings.
第1図は、プレキャスト・コンクリート製の柱部材1と
、同様にプレキャスト・コンクリート製の梁部材2とを
、組合わせ、PC鋼棒で緊結、構築した構造体の一部の
外観図である。FIG. 1 is an external view of a part of a structure constructed by combining a column member 1 made of precast concrete and a beam member 2 also made of precast concrete and fastened together with PC steel rods.
第2図は柱部材1を示した図である。FIG. 2 is a diagram showing the column member 1. As shown in FIG.
その上端及び下端のそれぞれ符号3で示した部分は矩形
断面をなしており、その中間部4の部分には、四隅には
符号5で示すような切欠部が設けてある。The upper and lower ends, each indicated by reference numeral 3, have a rectangular cross section, and the intermediate portion 4 is provided with notches indicated by reference numeral 5 at the four corners.
この切欠部5はPC鋼棒を差し込み、或いは小型ジャッ
キを据えPC鋼棒全緊張するための空間である。This notch 5 is a space for inserting a PC steel rod or installing a small jack to fully tension the PC steel rod.
また端部3の部分の四隅にはPC鋼棒を通すための孔6
が設けてある。Also, in the four corners of the end part 3 are holes 6 for passing the PC steel rod.
is provided.
さらに第2図では柱部材1の両端面には符号7で示した
突起部が設けてあるが、これは1例を示したもので、要
は比較的硬質のパッキン材であれば良い。Further, in FIG. 2, protrusions indicated by the reference numeral 7 are provided on both end faces of the column member 1, but this is merely an example, and any packing material may be used as long as it is made of relatively hard packing material.
第3図は、梁部材2を示した図である。FIG. 3 is a diagram showing the beam member 2. As shown in FIG.
両端部8の部分は、結合後柱の一部を形成するので、そ
の平面形は柱部材1の断面形と合致するようにしてあり
、四隅にはPC鋼棒を通すための孔9があけてある。Since both end portions 8 will form part of the column after being combined, their planar shape is made to match the cross-sectional shape of the column member 1, and holes 9 are drilled at the four corners for passing the PC steel rod. There is.
この孔9は第2図の孔6と同じ配置位置になっている。This hole 9 is located in the same position as the hole 6 in FIG.
構成部材の構造は、以上に述べたとおりのものであるが
、以下には構築方法について説明する。The structure of the constituent members is as described above, and the construction method will be explained below.
第4図は既設の基礎10の上に柱部材1を据付けた状態
を示したものである。FIG. 4 shows the column member 1 installed on the existing foundation 10.
PC鋼棒11の下端は、予め定位置にて、基礎10のコ
ンクリート中に埋込まれ、アンカーされており.PC@
棒11の上部は、基礎面上に裸で立っており、柱部材1
を上より、おろし乍ら,PC鋼棒11を孔6に差込み、
完全におろす。The lower end of the PC steel rod 11 is embedded in the concrete of the foundation 10 and anchored in advance at a fixed position. PC@
The upper part of the rod 11 stands bare on the foundation surface, and the column member 1
While lowering the PC steel rod 11 from above, insert it into the hole 6,
Grate completely.
柱部材1の水平位置を調整し、次に垂直方向の微調整は
四隅のPC鋼棒のナット締め又はゆるめる等の操作によ
り完全に行うことが出来る。After adjusting the horizontal position of the column member 1, fine adjustment in the vertical direction can be completely performed by tightening or loosening the nuts of the PC steel bars at the four corners.
この後、間隙12のところにドライモルタルを完全充填
し、ジャッキにより本緊張を行ない、定着して、基礎1
0と柱部材1とを剛結する。After this, the gap 12 is completely filled with dry mortar, the main tension is applied with a jack, and the foundation 1 is fixed.
0 and the column member 1 are rigidly connected.
第5図は中間層の部分の構築方法を示した図である。FIG. 5 is a diagram showing a method of constructing the intermediate layer portion.
下端の柱部材1は既にそれより以下の構造体に剛結され
ている。The column member 1 at the lower end is already rigidly connected to the structure below it.
その上に梁部材2を載せ,水平位置の調整を行ない、さ
らにその上に、上端の柱部材1を載せ、水平位置の調整
を行なう。The beam member 2 is placed on top of it, and the horizontal position is adjusted.Furthermore, the column member 1 at the upper end is placed on top of it, and the horizontal position is adjusted.
次にPC鋼棒13を通し、前と同様に、ナットを締める
か又はゆるめて、両部材1及び2の垂直方向の微調整を
行なう。Next, the PC steel rod 13 is passed through and the nuts are tightened or loosened as before to make fine vertical adjustments of both parts 1 and 2.
この後、間隙14のところにドライモルタルを完全充填
した後、ジャッキにより本緊張を行なって、各部材を剛
結する。Thereafter, after the gap 14 is completely filled with dry mortar, main tension is applied using a jack to rigidly connect each member.
第6図は最上層の部分の構築方法を示した図である。FIG. 6 is a diagram showing a method of constructing the uppermost layer.
この場合は、第5図の場合の上端の柱部材がない場合に
すぎないので、第5図の場合に準じて構築すれば良い。In this case, since there is no column member at the upper end in the case shown in FIG. 5, it is sufficient to construct the structure according to the case shown in FIG.
以上の説明から判かるように、本発明の構築方法によれ
ば、柱部材と梁部材の結合部において、水平方向及び垂
直方向の調整がきわめて容易に、しかも完全に行なうこ
とができ、従って要求される精度を有する全構造体を構
築し得るという特長がある。As can be seen from the above explanation, according to the construction method of the present invention, horizontal and vertical adjustments can be made extremely easily and completely at the joint between the column member and the beam member, and therefore the required It has the advantage that it is possible to construct the entire structure with a certain degree of accuracy.
第1図は、構築した構造体の一部の外観図であり、第2
図は、プレキャスト・コンクリート製の柱部材の図で、
第3図は同じく梁部材の図である。
第4図は基礎と柱部材との結合状態を示した図で、第5
図は中間層における、柱部材、梁部材、柱部材の3部材
を結合したところの図で、第6図は最上層の梁部坂と柱
部材との結合状態を示した説明図である。
これらの図において、1……柱部材、2……梁部材、3
……柱部材の上端部及び下端部、4……中間部、5……
切欠部、6……孔、7……突起部、8……梁部材の両端
部,9……孔、10……基礎、11……PC鋼棒、12
……間隙、13……PC鋼棒、14……間隙。Figure 1 is an external view of a part of the constructed structure;
The figure shows a column member made of precast concrete.
FIG. 3 is also a diagram of the beam member. Figure 4 is a diagram showing the state of connection between the foundation and column members, and Figure 5
The figure is a diagram showing the three members of the middle layer, a column member, a beam member, and a column member, combined together, and FIG. 6 is an explanatory diagram showing the state of connection between the beam slope and the column member in the uppermost layer. In these figures, 1... Column member, 2... Beam member, 3
... Upper end and lower end of the column member, 4... Middle part, 5...
Notch, 6... Hole, 7... Projection, 8... Both ends of beam member, 9... Hole, 10... Foundation, 11... PC steel bar, 12
...Gap, 13...PC steel bar, 14...Gap.
Claims (1)
は四隅部を切欠いた形の横断面形状をもたせ、上記の上
端および下端の横断面が矩形の部分には四隅部に近い個
所にて縦通ずるPC鋼棒を通すための孔を設け、さらに
上端上面中央部に突起部を設けてなる柱部材1と、両端
上下面の平面形状は上記の柱部材1の上端および下端の
矩形状断面に合致させた形のものとし、しかも、その平
面形の四隅部付近のところには、柱部材1に設けたPC
鋼棒貫通用の孔と見合う位置において、同様にPC鋼棒
を通す孔を設けてなる梁部材2とを交互配置に多数結合
するにあたり、基礎に埋め込んだPC鋼棒を柱部材1の
四隅部付近の孔に通しなから該柱部材1を据えつけ、そ
れらのPC鋼棒を緊張・定着して柱部材1を基礎に固結
し、そのようにして両側に2本立てこんだ柱部材1の間
に梁部材2をかけわたし、PC鋼材用の孔を合かせ、さ
らにその上に柱部材1を載せ、PC鋼棒をそれら各3個
の部材間に通し、仮締めを行ない、各部材の通り位置を
調整し、上記の突起部のある間隙にドライモルタルを充
填、PC鋼棒を緊張・定着する工程を逐次、最上層まで
施工することを特徴とするPC鋼棒を用いた柱と梁の結
合方法。1 The cross-sectional shape of the upper end and the lower end is rectangular, and the middle part has a cross-sectional shape with the four corners cut out, and the above-mentioned upper end and lower end have a rectangular cross-sectional shape at a place near the four corners. A column member 1 is provided with a hole for passing a vertically running PC steel rod, and a protrusion is provided at the center of the upper surface of the upper end, and the planar shape of the upper and lower surfaces of both ends is the rectangular cross section of the upper and lower ends of the column member 1. In addition, near the four corners of the planar shape, there are PCs installed on the column member 1.
When connecting a large number of beam members 2 in an alternating arrangement, each of which has holes for passing the PC steel rods at positions corresponding to the holes for passing through the steel rods, the PC steel rods embedded in the foundation are inserted into the four corners of the column member 1. Install the column member 1 without passing it through the nearby hole, tighten and fix the PC steel rods, and solidify the column member 1 to the foundation. Cross the beam member 2 between them, align the holes for the prestressed steel material, place the column member 1 on top of it, pass the prestressed steel rod between each of these three members, perform temporary tightening, and tighten each member. Columns and beams using PC steel bars, characterized in that the process of adjusting the passage position, filling the gaps with the above protrusions with dry mortar, and tensioning and fixing the PC steel bars is carried out sequentially up to the top layer. How to combine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11865675A JPS5812426B2 (en) | 1975-10-01 | 1975-10-01 | How to connect columns and beams using PC steel bars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11865675A JPS5812426B2 (en) | 1975-10-01 | 1975-10-01 | How to connect columns and beams using PC steel bars |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5242610A JPS5242610A (en) | 1977-04-02 |
JPS5812426B2 true JPS5812426B2 (en) | 1983-03-08 |
Family
ID=14741954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11865675A Expired JPS5812426B2 (en) | 1975-10-01 | 1975-10-01 | How to connect columns and beams using PC steel bars |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5812426B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10256034B2 (en) | 2014-05-09 | 2019-04-09 | Hitachi Metals, Ltd. | Core case unit, coil component, and method for producing coil component |
-
1975
- 1975-10-01 JP JP11865675A patent/JPS5812426B2/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10256034B2 (en) | 2014-05-09 | 2019-04-09 | Hitachi Metals, Ltd. | Core case unit, coil component, and method for producing coil component |
Also Published As
Publication number | Publication date |
---|---|
JPS5242610A (en) | 1977-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3722159A (en) | Prefabricated concrete structure | |
KR102312319B1 (en) | Magnetic assembly type mold panel | |
KR101640933B1 (en) | Prefabricated rahmen bridge and construction method thereof | |
JP6829631B2 (en) | Construction method of column base, reinforcement method of existing column base | |
JPS5812426B2 (en) | How to connect columns and beams using PC steel bars | |
JPH04166504A (en) | Connection of member | |
JPH11343667A (en) | Structure for fixing column base with underground beam made of reinforced concrete | |
JPH09264029A (en) | Foundation for construction, foundation structure using it and execution of works thereof | |
JPH06185111A (en) | Precast concrete beam and column and construction method of earthquake-proof wall using them | |
JPH06158716A (en) | Construction method of building with precast concrete member | |
JP2004285581A (en) | Steel framed foundation material for building and formation method of concrete foundation for building making use of steel framed base foundation material | |
JP3314357B2 (en) | Crimping method of precast concrete structure | |
JPS6026724A (en) | Integration work of steel-framed building structure and composite underground beam | |
JP7365518B1 (en) | Panel support material and formwork structure using it | |
JP2784450B2 (en) | Reinforced concrete foundation | |
JPS6157732A (en) | Construction of multilayered building skeletal by precast reinforced concrete unit | |
GB2056538A (en) | Shuttering system | |
JPH08209931A (en) | Beam-receiving bearing structure of concrete form | |
JPH08209712A (en) | Level adjustment body | |
JPH093912A (en) | Plate anchor construction method | |
JPH0841985A (en) | Method of binding precast beam to column | |
WO2020261342A1 (en) | Plant frame structure | |
JPH07247557A (en) | Foundation, column mold, and underground beam made of precast reinforced concrete | |
JP2023133989A (en) | Anchorage member fixing device, fixing girder fixing device, and anchorage member fixing method | |
JPH0240812B2 (en) |