JPS58113418A - Pile head treatment work - Google Patents
Pile head treatment workInfo
- Publication number
- JPS58113418A JPS58113418A JP21062581A JP21062581A JPS58113418A JP S58113418 A JPS58113418 A JP S58113418A JP 21062581 A JP21062581 A JP 21062581A JP 21062581 A JP21062581 A JP 21062581A JP S58113418 A JPS58113418 A JP S58113418A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- hole
- concrete
- bucket
- packet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/005—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
Abstract
Description
【発明の詳細な説明】
本発明は現場造成杭、いわゆる場所打杭の頭部処理工法
に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a head treatment method for piles constructed on site, so-called cast-in-place piles.
場所打杭では、掘削孔底に発生するスライムがコンクリ
ート等の打設時に上部に上昇し、コンクリート等が硬化
してできる杭の頭部は上記スライムが混入した脆弱部と
なるのでこの部分を破壊して取除く作業が必要である。With cast-in-place piles, the slime generated at the bottom of the excavation hole rises to the top when concrete, etc. is placed, and the head of the pile, which is formed when the concrete hardens, becomes a weak part with the slime mixed in, so this part is destroyed. It is necessary to remove it.
かかる杭頭処理作業としては、人力で研ったシまた、杭
頭を押し潰したシ、削ったりする機械を用いたりするが
、いずれにせよ杭頭全体を処理せねばならず時間と労力
を費す面倒なものであった。Such pile cap processing work involves manually grinding, crushing, or scraping the pile cap, but in either case, the entire pile cap must be processed, which takes time and effort. It was a hassle to spend.
本発明の目的は上記不都合を解消し、破壊する部分が少
なくしかも破壊しゃすい形状となるので、簡易かつ迅速
に作業を行なうことができる杭頭処理工法を提供するこ
とにある。It is an object of the present invention to provide a pile cap processing method that eliminates the above-mentioned disadvantages and allows for simple and quick work since the number of parts to be destroyed is small and the shape is easy to destroy.
しかしてこの目的は本発明によれば掘削孔内にコンクリ
ート等を打設する際に1砂又は砂利等の粒状物を充填し
たパケットを杭孔開口部よシ下方に吊シ下げ、上記コン
クリート等の硬化時に該パケットを除去して杭頭中心に
孔を形成し、しかる後に杭頭を破壊することにょシ達成
される。However, according to the present invention, the purpose of the lever is to suspend a packet filled with granular material such as sand or gravel below the pile hole opening when concrete or the like is poured into an excavated hole, and to suspend the concrete, etc. This is accomplished by removing the packets during hardening to form a hole in the center of the pile cap, and then destroying the pile cap.
以下、図面について本発明の実施例を詳細に説明する。Embodiments of the present invention will be described in detail below with reference to the drawings.
まず、本発明で使用するパケットについて先に説明する
と、第1図に示すようにパケット1は胴体2の部分を布
、又はビニール等の可撓性物質3で構成し、底部4に下
向きに突出する円錐形の調製器5を取付けて形成したも
ので、1〜1.5 m程の長さを有し、胴体2の上端開
口縁には吊シ下げ用のフック6.6′を上方に突出させ
て取付ける。First, the packet used in the present invention will be explained first. As shown in FIG. It has a length of about 1 to 1.5 m, and a hook 6.6' for hanging is attached to the upper opening edge of the body 2. Install it so that it sticks out.
図中、7は上記パケット1内に充填する砂又は砂利等の
粒状物である。In the figure, 7 is a granular material such as sand or gravel to be filled into the packet 1.
次に本発明工法の手順について説明すると、第2図〜第
7図は本発明工法の実施例を示す縦断正面図で、まず第
2図に示すように掘削機8を用いて地盤を掘削し杭孔9
を形成する。Next, to explain the procedure of the construction method of the present invention, FIGS. 2 to 7 are longitudinal sectional front views showing examples of the construction method of the present invention. First, as shown in FIG. 2, the ground is excavated using an excavator 8. Pile hole 9
form.
次に、上記杭孔9内に鉄筋前1oを挿入配設するが、こ
の鉄筋前1oを挿入し終えたところで鉄筋前IOの上端
に上記パケット1のフック6.6′を引掛けてパケット
1を杭孔9の上端開口部よシ下方に吊シ下げ、パケット
1内に砂又は、砂利等の粒状物7を充填する。(第6図
)
なお、上記粒状物7はパケット1を吊シ下げる前に予め
充填しておいてもよく、また、パケット1は挿入前の鉄
筋前】0に吊シ下げてこの鉄筋前1゜とともに杭孔9内
に挿入するようにしてもよい。Next, the reinforcing bar front 1o is inserted into the pile hole 9, and when the reinforcing bar front 1o has been inserted, hooks 6 and 6' of the packet 1 are hooked onto the upper end of the reinforcing bar front IO. is suspended below the upper end opening of the pile hole 9, and the packet 1 is filled with granular material 7 such as sand or gravel. (Fig. 6) The above-mentioned granular material 7 may be filled in advance before hanging the packet 1, or the packet 1 may be suspended at a point 1 in front of the reinforcing bar before being inserted. It may be inserted into the pile hole 9 along with the angle.
このようにしてセットした後に、第4図に示すように例
えばトレミー管11等を用いてコンクリート12を杭孔
9内に打設すると、杭孔9の底部から発生するスライム
はコンクI) −) 12に混入し、かつコンクリート
12の上部12αに位置して上昇してくる。After setting in this way, when concrete 12 is cast into the pile hole 9 using, for example, a tremie pipe 11 as shown in FIG. 4, the slime generated from the bottom of the pile hole 9 is removed by conc. 12, and rises to the upper part 12α of the concrete 12.
このようなスライムが混入したコンクリート12の上部
12αは、杭孔9の開口部近くなると第5図に示すよう
にノぐケント1に達し、更にこのパケット1と杭孔9と
の隙間に位置する。。When the upper part 12α of the concrete 12 mixed with such slime approaches the opening of the pile hole 9, it reaches the nogkent 1 as shown in FIG. 5, and is further located in the gap between this packet 1 and the pile hole 9. . .
上記パケット1の底部4には円錐形の鋼表面5が設けら
れているので、コンクリ−)12の上部盾はこの皿5の
先端突起から上部へ傾斜する外周面に沿って該パケット
lの胴体2の外側に押し上げられるようになシ、効率よ
くコンクリート12のスライム混入部を広げずに集める
ことができる。Since the bottom part 4 of the packet 1 is provided with a conical steel surface 5, the upper shield of the concrete plate 12 extends along the outer circumferential surface that slopes upward from the tip protrusion of the plate 5 to the body of the packet l. 2, the slime-containing portion of the concrete 12 can be efficiently collected without spreading.
また、鋼表面5の自重とこれに加わる粒状物7の重さが
あるので、上昇するコンクリート12でパケットlが浮
き上ってしまうこともない。Moreover, since there is the weight of the steel surface 5 and the weight of the granules 7 added thereto, the packet l will not be lifted up by the rising concrete 12.
コンクリート12が硬化した後にパケット1を取除くと
、第6図に示すようにコンクリート杭13の杭頭】3α
の中心にはパケット1の外形形状の孔14が上面から下
向きに形成され、スライム等の不純物混入部分はこの孔
I4の外側に限定される。When the packet 1 is removed after the concrete 12 has hardened, the pile cap of the concrete pile 13 ]3α as shown in FIG.
A hole 14 having the outer shape of the packet 1 is formed in the center downward from the top surface, and the portion containing impurities such as slime is limited to the outside of the hole I4.
そこで、第7図に示すように孔14の底面よシも下方に
位置するように杭】3の周囲地盤を掘削し、手作業での
研シ又はプレーカー等の簡易破壊機15を用いて上記孔
14の底面が露出するまでスライム等の混入部分のコン
クリートを壊し、またこのようにして内部の鉄筋前10
の上部鉄筋を顕出させてこれを上部構造体との結合用と
する。Therefore, as shown in Fig. 7, the ground around the pile 3 was excavated so that the bottom of the hole 14 was also located downward, and the ground was ground around the pile 3 by manual grinding or using a simple breaking machine 15 such as a breaker. Break the concrete in the area mixed with slime etc. until the bottom of the hole 14 is exposed, and in this way
The upper reinforcing bars are exposed and used for connection with the upper structure.
なお、パケット1の底部4は上述のごとく平担ではなく
テーパー面となっているので、この部分にスライム混入
部がくることはない。In addition, since the bottom part 4 of the packet 1 is not flat as described above but has a tapered surface, the slime-containing part will not come to this part.
以上述べたように本発明の杭頭処理工法は掘削孔内にコ
ンクリート等を打設する際に、砂又は砂利等の粒状物を
充填したパケットを杭孔開口部よシ下方に吊シ下げ、上
記コンクリート等の硬化時に該パケットを除去して杭頭
中心に孔を形成し、しかる後に杭頭を破壊することとし
たので、スライム等の不純物が混入した杭の頭部を破壊
するのを簡単かつ迅速に行なうことができ、しかも実施
するに当り面倒な型枠組立作業もいらず、パケットと砂
、砂利等のきわめて安価な材料を用いて低床な工費で行
なえるものである。As described above, the pile cap treatment method of the present invention involves suspending a packet filled with granular materials such as sand or gravel below the opening of the pile hole when placing concrete or the like in an excavated hole. When the above-mentioned concrete etc. hardens, the packet is removed and a hole is formed in the center of the pile head, and then the pile head is destroyed, so it is easy to destroy the head of the pile that has impurities such as slime mixed in. Moreover, it can be carried out quickly, does not require the troublesome work of assembling formwork, and can be carried out at a low construction cost using extremely inexpensive materials such as packets, sand, and gravel.
第1図は本発明工法で使用するパケットの斜視図、第2
図〜第7図は本発明工法の実施例の手順を示す縦断正面
図である。
1・・・・・パケット 2・・・・・・胴体3・・
・・・・可撓性物質 4・・・・・・底部5・・・・
・・鋼表面 6,6′・・・・・・フック7・・
・・・・粒状物 8・・・・・・掘削機9・・・
・・・杭孔 10・・・・・・鉄筋前■1・・
・・・・トレミー管 I2・・・・・・コンクリート
12α・・・・・上部13・・・・・・コンクリート杭
13α・・・・・・杭頭 14・・・・・・孔1
5・・・・・・破壊機
出願人 三和機材株式会社
第1図 牙2図
牙3図 牙4図Figure 1 is a perspective view of the packet used in the construction method of the present invention, Figure 2
7 to 7 are longitudinal sectional front views showing the procedure of an embodiment of the construction method of the present invention. 1... Packet 2... Body 3...
...Flexible material 4...Bottom part 5...
...Steel surface 6,6'...Hook 7...
...Particles 8...Excavator 9...
...Pile hole 10...In front of reinforcing bar ■1...
...Tremy pipe I2 ... Concrete 12α ... Upper part 13 ... Concrete pile 13α ... Pile cap 14 ... Hole 1
5... Destruction machine applicant Sanwa Kizai Co., Ltd. Figure 1 Fang 2 Fig. Fang 3 Fig. Fang 4
Claims (1)
等の粒状物を充填したパケットを杭孔開口部より下方に
吊シ下げ、上記コンクリート等の硬化時に該パケットを
除去して枕頭中心に孔を形成し、しかる後に杭頭を破壊
することを特徴とする杭頭処理工法。When pouring concrete into an excavated hole, a packet filled with granular material such as sand or gravel is suspended below the opening of the pile hole, and when the concrete hardens, the packet is removed and the center of the bed is placed. A pile cap processing method characterized by forming a hole in the pile and then destroying the pile cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21062581A JPS58113418A (en) | 1981-12-26 | 1981-12-26 | Pile head treatment work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21062581A JPS58113418A (en) | 1981-12-26 | 1981-12-26 | Pile head treatment work |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS58113418A true JPS58113418A (en) | 1983-07-06 |
Family
ID=16592420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP21062581A Pending JPS58113418A (en) | 1981-12-26 | 1981-12-26 | Pile head treatment work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58113418A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06173250A (en) * | 1992-12-11 | 1994-06-21 | Kajima Corp | Treatment method for concrete pile head |
JP2011038266A (en) * | 2009-08-07 | 2011-02-24 | Hisahiro Hiraishi | Precast pile head joint and method for constructing pile head section |
CN109235436A (en) * | 2018-10-22 | 2019-01-18 | 中国建筑第八工程局有限公司 | The working device of pile crown and its construction method |
CN113059705A (en) * | 2021-03-23 | 2021-07-02 | 上海建工一建集团有限公司 | Concrete cutting system for core area of end of structural beam column and control method |
-
1981
- 1981-12-26 JP JP21062581A patent/JPS58113418A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06173250A (en) * | 1992-12-11 | 1994-06-21 | Kajima Corp | Treatment method for concrete pile head |
JP2011038266A (en) * | 2009-08-07 | 2011-02-24 | Hisahiro Hiraishi | Precast pile head joint and method for constructing pile head section |
CN109235436A (en) * | 2018-10-22 | 2019-01-18 | 中国建筑第八工程局有限公司 | The working device of pile crown and its construction method |
CN113059705A (en) * | 2021-03-23 | 2021-07-02 | 上海建工一建集团有限公司 | Concrete cutting system for core area of end of structural beam column and control method |
CN113059705B (en) * | 2021-03-23 | 2023-03-03 | 上海建工一建集团有限公司 | Concrete cutting system for core area of end of structural beam column and control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS58113418A (en) | Pile head treatment work | |
JP2001131964A (en) | Pile head processing device for cast-in-plate pile, and pile head processing construction method using same | |
JPS6047119A (en) | Vibration and noise-free breaking of head of cast-in-place pile | |
JP2008144529A (en) | Pile head treating tool of cast-in-place concrete pile | |
JPH09328748A (en) | Pile cap of reinforced concrete pile, base plate of pile cap, and construction method for reinforced concrete pile | |
JPH08209686A (en) | Pile head processing tool and pile head processing construction method for cast-in-place pile | |
JPH04124317A (en) | Improvement of foundation ground for building | |
JPS58204216A (en) | Treatment of head of on-site concrete pile | |
JP2002115481A (en) | Excavation ring of casing tube | |
JP2576757B2 (en) | Pile head treatment method for ready-made prestressed concrete pile | |
JP2595391B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JPH0579265A (en) | Discharged soil free execution device for foundation pile and execution method for foundation pile | |
JPH042134B2 (en) | ||
JPH0377325B2 (en) | ||
JPH05272133A (en) | Pile head treating method of cast-in-place concrete pile | |
JP2745146B2 (en) | Earth retaining method using gravity type retaining wall-shaped soil structure | |
JP2693027B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JP2000192454A (en) | Removing method for extra-banking part of cast-in-place concrete pile and its removing device | |
JPS63308113A (en) | Chipping method of pile head of sheet pile in cast-in-place concrete pile | |
JPS5927026A (en) | On-site pile head treatment work | |
JPS6136571Y2 (en) | ||
JPH03183818A (en) | Noiseless disposal of pile head for cast-in-place reinforced concrete pile | |
JPH068533B2 (en) | Pile head processing method for cast-in-place piles | |
JPS61254754A (en) | Mold frame construction method of concrete structure utilizing steel sheet pile wall for sheathing | |
JP2004257065A (en) | Pile head processing method for cast-in-place concrete pile and partition frame used therefor |