Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP4060875ApriorityCriticalpatent/JPS51116012A/ja
Publication of JPS51116012ApublicationCriticalpatent/JPS51116012A/ja
Publication of JPS5750225B2publicationCriticalpatent/JPS5750225B2/ja
JP4060875A1975-04-031975-04-03Method of assembling frame construction of pillar with steel skeleton reinforced concrete structure by field placing concrete and precast concrete beam
GrantedJPS51116012A
(en)
Method of assembling frame construction of pillar with steel skeleton reinforced concrete structure by field placing concrete and precast concrete beam
Method of assembling frame construction of pillar with steel skeleton reinforced concrete structure by field placing concrete and precast concrete beam
Method of assembling frame construction of pillar with steel skeleton reinforced concrete structure by field placing concrete and precast concrete beam