Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP4153178ApriorityCriticalpatent/JPS54133713A/ja
Publication of JPS54133713ApublicationCriticalpatent/JPS54133713A/ja
Publication of JPS5534249B2publicationCriticalpatent/JPS5534249B2/ja
Underground Or Underwater Handling Of Building Materials
(AREA)
Bulkheads Adapted To Foundation Construction
(AREA)
JP4153178A1978-04-071978-04-07Method of removing slime of ditch bottom in method of construction of continuous underground wall
GrantedJPS54133713A
(en)