Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Shibaura Electric Co LtdfiledCriticalToshiba Corp
Priority to JP10637776ApriorityCriticalpatent/JPS5332204A/en
Publication of JPS5332204ApublicationCriticalpatent/JPS5332204A/en
PURPOSE: To permit safe and reliable operation of the turbine to be continued without changing the turbine output or generator output even at the time of valve test by providing two feedback systems for controlling cosntrol valves to control the turbine rpm and turbine output.
COPYRIGHT: (C)1978,JPO&Japio
JP10637776A1976-09-061976-09-06Steam turbine control means
PendingJPS5332204A
(en)